NGEX INTERSECTS 1.45% COPPER OVER 97.6 METRES AND G/T SILVER OVER 36 METRES AT FILO DEL SOL PROJECT

Similar documents
NGEX DRILLS 42 METRES OF 1.13 G/T GOLD AND G/T SILVER AT FILO DEL SOL PROJECT

FILO EXPANDS OXIDE COPPER AND GOLD ZONES - DRILLING INTERSECTS 0.77% COPPER OVER 102 METRES AND 0.73 G/T GOLD OVER 112 METRES

FILO MINING DRILLS 50 METRES OF G/T SILVER, 0.56% COPPER, 0.50 G/T GOLD AND 36 METRES OF 1.45% COPPER AT FILO DEL SOL

NGEX ANNOUNCES COPPER GOLD DISCOVERY AT NACIMIENTOS PROJECT

NGEX PROVIDES UPDATE ON EXPLORATION PROGRAM AT NACIMIENTOS PROJECT, ARGENTINA

NEWS RELEASE. Tigray Intersects 28.2 metres at 8.50 grams per tonne gold at Mato Bula, Adyabo Project, Northern Ethiopia

Assay Results Highlights (as of November 16, 2017) representing approximately 4,500 metres ( m ) of drilling:

BELO SUN RELEASES RESULTS FROM 65 DRILL HOLES FURTHER EXTENDING THE OURO VERDE DEPOSIT ALONG STRIKE NORTHWEST AND DOWN DIP

October 8, 2015 News Release Brucejack Regional Drilling Intersects Over 8,000 Grams Per Tonne Gold

Highlights include: Hole TTD050: 6.12 g/t Au over 7.00 metres from metres o Including g/t Au over 1.18 metres

BELO SUN RELEASES RESULTS FOR 74 ADDITIONAL DRILL HOLES AT ITS VOLTA GRANDE PROJECT

FILO MINING REPORTS UPDATED MINERAL RESOURCE ESTIMATE FOR THE FILO DEL SOL PROJECT

V Sample from C.O.D vein 15 metres southwest of V

BELO SUN INTERSECTS NEW HIGH GRADE ZONE AT GROTA SECA AND EXPANDS GRANDE DEPOSIT

Goldcrest Resources Ltd.

AVION GOLD DJAMBAYE II ZONE, TABAKOTO PROJECT, MALI, RETURNS HIGH GRADE INTERCEPTS OF 7.56 G/T Au OVER 7.0 METRES AND G/T Au OVER 3.

QMX GOLD CONTINUES TO INTERSECT STRONG MINERALIZATION AT BONNEFOND, INTERSECTING 39.5 g/t Au OVER 2.4 METRES AND 31.5 g/t Au OVER 1.

BELO SUN DISCOVERS NEW MINERALIZED ZONE AT ITS VOLTA GRANDE GOLD PROJECT, BRAZIL

IDM Mining s Underground Drilling Intersects g/t Au and g/t Ag over 6.80 Meters True Width at the Red Mountain Gold Project

Underground Exploration Drilling Complete; Brucejack Mineralization Extends to the East

Rich Saddle North Au-Cu-Ag Porphyry Expands by 275m Along Strike and 250m Down-Dip

NEWS RELEASE ORCA GOLD REPORTS CONTINUED SUCCESS AT GSS

Minsud to recommence resource outline diamond drilling at the Chita Valley Cu- Au-Ag-Mo Project, San Juan, Argentina

MONETA INTERCEPTS g/t GOLD INCLUDING g/t GOLD AND g/t GOLD INCLUDING g/t GOLD AT SOUTH WEST

DRILLING AT ASCOT S PREMIER PROPERTY EXTENDS GOLD MINERALIZATION 150 METRES WEST TOWARDS UNDERGROUND PORTAL

Gungnir Resources Inc.

COPPER MOUNTAIN COMPLETES PHASE 2 DRILL PROGRAM AT NEW INGERBELLE WITH CONTINUED POSITIVE RESULTS

Probe Metals Continues to Intersect Significant Gold Mineralization in Expansion Drilling at Val-d Or East, including 4.1 g/t Gold Over 15.

