RAILROAD COMMISSION OF TEXAS Oil & Gas Division P.O. Drawer Capitol Station Austin, TX

Similar documents
Regulatory Report (Grid North)

RAILROAD COMMISSION OF TEXAS OIL & GAS DIVISION

Elk River Resources, LLC Andrews County, TX Sec 24, Blk 12, University Land Survey Wapiti H Wellbore #1 Survey: MWD Surveys (QES) QES Survey Re

Crane County, TX Sec. 37, Block 31, University Lands Survey University Lands A 37 #1H. Wellbore #1. Survey: MWD

SlimPulse FS Original Hole Ft August 12, 2017

RAILROAD COMMISSION OF TEXAS OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG

National Oilwell Varco Survey Report

National Oilwell Varco Survey Report

FS Original Hole Ft April 26, 2016

Forge Energy. Andrews County, TX. Slot: No. 4426H Facility: Well: Andrews County, TX (NAD 83 / Grid) Wellbore: (UL 13 Dover) Sec 26, Blk 13, USLS

ARES ENERGY, LTD. SDI Survey Report. Fuhrman-Mascho Andrews County, Texas (Grid North) University 13 #2H VH - Job # KW-204.

Diamondback E&P LLC. Standard Survey Report. Andrews County, Tx UL Tawny Unit 8-12 #3LS OH. Design: OH

FIELD COPY ONLY (NOT DEFINITIVE) Depth Reference : GROUND LEVEL


National Oilwell Varco Survey Report

Regulatory Report (Grid North)

El Paso E & P Company, L.P. SDI Standard Survey Report

El Paso E & P Company, L.P. SDI Standard Survey Report


SDI Standard Survey Report

SDI Standard Survey Report

Report Date: ST. ANDREWS Rig: H&P 629 Operator: Lat/Long: 6.67 East Vertical Section Azimuth: Magnetic Declination: 0.00 North Reference: True North

Lease Sale 128: September 20, 2017

Company: HighMount Exploration & Production Site: University Unit Well: #11-3H Project: Crockett County, Texas (NAD 27) Rig Name: Nabors M17

BEFORE THE CORPORATION COMMISSION OF THE STATE OF OKLAHOMA CAUSE CD NO. APPLICANT: CONTINENTAL RESOURCES, INC.

OKLAHOMA CORPORATION COMMISSION OIL & GAS CONSERVATION DIVISION P.O. BOX OKLAHOMA CITY, OK (Rule 165:10-3-1) PERMIT TO DRILL

True North Directional Services Inc. Survey Report

OKLAHOMA CORPORATION COMMISSION OIL & GAS CONSERVATION DIVISION P.O. BOX OKLAHOMA CITY, OK (Rule 165:10-3-1) PERMIT TO DRILL

True North Directional Services Inc. Survey Report

SUMMARY OF BOTTOM HOLE LOCATIONS CIMAREX ENERGY CO. 11,252'

US ROCKIES REGION PLANNING

RAILROAD CoMMIssIoN OF TEXAS

For personal use only

Guideline Petroleum Drilling Regulations (CNR 1150/96)

SURVEYING AND MAPPING, INC. COORDINATE DATA SHEET JOB: CITY OF DECATUR CLIENT: CITY OF DECATUR SAM JOB#:

BEFORE THE OIL AND GAS CONSERVATION COMMISSION OF THE STATE OF COLORADO

US ROCKIES REGION PLANNING

Guideline REGULATORY REQUIREMENTS FOR FINAL WELL REPORTS ONSHORE TO OFFSHORE WELLS

Testing of the Strawn Sand, White Hat 20#3, Mustang Prospect, Permian Basin, Texas

The State of the Industry of Drillbit Geomechanics

Update - Testing of the Strawn Sand, White Hat 20#3, Mustang Prospect, Permian Basin, Texas

Statistical Series 59 Alberta Drilling Activity

KANSAS GEOLOGICAL SURVEY Open File Report LAND SUBSIDENCE KIOWA COUNTY, KANSAS. May 2, 2007

GEOSYNTEC CONSULTANTS

EXPLOR INTERSECTS MULTIPLE COPPER ZONES GRADES UP TO 3.65% CU OVER 5.35 METERS ON THE CHESTER COPPER PROPERTY

For personal use only

Downhole Navigation for Oil & Gas Drilling

Pershing Gold Extends High-Grade Mineralization through Step-Out Drilling in Phase 1 and Initiates Phase 2 Drilling Program

APACHE PERMIAN. John Christmann. November 14, 2012

AGGREGATE RESOURCES OF ONTARIO (ARO) METADATA

Enerdeq Template Attributes (v2.6) February 18, 2015

Dolores Public Lands Office Highway 184 Dolores, CO Ph (970) Fax (970)

Shale Gas; Wellbore Positioning Challenges

Structure contours on Bone Spring Formation (Lower Permian), Delaware Basin

Barnett Shale-Woodford Shale play of the Delaware basin is it another giant shale gas field in Texas?

CROCODILE GOLD INTERSECTS 7.1 G/T AU OVER 4.5 METERS INCLUDING 11.2 G/T AU OVER 2.6 METERS AT THE UNION REEFS PROJECT, PROSPECT DEPOSIT

September 28, Michael James Murphy PROPOSAL FOR DECISION PROCEDURAL HISTORY

Pershing Gold Hits Highest Grade Gold to Date in Relief Canyon with Grams per Tonne (3.618 Ounces per Ton) Intercept

County of San Diego, Planning & Development Services

" :..: - ~ :., ~... '

Initial Investigation of Petroleum Systems of the Permian Basin, USA. Acknowledgements

The SPE Foundation through member donations and a contribution from Offshore Europe

September 21,

DRILLING REPORT (DGO-GO-14)

DEVEX Moving in the Right Direction; Realising Upside Potential in a Mature Field Using Real Time 3D Geo-Steering Technology

Colorado River: Mile 8 to Mile 13.5

Malachite Resources Limited ABN

GEOSTEERING Scope of work, project management and geosteering scenarios

Georeferencing the Lackawanna Synclinorium using GIS

Horizontal San Andres Play

Township 34 North, Range 9 West, NMPM (NUL) Section 3: E/2

MARKET UPDATE ON URANIUM AND GOLD PROJECTS

EXAMINER S REPORT AND RECOMMENDATION STATEMENT OF THE CASE

Toronto, Canada March 4, 2013

MRD283-REV METADATA. Acronyms are Used to Identify the Data Set or Information Holding: MRD283-REV

4 Survey Datums. 4.1 Horizontal Datum Policy SURVEY DATUMS SEPTEMBER 2006

Horizontal Drilling Pilot In a Shallow Heavy Oil Reservoir in Northwestern Romania. Authors: John Lavelle, Amin Yaghoobi

Three Rivers II Overview

Manitoba s Designated Oil Fields & Pools 2015

HORIZONTAL PROJECTION PARAMETERS: DANE COUNTY COORDINATES

QMX GOLD INTERSECTS 29.8 G/T AU OVER 3.0 METERS AND 19.3 G/T AU OVER 3.2 METERS AT BONNEFOND

Kansas Underground Injection Control Program & Induced Seismicity. By: Benjamin Busboom Stinson Leonard Street

Phoenix South-3 drilling update 09 August 2018

Elevation s Barnett Oil Play: Its Genesis and Why it Works. April 25, 2018

M E M O R A N D U M. Mr. Jonathan K. Thrasher, P.E., Mr. Ian Kinnear, P.E. (FL) PSI

Suite 1800 Two Bentall Centre 555 Burrard Street Vancouver, BC V7X 1M9 Tel: (604) Tel: (888) April 8, 2018 SBB NR SBB TSX

APPLICATION FOR CHANGE OF WATER RIGHT

Butte County Board of Supervisors Agenda Transmittal

CROCODILE GOLD CONTINUES POSITIVE EXPLORATION RESULTS INTERSECTS HIGH GRADE GOLD AT UNION REEFS PROJECT

DRILLING REPORT (DGO-GO-14)

Julie Shemeta, MEQ Geo Inc., WCEE Webinar 1/13/2016 1/14/2016

BEFORE THE CORPORATION COMMISSION OF THE STATE OF OKLAHOMA

APPLICATION FOR CONDITIONAL ABSOLUTE WATER STORAGE RIGHT

Profit Island Project East Baton Rouge Parish, Louisiana

The Capitan Aquifer - Ellenburger Production Wells Geothermal Engine Source?

