Fluvial Erosion Impacts on Infrastructure Along Indiana Rivers and Streams

Similar documents
The Yellow River Initiative: The Birth of a System Approach to Challenges Facing the Everglades of the North

Development of a Fluvial Erosion Hazard Mitigation Program for Indiana

Stream Geomorphology. Leslie A. Morrissey UVM July 25, 2012

Appendix C Fluvial Flood Hazards

Historical channel change on the Upper Gila River, Arizona and New Mexico in response to anthropogenic modifications and extreme floods

Chapter 3 Erosion in the Las Vegas Wash

Working with Natural Stream Systems

Programmatic Approaches to Assessing and Mitigating Risk to Pipelines from Natural Forces

CASE STUDIES. Introduction

Griswold Creek August 22, 2013

CR AAO Bridge. Dead River Flood & Natural Channel Design. Mitch Koetje Water Resources Division UP District

Identifying, Understanding and Addressing Flood-Related Hazards

The last three sections of the main body of this report consist of:

May 7, Roger Leventhal, P.E. Marin County Public Works Laurel Collins Watershed Sciences

Suwannee Satilla Basins Flood Control Issues, Opportunities and Assistance

How Do Human Impacts and Geomorphological Responses Vary with Spatial Scale in the Streams and Rivers of the Illinois Basin?

Swift Creek Sediment Management Action Plan (SCSMAP)

STREAM RESTORATION AWRA Summer Specialty Conference, GIS and Water Resources IX

SEARCHING FOR SEDIMENT SOURCES IN SPRING CREEK

SCOPE OF PRESENTATION STREAM DYNAMICS, CHANNEL RESTORATION PLANS, & SEDIMENT TRANSPORT ANALYSES IN RELATION TO RESTORATION PLANS

Section 4: Model Development and Application

Swift Creek Sediment Management Action Plan (SCSMAP)

Pequabuck River Flooding Study and Flood Mitigation Plan The City of Bristol and Towns of Plainville and Plymouth, CT

Welcome to NetMap Portal Tutorial

L OWER N OOKSACK R IVER P ROJECT: A LTERNATIVES A NALYSIS A PPENDIX A: H YDRAULIC M ODELING. PREPARED BY: LandC, etc, LLC

1 INTRODUCTION AND MAJOR FINDINGS... 1

Birch Creek Geomorphic Assessment and Action Plan

UPPER COSUMNES RIVER FLOOD MAPPING

Opportunities to Improve Ecological Functions of Floodplains and Reduce Flood Risk along Major Rivers in the Puget Sound Basin

Black Gore Creek 2013 Sediment Source Monitoring and TMDL Sediment Budget

HYDROLOGIC AND HYDRAULIC REPORT FOR SR. 0522, SECTION 5BN ALONG BLACKLOG CREEK CROMWELL TOWNSHIP HUNTINGDON COUNTY. Prepared for:

Tom Ballestero University of New Hampshire. 1 May 2013

What is a watershed or landscape perspective?

Wetland & Floodplain Functional Assessments and Mapping To Protect and Restore Riverine Systems in Vermont. Mike Kline and Laura Lapierre Vermont DEC

When Creek Meets Valley Wall: Prioritizing Erosion Mitigation alongside the Oshawa Landfill

Kootenai River Habitat Restoration Program Update

Assessment. Assessment

RAILWAYS AND FISH: HOW TO PROTECT AND ENHANCE FISH HABITAT VALUES AT STREAM CROSSINGS THROUGH PROJECT DESIGN AND CONSTRUCTION

Frequently Asked Questions about River Corridors

Why Geomorphology for Fish Passage

GEOMORPHIC CHANGES IN LOWER CACHE CREEK 2012

Avoiding Geohazards in the Mid-Atlantic Highlands by Using Natural Stream Principles

AASHTO Extreme Weather Events Symposium Vermont s Road and Rivers - Managing for the Future

!"#$%&&'()*+#$%(,-./0*)%(!

Fluvial Driven Alluvial Fans

APPENDIX A REACH DECRIPTIONS. Quantico Creek Watershed Assessment April 2011

PENNSYLVANIA DEPARTMENT OF TRANSPORTATION ENGINEERING DISTRICT 3-0

Learning Objectives: I can identify and interpret river flows and directions.

4.9 GEOLOGY AND SOILS

Restoration Goals TFG Meeting. Agenda

3.11 Floodplains Existing Conditions

A SIMPLE GIS METHOD FOR OBTAINING FLOODED AREAS

KENTUCKY HAZARD MITIGATION PLAN RISK ASSESSMENT

Intense Precipitation Events and Flooding

Carmel River Bank Stabilization at Rancho San Carlos Road Project Description and Work Plan March 2018

Dolores River Watershed Study

Four Mile Run Levee Corridor Stream Restoration

Chapter 6 Mapping and Online Tools

GOAL 7 AREAS SUBJECT TO NATURAL DISASTERS AND HAZARDS. To protect life and property from natural disasters and hazards.

