Information for File # MMJ; Trunk Highway (TH) 7 / Louisiana Ave. Interchange Project

Similar documents
Information for File MVP RMM

Information for File # ERH

Public Notice ISSUED: July 31, 2017 EXPIRES: August 31, 2017

APPROVED JURISDICTIONAL DETERMINATION FORM U.S. Army Corps of Engineers

SAN FRANCISCO DISTRICT INFORMATION REQUESTED FOR VERIFICATION OF CORPS JURISDICTION

3.11 Floodplains Existing Conditions

Minimum Standards for Wetland Delineations

THE TRINITY RIVER VISION/ GATEWAY PARK / PANTHER ISLAND

APPROVED JURISDICTIONAL DETERMINATION FORM U.S. Army Corps of Engineers

THE TRINITY RIVER VISION/ GATEWAY PARK / PANTHER ISLAND Flood Control Project Update

McHenry County Property Search Sources of Information

APPROVED JURISDICTIONAL DETERMINATION FORM U.S. Army Corps of Engineers

McHenry County Property Search Sources of Information

MVP WMS, George Schorr

APPROVED JURISDICTIONAL DETERMINATION FORM U.S. Army Corps of Engineers

APPROVED JURISDICTIONAL DETERMINATION FORM U.S. Army Corps of Engineers

APPROVED JURISDICTIONAL DETERMINATION FORM U.S. Army Corps of Engineers

Louisiana Transportation Engineering Conference. Monday, February 12, 2007

APPROVED JURISDICTIONAL DETERMINATION FORM U.S. Army Corps of Engineers

GIS ANALYSIS METHODOLOGY

APPROVED JURISDICTIONAL DETERMINATION FORM U.S. Army Corps of Engineers

December 16, Mr. Lee Hughes Southwest Florida Water Management District Tampa Service Office 7601 Highway 301 North Tampa, FL 33637

73-2 have been satisfied; and

AQUATIC RESOURCES DELINEATION REFRESHER

APPROVED JURISDICTIONAL DETERMINATION FORM U.S. Army Corps of Engineers

APPROVED JURISDICTIONAL DETERMINATION FORM U.S. Army Corps of Engineers

NEWS RELEASE UNDER SECTION 404 OF THE CLEAN WATER ACT (33 USC 1344) ACTION NUMBER SPA ABQ

APPROVED JURISDICTIONAL DETERMINATION FORM U.S. Army Corps of Engineers

APPROVED JURISDICTIONAL DETERMINATION FORM U.S. Army Corps of Engineers

APPROVED JURISDICTIONAL DETERMINATION FORM U.S. Army Corps of Engineers

Honorable Mayor and Members of the City Council

U.S. ARMY CORPS OF ENGINEERS

APPROVED JURISDICTIONAL DETERMINATION FORM U.S. Army Corps of Engineers

Local Flood Hazards. Click here for Real-time River Information

Bank Erosion and Morphology of the Kaskaskia River

Engineers Architects Planners Scientists

Version TNW Only 1 of 3

MEMORANDUM FOR SWG

BEFORE THE HEARING EXAMINER IN AND FOR THE COUNTY OF THURSTON

Southwest Light Rail Transit Bicycle Facility Assessment Technical Memorandum #3 Prioritization. July 23, P age

APPROVED JURISDICTIONAL DETERMINATION FORM U.S. Army Corps of Engineers

UPPER COSUMNES RIVER FLOOD MAPPING

Least-Cost Transportation Corridor Analysis Using Raster Data.

EROSION HAZARD OF MINNESOTA'S LAKE SUPERIOR SHORELINE. Carol A. Johnston Principal Investigator

APPROVED JURISDICTIONAL DETERMINATION FORM U.S. Army Corps of Engineers

North Carolina Simplified Inundation Maps For Emergency Action Plans December 2010; revised September 2014; revised April 2015

APPROVED JURISDICTIONAL DETERMINATION FORM U.S. Army Corps of Engineers

DRY LAND APPROVED JURISDICTIONAL DETERMINATION FORM 1 U.S.