Version TNW Only 1 of 3

EXHIBIT H LOT 317 GRADING AND SITE PLAN

APPLICATION TO AMEND THE FUTURE LAND USE MAP (FLUM) SMALL SCALE

APPLICATION FOR AUTHORITY TO DRILL A WELL (ADW)

Relinquishment Report. Licence P1616. Block 21/12b

Transcription:

Evaluation, Drilling & Intervention 10000 West County Rd. 116 P.O. Box 61028 Midland, TX USA 79711 Tel. (432) 561-8892 Fax (432) 561-8895 RAILROAD COMMISSION OF TEXAS Oil & Gas Division P.O. Drawer 12967 Capitol Station Austin, TX 78711-2967 Attention: Pam Johns Date: March 2, 2017 Re: Forge Energy Well: UL 20 Sunlight 1H ST00 RRC Lease/Gas ID No. N/A- UL., Survey A- U20 Winkler County Texas API# 42-495-33775 Enclosed, please find the survey performed on the referenced well by Precision Energy Services, Inc. (P-5 No. 676004), a Weatherford company. Other information required by your office is as follows Name & Title Well Surveyed Dates Type of Of Surveyor Number Depths Performed Survey Derral Larance MWD Supervisor 1H ST00 794 MD 17445 MD 1/7/2017 2/6/2017 Measurement While Drilling A certified plat on which the bottom-hole location is oriented both to the surface location and to the lease lines (or unit line in case of pooling) is attached to the survey report. If any other information is required, please contact the undersigned at the letterhead address and phone number. Sincerely, Jonathan Leger MWD Ops. Coordinator

RAILROAD COMMISSION OF TEXAS OIL & GAS DIVISION PERMIT TO DRILL, DEEPEN, PLUG BACK, OR RE-ENTER ON A REGULAR OR ADMINISTRATIVE EXCEPTION LOCATION PERMIT NUMBER DATE PERMIT ISSUED OR AMENDED DISTRICT 821147 Dec 22, 2016 API NUMBER FORM W-1 RECEIVED COUNTY 42-495-33775 Dec 12, 2016 WINKLER TYPE OF OPERATION OPERATOR LOCATION NEW DRILL FORGE ENERGY, LLC 10999 IH 10 WEST SUITE 900 SAN ANTONIO, TX 78230-0000 LEASE NAME Section, Block and/or Survey FIELD(s) and LIMITATIONS: WELLBORE PROFILE(S) Horizontal DISTANCE TO SURVEY LINES 330 ft. EAST 240 ft. NORTH DISTANCE TO LEASE LINES 330 ft. EAST 240 ft. NORTH 276868 ACRES NOTICE This permit and any allowable assigned may be revoked if payment for fee(s) submitted to the Commission is not honored. District Office Telephone No: (432) 684-5581 WELL NUMBER UL 20 SUNLIGHT 1H 08 1281.4 TOTAL DEPTH 8.1 miles SW direction from WINK 12500 SECTION 37 BLOCK 20 ABSTRACT SURVEY UNIVERSITY LAND * SEE FIELD DISTRICT FOR REPORTING PURPOSES * * DISTANCE TO NEAREST LEASE LINE 200 ft. DISTANCE TO NEAREST WELL ON LEASE See FIELD(s) Below FIELD NAME ACRES DEPTH WELL # DIST LEASE NAME NEAREST LEASE NEAREST WE -------------------------------------------------------------------- -------- --------- ------- --- PHANTOM (WOLFCAMP) 1281.40 12,500 1H 08 UL 20 SUNLIGHT 200 0 ------------------------------------------------------- WELLBORE PROFILE(s) FOR FIELD: Horizontal ------------------------------------------------------- RESTRICTIONS: This is a hydrogen sulfide field. Hydrogen Sulfide Fields with perforations must be isolated and tested per State Wide Rule 36 and a Form H-9 filed with the district office. Fields with SWR 10 authority to downhole commingle must be isolated and tested individually prior to commingling production. Lateral: TH1 Penetration Point Location Lease Lines: 330.0 F EAST L 240.0 F NORTH L Terminus Location BH County: WINKLER Section: 48 Block: 20 Abstract: Survey: UNIVERSITY LAND Lease Lines: Survey Lines: 330.0 F EAST L 200.0 F SOUTH L 330.0 F EAST L 200.0 F SOUTH L THE FOLLOWING RESTRICTIONS APPLY TO ALL FIELDS Data Validation Time Stamp: Feb 1, 2017 1:18 PM( Current Version ) Page 3 of 5

RAILROAD COMMISSION OF TEXAS OIL & GAS DIVISION PERMIT TO DRILL, DEEPEN, PLUG BACK, OR RE-ENTER ON A REGULAR OR ADMINISTRATIVE EXCEPTION LOCATION PERMIT NUMBER DATE PERMIT ISSUED OR AMENDED DISTRICT 821147 Dec 22, 2016 API NUMBER FORM W-1 RECEIVED COUNTY 42-495-33775 Dec 12, 2016 WINKLER TYPE OF OPERATION OPERATOR LOCATION NEW DRILL FORGE ENERGY, LLC 10999 IH 10 WEST SUITE 900 SAN ANTONIO, TX 78230-0000 LEASE NAME Section, Block and/or Survey FIELD(s) and LIMITATIONS: WELLBORE PROFILE(S) Horizontal DISTANCE TO SURVEY LINES 330 ft. EAST 240 ft. NORTH DISTANCE TO LEASE LINES 330 ft. EAST 240 ft. NORTH 276868 ACRES NOTICE This permit and any allowable assigned may be revoked if payment for fee(s) submitted to the Commission is not honored. District Office Telephone No: (432) 684-5581 WELL NUMBER UL 20 SUNLIGHT 1H 08 1281.4 TOTAL DEPTH 8.1 miles SW direction from WINK 12500 SECTION 37 BLOCK 20 ABSTRACT SURVEY UNIVERSITY LAND * SEE FIELD DISTRICT FOR REPORTING PURPOSES * * DISTANCE TO NEAREST LEASE LINE 200 ft. DISTANCE TO NEAREST WELL ON LEASE See FIELD(s) Below FIELD NAME ACRES DEPTH WELL # DIST LEASE NAME NEAREST LEASE NEAREST WE This well shall be completed and produced in compliance with applicable special field or statewide spacing and density rules. If this well is to be used for brine mining, underground storage of liquid hydrocarbons in salt formations, or underground storage of gas in salt formations, a permit for that specific purpose must be obtained from Environmental Services prior to construction, including drilling, of the well in accordance with Statewide Rules 81, 95, and 97. This well must comply to the new SWR 3.13 requirements concerning the isolation of any potential flow zones and zones with corrosive formation fluids. See approved permit for those formations that have been identified for the county in which you are drilling the well in. The designated interval for one or more of the fields approved in this permit appears to overlap with the designated interval of another field or fields in this district. In the case of conflicting designated intervals you will be required to be consistent in field designation on this lease. Further, if the designated interval overlap of wells on this lease results in an actual or potential double assignment of reservoir and the applicant cannot conclusively demonstrate that there is no double assignment, the permitted well may not be assigned an allowable until the conflict is resolved. Because of the overlapping designated intervals in this area, issuance of this permit does not guarantee that the completion of the well will be approved or that the well will receive an allowable in any given field, even if that field is listed on the approved permit application. Data Validation Time Stamp: Feb 1, 2017 1:18 PM( Current Version ) Page 4 of 5