June 4, 2014 News Release Valley of the Kings Exploration Program Underway; Project Update

MONETA INTERCEPTS g/t GOLD INCLUDING g/t GOLD AT SOUTH WEST

June 4, 2015 News Release Valley of the Kings Underground Infill Drilling Underway

July 15, 2015 News Release Valley of the Kings Underground Infill Drilling Progresses

Probe Metals Confirms Continuity of Gold Mineralization on its Val-d Or East Project And Increases 2017 Drill Program to 75,000 metres

NEWS RELEASE November 5, 2018

Probe Metals Continues to Expand Gold Zones At Val-d Or East

This area in SE Sullivan Gulch was never mined by previous operators

Probe Metals Intersects 3.2 g/t Gold Over 45.5 Metres At Val-d Or East

EL CONDOR IN-FILL DRILLING INTERSECTS 26.9 METERS 2.19% CU & 0.58% NI

NEWS RELEASE TSX: ELD NYSE: EGO September 6, Eldorado Announces Drilling Results from KMC Project, Serbia

BALMORAL INTERSECTS g/t GOLD OVER 7.99 METRES, BUG LAKE SOUTH, DETOUR GOLD TREND PROJECT, QUEBEC

INV METALS ANNOUNCES DRILL RESULTS AT LOMA LARGA AND INITIAL PROSPECTING RESULTS ON NEW REGIONAL PROPERTIES

QMX GOLD INTERSECTS 29.8 G/T AU OVER 3.0 METERS AND 19.3 G/T AU OVER 3.2 METERS AT BONNEFOND

NEWS RELEASE NOVEMBER 28th, 2017 Trading Symbols: TSX-V: AMZ; OTCQX: AXDDF

MEXICAN GOLD INTERSECTS 7.18 G/T GOLD EQUIVALENT (2.00 G/T AU, G/T AG, 3.05 % CU) OVER 14.0 METERS AT LAS MINAS DIKE CONTACT ZONES

Suite West Georgia Street Vancouver, B.C. V6E 4M3 NEWS RELEASE

Goldgroup Drilling Continues to Extend the La Paila Zone at Caballo Blanco

CROCODILE GOLD CONTINUES POSITIVE EXPLORATION RESULTS INTERSECTS HIGH GRADE GOLD AT UNION REEFS PROJECT

LH Property Update: Magnum Goldcorp Hits High Grade Gold 16.9 m of g/t, including 10.9 m of g/t, and as well, 11 m of 20.

MINAURUM GOLD INC : : News Releases

May 12, 2016 News Release Valley of the Kings Infill Drilling Intersects 37,000 Grams Per Tonne Gold

Press Release Thunder Bay: August 2, 2018

August 20, 2018 SBB NR SBB TSX

NEWS RELEASE FULLER PROPERTY CONTINUES TO DELIVER GOOD RESULTS 2.53 GRAMS PER TONNE GOLD OVER METRES

Skeena Intersects g/t AuEq over metres at Eskay Creek

News Release. Infill Drilling Program

Detour Gold Reports Drilling Results from Lower Detour

OSISKO METALS INTERSECTS 10.49% ZINC+LEAD OVER METRES AND 12.15% ZINC+LEAD OVER METRES AT PINE POINT

ET and and and

NEWS RELEASE ORCA GOLD INDICATED AND INFERRED RESOURCES AT BLOCK 14 INCREASE BY 24% AND 48% RESPECTIVELY

PRESS RELEASE. DUBUISSON NORTH DRILLING CUTS g/t AU OVER 5.0 METRES NEW S50 EAST DISCOVERY, 3.39 g/t AU OVER 25.9 METRES

News Release February 27, 2014 TSX SYMBOL: COP

MINERAL MOUNTAIN RESOURCES LTD. MMV.TSX-V

Probe Metals Discovers New High Grade Gold Zone on Val-d Or East Project: Intersects 12.6 g/t Gold Over 7.3 Metres

Suite 1800 Two Bentall Centre 555 Burrard Street Vancouver, BC V7X 1M9 Tel: (604) Tel: (888) April 8, 2018 SBB NR SBB TSX

Vendetta Reports Additional High Grade Drilling Results from Zones 2 and 3 at Pegmont Lead-Zinc Project

