The Luminosity Upgrade at RHIC. G. Robert-Demolaize, Brookhaven National Laboratory

Similar documents
arxiv: v1 [physics.acc-ph] 21 Oct 2014

RHIC upgrades and capabilities for the next decade. Wolfram Fischer Brookhaven National Laboratory

SIMULATION STUDY FOR MEIC ELECTRON COOLING*

ELIC: A High Luminosity And Efficient Spin Manipulation Electron-Light Ion Collider Based At CEBAF

BEAM-BEAM EFFECTS IN RHIC

Practical Lattice Design

ERL FOR LOW ENERGY ELECTRON COOLING AT RHIC (LEREC)*

Conceptual design of an accumulator ring for the Diamond II upgrade

ELIC Design. Center for Advanced Studies of Accelerators. Jefferson Lab. Second Electron-Ion Collider Workshop Jefferson Lab March 15-17, 2004

FY04 Luminosity Plan. SAG Meeting September 22, 2003 Dave McGinnis

Run2 Problem List (Bold-faced items are those the BP Department can work on) October 4, 2002

RHIC AND ITS UPGRADE PROGRAMS

The TESLA Dogbone Damping Ring

Overview of LHC Accelerator

Operational Experience with HERA

LHC Luminosity and Energy Upgrade

On-axis injection into small dynamic aperture

LHC Collimation and Loss Locations

The Electron-Ion Collider

LHC Upgrade Plan and Ideas - scenarios & constraints from the machine side

RHIC - the high luminosity hadron collider

Transverse dynamics Selected topics. Erik Adli, University of Oslo, August 2016, v2.21

First propositions of a lattice for the future upgrade of SOLEIL. A. Nadji On behalf of the Accelerators and Engineering Division

OTHER MEANS TO INCREASE THE SPS 25 ns PERFORMANCE TRANSVERSE PLANE

arxiv: v1 [physics.acc-ph] 18 Dec 2013

Challenges and Plans for the Proton Injectors *

TUNE SPREAD STUDIES AT INJECTION ENERGIES FOR THE CERN PROTON SYNCHROTRON BOOSTER

7th IPAC, May 8-13, 2016, Busan, Korea

RHIC Electron Lens Commissioning

A Luminosity Leveling Method for LHC Luminosity Upgrade using an Early Separation Scheme

LHC operation in 2015 and prospects for the future

Beam. RF antenna. RF cable

Introduction to particle accelerators

CERN-ATS HiLumi LHC. FP7 High Luminosity Large Hadron Collider Design Study PUBLICATION

RHIC OPERATIONAL STATUS

OVERVIEW OF THE LHEC DESIGN STUDY AT CERN

BEAM TESTS OF THE LHC TRANSVERSE FEEDBACK SYSTEM

Low Energy RHIC electron Cooling (LEReC)

Luminosity Goals, Critical Parameters

The FAIR Accelerator Facility

III. CesrTA Configuration and Optics for Ultra-Low Emittance David Rice Cornell Laboratory for Accelerator-Based Sciences and Education

Plans for ions in the injector complex D.Manglunki with the help of I-LHC and LIU-PT teams

TRANSVERSE DAMPER. W. Höfle, CERN, Geneva, Switzerland. Abstract INTRODUCTION AND HIGHLIGHTS IN Controlled Transverse Blow-up

Beam-Beam DA Simulations for HL-LHC

Tevatron Beam-Beam Phenomena and Counter-Measures

Bernhard Holzer, CERN-LHC

DYNAMIC APERTURE STUDIES FOR HL-LHC V1.0 *

Plans for CESR (or Life Without CLEO)

LHC upgrade based on a high intensity high energy injector chain

The STAR Transverse Spin Program

HiLumi LHC FP7 High Luminosity Large Hadron Collider Design Study. Deliverable Report SIMULATION MODELS FOR ENERGY DEPOSITION

ICALEPCS Oct. 6-11, 2013

Longitudinal Top-up Injection for Small Aperture Storage Rings

Run II Status and Prospects

MEASUREMENT AND SIMULATION OF LUMINOSITY LEVELING IN LHC VIA BEAM SEPARATION

Ion Polarization in RHIC/eRHIC

Implementation of Round Colliding Beams Concept at VEPP-2000

Tools of Particle Physics I Accelerators

Beam Dynamics. D. Brandt, CERN. CAS Bruges June 2009 Beam Dynamics D. Brandt 1

Status of the LIU project and progress on space charge studies

Status and Outlook of the LHC

LHC. Construction Understanding first the commissioning. Prospects for

ThomX Machine Advisory Committee. (LAL Orsay, March ) Ring Beam Dynamics

Pros and Cons of the Acceleration Scheme (NF-IDS)