RAILROAD COMMISSION OF TEXAS OIL & GAS DIVISION SWR #13 Formation Data WINKLER (495) County Formation Shallow Top Deep Top Remarks Geological Order Effective Date RUSTLER 725 725 possible flow; possible usable quality water 1 12/17/2013 COLBY-QUEEN 2,900 3,200 2 12/17/2013 YATES 2,280 3,200 3 12/17/2013 QUEEN-SEVEN 2,700 3,400 4 12/17/2013 RIVERS SAN ANDRES 3,600 4,400 high flows, H2S, corrosive 5 12/17/2013 HOLT 4,500 4,800 6 12/17/2013 DELAWARE 4,300 5,000 7 12/17/2013 GLORIETA 4,900 5,600 8 12/17/2013 CLEARFORK 4,750 6,200 9 12/17/2013 WICHITA 6,600 6,850 10 12/17/2013 ALBANY BRUSHY 7,300 7,300 11 12/17/2013 CANYON CHERRY 6,000 7,800 12 12/17/2013 CANYON CANYON 8,400 8,400 13 12/17/2013 BONE SPRINGS 9,000 9,800 14 12/17/2013 MONTOYA 10,300 10,300 15 12/17/2013 WADDELL 11,000 11,000 16 12/17/2013 WOLFCAMP 7,600 12,400 17 12/17/2013 ATOKA 12,900 12,900 18 12/17/2013 STRAWN 8,100 14,800 19 12/17/2013 PENNSYLVANIAN 8,000 15,500 20 12/17/2013 MISSISSIPPIAN 10,200 17,300 21 12/17/2013 DEVONIAN 7,900 17,800 22 12/17/2013 SILURIAN 8,500 18,000 23 12/17/2013 FUSSELMAN 9,700 18,800 24 12/17/2013 ELLENBURGER 9,500 21,400 25 12/17/2013 The above list may not be all inclusive, and may also include formations that do not intersect all wellbores. Formation "TOP" information listed reflects an estimated range based on geologic variances across the county. To clarify, the "Deep Top" is not the bottom of the formation; it is the deepest depth at which the "TOP" of the formation has been or might be encountered. This is a dynamic list subject to updates and revisions. It is the operator2s responsibility to make sure that at the time of spudding the well the most current list is being referenced. Refer to the RRC website at the following address for the most recent information. http://www.rrc.texas.gov/oil-gas/compliance-enforcement/rule-13-geologic-formation-info

1 Forge Energy Field Name: Forge-Winkler Co, TX Nad 27 TCZ Site Name: UL 20 Sunlight 1H Well Name: UL 20 Sunlight 1H ST00 Survey: Definitive survey 10 February 2017 Weatherford International Limited 5D 8.1.26 (64 bit) : 10 February 2017, 10:41:32 UTC-6

2 UL 20 Sunlight 1H ST00 Map Units: US ft Company Name: Forge Energy Field Name: Forge-Winkler Co, TX Nad 27 TCZ Vertical Reference Datum (VRD): Mean Sea Level Projected Coordinate System: NAD27 / Texas Central Comment: Units: US ft North Reference: Grid Convergence Angle: -1.51 Site: Position: Northing: 743548.65 US ft Latitude: 31 40' 41.74" Easting: 1090949.91 US ft Longitude: -103 15' 21.09" UL 20 Sunlight 1H Elevation above MSL:2758.00 US ft Comment: Position (Relative to Site Centre) +N/-S: 0.00 US ft Northing: 743548.65 US ft Latitude: 31 40'41.74" Slot: UL 20 Sunlight 1H +E/-W: 0.00 US ft Easting: 1090949.91 US ft Longitude: -103 15'21.09" Slot TVD Reference: Ground Elevation Elevation above MSL: 2758.00 US ft Comment: Type:Main well UWI: File Number: Comment: Well: Closure Distance:6037.55US ft Closure Azimuth:164.14 UL 20 Sunlight 1H ST00 Vertical Section: Position of Origin (Relative to Slot centre) +N/-S: -0.00 US ft +E/-W: -0.00 US ft Az: 163.71 Drill floor: Survey Name: Definitive Survey Rig Height (Well TVD Reference): 25.00US ft Elevation above MSL: 2783.00US ft Inclination: 0.00 Azimuth: 0.00 Survey Name:Definitive Survey Date: 13/Dec/2016 Magnetic Model: Model Name: bggm2016 Tie Point: MD: 0.00 US ft Survey Tool Ranges: Survey Tool: See Survey Tool Ranges below. Date: 15/Jan/2017 Inclination: 0.00 Azimuth: 0.00 Field Strength: 47764.7nT Comment: TVD: 0.00 US ft Company: Declination: 6.93 Dip: 59.63 North Offset: -0.00 US ft East Offset: -0.00 US ft Name Start MD(USFt) End MD(USFt) Source Survey MWD 0.00 722.00 Ture Shot MWD MWD 722.00 3743.00 Wft MWD Svy (1) MWD 3743.00 4880.00 Wft MWD Svy (2) MWD 4880.00 9373.00 Wft MWD Svy (3) MWD 9373.00 11075.00 Wft MWD Svy (4) Weatherford International Limited 5D 8.1.26 (64 bit) : 10 February 2017, 10:41:32 UTC-6

