In the Matter of Emergency Regulation of the Level of

Similar documents
INTERNATIONAL JOINT COMMISSION

INTERNATIONAL JOINT COMMISSION. of Rainy Lake and of other Boundary Waters in the. Rainy Lake Watershed. CONSOLIDATION. of the

Proposal to limit Namakan Lake to 1970 Upper Rule Curve for remainder of summer

PRELIMINARY DRAFT FOR DISCUSSION PURPOSES

3.0 TECHNICAL FEASIBILITY

GAMINGRE 8/1/ of 7

Attachment B to Technical Memorandum No.2. Operations Plan of Ross Valley Detention Basins

2015 Fall Conditions Report

INTERNATIONAL RAINY LAKE BOARD OF CONTROL INTERNATIONAL RAINY RIVER WATER POLLUTION BOARD SPRING 2006 REPORT

DE PUBLIC SERVICE COMPANY OF NEW HAMPSHIRE

Lake Winnebago Regulation Meeting

International Joint Commission

WHEN IS IT EVER GOING TO RAIN? Table of Average Annual Rainfall and Rainfall For Selected Arizona Cities

2011 Flood: Technical Review of Lake Manitoba, Lake St. Martin and Assiniboine River Water Levels Summary

FORECAST-BASED OPERATIONS AT FOLSOM DAM AND LAKE

The Climate of Oregon Climate Zone 4 Northern Cascades

Folsom Dam Water Control Manual Update Joint Federal Project, Folsom Dam

Folsom Dam Water Control Manual Update Joint Federal Project, Folsom Dam

Changing Hydrology under a Changing Climate for a Coastal Plain Watershed

Published by ASX Settlement Pty Limited A.B.N Settlement Calendar for ASX Cash Market Products

A. Identification of Temperature as the Cause of Non-Attainment

2019 Settlement Calendar for ASX Cash Market Products. ASX Settlement

REDWOOD VALLEY SUBAREA

Lower Tuolumne River Accretion (La Grange to Modesto) Estimated daily flows ( ) for the Operations Model Don Pedro Project Relicensing

2001 ANNUAL REPORT on INTERBASIN TRANSFERS for RTP South and the Towns of Cary, Apex, and Morrisville

NRC Workshop Probabilistic Flood Hazard Assessment (PFHA) Jan 29-31, Mel Schaefer Ph.D. P.E. MGS Engineering Consultants, Inc.

Disentangling Impacts of Climate & Land Use Changes on the Quantity & Quality of River Flows in Southern Ontario

8 VISIBILITY. 8.1 Setting. 8.2 Assessment Focus. Table 8-1: Key Issue for Visibility

FLOOD REPORT FOR MANITOBA. June 28, A Gale wind warning is in effect for Lake Manitoba and Lake Winnipeg

Rainfall Observations in the Loxahatchee River Watershed

Rong Jiang. Map of River. Table of Basic Data. China 14. Serial No. : China-14

Application of Real-Time Rainfall Information System to CSO control. 2 October 2011 Naruhito Funatsu METAWATER Co., Ltd.

PROGRESS ACCOMPLISHED THIS PERIOD

PH YSIC A L PROPERT IE S TERC.UCDAVIS.EDU

San Francisco Public Utilities Commission Hydrological Conditions Report For April 2014

Unconventional Wisdom and the Effects of Dams on Downstream Coarse Sediment Supply. Byron Amerson, Jay Stallman, John Wooster, and Derek Booth

July, International SWAT Conference & Workshops

Scarborough Tide Gauge

The Climate of Oregon Climate Zone 5 High Plateau

Water Supply Conditions and Outlook June 4, 2018

January 22, Coronado National Forest 300 West Congress Street Tucson, AZ Jim Upchurch, Forest Supervisor. Dear Mr.

