UNCLASSIFIED. Environment, Safety and Health (ESH) Report

Similar documents
GAMINGRE 8/1/ of 7

Average 175, , , , , , ,046 YTD Total 1,098,649 1,509,593 1,868,795 1,418, ,169 1,977,225 2,065,321

Average 175, , , , , , ,940 YTD Total 944,460 1,284,944 1,635,177 1,183, ,954 1,744,134 1,565,640

Mr. XYZ. Stock Market Trading and Investment Astrology Report. Report Duration: 12 months. Type: Both Stocks and Option. Date: Apr 12, 2011

Record date Payment date PID element Non-PID element. 08 Sep Oct p p. 01 Dec Jan p 9.85p

Annual Average NYMEX Strip Comparison 7/03/2017

Jayalath Ekanayake Jonas Tappolet Harald Gall Abraham Bernstein. Time variance and defect prediction in software projects: additional figures

Time Series Analysis

2019 Settlement Calendar for ASX Cash Market Products. ASX Settlement

Florida Courts E-Filing Authority Board. Service Desk Report March 2019

WHEN IS IT EVER GOING TO RAIN? Table of Average Annual Rainfall and Rainfall For Selected Arizona Cities

STRATEGIC BUSINESS PLAN QUARTERLY KPI REPORT FOR: FISCAL YEAR 2016 THROUGH DECEMBER (JULY 2015 THROUGH DECEMBER 2015)

SPECIMEN. Date Morning/Afternoon. A Level Geography H481/01 Physical systems Sample Question Paper. Time allowed: 1 hour 30 minutes PMT

STRATEGIC BUSINESS PLAN QUARTERLY KPI REPORT FOR: FISCAL YEAR 2016 THROUGH OCTOBER (JULY 2015 THROUGH OCTOBER 2015)

Environmental Management Systems for the Reuse & Refurbishment of Electronics

ISO Lead Auditor Lean Six Sigma PMP Business Process Improvement Enterprise Risk Management IT Sales Training

THE BUILDING SAFETY GROUP HEALTH AND SAFETY TRAINING COURSES 2018 DATES AND PRICES

Salem Economic Outlook

REPORT ON LABOUR FORECASTING FOR CONSTRUCTION

Statistical Models for Rainfall with Applications to Index Insura

ENGINE SERIAL NUMBERS

SYSTEM BRIEF DAILY SUMMARY

Computing & Telecommunications Services

Computing & Telecommunications Services Monthly Report January CaTS Help Desk. Wright State University (937)

WindPRO version Dec 2005 Printed/Page 11/04/2008 1:54 PM / 1. Meteo data report, height: 66.0 Feet

ISO Lead Auditor Lean Six Sigma PMP Business Process Improvement Enterprise Risk Management IT Sales Training

ISO Lead Auditor Lean Six Sigma PMP Business Process Improvement Enterprise Risk Management IT Sales Training

Published by ASX Settlement Pty Limited A.B.N Settlement Calendar for ASX Cash Market Products

2017 Settlement Calendar for ASX Cash Market Products ASX SETTLEMENT

UWM Field Station meteorological data

Hazard assessment based on radar-based rainfall nowcasts at European scale The HAREN project

In Centre, Online Classroom Live and Online Classroom Programme Prices

SYSTEM BRIEF DAILY SUMMARY

Corn Basis Information By Tennessee Crop Reporting District

Jackson County 2018 Weather Data 67 Years of Weather Data Recorded at the UF/IFAS Marianna North Florida Research and Education Center

Meteo data report, height: 20.0 m. Name of meteo object: Ugashik

Long-term Water Quality Monitoring in Estero Bay

TMC Monthly Operational Summary

Jackson County 2013 Weather Data

July 2017 LOGISTICAL HARMONY

2016 Year-End Benchmark Oil and Gas Prices (Average of Previous 12 months First-Day-of-the Month [FDOM] Prices)

How are adding integers and subtracting integers related? Work with a partner. Use integer counters to find 4 2. Remove 2 positive counters.

Climatography of the United States No

STRATEGIC BUSINESS PLAN QUARTERLY KPI REPORT FOR: FISCAL YEAR 2018 THROUGH SEPTEMBER (JULY 2017 THROUGH SEPTEMBER 2017)

FEB DASHBOARD FEB JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC

DAILY QUESTIONS 28 TH JUNE 18 REASONING - CALENDAR

STRATEGIC BUSINESS PLAN QUARTERLY KPI REPORT FOR: FISCAL YEAR 2017 THROUGH JUNE (JULY 2016 THROUGH JUNE 2017)

TMC Monthly Operational Summary

Calculations Equation of Time. EQUATION OF TIME = apparent solar time - mean solar time

BEHAVIORIAL SAFETY STORY. Why we must change the way we implement our programs?