3 Survey Tool Ranges: Name Start MD(USFt) End MD(USFt) Source Survey MWD 11075.00 11945.00 Wft MWD Svy (5) MWD 11945.00 13828.00 Wft MWD Svy (6) MWD 13828.00 16018.00 Wft MWD Svy (7) MWD 16018.00 17538.00 Wft MWD Svy (8) Casing Points: (Relative to Slot centre)(tvd relative to Well TVD Reference) MD Inc Az TVD N.Offset E.Offset Northing Easting 748.00 2.03 111.24 747.81-2.34 11.54 743546.31 1090961.45 13 3/8 in 4990.00 1.49 58.88 4988.30 39.55 106.20 743588.20 1091056.11 9 5/8 in 12010.00 79.14 157.54 11743.26-529.19 99.09 743019.46 1091049.00 7 in Name Wellpath created using minimum curvature. Survey Points: (Relative to Slot centre)(tvd relative to Well TVD Reference) MD Inc Az TVD VS N.Offset E.Offset Northing Easting Clos.Dist Clos.Az Comment 722.00 2.30 120.60 721.83 4.82-1.76 10.62 743546.74 1090960.57 10.83 100.14 Tie On True Shot 748.00 2.03 111.24 747.81 5.48-2.34 11.54 743546.31 1090961.45 11.77 101.46 13 3/8 in 794.00 1.75 89.03 793.79 6.16-2.62 13.00 743546.03 1090962.91 13.26 101.40 First Wft Svy ST00 917.00 1.50 87.07 916.74 7.03-2.51 16.49 743546.14 1090966.40 16.68 98.65 1100.00 1.46 79.92 1099.68 7.84-1.98 21.17 743546.67 1090971.08 21.27 95.34 1284.00 1.51 75.38 1283.62 8.16-0.96 25.83 743547.69 1090975.74 25.84 92.12 1473.00 1.19 74.78 1472.57 8.27 0.19 30.13 743548.84 1090980.04 30.13 89.64 1662.00 1.30 70.75 1661.52 8.20 1.41 34.05 743550.06 1090983.96 34.08 87.63 1851.00 0.99 61.26 1850.48 7.73 2.90 37.50 743551.55 1090987.41 37.62 85.57 2040.00 0.92 59.01 2039.46 7.00 4.47 40.24 743553.12 1090990.15 40.48 83.66 2229.00 1.13 51.80 2228.43 5.92 6.40 43.00 743555.05 1090992.91 43.48 81.53 2419.00 1.42 52.57 2418.38 4.37 8.99 46.34 743557.64 1090996.25 47.21 79.02 2608.00 1.42 56.90 2607.32 2.85 11.69 50.16 743560.34 1091000.07 51.51 76.88 2797.00 1.14 48.62 2796.27 1.37 14.22 53.54 743562.87 1091003.45 55.39 75.13 2986.00 1.31 51.77 2985.23-0.23 16.80 56.64 743565.45 1091006.55 59.08 73.48 3176.00 0.76 50.81 3175.20-1.53 18.94 59.33 743567.59 1091009.24 62.28 72.30 3365.00 0.66 72.15 3364.18-2.05 20.06 61.34 743568.71 1091011.25 64.53 71.89 3554.00 0.14 156.52 3553.18-1.85 20.18 62.46 743568.83 1091012.37 65.64 72.09 3743.00 1.28 66.60 3742.16-1.88 20.81 64.49 743569.46 1091014.40 67.77 72.12 3838.00 1.49 68.72 3837.14-2.12 21.68 66.62 743570.33 1091016.53 70.06 71.97 3934.00 2.10 65.66 3933.09-2.48 22.86 69.38 743571.51 1091019.29 73.05 71.77 4123.00 2.23 64.33 4121.95-3.56 25.88 75.85 743574.53 1091025.76 80.14 71.16 4313.00 2.37 65.49 4311.80-4.73 29.11 82.76 743577.76 1091032.67 87.73 70.62 4502.00 2.51 67.67 4500.63-5.72 32.30 90.14 743580.95 1091040.05 95.76 70.28 4691.00 2.33 67.39 4689.46-6.58 35.35 97.52 743584.00 1091047.43 103.73 70.07 4880.00 1.68 63.17 4878.34-7.51 38.08 103.54 743586.73 1091053.45 110.32 69.81 4990.00 1.49 58.88 4988.30-8.17 39.55 106.20 743588.20 1091056.11 113.33 69.58 9 5/8 in 5079.00 1.35 54.56 5077.27-8.81 40.76 108.05 743589.41 1091057.96 115.48 69.33 5118.00 1.19 57.15 5116.27-9.08 41.24 108.76 743589.89 1091058.67 116.32 69.23 5213.00 0.65 55.11 5211.25-9.53 42.08 110.03 743590.73 1091059.94 117.81 69.07 5307.00 1.19 245.78 5305.25-9.57 41.99 109.58 743590.64 1091059.49 117.35 69.03 5402.00 2.18 259.95 5400.21-9.63 41.27 106.90 743589.92 1091056.81 114.59 68.89 5496.00 2.49 261.87 5494.13-10.11 40.67 103.12 743589.32 1091053.03 110.85 68.48 5591.00 2.84 260.66 5589.02-10.69 39.99 98.76 743588.64 1091048.67 106.55 67.95 5686.00 2.82 259.83 5683.91-11.22 39.20 94.13 743587.85 1091044.04 101.97 67.39 5780.00 2.83 263.33 5777.79-11.86 38.52 89.55 743587.17 1091039.46 97.49 66.72 5875.00 2.97 260.31 5872.67-12.53 37.84 84.80 743586.49 1091034.71 92.85 65.95 5969.00 2.97 260.97 5966.55-13.12 37.04 79.99 743585.69 1091029.90 88.15 65.15 6063.00 2.99 262.87 6060.42-13.82 36.36 75.15 743585.01 1091025.06 83.49 64.18 6157.00 3.08 262.78 6154.29-14.61 35.74 70.22 743584.39 1091020.13 78.79 63.03 6252.00 3.24 267.32 6249.14-15.64 35.29 65.00 743583.94 1091014.91 73.96 61.50 Weatherford International Limited 5D 8.1.26 (64 bit) : 10 February 2017, 10:41:32 UTC-6