Impacts of climate change on flooding in the river Meuse

2018 Annual Review of Availability Assessment Hours

PROJECT TITLE: 4.50 MW AKKIHEBBAL MINI HYDEL SCHEME, CAUVERY HYDRO ENERGY LTD., INDIA

CLIMATE OVERVIEW. Thunder Bay Climate Overview Page 1 of 5

Stream Discharge and the Water Budget

The Huong River the nature, climate, hydro-meteorological issues and the AWCI demonstration project

8.5. Modelling Data with Sinusoidal Functions. INVESTIGATE the Math

2017 Settlement Calendar for ASX Cash Market Products ASX SETTLEMENT

MARMOT CREEK BASIN: MANAGING FORESTS FOR WATER

Future Weather in Toronto and the GTA

Long-term Water Quality Monitoring in Estero Bay

Albeni Falls Operations Meeting 2015

San Francisco Public Utilities Commission Hydrological Conditions Report For March 2016

Location. Datum. Survey. information. Etrometa. Step Gauge. Description. relative to Herne Bay is -2.72m. The site new level.

U.S. ARMY CORPS OF ENGINEERS

ENGINE SERIAL NUMBERS

Cost of Inflow Forecast Uncertainty for Day Ahead Hydropower Production Scheduling

Location. Datum. Survey. information. Etrometa. Step Gauge. Description. relative to Herne Bay is -2.72m. The site new level.

Jackson County 2013 Weather Data

How are adding integers and subtracting integers related? Work with a partner. Use integer counters to find 4 2. Remove 2 positive counters.

AN ASSESSMENT OF THE RELATIONSHIP BETWEEN RAINFALL AND LAKE VICTORIA LEVELS IN UGANDA

Elm Creek Watershed Management Commission 2018 Treasurer's Report

Water Temperature Monitoring of the Klamath River Mainstem

Integrating Weather Forecasts into Folsom Reservoir Operations

Climate also has a large influence on how local ecosystems have evolved and how we interact with them.

INTERNATIONAL RAINY LAKE BOARD OF CONTROL (IRLBC) INTERNATIONAL RAINY RIVER WATER POLLUTION BOARD (IRRWPB) NEWSLETTER.

January 25, Summary

CHAPTER 5 DOWNTOWN DEVELOPMENT AUTHORITY

9. PROBABLE MAXIMUM PRECIPITATION AND PROBABLE MAXIMUM FLOOD

Project No India Basin Shadow Study San Francisco, California, USA

Cambridge International Examinations Cambridge International General Certificate of Secondary Education

Lake Michigan. St. Joseph River Assessment. Figure 1. The St. Joseph River watershed. Paw Paw River Paw Paw. Nottawa Creek. Watervliet Decatur

Typical Hydrologic Period Report (Final)

Hydrologic Conditions in the Delaware River Basin

A Report on a Statistical Model to Forecast Seasonal Inflows to Cowichan Lake

Ontonagon River Assessment FIGURES


Evapo-transpiration Losses Produced by Irrigation in the Snake River Basin, Idaho

2013 Tide Newsletter and occasionally by much more. What's more,

A meta-analysis of water vapor deuterium-excess in the mid-latitude atmospheric surface layer

The World Bank. Key Dates. Project Development Objectives. Components. Implementation Status & Results Report. Key Project Dates

2. PHYSICAL SETTING FINAL GROUNDWATER MANAGEMENT PLAN. 2.1 Topography. 2.2 Climate

ONESOURCE Indirect Tax Q Sales Tax & VAT Rate Report

WYANDOTTE MUNICIPAL SERVICES COMMUNITY WIND ENERGY PROJECT WIND RESOUCE SUMMARY

Hydrologic Conditions in the Delaware River Basin

March 5, British Columbia Utilities Commission 6 th Floor, 900 Howe Street Vancouver, BC V6Z 2N3

Three main areas of work:

Sections 01, 02, & 04 (Bressoud and Ehren) 9 October, 2015

Climate Change and Water Supply Research. Drought Response Workshop October 8, 2013

WIND EFFECTS ON CHEMICAL SPILL IN ST ANDREW BAY SYSTEM

UWM Field Station meteorological data

American International Journal of Research in Science, Technology, Engineering & Mathematics

Outage Coordination and Business Practices

CFCAS project: Assessment of Water Resources Risk and Vulnerability to Changing Climatic Conditions. Project Report II.