Vendetta Reports Initial Results from 2017 Pegmont Program with High Grade Zone 3 Step Out Drilling

Dalradian Intersects 2.48 metres Grading g/t Gold and 4.87 metres Grading 8.35 g/t Gold With Infill Drilling at Curraghinalt

REGULUS DISCOVERS NEW GOLD-RICH, HIGH-GRADE COPPER-GOLD ZONE AT RIO GRANDE

555 Burrard Street, Suite 375, Vancouver, B.C. V7X 1M June 13, 2017 SBB NR SBB TSX

Pacific Empire Minerals Provides Copper King RC Drilling Results

NEWS RELEASE. Mountain Province Diamonds Completes the Kennady North Winter Exploration Program

FALCO PACIFIC COMPLETES INITIAL MODEL FOR THE HORNE 5 GOLD/SILVER/ZINC/COPPER DEPOSIT

SilverCrest Expands Babicanora High Grade Footprint to 600 metres; New High Grade Vein Discoveries Highlight District Scale Potential

Probe Metals Intersects 1,122 g/t Gold Over 0.7 Metres in New Zone at Val-d Or East

MEDIA RELEASE OCEANAGOLD ANNOUNCES FURTHER DOWN DIP EXTENSIONS OF MINERALISATION AT PANEL 2: FRASERS UNDERGROUND MINE

NEWS RELEASE. Evrim announces initial drilling results at Cuale Gold Project in Mexico

Cordoba Minerals Provides an Update on Exploration Activities at the San Matias Copper-Gold Project in Colombia

MCEWEN MINING ANNOUNCES EXPLORATION UPDATE FOR EL GALLO 1, MEXICO

55 Adelaide Street East, Suite St-Charles west, Suite 411, West Tower

Sabina Gold & Silver Reports 2018 Drilling has Commenced at Back River Gold Project

For Immediate Release ASCOT DRLLING AT UNICORN INTERSECTS MORE HIGH-GRADE GOLD

True Width (m) Carneritos to

CROCODILE GOLD INTERSECTS 7.1 G/T AU OVER 4.5 METERS INCLUDING 11.2 G/T AU OVER 2.6 METERS AT THE UNION REEFS PROJECT, PROSPECT DEPOSIT

Comparison Between July 2012 Technical Report and December 2012 Mineral Resource Statement July 2012 December 2012 Percentage Difference.

Asiamet Drilling Further Extends BKM Mineralisation

Northern Dynasty Minerals Ltd.

A New Direction. Copper-Gold Deposit at Thor TSX.V:COL. August 11, May 2013

CANARC RESOURCE CORP Howe Street Vancouver, BC V6C 2T6. News Release

Highlights from the four holes announced in this news release include:

NEWS RELEASE LATEST EXPLORATION PROGRAM CONTINUES TO DEMONSTRATE NARANJILLO AS A HIGH GRADE SILVER HOST

TROILUS GOLD CORP. INITIATES 30,000 METRE DRILL PROGRAM ON TROILUS PROPERTY

Corvus Gold Drills g/t Gold, Extends Mother Lode Sediment Hosted Gold System to at Least 450 Metres Along Strike

West Pender Street Vancouver, BC V6C 2V6 Tel: Fax: TSX-V: GBR NEWS RELEASE

CHAMPION IRON REPORTS EXPLORATION RESULTS AT POWDERHORN PROJECT, NEWFOUNDLAND

Monument Announces NOA 7/8 Drilling Program Results at Burnakura Gold Project

NEWS RELEASE. Evrim and Harvest Gold Complete Drilling at Cerro Cascaron

Drilling at Perseverance in Arizona, USA Suggests Proximity to Porphyry Copper System

NEWS RELEASE. Mountain Province Diamonds Reports Additional Kimberlite Identified in Gahcho Kué Exploration Program

GOLDPLAY ANNOUNCES FURTHER SAMPLING RESULTS FROM SAN MARCIAL HISTORICAL CORE; CONFIRMS OPEN PIT TARGET NEAR SURFACE WITH gpt AgEq.