4 Survey Points: (Relative to Slot centre)(tvd relative to Well TVD Reference) MD Inc Az TVD VS N.Offset E.Offset Northing Easting Clos.Dist 6346.00 3.21 266.91 6342.99-16.87 35.02 59.72 743583.67 1091009.63 69.23 59.61 6441.00 3.38 269.72 6437.84-18.24 34.87 54.26 743583.52 1091004.17 64.50 57.28 6536.00 3.58 270.74 6532.66-19.89 34.89 48.50 743583.54 1090998.41 59.74 54.27 6630.00 3.61 268.56 6626.48-21.50 34.85 42.60 743583.50 1090992.51 55.05 50.71 6724.00 3.09 261.69 6720.32-22.61 34.41 37.14 743583.06 1090987.05 50.63 47.18 6819.00 2.98 257.33 6815.18-23.13 33.50 32.20 743582.15 1090982.11 46.46 43.86 6914.00 3.33 263.60 6910.04-23.76 32.65 27.05 743581.30 1090976.96 42.40 39.63 7008.00 2.97 250.89 7003.90-24.10 31.55 22.03 743580.20 1090971.94 38.48 34.93 7103.00 2.76 247.63 7098.78-23.74 29.87 17.59 743578.52 1090967.50 34.67 30.49 7198.00 2.76 247.16 7193.67-23.24 28.12 13.37 743576.77 1090963.28 31.13 25.43 7293.00 2.96 243.18 7288.55-22.53 26.12 9.07 743574.77 1090958.98 27.65 19.15 7387.00 2.84 242.13 7382.43-21.62 23.94 4.85 743572.59 1090954.76 24.42 11.44 7482.00 2.74 241.78 7477.32-20.68 21.76 0.76 743570.41 1090950.67 21.78 2.01 7576.00 2.52 242.79 7571.22-19.82 19.76-3.05 743568.41 1090946.86 19.99 351.22 7671.00 2.70 243.92 7666.12-19.04 17.82-6.92 743566.47 1090942.99 19.11 338.78 7766.00 2.49 241.75 7761.02-18.24 15.86-10.75 743564.51 1090939.16 19.16 325.87 7860.00 2.53 239.47 7854.93-17.30 13.84-14.33 743562.49 1090935.58 19.92 313.99 7955.00 2.50 243.33 7949.84-16.41 11.84-17.99 743560.49 1090931.92 21.54 303.36 8050.00 2.52 239.72 8044.75-15.54 9.86-21.65 743558.51 1090928.26 23.79 294.49 8144.00 2.14 216.27 8138.68-13.97 7.40-24.47 743556.05 1090925.44 25.56 286.83 8239.00 2.57 211.54 8233.59-11.46 4.16-26.63 743552.81 1090923.28 26.95 278.87 8333.00 1.48 217.67 8327.53-9.33 1.40-28.48 743550.05 1090921.43 28.51 272.81 8428.00 1.28 212.19 8422.51-7.91-0.47-29.79 743548.18 1090920.12 29.79 269.10 8523.00 0.95 228.34 8517.49-6.87-1.89-30.94 743546.76 1090918.97 31.00 266.50 8617.00 0.85 264.15 8611.48-6.66-2.48-32.22 743546.17 1090917.69 32.32 265.60 8712.00 0.36 317.88 8706.47-7.05-2.33-33.12 743546.32 1090916.79 33.20 265.98 8806.00 0.76 313.48 8800.47-7.86-1.68-33.77 743546.97 1090916.14 33.81 267.15 8901.00 0.94 299.24 8895.46-8.96-0.87-34.91 743547.78 1090915.00 34.92 268.58 8995.00 1.88 290.71 8989.43-10.44 0.05-37.02 743548.70 1090912.89 37.02 270.08 9089.00 2.32 278.94 9083.37-12.18 0.89-40.35 743549.54 1090909.56 40.36 271.27 9184.00 2.42 283.45 9178.28-13.99 1.66-44.20 743550.31 1090905.71 44.23 272.15 9279.00 2.75 268.27 9273.19-15.56 2.06-48.43 743550.71 1090901.48 48.47 272.43 9373.00 3.52 242.00 9367.05-15.54 0.64-53.23 743549.29 1090896.68 53.23 270.68 9466.00 5.33 227.09 9459.77-13.02-3.65-58.91 743545.00 1090891.00 59.03 266.46 9563.00 4.88 224.27 9556.39-8.98-9.67-65.09 743538.98 1090884.82 65.81 261.55 9657.00 3.06 213.79 9650.16-5.40-14.62-69.28 743534.03 1090880.63 70.80 258.09 9752.00 1.59 190.08 9745.08-2.59-18.02-70.92 743530.63 1090878.99 73.17 255.74 9846.00 1.20 169.21 9839.05-0.45-20.27-70.96 743528.38 1090878.95 73.80 254.06 9941.00 1.05 201.56 9934.04 1.23-22.06-71.10 743526.59 1090878.81 74.44 252.76 10130.00 0.77 206.32 10123.01 3.53-24.81-72.30 743523.84 1090877.61 76.44 251.06 10319.00 1.83 267.61 10311.97 3.74-26.07-75.88 743522.58 1090874.03 80.23 251.04 10508.00 1.77 240.91 10500.88 3.66-27.62-81.44 743521.03 1090868.47 86.00 251.27 10697.00 2.87 210.74 10689.73 7.54-33.10-86.41 743515.55 1090863.50 92.53 249.04 10886.00 1.75 235.45 10878.58 11.67-38.81-91.21 743509.84 1090858.70 99.12 246.95 11075.00 2.38 281.13 11067.46 10.76-39.69-97.43 743508.96 1090852.48 105.21 247.84 11118.00 2.76 289.13 11110.42 9.75-39.18-99.29 743509.47 1090850.62 106.74 248.47 11149.00 2.11 291.21 11141.39 8.97-38.72-100.53 743509.93 1090849.38 107.73 248.93 11181.00 2.52 191.50 11173.38 9.24-39.20-101.22 743509.45 1090848.69 108.54 248.83 11212.00 6.71 166.59 11204.27 11.65-41.63-100.93 743507.02 1090848.98 109.18 247.59 11244.00 11.90 160.66 11235.84 16.81-46.57-99.40 743502.08 1090850.51 109.77 244.90 11275.00 16.22 158.68 11265.91 24.32-53.62-96.77 743495.03 1090853.14 110.63 241.01 11306.00 20.18 157.85 11295.35 33.96-62.61-93.18 743486.04 1090856.73 112.26 236.10 11338.00 23.97 157.84 11325.00 45.92-73.74-88.64 743474.91 1090861.27 115.31 230.24 11369.00 27.25 157.44 11352.95 59.24-86.13-83.54 743462.52 1090866.37 119.99 224.13 11401.00 29.87 158.33 11381.05 74.46-100.31-77.79 743448.34 1090872.12 126.94 217.79 11432.00 31.88 158.40 11407.66 90.30-115.09-71.93 743433.56 1090877.98 135.72 212.00 11464.00 33.35 159.00 11434.61 107.48-131.16-65.66 743417.49 1090884.25 146.68 206.59 11495.00 35.57 159.57 11460.17 124.97-147.57-59.46 743401.08 1090890.45 159.10 201.95 11527.00 37.56 159.07 11485.87 143.97-165.40-52.73 743383.25 1090897.18 173.60 197.68 Clos.Az Comment Weatherford International Limited 5D 8.1.26 (64 bit) : 10 February 2017, 10:41:32 UTC-6

