Aurora Tank Gold Drilling Update

Similar documents
ASX ANNOUNCEMENT 19 NOVEMBER 2015 SIGNIFICANT GOLD PROSPECT CONFIRMED AT APOLLO S SA GOLD PROJECT NEAR CHALLENGER

HIGH-GRADE GOLD MINERALISATION CONTINUES ALONG STRIKE AT THE BODDINGTON SOUTH GOLD PROJECT

For personal use only

ROE HILLS COBALT AND GOLD DRILLING ADVANCES

For personal use only

TANDARRA GOLD PROJECT DRILLING COMMENCES AND FOUR EAGLES GOLD PROJECT DRILLING UPDATE

Malachite Resources Limited ABN

STEP-OUT DRILLING EXTENDS HIGH GRADE COPPER ZONE AT SYNDICATED S 100% BARBARA SOUTH LODE

High Grade Gold Intercepts at Bangaba

APOLLO SOUTH AUSTRALIAN EXPLORATION UPDATE

UPDATE ON DRILLING TO BE CONDUCTED AT AURORA TANK GOLD PROJECT

FOUR EAGLES MINERALISATION REPORT ACCEPTED AND DRILLING TO RECOMMENCE

For personal use only

Drilling Commences at Telfer West Gold Project

For personal use only

For personal use only

Norwest successfully lists on ASX, Drilling commenced at Warriedar Gold Project

For personal use only

High Grade Gold Results from RAB Drilling at the Central Bore Prospect

Drilling program commences on Cloncurry and Mount Isa projects

New Drilling Program Commences at Mutiny s Deflector Deposit

SECOND ADVANCED GOLD PROJECT IDENTIFIED AT THREE RIVERS PROJECT

For personal use only

New High Grade Gold-Copper Extensions At Mutiny s Deflector Deposit Highlight Project s Significant Growth Potential

DIAMOND AND AIR CORE DRILLING TO COMMENCE ON WHITELAW GOLD BELT

MT PLEASANT AUGER GEOCHEM RESULTS OUTLINE A NEW GOLD ZONE TO THE NORTH-EAST OF FIDELATAS PROSPECT HIGHLIGHTS

ASX Announcements & Media Release

Biogeochem yields multiple new gold targets at Aurora Tank

ASX RELEASE ACTIVITY UPDATE SPARGOVILLE PROJECT WA MINING AND EXPLORATION

High-grade Gold in First Drilling Undertaken at Productora South

LATEST DRILL RESULTS REVEALS MINERALISATION OPEN AT STRIKE AND DEPTH AT KATANNING GOLD DEPOSIT

ASX RELEASE / MEDIA RELEASE 2,810 ppb gold in shallow auger samples Four new parallel zones defined up to 1500m in strike

Drilling Program Commences on Iron Oxide Copper Gold Targets

For personal use only

For personal use only

High-grade Copper and Gold Discovered at Productora

CRATER MOUNTAIN MAJOR MULTIPLE MINERALISATION EVENTS POTENTIAL ASSOCIATED WITH PORPHYRY SYSTEM NOW IDENTIFIED

For personal use only

ASX Release and Media Announcement 27 September Central Eyre Iron Project 2011 Stage VI Drilling Programme Completion

For personal use only

For personal use only

COARSE NUGGET PATCH LATERITE EXTENDED BY 600% TO 22 SQ.KM AT MERTONDALE

A1 GOLD MINE 14 LEVEL STOCK WORKS TARGET FURTHER HIGH GRADE DRILL INTERCEPTS

ATLAS GOLD LIMITED ABN QUARTERLY REPORT FOR THE PERIOD ENDED 31 MARCH 2005

For personal use only

For personal use only

ASX Announcement NAKRU DRILLING AND TRENCHING INTERSECTS 11 METRES AT 2.84 G/T GOLD AND 28.4 METRES AT 1.1% COPPER

RC DRILLING TO RESUME THIS WEEK AT CARLISLE REEFS

Further Extensions to the Netiana Lodes at Balogo, Burkina Faso

Trouser Legs Mine Strong Drilling Results - including g/t Au Potential for Further Mine Development

For personal use only

ASX Release. 14 th September Corporate Update Divestment of Gold, Copper and Nickel Projects

Additional significant gold and copper intercepts obtained in Sweden

GEOPACIFIC REPORTS HIGH GOLD VALUES IN AUGER SOIL SAMPLES FROM THE QALAU AND TATAIYA PROSPECTS, RAKI RAKI PROJECT,

For personal use only

Hann Prospect New Gold Discovery Confirmed

Developing the +1.2Moz Pilbara Gold Project

For personal use only

MOUNT DOROTHY AND ELAINE DOROTHY PROSPECTS UPDATE

Auger Drilling Progress Report - Moktedu Trend Prospect 5km Gold Trend Confirmed Along Strike from 3.5Moz Deposit

New Zone of High Grade Gold Mineralisation Discovered at Balogo, Burkina Faso

Auger Drilling Progress Report - Meguet Trend Prospect Multiple Highly Anomalous Gold Discoveries within 8km Mineralised Corridor

ASX and Media Release

Ausgold awarded EIS grant for Jinkas deep drilling

December 2017 Quarter Activities Report

DRILLING TO COMMENCE AT AURORA TANK GOLD PROJECT

ASX RELEASE. Punt Hill Project Update

Champion Copper: 2017 RC Drilling Results

African Energy Resources Limited

AGM Presentation 6 November 2012

For personal use only

NEW COBAR-STYLE COPPER DISCOVERY IN NSW

For personal use only

For personal use only

GEOPHYSICAL SURVEYING COMMENCES AT ESK TROUGH

FIVE RIGS DRILLING AT KARLAWINDA

QUARTERLY ACTIVITIES REPORT ENDING 30 SEPTEMBER 2010 HIGHLIGHTS

For personal use only

DRILLING COMMENCES AT ESK TROUGH

New Zone of High Grade Gold Discovered at Balogo

Acquisition of Kilfoyle Project, Northern Territory

For personal use only

Mundo Minerals Limited

Bass Metals records further positive drill results & progress at 3 prospects.

