Saving on the Geotechnical Investigation A False Economy

Similar documents
Piles & Chalk. Lessons Learnt the Hard Way

World Academy of Science, Engineering and Technology International Journal of Geotechnical and Geological Engineering Vol:11, No:9, S.

Central Queensland Coal Project Appendix 4b Geotechnical Assessment. Environmental Impact Statement

Role of the Geotechnical Consultant in Design Build Projects a General Contractors Geotechnical Engineer s Perspective

Geotechnical Engineering Report

SITE INVESTIGATION 1

Geotechnical Engineering Report

APPENDIX H SOIL SURVEY

Measurement of effective stress shear strength of rock

The process of determining the layers of natural soil deposits that will underlie a proposed structure and their physical properties is generally

TATA CHEMICALS MAGADI LIMITED (Mining Section) TRONA CRUSHING PLANT AND PREWASH TANK FACILITY PROJECT

Local Construction Practice and Geotechnical Performance of Rock Socketed Bored Pile in Sedimentary Crocker Range Formation in Sabah

Geotechnical Engineering Report

Boreholes. Implementation. Boring. Boreholes may be excavated by one of these methods: 1. Auger Boring 2. Wash Boring 3.

ON ADDITIONAL GEOTECHNICAL INVESTIGATION FOR PROPOSED STAGES 4 & 5 DEVELOPMENT

General. DATE December 10, 2013 PROJECT No TO Mary Jarvis Urbandale/Riverside South Development Corporation

Chapter 12 Subsurface Exploration

Oposura Scoping Study Nearing Completion

BELFAST SEWERS PROJECT

PRO GEO GEOTECHNICAL CONSULTANTS SHORT PRESENTATION BARCELONA, SPAIN

ENCE 3610 Soil Mechanics. Site Exploration and Characterisation Field Exploration Methods

GEOTECHNICAL INVESTIGATION REPORT

Portia Gold Mine Update

Square Kilometre Array (SKA) from a Geotechnical Perspective

10. GEOTECHNICAL EXPLORATION PROGRAM

GEOTECHNICAL ENGINEERING II. Subject Code : 06CV64 Internal Assessment Marks : 25 PART A UNIT 1

Interpretation of Pile Integrity Test (PIT) Results

OFFSHORE. Advanced Weather Technology

ADSC Research Project Update: Rock Sockets in the Southeastern U.S.

Civil Engineering, Surveying and Environmental Consulting WASP0059.ltr.JLS.Mich Ave Bridge Geotech.docx

Gotechnical Investigations and Sampling

Drilled Shaft Foundations in Limestone. Dan Brown, P.E., Ph.D. Dan Brown and Associates

Collaborative Geotechnical BIM technologies. Carl Grice Software Development Director (Keynetix) Holger Kessler - Team Leader Modelling Systems (BGS)

Use of monitoring data during construction to refine cavern design

For personal use only

LECTURE 10. Module 3 : Field Tests in Rock 3.6 GEOPHYSICAL INVESTIGATION

For personal use only

Geotechnical Level 1 Supervision Report Muller Street, Redland Bay.

REPORT NO 12/115/D NOVEMBER 2012 GEOTECHNICAL INVESTIGATION FOR THE PROPOSED SOLAR PHOTOVOLTAIC FACILITY, GROOTVLEI POWER STATION

The attitude he maintains in his relation to the engineer is very well stated in his own words:

SCOPE OF INVESTIGATION Simple visual examination of soil at the surface or from shallow test pits. Detailed study of soil and groundwater to a

APPENDIX E SOILS TEST REPORTS

Limited Geotechnical Engineering Evaluation Classroom Additions Albany County Campus Laramie, Wyoming

REPORT ON THE ASSESSMENT OF TRENCHING INTHE ROAD RESERVE OF THE ROAD BETWEEN BEAUFORT WEST AND CARNAVON.

Causes of Dynamic Overbreak and Control Measures Taken at the Alborz Tunnel, Iran

THE MINISTRY OF ENERGY AND ENERGY INDUSTRIES MINERALS DIVISION MINE DESIGN TEMPLATE OPERATOR NAME: OPERATOR ADDRESS: PHONE NUMBER: FACSIMILE:

GEOTECHNICAL REPORT CBSA Facility Redevelopment Thousand Islands International Crossing Lansdowne, Ontario

R.M.HARW & ASSOCIATES LTD. GEOTECHNICAL INVESTIGATION PROPOSED BRIDGE SITE. HELAVA CREEKl MILE MACKENZIE HIGHWAY E-2510 OCTOBER 16, 1973