Lattice Design and Performance for PEP-X Light Source

Potential use of erhic s ERL for FELs and light sources ERL: Main-stream GeV e - Up-gradable to 20 + GeV e -

Gianluigi Arduini CERN - Beams Dept. - Accelerator & Beam Physics Group

Accelerator Physics. Accelerator Development

HL-LHC: parameter space, constraints & possible options

Consideration for polarization in FCChh. V. Ptitsyn (BNL)

OPERATIONAL BEAMS FOR THE LHC

Electron cloud experiments, and cures in RHIC

SBF Accelerator Principles

Introduction to Collider Physics

EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH CERN ACCELERATORS AND TECHNOLOGY SECTOR ION COLLIDERS. John M. Jowett CERN, CH-1211 Geneva 23, Switzerland.

Particle physics experiments

The 2015 erhic Ring-Ring Design. Christoph Montag Collider-Accelerator Department Brookhaven National Laboratory

Superconducting Magnets for Future Electron-Ion Collider. Yuhong Zhang Thomas Jefferson National Accelerator Facility, USA

e + e Factories M. Sullivan Presented at the Particle Accelerator Conference June 25-29, 2007 in Albuquerque, New Mexico e+e- Factories

The MAX IV Thermionic preinjector

Accelerator. Physics of PEP-I1. Lecture #7. March 13,1998. Dr. John Seeman

The LHC: the energy, cooling, and operation. Susmita Jyotishmati

COMBINER RING LATTICE

HE-LHC Optics Development

Accelerator Physics. Tip World Scientific NEW JERSEY LONDON SINGAPORE BEIJING SHANGHAI HONG KONG TAIPEI BANGALORE. Second Edition. S. Y.

Fermilab Collider Run II: Accelerator Status and Upgrades 1

Plans for 2016 and Run 2

Accelerator Physics Final Exam pts.

Low energy electron storage ring with tunable compaction factor

WG2 on ERL light sources CHESS & LEPP

Optics considerations for

Impedance & Instabilities

ELECTRON COOLING OF PB54+ IONS IN LEIR

The HL-LHC Accelerator Physics Challenges

IMPLEMENTATION AND EXPERIENCE WITH LUMINOSITY LEVELLING WITH OFFSET BEAM

Accelerator Design of High Luminosity Electron-Hadron Collider erhic

1.5-GeV FFAG Accelerator as Injector to the BNL-AGS

Beam Physics at SLAC. Yunhai Cai Beam Physics Department Head. July 8, 2008 SLAC Annual Program Review Page 1

SLS at the Paul Scherrer Institute (PSI), Villigen, Switzerland

LHC commissioning. 22nd June Mike Lamont LHC commissioning - CMS 1

Transcription:

The Luminosity Upgrade at RHIC G. Robert-Demolaize, Brookhaven National Laboratory

RHIC accelerator complex: IPAC'15 - May 3-8, 2015 - Richmond, VA, USA 2

The Relativistic Heavy Ion Collider (RHIC) aims at recreating the quark-gluon plasma and study the rare processes R of cross-section σ p associated with it: For rare events, σ p is usually very small therefore the luminosity L needs to be maximized, which requires: increased per-bunch intensity; beam lifetime dominated by burn-off; smaller beam size at the interaction point (IP). Run7 marked the first efforts towards the RHIC-II Upgrade with the implementation of components aimed at improving the design average store luminosity by a factor of 20. Run14 featured the completion of the Upgrade: average store luminosities have been improved by a factor of 25 from Run4, reaching a consistent L = 50.0x10 26 cm -2 s -1 while keeping the beams for physics for twice as long. IPAC'15 - May 3-8, 2015 - Richmond, VA, USA 3