APPLICATION TO AMEND THE FUTURE LAND USE MAP (FLUM) SMALL SCALE

CITY OF MINOT SNOW REMOVAL PLAN October 2018

City of Brainerd, Minnesota Snowplowing Policy

FOR PROJECTS INITIATED AFTER NOVEMBER 1, 2008 ITEM 716 EMBANKMENT EARTH OUTLET SEDIMENT TRAP

Development of Webbased. Tool for Tennessee

YELLOWSTONE RIVER FLOOD STUDY REPORT TEXT

NATHAN HALE HIGH SCHOOL PARKING AND TRAFFIC ANALYSIS. Table of Contents

OXFORD HEIGHTS SUBDIVISION EMERGENCY EVACUATION PLAN

HEC & GIS Modeling of the Brushy Creek HEC & GIS Watershed Modeling of the

Public Notice ISSUED: October 11, 2018 Expires: November 13, 2018

Summary Description Municipality of Anchorage. Anchorage Coastal Resource Atlas Project

1600 Prairie Drive , FAX

UTILITY REPORT FOR THORNTON SELF STORAGE THORNTON, COLORADO

TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M. To: Council Members AGENDA ITEM 4B10

APPROVED JURISDICTIONAL DETERMINATION FORM U.S. Army Corps of Engineers

Great California Delta Trail Blueprint for Contra Costa and Solano Counties GIS AND MAPPING MEMORANDUM JULY 2010

TRAFFIC IMPACT STUDY. Platte Canyon Villas Arapahoe County, Colorado (Arapahoe County Case Number: Z16-001) For

Sacred Lands File & Native American Contacts List Request

3D Elevation Program, Lidar in Missouri. West Central Regional Advanced LiDAR Workshop Ray Fox

Digital Wetlands. Bringing the Field into the Office Through GIS

LOMR SUBMITTAL LOWER NESTUCCA RIVER TILLAMOOK COUNTY, OREGON

COLORADO CULTURAL RESOURCE SURVEY Management Data Form Rev. 11/10

Managing an Extreme Weather Event of Prolonged Duration May 22, 2013

CITY OF MINOT SNOW REMOVAL PLAN November 2017

TRAFFIC FORECAST METHODOLOGY

Wetlands in the Context of Road Projects

LOMR SUBMITTAL LOWER NEHALEM RIVER TILLAMOOK COUNTY, OREGON

Chapter 7 Mudflow Analysis

April 10, Mr. Curt Van De Walle, City Manager City of Castle Hills 209 Lemonwood Drive Castle Hills, Texas 78213

LOCATED IN INDIAN RIVER COUNTY PREPARED FOR S.J.R.W.M.D. AND F.W.C.D. DECEMBER, 2003 Updated 2007 Updated May 2014 PREPARED BY

APPROVED JURISDICTIONAL DETERMINATION FORM U.S. Army Corps of Engineers

Appendix E Guidance for Shallow Flooding Analyses and Mapping

The Dance Hall Goes in What School District?

Special Public Notice

Author(s): Charles K. Cover, P.E. Federal Energy Regulatory Commission

Background on the March 13-14, 2007 Flooding in Browns Valley (Traverse County), Minnesota

Severe Storm Response Version # 1-0-1

4 Survey Datums. 4.1 Horizontal Datum Policy SURVEY DATUMS SEPTEMBER 2006

APPROVED JURISDICTIONAL DETERMINATION FORM U.S. Army Corps of Engineers

January 12, Mr. Ryan Granger TMGB Wilson, LLC 2221 Health Drive SW, Suite 2200 Wyoming, Michigan 49519

PENNSYLVANIA DEPARTMENT OF TRANSPORTATION ENGINEERING DISTRICT 3-0

White River Update. Jeanne Stypula, Supervising Engineer. Advisory Committee Meeting April 26, 2016

GIS-Based Sediment Quality Database for the St. Louis River Area of Concern (AOC): Overview Presentations and Demonstration

Minimum Standards for Aquatic Resource Delineations

Oregon APA Legal Issues Workshop December 7, Tricia Sears, DLCD With information from Bill Burns, DOGAMI

[Leveraging & Improving Neighborhood Connections] Area E Cedar Creek

² 2015 Program Year. Farm Tract McLeod County, Minnesota 1:4, NHEL NHEL

Sunset Harbour / Huntington Harbour Maintenance Dredging and Waterline Installation Project. CMANC 21 January 2016

Chapter 7 Mudflow Analysis

D Yes ~ No D To Be Determined

Technical Memorandum #2 Future Conditions

Mineral Resources

Transcription:

Information for File # 2013-00531-MMJ; Trunk Highway (TH) 7 / Louisiana Ave. Interchange Project Applicant: City of St. Louis Park Corps Contact: Melissa Jenny Address: U.S. Army Corps of Engineers Attn: Regulatory Branch 180 E. 5 th St., Suite 700 St. Paul, Minnesota 55101 E-Mail: Melissa.m.jenny@usace.army.mil Phone: 651-290-5363 Primary County: Hennepin Location: Section 17, T. 117 N., R. 21 W. Information Complete n: 2/1/2013 Posting Expires n: 2/25/2013 Authorization Type: LP-05-MN This application is being reviewed in accordance with the practices for documenting Corps jurisdiction under Sections 9 & 10 of the Rivers and Harbor Act of 1899 and Section 404 of the Clean Water Act identified in Regulatory Guidance Letter 07-01. We have made a preliminary determination that the aquatic resources that would be impacted by the proposed project are regulated by the Corps of Engineers under Section 404 of the Clean Water Act. ur jurisdictional review and final jurisdictional determination could result in modifications to the scope of the project s regulated wetland impacts and compensatory mitigation requirements identified above. An approved jurisdictional determination will be made prior to reaching a permit decision, and will be posted on the St. Paul District web page at http://www.mvp.usace.army.mil/. PRJECT PURPSE AND DESCRIPTIN: The primary purpose of the TH 7 and Louisiana Avenue Interchange Project is to address deteriorating safety and operational conditions at the intersection. The project as proposed would replace the existing at-grade intersection with a new interchange; TH 7 would be elevated to bridge over Louisiana Avenue. TH 7 would remain as two thru-lanes in each direction, and would be located along the same alignment. Single entrance and exits ramps would be located at each quadrant of the existing intersection. Two single lane roundabouts would replace the signal-controlled intersections of Louisiana Avenue at Walker and West Lake streets. The slip ramp intersections at Lake Street West (north side of TH 7) and Hampshire Avenue South (south side of TH 7), located east of the existing intersection, would be closed. Traffic would be directed towards the new roundabouts. Removal of these accesses would be a significant safety improvement, by reducing access to TH 7. Pedestrian trails would be replaced along both sides of Louisiana Avenue. The trails would be the same dimensions as the existing trails, but are a significant safety 1

improvement, as they would be located under the bridge, and pedestrians would not have to cross over TH 7. Two storm water ponds would be constructed with the project. Walker Pond will be located in the northeast quadrant, and would be used for initial treatment and flood storage. West Lake Pond would be located in the southeast quadrant, and would provide for additional flood storage and treatment to meet Minnehaha Creek sediment and nutrient reduction requirements. NAME, AREA AND TYPES F WATERS (INCLUDING WETLANDS) SUBJECT T LSS: The project as proposed would result in the permanent discharge of fill material over 0.38 acre of wetland. The project would also involve excavation of 0.72 acre of wetland, in conjunction with the construction of an improved storm water management system at the intersection. Reconstruction as proposed would adversely impact approximately 1.10 acres of wetland. ALTERNATIVES CNSIDERED: In addition to the no-build alternative, the City of St. Louis Park and its project partners identified and evaluated ten concept designs, including seven grade-separated interchange designs and three at-grade intersection designs. Numerous measures were used to evaluate how well each concept alternative achieved the project purpose and need and satisfied the project goals and objectives, including: Traffic perations/mobility, Sensitivity to Traffic Forecast, Safety, Transit Friendliness (compatibility with the proposed Southwest LRT line and transit station at Louisiana Avenue), Environmental Impacts, Right of Way/Property Impacts, Aesthetics, etc. Based on this evaluation, eight concept alternatives were removed from further consideration. A total of two build alternatives (#6 Tight Diamond with Roundabouts and #4 Buttonhook Ramps with Roundabouts), and the No-Build Alternative, were carried forward for a more detailed evaluation to compare the potential impacts to the natural and built environment as well as the affect on traffic operations. After reviewing technical evaluations, assessments, and input from the public and agency representatives that occurred as part of a multi phase screening process, the alternative Tight Diamond with Roundabouts was identified as the preferred alternative. This decision was made with regard to many variables, but ultimately would have the least overall environmental impact, and would concentrate the project to within the existing Louisiana Avenue corridor. CMPENSATRY MITIGATIN: The reconstruction of the TH 7 and Louisiana Avenue intersection into an interchange has been proposed as a safety improvement. The City of St. Louis Park applied for a federal grant for this project on this basis, and was awarded funding. An Environmental Assessment was completed to satisfy Federal Highway Administration requirements, and also highlighted the need of the project being based primarily on safety improvements. n the basis that the project is proposed primarily for safety improvements, and the project is being led by a local road authority (City of St. Louis Park), compensatory mitigation would be achieved by debiting wetland credits (at a 2:1 ratio) from a Corpsapproved, Board of Water and Soil Resources (BWSR) Local Government Roads Wetland Replacement Program (LGRWRP) mitigation bank. Drawings: See attached, labeled as 2013-00531-MMJ, s 1-4. 2