Appendix A. Producer Statement Advisory Note

IMAGING OF DEEP SINKHOLES USING THE MULTI-ELECTRODE RESISTIVITY IMPLANT TECHNIQUE (MERIT) CASE STUDIES IN FLORIDA

GLOUCESTER COAL LTD 2006 Annual Results Media Presentation 25 August 2006

MONTE CARLO SIMULATION RISK ANALYSIS AND ITS APPLICATION IN MODELLING THE INCLEMENT WEATHER FOR PROGRAMMING CIVIL ENGINEERING PROJECTS

Engineer. Engineering. Engineering. (in-ja-neer ) A person trained and skilled in any of the various branches of engineering: a civil engineer

Chapter (11) Pile Foundations

HISTORY OF CONSTRUCTION FOR EXISTING CCR SURFACE IMPOUNDMENT PLANT GASTON ASH POND 40 CFR (c)(1)(i) (xii)

Geotechnical Engineering Study, Conifer Senior High School Football Field Improvements, Conifer, Colorado

BORE CORE SAMPLING DESIGN & OBJECTIVES. John Bamberry Principal Geologist Palaris Australia

Pierce County Department of Planning and Land Services Development Engineering Section

Seismic Evaluation of Tailing Storage Facility

14 Geotechnical Hazards

June 9, R. D. Cook, P.Eng. Soils Engineer Special Services Western Region PUBLIC WORKS CANADA WESTERN REGION REPORT ON


NEW DOWN-HOLE PENETROMETER (DHP-CIGMAT) FOR CONSTRUCTION APPLICATIONS

Shaft Sinking with Electronic detonators at the Gautrain Rapid Rail Link Project

Preliminary Geotechnical Investigation Cadiz / Trigg County I-24 Business Park. Cadiz, Kentucky

Module 1 : Site Exploration and Geotechnical Investigation

THE INSTITUTE OF COST ACCOUNTANTS OF INDIA (ICAI)

Geotechnical verification of impact compaction

ASX RELEASE ACTIVITY UPDATE SPARGOVILLE PROJECT WA MINING AND EXPLORATION

BUFFALO RIVER COALITION PO Box 101, Jasper, AR (870)

BLOCK SHEAR CONNECTION DESIGN CHECKS

NOTES ON SUBBASE AGGREGATE SPECIFICATION TNZ M/3. These notes must not be included in the Contract Documents.

OP-13. PROCEDURES FOR DESIGN OF EMBANKMENT

OP-023. INTERPRETATION OF INSTRUMENTED TEST PILE RESULT

!!!!!! Piles Capacity Reference Manual

GOULAMINA DRILLING AND GENERAL PROGRESS UPDATE

Appendix J. Geological Investigation

HIGH-GRADE GOLD MINERALISATION CONTINUES ALONG STRIKE AT THE BODDINGTON SOUTH GOLD PROJECT

Bored Sockets in weathered Basalt

For personal use only

February 22, 2016 AG File No

Report on Site Classification & Construction Testing

16 January 2018 Job Number: RICHARD NEWMAN C\- CLARK FORTUNE MCDONALD AND ASSOCIATES PO BOX 553 QUEENSTOWN

Geophysics for Land Development

Contents. Ipswich City Council Ipswich Adopted Infrastructure Charges Resolution (No. 1) Page

WHAT IS MINERAL EXPLORATION?

2014/15 Annual review of the Meteorological Service of New Zealand Limited

Large scale three-dimensional pit slope stability analysis of the structurally controlled mechanism in Mae Moh coal mine

STEP-OUT DRILLING EXTENDS HIGH GRADE COPPER ZONE AT SYNDICATED S 100% BARBARA SOUTH LODE

patersongroup Mineral Aggregate Assessment 3119 Carp Road Ottawa, Ontario Prepared For Mr. Greg LeBlanc March 7, 2014 Report: PH2223-REP.