National Integrated Drought Information System. Southeast US Pilot for Apalachicola- Flint-Chattahoochee River Basin 20-March-2012

March 31, Dear Ms. Shreve:

Using Reanalysis SST Data for Establishing Extreme Drought and Rainfall Predicting Schemes in the Southern Central Vietnam

UNDERSTANDING GREAT LAKES WATER LEVEL FLUCTUATIONS AND CURRENT CONDITIONS APRIL 2013

Lake Worth Lagoon Hydrographic Survey Report

Transcription:

INTERNATIONAL JOINT COMMISSION In the Matter of Emergency Regulation of the Level of Rainy Lake and of other Boundary Waters in the Rainy Lake Watershed. Supplementary Order to the Order Prescribing Method of Regulating the Levels of Boundary Waters, dated 8 June 1949, as amended by Supplementary Order dated 1 October 1957. WHEREAS: A Convention between the United States of America and Canada providing for emergency regulation of the level of Rainy Lake and of the level of other Boundary Waters in the Rainy Lake watershed was signed at Ottawa on 15 September 1938 and was duly ratified; Pursuant to the said Convention the Commission, by Order Prescribing Method of Regulating the Levels of Boundary Waters dated 8 June 1949, determined when emergency conditions exist in the Rainy Lake watershed and adopted certain masures of control with respect to the dams at Kettle Falls and International Falls - Fort Frances in order to prevent the Occurrence of such emergency conditions ; The Commission specifically reserved the right to amnd or rescind its Order of 8 June 1949 at any time and

2 to issue such supplementary or other Orders as it might deem to be in the public interest; The Commission, by Supplementary Order dated 1 October 1957 amended its Order of 8 June 1949 to permit greater flexibility in the regulation of the level of Namakan Lake, the amendment to terminate 30 September 1962 unless the Commission continued it in force beyond that date; The Commission, after affording opportunity for the interested parties to be heard and deeming such action to be in the public interest, has extended the termination date of the 1 October 1957 amendment on two occasions and the said amendment is in force at the present time; Heavy rainfalls have occurred at various times since 1957, and especially throughout the summer of 1968, which caused both Rainy and Namakan Lakes to rise considerably above the full pool elevations set forth in the Commission's Order of 8 June 1949, as amended by the Supplementary Order of 1 October 1957 ; Low water conditions also have occurred at various times since 1957, causing both Rainy and Namakan Lakes to fall below the minimum elevations set forth in the said Order, as amended; Experience has demonstrated the difficulties of operating the outlet works so as to ensure that lake levels will be at precise elevations on certain dates, under all

3 conditions of supply, and also the desirability of further qualifying the Commission's determination of "emergency conditions'' within the meaning of the Convention signed on September 158 1938; At the Commission's request in the summer of 1968, its International Rainy Lake Board of Control undertook an examination of further measures of regulating the levels of Namakan and Rainy Lakes and the results of such examination and the Board's conclusions were set forth in the Board's Report to the Commission, dated March 1969: The Commission made copies of the Board's Report available at once to all interested persons: After due notice, the Commission held a public hearing at International Falls, Minnesota, on 24 June 1969 at which time the concsusions of the International Rainy Lake Board of Control and the proposed changes in regulation were explained by the Board of Control and all interested persons were given opportunity to present testimony and make representations to the Commission; At the hearing testimony was presented and representations were made on behalf of the Province of Ontario and the State of Minnesota, the Amnitoh Hydro- Electric Board, the City of Winnipeg Hydro-Electric System, The Hydro-Electric Power Commission of Ontario, The Ontario-Minnesota Pulp and Paper Company Limited, the operators of tourist, fishing and hunting camps and resorts and by various individuals;