5 Survey Points: (Relative to Slot centre)(tvd relative to Well TVD Reference) MD Inc Az TVD VS N.Offset E.Offset Northing Easting Clos.Dist 11558.00 39.30 159.11 11510.15 163.18-183.40-45.85 743365.25 1090904.06 189.05 194.04 11590.00 41.19 159.34 11534.58 183.79-202.73-38.52 743345.92 1090911.39 206.36 190.76 11621.00 42.89 159.20 11557.60 204.48-222.15-31.17 743326.50 1090918.74 224.32 187.99 11653.00 45.68 158.32 11580.51 226.74-242.97-23.07 743305.68 1090926.84 244.06 185.42 11685.00 49.18 158.56 11602.15 250.20-264.88-14.42 743283.77 1090935.49 265.27 183.12 11716.00 50.82 158.41 11622.08 273.85-286.97-5.71 743261.68 1090944.20 287.03 181.14 11748.00 52.71 157.48 11641.88 298.86-310.27 3.73 743238.38 1090953.64 310.29 179.31 11779.00 56.06 157.20 11659.93 323.90-333.52 13.44 743215.13 1090963.35 333.79 177.69 11811.00 60.12 157.24 11676.84 350.89-358.56 23.96 743190.09 1090973.87 359.36 176.18 11842.00 62.66 155.66 11691.68 377.88-383.50 34.83 743165.15 1090984.74 385.08 174.81 11873.00 66.16 155.22 11705.07 405.54-408.93 46.46 743139.72 1090996.37 411.56 173.52 11905.00 70.89 155.57 11716.78 435.00-435.99 58.85 743112.66 1091008.76 439.95 172.31 11945.00 74.77 156.48 11728.59 472.87-470.91 74.37 743077.74 1091024.28 476.75 171.03 12010.00 79.14 157.54 11743.26 535.74-529.19 99.09 743019.46 1091049.00 538.39 169.39 7 in 12021.00 79.88 157.72 11745.26 546.50-539.19 103.21 743009.46 1091053.12 548.98 169.16 12053.00 83.48 159.21 11749.89 578.02-568.64 114.83 742980.01 1091064.74 580.12 168.58 12085.00 85.73 160.28 11752.90 609.80-598.53 125.85 742950.12 1091075.76 611.61 168.13 12116.00 85.94 161.17 11755.15 640.68-627.71 136.06 742920.94 1091085.97 642.29 167.77 12148.00 86.43 160.69 11757.28 672.57-657.89 146.49 742890.76 1091096.40 674.00 167.45 12179.00 89.86 162.37 11758.28 703.52-687.27 156.31 742861.38 1091106.22 704.82 167.19 12211.00 92.52 163.51 11757.62 735.51-717.85 165.69 742830.80 1091115.60 736.73 167.00 12306.00 92.45 163.84 11753.50 830.42-808.94 192.37 742739.71 1091142.28 831.49 166.62 12402.00 88.74 162.96 11752.50 926.40-900.91 219.79 742647.74 1091169.70 927.34 166.29 12497.00 90.63 163.17 11753.03 1021.38-991.79 247.46 742556.86 1091197.37 1022.19 165.99 12592.00 88.67 163.06 11753.61 1116.37-1082.69 275.05 742465.96 1091224.96 1117.08 165.75 12687.00 88.46 160.23 11755.99 1211.27-1172.82 304.95 742375.83 1091254.86 1211.81 165.42 12782.00 91.19 159.40 11756.28 1306.04-1261.97 337.73 742286.68 1091287.64 1306.38 165.02 12878.00 89.86 158.39 11755.40 1401.70-1351.52 372.29 742197.13 1091322.20 1401.86 164.60 12973.00 91.89 157.72 11753.95 1496.22-1439.63 407.79 742109.02 1091357.70 1496.27 164.18 13067.00 93.64 159.55 11749.41 1589.73-1527.06 441.99 742021.59 1091391.90 1589.74 163.86 13162.00 93.71 162.09 11743.32 1684.41-1616.59 473.14 741932.06 1091423.05 1684.41 163.69 13258.00 92.52 166.01 11738.10 1780.24-1708.74 499.47 741839.91 1091449.38 1780.24 163.71 13353.00 88.67 167.10 11737.12 1875.10-1801.11 521.56 741747.54 1091471.47 1875.11 163.85 13448.00 87.20 162.67 11740.54 1969.99-1892.74 546.30 741655.91 1091496.21 1970.00 163.90 13543.00 89.58 163.61 11743.21 2064.94-1983.61 573.84 741565.04 1091523.75 2064.95 163.87 13638.00 91.26 164.13 11742.51 2159.94-2074.87 600.23 741473.78 1091550.14 2159.94 163.87 13733.00 90.00 164.30 11741.47 2254.93-2166.28 626.07 741382.37 1091575.98 2254.94 163.88 13828.00 88.74 164.91 11742.51 2349.91-2257.86 651.29 741290.79 1091601.20 2349.92 163.91 13926.00 88.11 164.84 11745.21 2447.85-2352.43 676.85 741196.22 1091626.76 2447.87 163.95 14021.00 87.05 162.05 11749.22 2542.75-2443.40 703.89 741105.25 1091653.80 2542.77 163.93 14117.00 88.60 163.44 11752.86 2638.66-2535.01 732.35 741013.64 1091682.26 2638.68 163.89 14212.00 91.26 163.33 11752.98 2733.65-2626.04 759.51 740922.61 1091709.42 2733.66 163.87 14306.00 91.19 162.82 11750.97 2827.63-2715.94 786.87 740832.71 1091736.78 2827.63 163.84 14402.00 90.14 163.65 11749.85 2923.61-2807.85 814.56 740740.80 1091764.47 2923.62 163.82 14497.00 89.72 164.16 11749.97 3018.61-2899.13 840.89 740649.52 1091790.80 3018.62 163.83 14592.00 89.23 163.21 11750.84 3113.61-2990.30 867.58 740558.35 1091817.49 3113.61 163.82 14687.00 89.09 163.80 11752.23 3208.60-3081.38 894.55 740467.27 1091844.46 3208.60 163.81 14782.00 90.35 162.93 11752.70 3303.59-3172.40 921.74 740376.25 1091871.65 3303.59 163.80 14877.00 90.98 163.90 11751.59 3398.58-3263.44 948.86 740285.21 1091898.77 3398.58 163.79 14972.00 91.89 166.04 11749.22 3493.52-3355.16 973.48 740193.49 1091923.39 3493.53 163.82 15067.00 91.61 166.24 11746.31 3588.39-3447.35 996.23 740101.30 1091946.14 3588.41 163.88 15162.00 92.10 165.29 11743.24 3683.28-3539.38 1019.58 740009.27 1091969.49 3683.31 163.93 15257.00 90.00 164.19 11741.50 3778.24-3631.01 1044.58 739917.64 1091994.49 3778.27 163.95 15352.00 89.37 163.50 11742.02 3873.24-3722.25 1071.01 739826.40 1092020.92 3873.27 163.95 15447.00 87.62 163.14 11744.52 3968.20-3813.22 1098.27 739735.43 1092048.18 3968.23 163.93 15543.00 92.67 162.40 11744.27 4064.16-3904.88 1126.69 739643.77 1092076.60 4064.18 163.91 15638.00 93.71 163.82 11738.99 4159.00-3995.64 1154.25 739553.01 1092104.16 4159.02 163.89 15734.00 91.12 162.97 11734.94 4254.90-4087.55 1181.66 739461.10 1092131.57 4254.92 163.88 15828.00 90.49 166.13 11733.62 4348.87-4178.13 1206.69 739370.52 1092156.60 4348.89 163.89 Clos.Az Comment Weatherford International Limited 5D 8.1.26 (64 bit) : 10 February 2017, 10:41:32 UTC-6

6 Survey Points: (Relative to Slot centre)(tvd relative to Well TVD Reference) MD Inc Az TVD VS N.Offset E.Offset Northing Easting Clos.Dist 15923.00 90.84 171.61 11732.52 4443.44-4271.30 1225.02 739277.35 1092174.93 4443.50 164.00 16018.00 91.05 176.76 11730.95 4536.82-4365.77 1234.64 739182.88 1092184.55 4536.99 164.21 16114.00 90.49 179.41 11729.66 4629.79-4461.70 1237.85 739086.95 1092187.76 4630.23 164.49 16209.00 87.55 175.83 11731.28 4721.97-4556.57 1241.79 738992.08 1092191.70 4722.76 164.76 16304.00 85.31 174.43 11737.20 4814.90-4651.04 1249.84 738897.61 1092199.75 4816.04 164.96 16399.00 84.11 168.28 11745.97 4908.61-4744.51 1264.05 738804.14 1092213.96 4910.01 165.08 16495.00 85.10 165.37 11754.99 5004.03-4837.56 1285.83 738711.09 1092235.74 5005.53 165.11 16590.00 87.76 161.09 11760.91 5098.81-4928.31 1313.18 738620.34 1092263.09 5100.27 165.08 16685.00 89.02 159.37 11763.58 5193.59-5017.67 1345.30 738530.98 1092295.21 5194.89 164.99 16780.00 91.33 158.47 11763.29 5288.25-5106.31 1379.47 738442.34 1092329.38 5289.36 164.88 16875.00 90.07 157.38 11762.13 5382.76-5194.33 1415.17 738354.32 1092365.08 5383.66 164.76 16970.00 89.02 155.24 11762.88 5476.96-5281.32 1453.33 738267.33 1092403.24 5477.64 164.61 17065.00 96.17 155.03 11758.59 5570.74-5367.37 1493.21 738181.28 1092443.12 5571.21 164.45 17160.00 98.14 155.69 11746.75 5663.99-5453.04 1532.51 738095.61 1092482.42 5664.30 164.30 17255.00 99.42 159.54 11732.25 5757.33-5539.83 1568.26 738008.82 1092518.17 5757.53 164.19 17350.00 98.99 162.43 11717.05 5850.99-5628.48 1598.81 737920.17 1092548.72 5851.15 164.14 Clos.Az Comment 17445.00 97.57 164.81 11703.37 5944.99-5718.67 1625.32 737829.98 1092575.23 5945.15 164.13 Last Wft Svy ST00 17538.00 95.32 164.21 11692.93 6037.38-5807.72 1650.00 737740.93 1092599.91 6037.55 164.14 PTB Weatherford International Limited 5D 8.1.26 (64 bit) : 10 February 2017, 10:41:32 UTC-6