Recent Performance Overview: Species N b Intensity [10 9 ] β* (IR6/8) [m] ε rms [μm] L peak [10 26 cm -2 s -1 ] L avg [10 26 cm -2 s -1 ] L week [μb -1 ] Store Length [h] Design A-A 55 1.0 2.0 2.5 6.7 9 2 50 Enhanced A-A 111 1.0 1.0 2.5 6.7 30 8 300 Run4 Au-Au 45 1.1 1.0 2.5 6.7 15 5 160 5.0 Run7 Au-Au 103 1.1 0.83 / 0.77 2.8 5.8 30 12 380 5.0 Run10 Au-Au 111 1.1 0.75 2.8 3.3 45.3 20.0 670 4.0 Run11 Au-Au 111 1.3 0.75 2.5 1.7 52.6 30.0 1000 4.0 Run12 Cu-Au 111 4.0 / 1.3 0.7 4.1 1.2 120.0 100.0 3500 14.0 U-U 111 0.3 0.7 2.2 0.4 8.8 5.6 200 7.5 Run14 Au-Au 111 1.6 0.7 0.5 2.5 0.65 84.0 50.0 2200 10.0 The following reviews the upgrades brought to all three tiers of RHIC s activities: machine hardware, lattice design and operational efficiency. IPAC'15 - May 3-8, 2015 - Richmond, VA, USA 4

INJECTORS Courtesy of J. Alessi A new Electron Beam Ion Source (EBIS) followed by an RFQ and a short linac is now used instead of the Tandem Van de Graaf. It allows switching rapidly between various ion species while still providing high per-bunch intensities. Successfully commissioned in 2010 and has since delivered beams to both RHIC and the NASA facility without slowing down operations for either programs. The ion species other than Au that have been used for RHIC physics are (to date) Cu, U and 3 He. IPAC'15 - May 3-8, 2015 - Richmond, VA, USA 5

STOCHASTIC COOLING Courtesy of K. Mernick Main limitation to luminosity lifetime: emittance blowup from intrabeam scattering. The RHIC Stochastic Cooling system was designed to counter this mechanism and reduce the beam emittance: for each of the three planes of motion, it uses a pickup (left) and kicker magnet (right) pair separated by a multiple of π/2 phase advance. Installed in stages: longitudinal in Run7, vertical in Run10, full system in Run11. Reference: M.Blaskiewicz,J.M.Brennan,and K.Mernick,Phys.Rev. Lett. 105, 094801 (2010) IPAC'15 - May 3-8, 2015 - Richmond, VA, USA 6

Schematic view of the installation: STOCHASTIC COOLING PHENIX STAR IPAC'15 - May 3-8, 2015 - Richmond, VA, USA 7

System performance: STOCHASTIC COOLING IPAC'15 - May 3-8, 2015 - Richmond, VA, USA 8

System performance: STOCHASTIC COOLING With a full 3D system in Run11, transverse RMS emittances were reduced by up to 30%. IPAC'15 - May 3-8, 2015 - Richmond, VA, USA 9

System performance: STOCHASTIC COOLING With a full 3D system in Run11, transverse RMS emittances were reduced by up to 30%. Additional upgrades for reliability in Run14 allowed lowering emittances by a factor 3. IPAC'15 - May 3-8, 2015 - Richmond, VA, USA 10

FEEDBACK SYSTEMS Goal of RHIC Operations: deliver high luminosities to experiments with great store-to-store reproducibility => need state-of-the-art control of all beam parameters! Improved measurement precision has contributed to improved control of the beam s properties and to the successful application of routine orbit, energy, tune, and coupling feedback in RHIC: Parameter Stability, no feedback Stability, w/ feedback rms beam position 1 mm 20μm betatron tunes 0.02 0.001 coupling coefficients 0.04 0.01 beam energy 250μm 15μm chromaticity 10 3 Ramp development efficiency has been reduced from several days (Run8 and prior) down to 1 ramp or about 2 hours (as of Run11). Overall accelerator availability is estimated to be increased by ~ 1 week per fiscal year due to the improved reproducibility afforded by use of feedback-based beam control. IPAC'15 - May 3-8, 2015 - Richmond, VA, USA 11

FEEDBACK SYSTEMS Highlight reel: Courtesy of M. Minty Average orbit measurements (vertical plane) with and without improved data processing algorithm Superposition of measurements from multiple ramps of horizontal (top) and vertical (bottom) orbit rms measured without (left, Run9) and with (right, Run11) orbit feedback. Measured RHIC betatron tunes (top) and chromaticity (bottom) with (blue) and without (red) tune/coupling feedback during the energy ramp and beta-squeeze during Run11. IPAC'15 - May 3-8, 2015 - Richmond, VA, USA 12

RF SYSTEMS A new Low-Level RF Upgrade Platform has been deployed across the entire RHIC accelerator complex in both operational as well as R&D applications: improved flexibility and precision of bunch merging gymnastics in the Booster and AGS; improved stability of synchronization and bunch to bucket transfers between Booster, AGS and RHIC; bunch by bunch longitudinal damping and transient beam loading compensation in RHIC; improved flexibility and precision in the RHIC store rebucketing gymnastic; development of a RHIC bunch by bunch transverse damper. During Run14, a 56 MHz SRF cavity was installed and commissioned with beam, providing additional longitudinal focusing in complement to what is achieved by the longitudinal Stochastic Cooling Courtesy of Q. Wu IPAC'15 - May 3-8, 2015 - Richmond, VA, USA 13