STRATEGIC BUSINESS PLAN QUARTERLY KPI REPORT FOR: FISCAL YEAR 2018 THROUGH DECEMBER (JULY 2017 THROUGH DECEMBER 2017)

STRATEGIC BUSINESS PLAN QUARTERLY KPI REPORT FOR: FISCAL YEAR 2017 THROUGH SEPTEMBER (JULY 2016 THROUGH SEPTEBMER 2016)

DEPARTMENT OF THE ARMY MILITARY SURFACE DEPLOYMENT AND DISTRIBUTION COMMAND (SDDC) 1 SOLDIER WAY SCOTT AFB, IL 62225

Technical note on seasonal adjustment for M0

2016 Meteorology Summary

Scarborough Tide Gauge

TILT, DAYLIGHT AND SEASONS WORKSHEET

Climatography of the United States No

Climatography of the United States No

Please see the attached document in relation to your Freedom of Information request.

PROGRESS ACCOMPLISHED THIS PERIOD

INMATE ESCAPES FLORIDA DEPARTMENT OF CORRECTIONS. July 2016 June 2017

Quantification of energy losses caused by blade icing and the development of an Icing Loss Climatology

GTR # VLTs GTR/VLT/Day %Δ:

Climatography of the United States No

Climatography of the United States No

Climatography of the United States No

Climatography of the United States No

Climatography of the United States No

Climatography of the United States No

Climatography of the United States No

Climatography of the United States No

Climatography of the United States No

Pre-Calc Chapter 1 Sample Test. D) slope: 3 4

Safety effects of lower speed limits during winter months

Climatography of the United States No

Climatography of the United States No

2.1 Inductive Reasoning Ojectives: I CAN use patterns to make conjectures. I CAN disprove geometric conjectures using counterexamples.

Climatography of the United States No

Climatography of the United States No

Climatography of the United States No

Monthly Trading Report July 2018

Time Series Model of Photovoltaic Generation for Distribution Planning Analysis. Jorge Valenzuela

A Method of Quantifying Noble Gas Releases Douglas Wahl Exelon Limerick Generating Station

Weather Products for Decision Support Tools Joe Sherry April 10, 2001

Algae and Dissolved Oxygen Dynamics of Landa Lake and the Upper Spring Run

8 VISIBILITY. 8.1 Setting. 8.2 Assessment Focus. Table 8-1: Key Issue for Visibility

Alterations to the Flat Weight For Age Scale BHA Data Published 22 September 2016

Climatography of the United States No

Location. Datum. Survey. information. Etrometa. Step Gauge. Description. relative to Herne Bay is -2.72m. The site new level.

Climatography of the United States No

Climatography of the United States No

Climatography of the United States No

Climatography of the United States No

Jackson County 2014 Weather Data

Location. Datum. Survey. information. Etrometa. Step Gauge. Description. relative to Herne Bay is -2.72m. The site new level.

Outline. The Path of the Sun. Emissivity and Absorptivity. Average Radiation Properties II. Average Radiation Properties

Presented By Quarterly Public Meeting February 22, 2012

Dates and Prices ICAEW - Manchester In Centre Programme Prices

The Cryosphere Radiative Effect in CESM. Justin Perket Mark Flanner CESM Polar Climate Working Group Meeting Wednesday June 19, 2013

Transcription:

Environment, Safety and Health (ESH) Report

Perfect Days On a Perfect Day nobody is hurt, we receive no community complaints, we have no security breaches, we do not breach our environmental permit conditions, and there is no loss of our process safety controls: May 211 15 June 211 16 July 211-15 2

OSHA Recordable Incidents 9 Reduce work related injuries and ill-health, and improve employee wellbeing: KPI 6 OSHA Recordable Incidents by number of cases in month and 12 month rolling rate 8 7 1.4 1.2 Number of incidents 6 5 4 3 2 1..8.6.4 12 month rolling rate per 2, hours worked 1 Target = Zero Number of incidents in month Rolling 12 month rate Feb-1 Mar-1 Apr-1 May-1 Jun-1 Jul-1 Aug-1 Sep-1 Oct-1 Nov-1 Dec-1 Jan-11 Feb-11 Mar-11 Apr-11 May-11 Jun-11 Jul-11 7 5 6 3 4 5 5 2 7 4 4 3 7 3 4 7 4.61.6.67.67.66.68.69.65.6.67.73.74.68.71.68.69.73.72.2. 3