Canadian Gold Miner Grab Sample Returns 29.5 Grams per tonne Gold from South Kirkland Project

Transcription:

NEWS RELEASE NGEX INTERSECTS 1.45% COPPER OVER 97.6 METRES AND 393.7 G/T SILVER OVER 36 METRES AT FILO DEL SOL PROJECT Vancouver, June 19, 2012 (TSX:NGQ) NGEx Resources Inc. ("NGEx" or the "Company") is pleased to announce initial results from 4 of 7 diamond drill holes completed during the 2012 exploration program at the Filo del Sol project located in San Juan province of Argentina. Filo del Sol is part of the Company s Vicuña Project which includes the Los Helados and Josemaria copper-gold porphyry systems. Highlights from the results reported today include: FSDH-02 with 222.5m of 0.46% Cu, 0.50 g/t Au, and 73.7 g/t Ag; including 36.0m of 0.53% Cu, 0.38 g/t Au, and 393.7 g/t Ag FSDH-03D with 97.6m of 1.45% Cu, 0.27 g/t Au, and 16.3 g/t Ag; including 24m of 3.41% Cu, 0.29 g/t Au, and 9.3 g/t Ag HOLE-ID From (m) To (m) Length (m) Cu % Au g/t Ag g/t FSDH-02 40.0 48.0 8.0 0.01 0.51 4.3 plus 216.0 438.5 222.5 0.46 0.50 73.7 incl. 216.0 324.0 108.0 0.62 0.49 150.1 incl. 230.0 266.0 36.0 0.53 0.38 393.7 Extends and deepens mineralization in hole VRC04, 25 metres to south. Ended in 0.32 g/t Au; 0.45% Cu. FSDH-03D 100.0 197.6 97.6 1.45 0.27 16.3 incl. 100.0 124.0 24.0 3.41 0.29 9.3 incl. 130.0 144.0 14.0 1.17 0.30 86.4 Confirms high-grade mineralization in hole VRC05 at same location. Hole lost above target depth. FSDH-04 100.0 119.6 19.6 1.14 0.42 1.8 Extends high-grade copper in hole VRC28 60m to north. Hole lost above target depth. FSDH-05 12.0 500.6 488.6 0.34 0.25 1.9 Extends and deepens mineralization in hole VRC36, 80 metres to south. The intervals listed above are core lengths. Filo del Sol is characterized by a large volume of relatively homogeneous mineralization and drilled lengths are interpreted to be representative of the true width of the mineralized zone. Filo del Sol is a high-sulphidation copper-gold target that is superimposed on a porphyry copper system

at depth. Copper mineralization in the upper part of the system occurs as chalcanthite, a soluble copper sulfate mineral. This transitions at depth to disseminated and veinlet controlled sulphides including pyrite, enargite, chalcopyrite, and occasional covellite, and chalcocite. The high-sulphidation epithermal part of the system contains appreciable gold and silver. Porphyry-style copper and gold mineralization has been intersected at depth and lateral to the high-sulphidation mineralization. Secondary enrichment of this mineralized system has locally formed a high-grade copper zone. The high grade silver intercepts in FSDH-02 further add to the potential at Filo del Sol. Based on correlation with other drill holes the higher grade zones appear to be relatively flat lying. Filo del Sol is a very large system, with minimum dimensions of the alteration zone extending approximately 2.8 kilometres in a north-south direction and 1 kilometre in an east-west direction. Drilling to date has tested only a portion of the overall system. The 2012 drill program was designed to confirm and extend assay results from previous reverse circulation ( RC ) drill holes with diamond drill hole results, test for extensions of mineralization at depth, since most previous holes ended in mineralization, and to improve the Company s understanding of this large, complex mineralized system with the additional geological information provided by drill core instead of RC chips. Drill holes were spaced along an approximately north-south oriented section line in order to provide better geological information along approximately 1.2 kilometres of the system. The diamond drill holes successfully confirmed the results of the historic RC drilling, and extended previously-known mineralization to depth in holes FSDH02 and FSDH05. Holes FSDH03D and FSDH04 were lost above target depth due to challenging rock conditions. Hole FSDH02 was drilled into the northern part of the deposit area in order to confirm the mineralization intersected in previous RC hole VRC04 and to determine the depth extent of this mineralization. FSDH02 intersected a 222.5 metre section of 0.46% copper, 0.50 g/t gold, and 73.7 g/t silver. A zone of highgrade silver mineralization was also intersected in this hole, with 36 metres of 393.7 g/t silver occurring within the high-sulphidation epithermal zone of the system. Silver mineralization occurs as sulfo-salt minerals. The hole ended at a depth of 438.5 metres while still in good copper-gold mineralization (0.45% copper and 0.32 g/t gold in the last sample). Hole FSDH03D was drilled 400 metres to the south of FSDH02, to test a high-grade copper intersection in previous RC hole VRC05. The zone was confirmed with an intersection of 97.6 metres at 1.45% copper and 0.27 g/t gold, including the extension of the silver zone encountered in FSDH02 with 14 metres at 86.4 g/t silver. FSDH03D was lost at a depth of 197.6 metres while still in strong copper-gold mineralization (0.63% copper and 0.75 g/t gold in the last sample). Hole FSDH04 was drilled near the northern limit of the known mineralization, 200 metres to the north of FSDH02, and had to be abandoned at a depth of 119.6 metres. This hole confirmed the presence of a high-grade zone of copper mineralization indicated by previously drilled RC hole VRC28. However it was unable to test the high-grade copper-gold zone indicated by previous RC holes VRC28, VRC35 and VRC38.