Evaluation, Drilling & Intervention 10000 West County Rd. 116 P.O. Box 61028 Midland, TX USA 79711 Tel. (432) 561-8892 Fax (432) 561-8895 State Of Texas County Of Winkler I, Derral Larance certify that I am employed by Precision Energy Services, Inc., a Weatherford Company, and on the days of 01/07/17 through 2/6/2017 I did conduct, or supervise the taking of a Measurement While Drilling survey from a depth of 794 MD ft. to a depth of 17445 MD ft., that the data is true, correct, complete, and within the limitations of the tool as set forth by Weatherford; that I am authorized and qualified to make this report, that this survey was conducted at the request of: Forge Energy for the UL 20 Sunlight 1H ST00 well, API Number: 42-495-33775 in Winkler County, Texas; and find that it conforms to the principles and procedures as set forth by Weatherford. Sincerely, Jonathan Leger MWD Ops. Coordinator

1 Forge Energy Field Name: Forge-Winkler Co, TX Nad 27 TCZ Site Name: UL 20 Sunlight 1H Well Name: UL 20 Sunlight 1H ST01 Survey: Definitive survey 2 March 2017 Weatherford International Limited 5D 8.1.26 (64 bit) : 2 March 2017, 13:39:29 UTC-6

2 UL 20 Sunlight 1H ST01 Map Units: US ft Company Name: Forge Energy Field Name: Forge-Winkler Co, TX Nad 27 TCZ Vertical Reference Datum (VRD): Mean Sea Level Projected Coordinate System: NAD27 / Texas Central Comment: Units: US ft North Reference: Grid Convergence Angle: -1.51 Site: Position: Northing: 743548.65 US ft Latitude: 31 40' 41.74" Easting: 1090949.91 US ft Longitude: -103 15' 21.09" UL 20 Sunlight 1H Elevation above MSL:2758.00 US ft Comment: Position (Relative to Site Centre) +N/-S: 0.00 US ft Northing: 743548.65 US ft Latitude: 31 40'41.74" Slot: UL 20 Sunlight 1H Well: UL 20 Sunlight 1H ST01 +E/-W: 0.00 US ft Easting: 1090949.91 US ft Longitude: -103 15'21.09" Elevation above MSL: 2758.00 US ft Comment: Type:Sidetrack UWI: Parent: UL 20 Sunlight 1H ST00 Tie Point Method: MD File Number: Comment: Closure Distance:10125.9US ft Closure Azimuth:164.14 Vertical Section: Position of Origin (Relative to Slot centre) +N/-S: -0.00 US ft +E/-W: -0.00 US ft Az: 163.71 Drill floor: Survey Name: Definitive Survey Rig Height (Well TVD Reference): 25.00US ft Elevation above MSL: 2783.00US ft Inclination: 0.00 Azimuth: 0.00 Survey Name:Definitive Survey Date: 07/Feb/2017 Magnetic Model: Model Name: bggm2016 Tie Point: MD: 15447.00 US Inclination: ft 87.62 Survey Tool Ranges: Survey Tool: See Survey Tool Ranges below. Date: 15/Jan/2017 Field Strength: 47764.7nT Comment: Company: Declination: 6.93 Dip: 59.63 Azimuth: 163.14 TVD: North Offset: - 11744.52 US ft 3813.22 US ft East Offset: 1098.27 US ft Name Start MD(USFt) End MD(USFt) Source Survey MWD 0.00 722.00 Ture Shot MWD MWD 722.00 3743.00 Wft MWD Svy (1) MWD 3743.00 4880.00 Wft MWD Svy (2) MWD 4880.00 9373.00 Wft MWD Svy (3) MWD 9373.00 11075.00 Wft MWD Svy (4) Weatherford International Limited 5D 8.1.26 (64 bit) : 2 March 2017, 13:39:29 UTC-6

3 Survey Tool Ranges: Name Start MD(USFt) End MD(USFt) Source Survey MWD 11075.00 11945.00 Wft MWD Svy (5) MWD 11945.00 13828.00 Wft MWD Svy (6) MWD 13828.00 15447.00 Wft MWD Svy (7) MWD 15447.00 17065.00 Wft Svy ST01 (8) MWD 17065.00 17918.00 Wft Svy ST01 (9) MWD 17918.00 18873.00 Wft Svy ST01 (10) MWD 18873.00 19537.00 Wft Svy ST01 (11) MWD 19537.00 21613.00 Wft Svy ST01 (12) Wellpath created using minimum curvature. Survey Points: (Relative to Slot centre)(tvd relative to Well TVD Reference) MD Inc Az TVD VS N.Offset E.Offset Northing Easting Clos.Dist Clos.Az Comment 15447.00 87.62 163.14 11744.52 3968.20-3813.22 1098.27 739735.43 1092048.18 3968.23 163.93 Tie On Wft Svy ST00 15515.00 86.08 163.24 11748.25 4036.09-3878.22 1117.90 739670.43 1092067.81 4036.12 163.92 First Wft Svy ST01 15544.00 85.16 163.20 11750.47 4065.01-3905.90 1126.25 739642.75 1092076.16 4065.03 163.92 15576.00 84.96 162.78 11753.22 4096.89-3936.39 1135.58 739612.26 1092085.49 4096.91 163.91 15608.00 84.61 161.65 11756.13 4128.74-3966.73 1145.31 739581.92 1092095.22 4128.76 163.90 15640.00 85.03 160.41 11759.02 4160.57-3996.87 1155.67 739551.78 1092105.58 4160.59 163.87 15735.00 87.06 158.89 11765.57 4255.10-4085.72 1188.63 739462.93 1092138.54 4255.11 163.78 15830.00 90.49 161.31 11767.60 4349.87-4175.01 1220.95 739373.64 1092170.86 4349.87 163.70 15924.00 90.42 160.50 11766.86 4443.76-4263.83 1251.70 739284.82 1092201.61 4443.76 163.64 16019.00 90.00 158.13 11766.51 4538.47-4352.70 1285.25 739195.95 1092235.16 4538.49 163.55 16114.00 91.47 158.27 11765.29 4633.02-4440.90 1320.53 739107.75 1092270.44 4633.07 163.44 16209.00 92.31 160.94 11762.16 4727.71-4529.88 1353.61 739018.77 1092303.52 4727.80 163.36 16304.00 93.22 163.46 11757.57 4822.56-4620.22 1382.62 738928.43 1092332.53 4822.66 163.34 16399.00 91.40 164.45 11753.74 4917.48-4711.44 1408.85 738837.21 1092358.76 4917.57 163.35 16495.00 92.38 166.46 11750.58 5013.38-4804.31 1432.95 738744.34 1092382.86 5013.45 163.39 16590.00 88.88 167.40 11749.53 5108.20-4896.83 1454.42 738651.82 1092404.33 5108.25 163.46 16685.00 84.32 166.44 11755.17 5202.86-4989.17 1475.88 738559.48 1092425.79 5202.89 163.52 16780.00 85.10 161.98 11763.93 5297.43-5080.17 1501.61 738468.48 1092451.52 5297.45 163.53 16875.00 90.70 164.48 11767.41 5392.32-5171.03 1528.99 738377.62 1092478.90 5392.34 163.53 16970.00 90.00 162.39 11766.83 5487.31-5262.08 1556.07 738286.57 1092505.98 5487.34 163.53 17065.00 88.88 161.58 11767.76 5582.26-5352.42 1585.45 738196.23 1092535.36 5582.30 163.50 17158.00 91.26 161.62 11767.64 5675.19-5440.66 1614.80 738107.99 1092564.71 5675.24 163.47 17253.00 89.65 161.15 11766.89 5770.10-5530.68 1645.13 738017.97 1092595.04 5770.17 163.43 17348.00 89.86 161.69 11767.30 5865.03-5620.73 1675.40 737927.92 1092625.31 5865.11 163.40 17443.00 91.12 163.97 11766.48 5960.00-5711.48 1703.44 737837.17 1092653.35 5960.09 163.39 17538.00 89.65 161.84 11765.85 6054.98-5802.28 1731.36 737746.37 1092681.27 6055.08 163.39 17633.00 89.37 162.10 11766.66 6149.94-5892.61 1760.76 737656.04 1092710.67 6150.05 163.36 17728.00 90.07 161.56 11767.12 6244.88-5982.87 1790.39 737565.78 1092740.30 6245.01 163.34 17823.00 91.19 164.50 11766.08 6339.86-6073.71 1818.11 737474.94 1092768.02 6339.99 163.34 17918.00 89.86 164.96 11765.21 6434.84-6165.35 1843.13 737383.30 1092793.04 6434.96 163.36 18019.00 90.77 164.54 11764.65 6535.82-6262.80 1869.69 737285.85 1092819.60 6535.93 163.38 18113.00 89.93 163.06 11764.08 6629.81-6353.06 1895.92 737195.59 1092845.83 6629.92 163.38 18208.00 89.86 162.60 11764.25 6724.80-6443.82 1923.96 737104.83 1092873.87 6724.92 163.38 18303.00 88.81 164.25 11765.35 6819.79-6534.87 1951.06 737013.78 1092900.97 6819.90 163.38 18398.00 88.53 163.92 11767.56 6914.76-6626.20 1977.10 736922.45 1092927.01 6914.87 163.39 18492.00 90.21 166.67 11768.59 7008.71-6717.10 2000.96 736831.55 1092950.87 7008.80 163.41 18588.00 90.56 166.39 11767.95 7104.59-6810.46 2023.32 736738.19 1092973.23 7104.66 163.45 18683.00 91.47 167.23 11766.26 7199.43-6902.94 2044.99 736645.71 1092994.90 7199.48 163.50 18778.00 92.18 166.74 11763.24 7294.23-6995.45 2066.38 736553.20 1093016.29 7294.26 163.54 18873.00 91.19 166.97 11760.45 7389.04-7087.92 2087.97 736460.73 1093037.88 7389.06 163.59 18968.00 89.93 166.49 11759.52 7483.90-7180.38 2109.78 736368.27 1093059.69 7483.91 163.63 19063.00 89.58 166.07 11759.92 7578.81-7272.66 2132.31 736275.99 1093082.22 7578.81 163.66 19158.00 89.86 166.04 11760.39 7673.73-7364.86 2155.20 736183.79 1093105.11 7673.73 163.69 Weatherford International Limited 5D 8.1.26 (64 bit) : 2 March 2017, 13:39:29 UTC-6