OSHA Days Away Cases Reduce work related injuries and ill-health, and improve employee wellbeing: KPI 7 OSHA Days Away Cases by number of cases in month and rolling 12 month rate 7 1.1 6 1. Number of cases in month. 5 4 3 2.9.8.7.6.5.4.3 Rolling 12 month rate per 2, hours worked 1.2.1 Target = Zero Number of cases in month Rolling 12 month rate Feb 1 Mar 1 Apr 1 May 1 Jun 1 Jul 1 Aug 1 Sep 1 Oct 1 Nov 1 Dec 1 Jan 11 Feb 11 Mar 11 Apr 11 May 11 Jun 11 Jul 11 4 3 3 1 2 2 3 1 3 2 1 2 4 1 3 4 1.35.34.36.35.37.37.4.37.3.34.37.36.33.34.32.35.37.36. 4

OSHA First Aid Injuries Reduce work related injuries and ill-health, and improve employee wellbeing OSHA First Aid Injuries by number of events in month and 12 month rolling mean 35 25 3 2 Number of cases in month 25 2 15 1 15 1 12 month rolling mean 5 5 Target = Zero Feb 1 Mar 1 Apr 1 May 1 Jun 1 Jul 1 Aug 1 Sep 1 Oct 1 Nov 1 Dec 1 Jan 11 Feb 11 Mar 11 Apr 11 May 11 Jun 11 Jul 11 Total First Aid Events in month 2 21 17 7 1 17 14 18 16 2 9 9 13 29 1 16 15 2 12 month rolling mean 15.33 15.42 15.58 15.25 14.17 14.17 14.58 14.67 14.67 14.5 14.5 14.83 14.25 14.92 14.33 15.8 15.5 15.75 5

RIDDOR Reportable Incidents RIDDOR Total Reportable Incidents by number of events in month and rolling 12 month rate 5.4 4.35.3 Number of incidents 3 2 1.25.2.15.1 Rolling 12 month rate per 1, hours worked.5 Target = Zero Number of incidents in month Rolling 12 month rate Feb 1 Mar 1 Apr 1 May 1 Jun 1 Jul 1 Aug 1 Sep 1 Oct 1 Nov 1 Dec 1 Jan 11 Feb 11 Mar 11 Apr 11 May 11 Jun 11 Jul 11 3 3 1 1 2 2 4 2 1 1 4 1 1 1.11.13.13.13.15.16.17.15.13.14.14.14.12.13.13.13.12.11. 6

3.5 Reduce work related injuries and ill-health, and improve employee wellbeing: KPI 1 Maximum individual radiation dose against the anticipated work program Contract Year to date CY 12 objective = 3.5 (msv) maximum 3 Maximum individual radiation dose, msv.. 2.5 2 1.5 1.5 Individual dose (msv) CYTD Apr 11 May 11 Jun 11 Jul 11 Aug 11 Sep 11 Oct 11 Nov 11 Dec 11 Jan 12 Feb 12 Mar 12.28.5.77 7

Reduce work related injuries and ill-health, and improve employee wellbeing: KPI 11 Collective total radiation dose for higher exposed groups Contract Year to date 15. CY12 objective = 152 man msv maximum 14. 13. 12. 11. Contract year to date collective radiation dose, msv 1. 9. 8. 7. 6. 5. 4. 3. 2. 1.. Collective dose (msv) CYTD Apr 11 May 11 Jun 11 Jul 11 Aug 11 Sep 11 Oct 11 Nov 11 Dec 11 Jan 12 Feb 12 Mar 12 1.82 4.96 9.96 8

Reduce environmental impact: KPI 14 Overall total waste diverted away from landfill (and therefore available for refuse, recycle or recovery) 1% % by weight diverted away from landfill, relative to the total waste generated in tonnes 9% 8% 7% 6% 5% 4% 3% 2% Overall total waste target = 7% 1% % Performance in Month Aug 1 Sep 1 Oct 1 Nov 1 Dec 1 Jan 11 Feb 11 Mar 11 Apr 11 May 11 Jun 11 Jul 11 74.79% 89.31% 89.9% 67.67% 94.42% 74.39% 95.15% 76.35% 59.89% 87.52% 93.75% 94.97% 9

Public Dose Assessment Discharge Aldermaston Burghfield Guidance Levels Q2 211 Jul 1 to Jun 11 Q2 211 Jul 1 to Jun 11 Atmosphere 6 nsv (.6 msv) 23 nsv (.23 msv).4 psv (.4 msv) 2 psv (.2 msv).5 msv Trade Effluent 8 nsv (.8 msv) 24 nsv (.24 msv).5 msv Aldermaston Stream.1 nsv (.1 msv).4 nsv (.4 msv).5 msv The calculated doses represent minute fractions of the dose constraint set by the Environment Agency of.5 msv per year for a nuclear site The model concludes that there is no hazard to members of the public 1 1