Hole FSDH05 was collared 1,000 metres to the south of FSDH02 in order to confirm and test for the depth extension of porphyry copper-gold style mineralization intersected in previous RC hole VRC36 located approximately 80 metres to the south. FSDH05 was mineralized throughout its entire length, below the overburden, with a 488.6 metre section of 0.34% copper and 0.25 g/t gold. Commenting on today s results, Wojtek Wodzicki, President and CEO of the Company, stated: We are very pleased with these results which confirm the potential of Filo del Sol to host very high-grade copper and precious metal mineralization within a very large envelope of disseminated mineralization. The Company s 2012 exploration program is shaping up to be the most successful in its history. The outstanding results released today from Filo del Sol follow the equally impressive results we obtained earlier this year from our nearby Los Helados and Josemaria projects. The results released today support our view that the Company's land package has the potential to host a very significant new copper-gold district with multiple deposits within a 15 kilometre radius. The results reported today are from the first 4 holes from this year s drill program representing 1,256 metres of core drilling. Assay results for an additional 3 holes representing 590 metres are pending. Drilling at Filo del Sol was completed in April and drilling operations are currently suspended for the South American winter months. Collar coordinates and drill hole orientations for the holes in this news release are shown below: HOLE-ID East North Elevation Length Azimuth Dip FSDH02 435103 6848599 5208 438.5 0-90 FSDH03D 435097 6848199 5142 197.6 0-90 FSDH04 435097 6848797 5211 119.6 0-90 FSDH05 435100 6847600 5089 500.6 0-90 Filo del Sol is one of several large copper-gold systems including the Company's Los Helados and Josemaria projects, located on a contiguous land package that the Company holds in Chile's Region 3 and adjacent San Juan Province Argentina. Los Helados, Josemaria, and Filo del Sol are all part of a joint venture in which the Company holds 60% and JOGMEC (Japan, Oil, Gas, and Metals National Corporation) holds 40%. Each party funds its pro-rata share of expenditures. Filo del Sol is located in San Juan Province, Argentina along the international border with Chile. The project area is located approximately 15 kilometres west of the Josemaria and 17 kilometres southwest of Los Helados. On behalf of the board Wojtek Wodzicki President and CEO For further information, please contact: Sophia Shane, Corporate Development (604) 689-7842. www.ngexresources.com