4 Survey Points: (Relative to Slot centre)(tvd relative to Well TVD Reference) MD Inc Az TVD VS N.Offset E.Offset Northing Easting Clos.Dist 19253.00 89.93 166.37 11760.56 7768.64-7457.12 2177.85 736091.53 1093127.76 7768.64 163.72 19348.00 89.44 166.54 11761.08 7863.53-7549.48 2200.10 735999.17 1093150.01 7863.53 163.75 19443.00 88.74 165.88 11762.59 7958.42-7641.73 2222.75 735906.92 1093172.66 7958.43 163.78 19537.00 86.57 166.06 11766.44 8052.26-7732.84 2245.51 735815.81 1093195.42 8052.28 163.81 19658.00 84.67 163.50 11775.68 8172.87-7849.24 2277.18 735699.41 1093227.09 8172.89 163.82 19752.00 87.69 162.56 11781.94 8266.65-7938.94 2304.55 735609.71 1093254.46 8266.66 163.81 19848.00 90.56 162.45 11783.41 8362.60-8030.48 2333.40 735518.17 1093283.31 8362.61 163.80 19943.00 90.84 164.32 11782.25 8457.59-8121.50 2360.57 735427.15 1093310.48 8457.60 163.79 20038.00 91.12 164.44 11780.62 8552.57-8212.98 2386.14 735335.67 1093336.05 8552.58 163.80 20132.00 91.61 165.14 11778.38 8646.53-8303.66 2410.80 735244.99 1093360.71 8646.54 163.81 20227.00 92.59 166.56 11774.90 8741.39-8395.71 2434.00 735152.94 1093383.91 8741.41 163.83 20322.00 92.45 167.11 11770.73 8836.16-8488.12 2455.62 735060.53 1093405.53 8836.19 163.86 20417.00 90.21 167.60 11768.52 8930.94-8580.79 2476.41 734967.86 1093426.32 8930.99 163.90 20512.00 90.07 167.84 11768.29 9025.70-8673.61 2496.61 734875.04 1093446.52 9025.78 163.94 20607.00 88.17 167.40 11769.75 9120.47-8766.39 2516.98 734782.26 1093466.89 9120.57 163.98 20702.00 89.44 166.24 11771.73 9215.30-8858.86 2538.63 734689.79 1093488.54 9215.43 164.01 20797.00 89.51 165.72 11772.60 9310.22-8951.03 2561.65 734597.62 1093511.56 9310.37 164.03 20891.00 89.71 166.94 11773.24 9404.12-9042.36 2583.86 734506.29 1093533.77 9404.29 164.05 20987.00 88.95 167.30 11774.36 9499.94-9135.94 2605.26 734412.71 1093555.17 9500.15 164.08 21081.00 90.35 164.81 11774.94 9593.85-9227.16 2627.91 734321.49 1093577.82 9594.08 164.10 21176.00 90.28 164.54 11774.41 9688.84-9318.78 2653.02 734229.87 1093602.93 9689.07 164.11 21271.00 90.42 166.76 11773.83 9783.78-9410.81 2676.56 734137.84 1093626.47 9784.03 164.12 21366.00 88.24 163.75 11774.94 9878.72-9502.66 2700.73 734045.99 1093650.64 9878.99 164.13 21461.00 88.11 164.04 11777.97 9973.67-9593.88 2727.07 733954.77 1093676.98 9973.94 164.13 Clos.Az Comment 21558.00 88.39 164.73 11780.93 10070.62-9687.26 2753.17 733861.39 1093703.08 10070.89 164.13 Last Wft Svy ST01 21613.00 88.39 164.73 11782.48 10125.59-9740.29 2767.65 733808.36 1093717.56 10125.87 164.14 PTB Weatherford International Limited 5D 8.1.26 (64 bit) : 2 March 2017, 13:39:29 UTC-6

Evaluation, Drilling & Intervention 10000 West County Rd. 116 P.O. Box 61028 Midland, TX USA 79711 Tel. (432) 561-8892 Fax (432) 561-8895 State Of Texas County Of Winkler I, Chris Hinterlach certify that I am employed by Precision Energy Services, Inc., a Weatherford Company, and on the days of 02/07/17 through 3/2/2017 I did conduct, or supervise the taking of a Measurement While Drilling survey from a depth of 15515 MD ft. to a depth of 21558 MD ft., that the data is true, correct, complete, and within the limitations of the tool as set forth by Weatherford; that I am authorized and qualified to make this report, that this survey was conducted at the request of: Forge Energy for the UL 20 Sunlight 1H ST01 well, API Number: 42-495-33775 in Winkler County, Texas; and find that it conforms to the principles and procedures as set forth by Weatherford. Sincerely, Jonathan Leger MWD Ops. Coordinator