4 Both the Government of Canada and the Government of the United States were represented at the said hearing by Counse 1: The International Rainy River Water Pollution Board reported to the Commission in April, 1970 that when the outflow from Rainy Lake is low, unsightly fibrous sludge deposits on the bed of Rainy River are exposed; that this condition becomes increasingly offensive when the outflow is less than 4000 cfs (cubic feet per second): and that at a streamflow of 3300 cfs dissolved oxygen in Rainy River is below the objective of 5 milligrams per litre; and WHEREAS the Commission has been informed that Minnesota and Ontario Paper Company was merged with and into Boise Cascade Corporation in 1965; NOW THEREFORE THIS COPMISSION ORDERS AND DIRECTS THAT: 1. The Order Prescribing Nethod of Regulating the Levels of Boundary Waters, dated 8 June 1949, is hereby amended by deleting paragraphs A, B and C, relating to the determination of emergency conditions in and along the shores of the Namakan Chain of Lakes and Rainy Lake, and substituting therefor the following: "A. Emergency conditions exist in and along the shores of the Namakan Chain of Lakes when the level of Namakan Lake is higher than elevation

5 1118.6 feet above mean sea level, excluding the effect of wind and currents, and the inflow at that time is in excess of the total outflow capacity of the present structures at Kettle Falls; emergency conditions also exist when the level of Namakan Lake is lower than elevation 1108.6 feet above mean sea level and the outflow has been reduced to 1000 cfs (cubic feet per second) ; "B. Emergency conditions exist in and along the shores of Rainy Lake when its level is higher than elevation 1108.1 feet above mean sea level, excluding the effect of wind and currents, and the inflow at that time is in excess of the total outflow capacity of the present structure at International Falls-Fort Frances; emergency conditions also exist when the level of Rainy Lake is lower than elevation 1104.6 feet above mean sea level and the outflow has been reduced to the minimum allowable discharge prescribed by Order of this Commission; and "C. In order to prevent the occurrence of such emergency conditions, it is necessary to anticipate high and low inflows to said lakes insofar as possible and so regulate the outflow at the Kettle Falls Dams and the International

6 Falls-Fort Frances Dam as to avoid as far as possible the occurrence of such conditions." 2. The said Order dated 8 June 1949, as amended by Supplementary Order dated 1 October 1957, is further amended by deleting Paragraph numbered 1 and substituting therefor the following: "1.(a) The Companies, their successors or assigns shall operate the discharge facilities at the Kettle Falls Dams as authorized by the International Rainy Lake Board of Control in such manner that insofar as possible the level of Namakan Lake, as determined at the Kettle Falls- Namakan Lake gauge, will be between the following minimum and maximum elevations on the dates shown or between elevations which can be interpolated therefrom between these dated; these elevations being shown in feet above mean sea level: - Date 1 Jan 1 Feb 1 Mar 1 Apr 21 Apr 1 May 1 Jun 21 Jun 1 Jul 21 Jul 1 Aug 1 Sep 11 Sep 1 O ct 1 Nov 1 Dec NAMAKAN W ELEVATIONS Minimum 1113 6 1111.9 1110 3 1108.6 1108-6 1110.2 1115 3 1117.5 1117 6 1118 0 1118 0 1118.0 1118 0 1117 6 1116.3 1115. 0 Maximum 1115 3 1114.1 1113 1 1112.o 1113 1 1113.6 1116 6 1118.6 1118.6 1118 6 1118. 6 1118 6 1118.6 1118.6 1117.5 1116. 4