Qualified Person and Assay Methods The drill core was logged, sawed, and half cores were sampled in their entirety in two meter intervals at the Company s core processing facility. Samples were analyzed at the ACME lab in Santiago, Chile. Samples were crushed, split and 500g was pulverized to 85% passing 200 mesh. Gold analyses were by fire assay fusion with AAS finish on a 30g sample. Copper was analyzed by digestion in three steps of a representative 1 gram from the subsample: 1) with a 10% sulphuric acid cold solution, 2) a 10% sodium cyanide digestion of the residue of step 1, and 3) a 3-acid digestion of the residue of step 2. Solutions from each step were analyzed by atomic absorption. Samples were also analyzed for a suite of 36 elements with ICP-ES. Copper and gold standards as well as blanks and duplicates (field, preparation and analysis) were randomly inserted into the sampling sequence for Quality Control. On average, 9% of the submitted samples correspond to Quality Control samples. The Quality Control/Quality Assurance (QA/QC) program on the Filo del Sol Project is under the management of Diego Charchaflie MSc., P.Geo (BC), a Qualified Person pursuant to NI 43-101. Mr. Bob Carmichael, B.A.Sc, P.Eng., Vice President, Exploration for the Company, is the Qualified Person as defined by National Instrument 43-101 and has reviewed and approved the technical information contained in this news release. Cautionary Note Regarding Forward-Looking Statements This news release contains "forward-looking statements" within the meaning of applicable Canadian securities legislation, concerning the business, operations and financial performance and condition of NGEx Resources Inc. Forward-looking statements include, but are not limited to, statements with respect to the estimation of commodity prices, mineral reserves and resources, the realization of mineral reserve estimates, capital expenditures, costs and timing of the development of new deposits, the success of exploration activities, permitting time lines, currency exchange rate fluctuations, requirements for additional capital, government regulation of mining activities, environmental risks, unanticipated reclamation expenses, title disputes or claims and limitations on insurance coverage. Generally, these forward-looking statements can be identified by the use of forward-looking terminology such as "plans", "expects" or "does not expect", "is expected", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates" or "does not anticipate", or "believes", or variations of such words and phrases or state that certain actions, events or results "may", "could", "would", "might" or "will be taken", "occur" or "be achieved" or the negative connotations thereof. All such forward-looking statements are based on the opinions and estimates of the relevant management as of the date such statements are made and are subject to important risk factors and uncertainties, many of which are beyond the Company's ability to control or predict. Forward-looking statements are necessarily based on estimates and assumptions that are inherently subject to known and unknown risks, uncertainties and other factors that may cause the actual results, level of activity, performance or achievements of the Company to be materially different from those expressed or implied by such forward-looking statements, including but not limited to: risks and uncertainties relating to, among other things, changes in commodity prices, currency fluctuation, financing, unanticipated reserve and resource grades, infrastructure, results of exploration activities, cost overruns, availability of materials and equipment, timeliness of government approvals, taxation, political risk and related economic risk and unanticipated environmental impact on operations as well as other risks and uncertainties described under "Risks Factors" in the Company's Annual Information Form available under the Company's profile at www.sedar.com and the Company's website.

Although the Company has attempted to identify important factors that would cause actual results to differ materially from those contained in forward-looking statements, there may be other factors that cause results not to be as anticipated, estimated, or intended. There can be no assurance that such statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. All of the forward-looking statements contained in this document are qualified by these cautionary statements. Readers should not place undue reliance on forward-looking statements. Forward-looking statements are provided for the purpose of providing information about management's current expectations and plans and allowing investors and other to get a better understanding of the Company's operating environment. The Company expressly disclaims any intention or obligation to update or revise any forward-looking statements whether as a result of new information, events or otherwise, except in accordance with applicable securities laws.

6849000N 6848500N VRC-01 VRC-25 VRC-02 FSDH04 VRC-28 VRC-55 VRC-35 VRC-38 FSDH02 VRC-04 FSDH01 VRC-06 VRC-27 VRC-34 DDHV-01 VRC-54 VRC-05 FSDH03D VRC-26 VRC-07 6848000N VRC-53 FSDH07 VRC-49 VRC-33 VRC-50 VRC-48 FSDH06 VRC-47 VRC-52 VRC-20 VRC-46 VRC-21 6847500N VRC-51 FSDH05 VRC-36 VRC-30 RCVI-12 VRC-29 North 434500E RCVI-17 435000E 0 250 m 500 m 435500E RC HOLE - PREVIOUS YEARS 2012 DRILL HOLE - CURRENT REPORT 2012 DRILL HOLE - ASSAY PENDING FILO DEL SOL PROJECT DRILL HOLE PLAN MAP JUNE 19 2012