CENTRAL REGION GEOHAZARDS RISK ASSESSMENT SITE INSPECTION FORM

Driven pile installations on Australia s longest bridge

Helix Resources Limited A.C.N Incorporated in Western Australia

STATISTICAL APPROACH FOR HIGHER TECHNICAL OBJECTIVITY CONCERNING THE IDEAL NUMBER OF SPT PROBING FOR OPTIMIZATION OF FOUNDATION PROJECTS

Activity Submitted by Tim Schroeder, Bennington College,

McElroy Bryan Geological Services. Consulting Geologists since 1970 CORPORATE PROFILE

Department of National Defence B-Jetty Reconstruction

Snow Cover. Snow Plowing and Removal Services Best Practices Guide. l

Milford Centre Ltd. Private Plan Change GEOTECHNICAL ASSESSMENT

DIFFICULTIES IN ASSESSING LIQUEFACTION POTENTIAL FROM CONVENTIONAL FIELD TESTING

Transcription:

Saving on the Geotechnical Investigation A False Economy G. S. Young 1, BE, MEngSc, FIEAust and W. Ellis 2. 1 Douglas Partners Pty Ltd, 96 Hermitage Road, West Ryde, NSW 2114 PH (02) 9809 0666; email: geoff.young@douglaspartners.com.au 2 SFL/Piletech (EA) Pty Ltd, PO Box 11, Strathfield South, NSW 2136; PH (02) 9742 3444; email: warwick@sflgroup.com.au ABSTRACT For an infrastructure project in Sydney south-west, the client organised a geotechnical investigation via his structural engineer for the design and construction of the facility. The geotechnical investigation comprised nine bores augered to the top of rock and the report made recommendations for foundations. The tender design, based on the recommendations of the geotechnical investigation, resulted in piled foundations of varying sizes and depths. Some of the piles were designed as 900 mm diameter with 5.5 m sockets into rock. Following the award of the contract for the piling works, the piling contractor arranged for core drilling of the rock and redesigned the piles based on significantly higher design parameters. This case study compares the cost of the piling works based on the original geotechnical investigation with the cost of redesigned piling works. It emphasises the cost savings made during the initial geotechnical investigation can lead to more expensive designs and loss of initial cost savings many times over during construction. Keywords: investigation costs, piling costs 1 INTRODUCTION An infrastructure project was proposed in south-western Sydney and the client via his structural engineer organised a combined geotechnical and environmental investigation. The client directly commissioned the investigation. The geotechnical report states that the objective of the investigation was to assess the subsurface ground conditions and provide comments on several items including suitable footing type including allowable bearing capacity. This is a real site and the numbers presented in the paper are also real, however, the location and names of the some parties have been withheld. 2 INITIAL GEOTECHNICAL INVESTIGATION The combined geotechnical and contamination investigation for the site was carried out by a company specialising in geotechnical and environmental investigations. For the investigation, a total of nine (9) boreholes were drilled across the site and were spaced to provide reasonable coverage of the structure envelope. The bores were reported as being drilled using spiral augers attached to a V-bit to refusal depth on shale followed by tungsten carbide (TC) bit drilling into shale to refusal depths ranging from 5 m to 8 m. No coring of the rock was undertaken. A total length of drilling was 55.4 m. The strength of the shale was subjectively assessed by visually examining the shale cuttings off the augers and observing the TC bit resistance. The subsurface profile given in the geotechnical report was summarised as topsoil over filling, silty clay and bedrock. The bedrock was encountered at depths ranging from 4.4 m to 7.4 m and visually assessed to be medium strength, extremely to distinctly weathered shale which increased to medium to high strength with depth. The geotechnical investigation report recommended that footings for the structure be piers founded on weathered shale bedrock adopting an allowable end bearing pressure of 600 kpa. A shaft adhesion of 20 kpa was provided for the sections of the piers below 1 m depth. It is estimated that the cost of the above geotechnical investigation component with some laboratory and geotechnical reporting would have been of the order of $10 000 plus GST.