7 'I (b) Whenever the level of Namakan Lake is in excess of 1119.1 feet, as will occur occasionally when flood inflows are in excess of the outflow capacity of the present dams at Kettle Falls, all gates and fishways in those dams shall be fully open to ensure the most rapid possible return to the maximum elevation prescribed in sub-paragraph (a). I' (c) Whenever the level of Namakan Lake is lower than the minimum elevation prescribed in sub-paragraph(a), as will occur occasionally during periods of deficient inflow, the total outflow from the dams at Kettle Falls shall be reduced to 1000 cfs (cubic feet per second) until the lake level returns to the minimum elevation prescribed in sub-paragraph (a) '' 3. The said Order dated 8 June 1949 is hereby amended by deleting Paragraphs numbered 2 and 3 and substituting therefore the following: "2 e (a) The Companies, their successors or assigns shall operate the discharge facilities at the International Falls-Fort Frances Dam as authorized by the International Rainy Lake Board of Control in such manner that insofar as possible the level of Rainy Lake, as determined at the gauge on the Department of Public Works, Canada, Five Mile Dock, will be between the following minimum and maximum

8 elevations on the dates shown or between elevations which can be interpolated therefrom between these dates; these elevations being shown in feet above mean sea level: - RAINY LAKE ELEVATIONS Date Minimum Maximum 1 Jan 1 Feb 1 Mar 1 Apr 21 Apr 1 May 1 Jun 1 Jul 1 Aug 1 Sep 1 O ct 11 Oct 1 Nov 1 Dec 1106. 4 1105.8 1105. 2 1104.6 1104. 6 1105.1 1106. 6 1107.4 1107 4 1107. 4 1107. 4 1107.4 1107. 2 1106.8 1107. 1 1106. 6 1106. 2 1105.6 1106. 2 1106. 6 1107 6 1108.1 1108.1 1108.1 1108,l 1108. 1 1108.1 1107. 6 " (b) Whenever the level of Rainy Lake is in excess of 1108.6 feet, as will occur occasionally when flood inflows are in excess of the outflow capacity of the dam at International Falls-Fort Frances, all gates in that dam shall be fully open to ensure the most rapid possible return to the maximum elevation prescribed in subparagraph (a). 'I (c) Whenever the level of Rainy Lake is lower than the minimum elevation prescribed in subparagraph (a), as will occur occasionally during periods of deficient inflow, the outflow from the dam at International Falls-Fort Frances shall be

9 reduced to the minimum outflow prescribed in sub-paragraph(d), until the lake level returns to the minimum elevation prescribed in subparagraph (a). I' (d) The minimum instantaneous outflow from the dam at International Falls-Fort Frances shall be 4000 cfs (cubic feet per second) between the hours of sunrise and sunset in the months of May to October, inclusive, and 3300 cfs at all other times. 'I (e) The existing barrier which obstructs or partially obstructs the high-level Bear Portage outlet, and which has deteriorated by natural process, shall not be repaired, strengthened, raised, lowered, or otherwise modified in any way be the Companies, their successors or assigns, or by any other corporation or person without specific authorization from this Commission. "3. Notwithstanding Paragraphs numbered 1 and 2 of this Order, if extremely high or low inflows to Namakan Lake or Rainy Lake are anticipated, the International Rainy Lake Board of Control, after obtaining the approval of the Commission, may authorize the levels of Namakan Lake and/or Rainy Lake to be raised temporarily to greater than the maximum or lowered temporarily to less than the

10 1. minimum elevations respectively prescribed in Paragraphs numbered 1 (a) and 2 (a) of this Order. I' 4. All obligations imposed in the said Order dated 8 June 1949, as amended by the said Supplementary Order dated 1 October 1957 and by this Order, upon the Companies, their successors or assigns apply jointly and severally to Boise Cascade Corporation, Minnesota and Ontario Paper Company, Rainy River Improvement Company and The Ontario-Minnesota Pulp and Paper Company Limited. Signed this 29th day of July, 1970. A.D.P. HEENEY CHRISTIAN A. HERTER, JR. EUGENE W. WEBER CHARLES R. ROSS A.D. SCOTT BERNARD BEAUPRE