RF SYSTEMS Longitudinal focusing from Run14 operations with 56 MHz SRF cavity: Courtesy of Q. Wu 3 He Au Fill 18476 - no 56 MHz cavity Fill 18480 - with 56 MHz cavity => the population of Au beam in the satellite buckets is squeezed towards the center. IPAC'15 - May 3-8, 2015 - Richmond, VA, USA 14

Luminosity and Lattice Implications For Gaussian shaped bunched beams colliding head-on, the luminosity is given by: with: => two ways to maximize luminosity: higher beam intensity in smaller transverse beam sizes! For RHIC physics runs: the revolution frequency f is given; the number of bunches N b is already maximized 111 per ring; the number of particles per bunch N 1,2 can be improved with better lifetime; the transverse β * x,y functions at each experimental insertion can be reduced ( squeezed ). => goal of RHIC-II Upgrade: beam lifetime dominated by burn-off + collisions at β * x,y < 0.7 m. IPAC'15 - May 3-8, 2015 - Richmond, VA, USA 15

Beam lifetime Off-Momentum Dynamic Aperture Main limitation to high luminosities in RHIC: emittance blowup from Intrabeam Scattering (IBS). Potential solution: change the design lattice to reduce the contribution of longitudinal IBS diffusion to the transverse planes: => need higher integer tunes to lower the average dispersion function D z (s) in the arcs! For RHIC Run8, the Au lattice featured for the first time (Q x,q y ) = (31,32), 3 units larger than before: => phase advance per cell: 84 -> 95 ; => 30% reduction in emittance blowup; => large beam losses after RF rebucketing. Courtesy of V. Litvinenko IPAC'15 - May 3-8, 2015 - Richmond, VA, USA 16

Beam lifetime Off-Momentum Dynamic Aperture RF rebucketing at RHIC is the process by which bunches are transferred from the 28 MHz acceleration system to the 197 MHz storage system. This process involves compressing bunches down to 5 ns, but it also increases the momentum spread, with δp/p max going from 0.9x10-3 to 1.7x10-3. Tracking studies show that IBS suppression lattice has a reduced off-momentum dynamic aperture: 2 σ Courtesy of Y. Luo => successful implementation of Stochastic Cooling system allows reverting to Standard lattice!! IPAC'15 - May 3-8, 2015 - Richmond, VA, USA 17

Luminosity Leveling with Dynamic β * Squeeze End of Run11: first attempt to reduce the transverse beam size at the collision point of one of RHIC s experimental insertions => served as a good proof of principle, but also highlighted some limitations to the method. Power supply wiring scheme: nested shunt supplies control both sides of each insertion region => limits in current prevent from reaching β * lower than 0.55 m! IPAC'15 - May 3-8, 2015 - Richmond, VA, USA 18

Luminosity Leveling with Dynamic β * Squeeze New magnet strengths from squeezing algorithm need to be implemented after the linear optics have been corrected: IPAC'15 - May 3-8, 2015 - Richmond, VA, USA 19

Luminosity Leveling with Dynamic β * Squeeze New magnet strengths from squeezing algorithm need to be implemented after the linear optics have been corrected: IPAC'15 - May 3-8, 2015 - Richmond, VA, USA 20

Luminosity Leveling with Dynamic β * Squeeze A new technique, the Achromatic Telescopic Squeeze (ATS), was developed at CERN for LHC studies and uses the insertions around the targeted IP to launch and close a β-beat wave to allow reducing β * further with little to no change to the chromatic functions. Constraints for RHIC: initial lattice design does not feature the required phase advance of 90 /cell; STAR and PHENIX experiments are next to each other. Solution: use a global rematching algorithm over a larger section of the machine that includes STAR & PHENIX: baseline optics, β * (IR6.IR8) = 0.7m IPAC'15 - May 3-8, 2015 - Richmond, VA, USA 21

Luminosity Leveling with Dynamic β * Squeeze A new technique, the Achromatic Telescopic Squeeze (ATS), was developed at CERN for LHC studies and uses the insertions around the targeted IP to launch and close a β-beat wave to allow reducing β * further with little to no change to the chromatic functions. Constraints for RHIC: initial lattice design does not feature the required phase advance of 90 /cell; STAR and PHENIX experiments are next to each other. Solution: use a global rematching algorithm over a larger section of the machine that includes STAR & PHENIX: THOR optics, β * (IR6.IR8) = 0.5m IPAC'15 - May 3-8, 2015 - Richmond, VA, USA 22