27 metres Grading 66.8 g/t Gold and

For personal use only

Rock chip sampling confirms high grade quartz vein 500m long and up to 20m wide

ASX ANNOUNCEMENT 2 August Aurora Tank Gold. July drilling intersects 4m at 40g/t gold

NT RESOURCES LIMITED QUARTERLY ACTIVITIES REPORT FOR THE PERIOD ENDED 30 JUNE 2010 ASX CODE: NTR

For personal use only

For personal use only

RC Drilling Confirms Zeus Gold Prospect

SIGNIFICANT GOLD MINERALISATION INTERSECTED AT MANIEMA PROJECT, DRC 21.7m at 3.58g/t Au HIGHLIGHTS

Mt Cannindah IP Data Reprocessing & 3D Geological Modelling Identifies Potential Resource Extensions

Spectacular uranium assays from rock sampling. at FYI s Yarlarweelor project in Western Australia

SUMBA EPITHERMAL GOLD SYSTEM

ASX/Media Announcement 14 July 2010

High Grade Gold Intersections at Harry Smith Prospect

ASX Release. 16 December 2010 LIMITED. EXPLORATION UPDATE Highlights

ASX announcement 16 May 2016

Transcription:

ASX ANNOUNCEMENT 19 December 2016 Marmota Limited (ASX: MEU) ( Marmota ) Aurora Tank Gold Drilling Update Marmota is pleased to advise that 31 RC holes at Aurora Tank have now been completed. KEY POINTS Phase 2 drilling at Aurora Tank commenced on 30 November 2016 [see ASX:MEU 1 Dec 2016] Drilling has stopped for the on-set of the holiday period. Program 31 of 53 angled RC (reverse circulation) drill holes have now been completed Target depths: 90 m (approximate) Total drilling to date: 2,604m (approximately 150m per day) Phase 2 program is shown in Figure 1. Completed holes to date is shown in Figure 2. New assays coming Assay results from drilling samples are anticipated at around the end of January. Page 1

Page 2 Figure 1: Phase 2 RC drill grid (with previous drilling locations / results)

Page 3 Figure 2: Phase 2 RC drill holes now completed

Background Aurora Tank (EL 5589) is situated about 50km NE of the Challenger Gold Mine [ see Fig. 3 ] Aurora Tank is 100% owned by Marmota [see ASX:MEU 4 July 2016] Gold was identified at the Goshawk prospect by drilling historical calcrete sampling anomalies. Phase 1 In September 2016, Marmota conducted an aircore drilling program to test the Goshawk Gold Prospect at Aurora Tank with the intention of fully defining gold geochemical dispersion in the near-surface zone to 40 metres vertical depth [see ASX:MEU 5 Sept 2016] During Phase 1: 98 angled aircore holes totaling 4,385m were drilled Phase 1 Results Phase 1 (September drilling) has already yielded excellent results [ see ASX:MEU 25 Oct 2016 and 29 Nov 2016 ] with 31 intersections greater than 1 g/t gold, all close to surface, including: 3m at 11.3 g/t gold from 22m Hole 16AT019 ( incl 1m @ 23 g/t gold from 22m) 4m at 9.0 g/t gold from 25m Hole 16AT043 ( incl 1m @ 34 g/t gold from 27m) 4m at 3.7 g/t gold from 24m Hole 16AT044 ( and 1m @ 11 g/t gold from 20m) 4m at 6.2 g/t gold from 35m Hole 16AT061 ( incl 1m @ 23 g/t gold from 35m) 4m at 3.9 g/t gold from 20m Hole 16AT062 4m at 3.3 g/t gold from 36m Hole 16AT028 Significant gold mineralization intersected over 750m strike length Mineralization consistently close to surface Phase 2 RC drilling program commenced on 30 Nov 2016. Page 4

Page 5 Figure 3: Marmota s Gawler Craton tenements around the Challenger Gold Mine Aurora Tank circled in green; new tenements in red

Marmota now intends to implement an expanded program, consisting of the Phase 2 holes not yet completed, and additional holes, designed with the benefit of the new assays from the current drilling just completed, which are expected around the end of January. For further information, please contact: Marmota Limited Dr Kevin Wills Acting Managing Director Email: info@marmota.com.au Unit 6 79-81 Brighton Road Glenelg SA 5045 ABN: 38 119 270 816 T: (08) 8294 0899 F: (08) 8376 8633 www.marmota.com.au About Marmota Limited Marmota Limited (ASX: MEU) is a South Australian mining exploration company, focused on gold, copper and uranium. Gold exploration is centred on the Company s dominant tenement holding in the highly prospective and significantly underexplored Gawler Craton, near the Challenger gold mine, in the Woomera Prohibited Defence Area. The Company s cornerstone copper project is based at the Melton project on the Yorke Peninsula. The Company's largest uranium project is at Junction Dam adjacent to the Honeymoon mine. For more information, please visit: www.marmota.com.au Page 6 Competent Persons Statement Information in this Release relating to Exploration Targets, Exploration Results and Mineral Resources is based on information compiled by Dr Kevin Wills, who is a Member of the Australasian Institute of Mining and Metallurgy. He has sufficient experience which is relevant to the styles of mineralisation and types of deposits under consideration and to the activities being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the Australasian Code of Reporting of Exploration Results, Mineral Resources and Ore Reserves. Dr Wills consents to the inclusion in this report of the matters based on his information in the form and context in which it appears.