The River Restoration Centre therrc.co.uk. Understanding Fluvial Processes: supporting River Restoration. Dr Jenny Mant

Why Stabilizing the Stream As-Is is Not Enough

Thinking Outside the Box (Culvert) Making difficult decisions for Fish Passage. Dave Stewart Oregon Department of Fish and Wildlife

Stream Restoration and Environmental River Mechanics. Objectives. Pierre Y. Julien. 1. Peligre Dam in Haiti (deforestation)


Sacramento River Bank Protection Project

APPENDIX B Hydraulic Considerations for Pipeline Crossings of Stream Channels

Flood Frequency and Hazard Analysis of Santa Barbara s Mission Creek

GENERAL SUMMARY BIG WOOD RIVER GEOMORPHIC ASSESSMENT BLAINE COUNTY, IDAHO

CITY OF TUSCALOOSA ORGANIZATION OF 2015 FMP FLOODPLAIN MANAGEMENT PLAN

10/8/ W01. Daniel Catiglione First Gulf Corporation 3751 Victoria Park Avenue Toronto, ON M1W 3Z4

NORTHUMBERLAND COUNTY, PA

Sediment and nutrient transport and storage along the urban stream corridor

Extreme Weather Events

Sixteen Mile Creek Tributaries Meander Belt Width Assessment November 2009

Illinois State Water Survey Division

OBJECTIVES. Fluvial Geomorphology? STREAM CLASSIFICATION & RIVER ASSESSMENT

Earth Science Chapter 6 Section 2 Review

Massachusetts Rivers & Roads Training

ARMSTRONG COUNTY, PA

Bank Erosion and Morphology of the Kaskaskia River

Climate Risk Visualization for Adaptation Planning and Emergency Response

EFFECTS OF RIPARIAN RETENTION (IN WATERSHEDS) ON ALLUVIAL FANS

Field Trip Number One. By: Pat Dryer. Geography 360

CASE STUDY #9 - Brushy Fork Dam, Sugar Grove, West Virginia

CITY OF VESTAVIA HILLS

Diagnostic Geomorphic Methods for Understanding Future Behavior of Lake Superior Streams What Have We Learned in Two Decades?

Conceptual Model of Stream Flow Processes for the Russian River Watershed. Chris Farrar

Predicting Erosion Impact on Highway and Railway Bridge Substructures

THE TRINITY RIVER VISION/ GATEWAY PARK / PANTHER ISLAND

Dam Removal Analysis Guidelines for Sediment

Red River Levee Panel

3.12 Geology and Topography Affected Environment

Use of Space-for-Time Substitution in River Restoration: examples from SE England

The Effects of Flooding on Structures. Or What to Expect when the Drought Ends Violently

Geomorphology Studies

Minimizing Flood Risks and Habitat Impacts Due to Post-Flood Recovery Efforts

Great Lakes Tributary Modeling: Canaseraga Creek Watershed

Implementing a Project with 319 Funds: The Spring Brook Meander Project. Leslie A. Berns

City of Manitou Springs

FUTURE MEANDER BEND MIGRATION AND FLOODPLAIN DEVELOPMENT PATTERNS NEAR RIVER MILES 200 TO 191 OF THE SACRAMENTO RIVER PHASE III REPORT

Transcription:

Fluvial Erosion Impacts on Infrastructure Along Indiana Rivers and Streams Siavash Beik, Robert Barr, Brian Meunier 2017 Purdue Road School March 6-9, 2017

In June 2008, flooding damaged or destroyed more than 650 sections of road, 60 bridges, and 100 culverts in Indiana.

White River, Morgan County, IN June,2008

Distribution of relatively stationary and actively migrating stream reaches of the 42 drainage basins where channel-migration-rate values were documented in Indiana B. A. Robinson, USGS

Distribution of channel migration rates for 970 meander bends where channel-migration rates were documented in Indiana (B. A. Robinson, U. S. Geological Survey)

The 75th percentile channel-migration rate for the 42 stream reaches where channel-migration-rate values were documented in Indiana (B.A. Robinson, USGS)

Meander-Vulnerable Assets White River near Centerton, Ind. Transportation Assets Bridges Roads Railroads Railroad Bridges Utility Assets Power Lines Pipelines Dams Water-treatment Plants B. A. Robinson, U.S. Geological Survey Google Earth TM