Luminosity Leveling with Dynamic β * Squeeze After commissioning the new lattice in dedicated beam experiment time, it was made operational for the last two weeks of Run14. Luminosity as a function of time during one of the Run14 stores featuring dynamic β* squeeze: IPAC'15 - May 3-8, 2015 - Richmond, VA, USA 23

Luminosity Leveling with Dynamic β * Squeeze After commissioning the new lattice in dedicated beam experiment time, it was made operational for the last two weeks of Run14. Zoom on the luminosity jump at the time of the β* squeeze: Measured luminosity gain: Δ = 14.54% Predicted: (hourglass/β) THOR /(hourglass/β) classic = 14.47% (using APEX optics measurements and assuming stable bunch length). IPAC'15 - May 3-8, 2015 - Richmond, VA, USA 24

Luminosity Leveling with Dynamic β * Squeeze Effect on integrated luminosity for PHENIX: IPAC'15 - May 3-8, 2015 - Richmond, VA, USA 25

RHIC as a Versatile Collider RHIC can routinely produce collisions for multiple physics programs during one calendar year, often for only a few weeks in each running mode. Each program can include symmetric or asymmetric collisions, for heavy ions and/or polarized protons, and for a wide range of energies. Generic, highly configurable tools for sequencing accelerator task have been developed, along with software for saving and restoring many accelerator configuration parameters that allow fast switching between operating modes and/or species. The generic nature of the tools allows new equipment to be integrated and reconfigured on the fly. Courtesy of W. Fischer IPAC'15 - May 3-8, 2015 - Richmond, VA, USA 26

Looking Back Looking Forward With the RHIC-II upgrade now completed, there is a significant increase of all performance indicators of the entire accelerator complex: solutions against intrabeam scattering, which limited the delivered luminosity to STAR and PHENIX, have been successfully implemented: the Stochastic Cooling system is reducing the transverse emittances by more than a factor 3, allowing for new mechanisms for luminosity leveling to be commissioned for the first time with beam; a new, superconducting 56 MHz RF cavity was also installed to help focusing the beam longitudinally; upgrades to the instrumentation and feedback systems introduced state-of-the-art beam control tools. All of those factors contributed to making the Au-Au run of Run14 the most successful heavy ion physics run to date, with a record average luminosity of 50.0x10 26 cm -2 s -1. Run14 is now the staple for all coming RHIC runs with heavy ions, with the goal of pushing the most recent tools (dynamic β * squeeze and 56 MHz SRF cavity) to their limit in order to achieve flat, high level luminosity for Run16. IPAC'15 - May 3-8, 2015 - Richmond, VA, USA 27

Many Thanks to all members of the Collider-Accelerator Department at Brookhaven National Laboratory whose collective accomplishments are reported here and in particular to J. Alessi, W. Fischer, P. Ingrassia, V. Litvinenko, Y. Luo, M. Minty, V. Schoefer, K. Smith, Q. Wu for sharing material for this report... and finally, YOU, FOR YOUR ATTENTION! IPAC'15 - May 3-8, 2015 - Richmond, VA, USA 28

Backup Slides

RF SYSTEMS Impact of 56 MHz SRF cavity on delivered luminosity: IPAC'15 - May 3-8, 2015 - Richmond, VA, USA 30

Backup Slides Run15 pp lattice w/ ATS scheme: Blue lattice IPAC'15 - May 3-8, 2015 - Richmond, VA, USA 31

Backup Slides Run15 pp lattice w/ ATS scheme: Yellow lattice IPAC'15 - May 3-8, 2015 - Richmond, VA, USA 32

Highly Trained Operators Courtesy of Y. Dutheil Since Run4, the rate of operations personnel replacement has been halved. The increased stability in the number of operators is beneficial in that more operators are experienced in accelerator operation. Operations group was expanded to include accelerator specialists who could be relied upon to train operators and others and solve accelerator performance problems. Accelerator specialists were also charged with managing the cold restart of RHIC following each yearly shutdown. In spite of automation via software, operators were encouraged to explore parameter changes at appropriate times in the cycle: this tuning of the parameter space paid dividends, as evidenced by the successful commissioning and operation of Stochastic Cooling during Run10 and Run11. IPAC'15 - May 3-8, 2015 - Richmond, VA, USA 33