Hennepin County City of St. Louis Park Project Area Map Document: (S:\PT\S\Stlou\106311\GIS\Maps\Fig01_ProjectLocationMap.mxd) 6/3/2009 -- 8:07:07 AM 1,000 500 0 1,000 Projection: NAD 83, UTM zone 15 Source: USGS, Mn/DT, SEH PRJECT LCATIN 1 This map is neither a legally recorded map nor a survey map and is not intended to be used as one. This map is a compilation of records, information, and data gathered from various sources listed on this map and is to be used for reference purposes only. SEH does not warrant that the Geographic Information System (GIS) Data used to prepare this map are error free, and SEH does not represent that the GIS Data can be used for navigational, tracking, or any other purpose requiring exacting measurement of distance or direction or precision in the depiction of geographic features. The user of this map acknowledges that SEH shall not be liable for any damages which arise out of the user's access or use of data provided. 2013-00531-MMJ, 1 (Posting)

Hennepin County City of St. Louis Park Project Area Map Document: (S:\PT\S\Stlou\106311\GIS\Maps\Fig01_ProjectLocationMap.mxd) 6/3/2009 -- 8:07:07 AM 1,000 500 0 1,000 Projection: NAD 83, UTM zone 15 Source: USGS, Mn/DT, SEH 2012 AERIAL PHTGRAPH 2 This map is neither a legally recorded map nor a survey map and is not intended to be used as one. This map is a compilation of records, information, and data gathered from various sources listed on this map and is to be used for reference purposes only. SEH does not warrant that the Geographic Information System (GIS) Data used to prepare this map are error free, and SEH does not represent that the GIS Data can be used for navigational, tracking, or any other purpose requiring exacting measurement of distance or direction or precision in the depiction of geographic features. The user of this map acknowledges that SEH shall not be liable for any damages which arise out of the user's access or use of data provided. 2013-00531-MMJ, 2 (Posting)

W 35th St Republic Ave 1st St NW Brownlow Ave Library La Pennsylvania Ave S Wetland 2 Walker Pond Gorham Ave Lake St Walker St Wetland 1 Frontage Rd W 37th St Wetland 3 Hampshire Ave S Frontage Rd W Lake St Monitor St West Lake Pond Map Document: (S:\PT\S\Stlou\106311\GIS\Maps\Fig02_SitePlan.mxd) 6/3/2009 -- 9:45:14 AM Pennsylvania Ave S regon Ave S Projection: NAD 83, Hennepin County Source: Aerials Express, Mn/DT, SEH Wetland 4 0 250 500 1,000 Taft Ave S Wetland Delineation This map is neither a legally recorded map nor a survey map and is not intended to be used as one. This map is a compilation of records, information, and data gathered from various sources listed on this map and is to be used for reference purposes only. SEH does not warrant that the Geographic Information System (GIS) Data used to prepare this map are error free, and SEH does not represent that the GIS Data can be used for navigational, tracking, or any other purpose requiring exacting measurement of distance or direction or precision in the depiction of geographic features. The user of this map acknowledges that SEH shall not be liable for any damages which arise out of the user's access or use of data provided. Construction Plans 2013-00531-MMJ, 3 (Posting) 4

Republic Ave Gorham Ave Wetland 2 Walker St Walker Pond Wetland 1 Wetland 3 W 37th St Map Document: (S:\PT\S\Stlou\106311\GIS\Maps\Fig02_SitePlan.mxd) 6/3/2009 -- 9:45:14 AM Frontage Rd Wetland 4 0 100 200 400 Projection: NAD 83, Hennepin County Source: Aerials Express, Mn/DT, SEH W Lake St West Lake Pond Area of new wetland are not eligible or proposed to be used as wetland mitigation. New wetland areas have been included as part of the effort to document the total project impacts, and to indicate that while areas of existing wetland will be filled and converted, the net area of wetland, and the existing functions and values, will be maintainded post-construction. Monitor St Wetland Delineation Wetland Impacts - 1.10 acres Fill - 0.38 acres Excavation - 0.72 acres New Wetland - 1.11 acres Wet Meadow - 0.79 acres pen Water - 0.32 acres This map is neither a legally recorded map nor a survey map and is not intended to be used as one. This map is a compilation of records, information, and data gathered from various sources listed on this map and is to be used for reference purposes only. SEH does not warrant that the Geographic Information System (GIS) Data used to prepare this map are error free, and SEH does not represent that the GIS Data can be used for navigational, tracking, or any other purpose requiring exacting measurement of distance or direction or precision in the depiction of geographic features. The user of this map acknowledges that SEH shall not be liable for any damages which arise out of the user's access or use of data provided. Wetland Impacts 2013-00531-MMJ, 4 (Posting) 5