B. A. Robinson, U.S. Geological Survey

Data set includes: 1,128 Assets Asset Class Latitude Longitude Stream Proximity Asset name Ownership B. A. Robinson, U.S. Geological Survey

Buried Pipelines (Natural Gas & Oil) Actively Migrating Streams (16) Migrating Tributaries (38 not shown) 141 Crossings B. A. Robinson, U.S. Geological Survey

Eight counties account for 57% of vulnerable assets Putnam Parke Franklin Hendricks Morgan Shelby Knox Tippecanoe 115 110 97 85 68 57 56 56 644 B. A. Robinson, U.S. Geological Survey

White River at US 37, near Martinsville, Morgan County, Indiana

Beacon Run at US 40, near Brazil, Putnam County, Indiana Note rotational slump (yellow arrow)

Whitewater River at Levee Road, near Brookville, Franklin County, Indiana

Lessons from White Lick Creek, Hendricks County, Indiana

White Lick Creek at SR 267, near Plainfield, Indiana

White Lick Creek at SR 267, near Plainfield, Indiana

Quaternary geologic map of Indiana Gray, H.H. 1989

White Lick Creek at SR 267, near Plainfield, Indiana Indiana 2011/2012 LiDAR

White Lick Creek at SR 267, near Plainfield, Indiana (39.6550, -86.3843) left bank, yellow arrow indicates SR 267

White Lick Creek at SR 267, near Plainfield, Indiana (39.6550, -86.3843) right bank

White Lick Creek at SR 267, near Plainfield, Indiana (39.6550, -86.3843) left bank, bank sediment stratigraphy

White Lick Creek at SR 267, near Plainfield, Indiana (39.6550, -86.3843) downstream

White Lick Creek at SR 267, near Plainfield, Indiana (39.6550, -86.3843) upstream

Managing the Problems

Risk Reduction Strategies 1. Stay Away Erosion & channel migration will continue Limit exposure When possible, move infrastructure out of stream corridor Increase mitigation requirements to discourage development in stream corridor Refined Corridor Map Available at: http://indnr.maps.arcgis.com/apps/webapp viewer/index.html?id=43e7b307a0184c7c8 51b5068941e2e23 RCB

Risk Reduction Strategies 2. More Stringent Development Standards Increase detention requirements (Channel protection volume) Promote / require use of LID & green infrastructure stormwater management strategies Institute riparian corridor with use restrictions RCB

Risk Reduction Strategies 3. Improve Planning & Risk Assessment Update regulatory flow rates Improve / update floodplain models Lateral migration monitoring 195 ft 35 ft Change in FEH Status from Channel Migration (Left Image taken 8/29/12; Right image taken 10/17/15, from Google Earth) RCB

Risk Reduction Strategies 4. Improve Maintenance & Protect Critical Infrastructure Tree maintenance program Strategic / critical erosion mitigation projects RCB

Bottom Line!

Things to Remember: Expect continued significant migration within expected erosional corridors SEB

Things to Remember: Expect continued significant migration within expected erosional corridors Increase in urbanization within the watershed has exacerbated the issues SEB

Things to Remember: Expect continued significant migration within expected erosional corridors Increase in urbanization within the watershed has exacerbated the issues Fixing the problem not likely feasible 1939 SEB

Things to Remember: Expect continued significant migration within expected erosional corridors Increase in urbanization within the watershed has exacerbated the issues Fixing the problem not likely feasible The recommended strategies: Multi-jurisdictional Coordination Disturbance Avoidance Zones Channel Protection Volume & GI Detailed Geomorphic Assessment Relocating Threatened Assets Monitoring At-risk Structures Protecting In-place Infrastructure Balanced Tree Management Strategies SEB

Riverine Impacts on Transportation Routes in a Nutshell Several Roads and Bridges in Indiana are Vulnerable to Floods and Stream Movement/Erosion Impacts There are ways to Predict, Screen, Monitor, and Prioritize Problem Sites before Potential Service Disruptions Occur A Detailed Morphological Stream Assessment is Crucial in Understanding the Overall System, Understanding the underlying System Stressors, and Making the Right Response and Repair Decisions Early Detection and Mitigation of Problems Saves Time, Money, and Headaches! SEB

QUESTIONS? Robert Barr Research Scientist Center for Earth and Environmental Science Department of Earth Sciences IUPUI 317.278.6911 (office) 317.332.5463 (mobile) e-mail: rcbarr@iupui.edu Siavash Beik, PE, CFM, D.WRE Vice President, Principal Engineer Brian Meunier, PE H&H Team Leader Christopher B. Burke Engineering, LLC 115 West Washington Street, Suite 1368 South Indianapolis, IN 46204 Ph: 317.266.8000 Email: sbeik@cbbel-in.com Email: bmeunier@cbbel-in.com