3 INITIAL DESIGN The structural engineer for the project adopted the findings and recommendations of the geotechnical report and designed the footings. The initial pile design was for 392 bored piles founded in rock. The pile designs ranged from 450 mm to 1050 mm in diameter and from 3.0 m to 9.4 m in depth. Details of pile diameters and depths for the initial design are given in Table 2. The initial foundation design quantities were: Linear metres of piles 1754 m Quantity of concrete 845 m 3 Reinforcement 51.5 tonnes It was the above foundation design which went out to tender for construction. The quantities of concrete and steel had an allowance for wastage and spoil. 4 ADDITIONAL INVESTIGATION Following the award of the piling works tender, the Piling Contractor, SFL/Piletech, engaged Douglas Partners to reassess the underlying rock strength by coring the rock. Four (4) boreholes were drilled on the site by augering and wash boring to top of rock and recovering approximately 3 m of NMLC size (52 mm diameter) cores of rock. The additional investigation was suggested by the piling contractor, not the client or his structural engineer. The recovered cores were logged describing the rock type, strength, weathering, bedding planes, jointing and defects. The rock strength was assessed using Point Load Index Strength test and the results ranged from 0.2 MPa to 5.1 MPa with an average of 2.7 MPa. As the defects were visible and the rock could be tested for strength, it was possible to classify the rock using the Pells et al (1978, 1998) rock classes. The subsurface profile encountered in the bores was clay over siltstone or sandstone. (It is noted that the site had been stripped of topsoil and filling prior to the additional investigation.) Extremely low to very low strength sandstone (Class V) was found at depths ranging from 3.2 m to 4.6 m with medium to high strength sandstone (Class III) encountered at depth of 4.9 m to 6.0 m depth. There was a different in rock description as the additional investigation described the rock as siltstone or sandstone while the previous investigation described the rock as shale. It may be that the grinding of the rock using a TC bit in the initial investigation did not allow for a proper identification of the rock. A summary of the rock depths from the additional investigation is given in Table 1. Table 1: Borehole summary Stratum Extremely low to very low strength sandstone (Class V) Low strength sandstone (Class IV) Medium or high strength sandstone (Class III) Depth to Stratum 3.2 m - 4.6 m 4.5 m - 5.3 m 4.9 m 6.0 m As a result of the additional investigation, serviceability end bearing pressures of 1 000 kpa, 2 000 kpa and 6 000 kpa were suggested for Class V, Class IV and Class III sandstone respectively. Using the same quantities of work as for the initial investigation but including an allowance for rock coring in each bore, the cost of the field work, laboratory testing and reporting is estimated to be of the order of $15 000.

5 REVISED PILE DESIGN As a result of the additional investigation, the Piling Contractor was able to redesign the piles with higher end bearing pressures and shaft adhesion. The redesign resulted in the same number of piles but with 121 piles of 600 mm diameter and 271 piles of 400 mm diameter. The revised pile design is given in Table 2. Table 2: Revised Pile Design Pile Type No of Piles Initial Design Revised Design Pile Diameter (mm) Length of pile (m) Pile Diameter (mm) Length of pile (m) A 84 1050 3.0 600 3.4 B 29 900 3.0 600 3.4 C 29 600 3.0 400 3.4 D 15 750 6.7 400 5.2 E 63 750 5.5 400 4.9 F 15 600 6.0 400 5.2 G 32 600 5.1 400 4.9 H 27 450 6.0 400 4.9 I 6 750 8.9 600 5.3 J 2 750 9.4 600 5.3 K 38 450 3.5 400 3.0 L 52 600 5.0 400 5.3 6 COMPARISON OF PILE DESIGNS The revised pile design generally reduced the pile diameters and, in many cases, decreased the pile depths. The most noticeable changes were Pile A which was reduced from 1050 mm diameter to 600 mm diameter and Pile J whose depth decreased from 9.4 m to 5.3 m. There were some significant changes. A summary of the quantities involved in both the initial and revised design is provided in Table 3. Table 3: Pile Design Comparison Quantities Initial Design Revised Design Savings Quantity Percentage No of piles 392 392 0 0 Linear length of piles 1754 m 1668 m 86 m 5% Concrete Volume 845 m 3 306 m 3 539 m 3 64% Reinforcement 51.5 tonnes 22.7 tonnes 28.8 tonnes 56% No of days piling 47 days 19 days 28 days 60% Amount of spoil 1440 tonnes 550 tonnes 890 tonnes 62% The cost benefits of the redesign are provided in Table 4. Table 4: Cost Benefits Initial Revised Savings Design Design Quantity Percentage Approximate cost of investigation $10 000 $15 000 ($ 5000) (50%) Cost of piling $620 000 $425 000 $195 000 31% On this particular project, the client saved approximately $5 000 on the geotechnical investigation by not coring the underlying bedrock. Due to the conservative recommendations contained in the initial geotechnical report, the cost of the piling works as initially designed was $620 000. However, if the client had spent the extra money, approximately $5 000, to core the rock and obtain more appropriate design parameters, the pile design would have cost $425 000 and occupied 19 days in the program. Therefore an initial saving of $5 000 on the geotechnical investigation cost the client approximately $200 000 more in the long run. In other works, the additional piling costs were nearly 40 times the initial cost savings made during the investigation.

The redesign also lead to other savings such as the reduced time of site, reduced interest payment on loans, reduced site administration costs, etc. This can be significant on some site, especially where there is a tight construction program and/or high liquidated damage costs. The major saving on this particular site was the reduced time spent on the site as there was a tight construction program. There were some other costs involved in that the piles had to be redesigned by engineers following an additional investigation and there was a delay on site while the redesign was being carried out. These costs were significantly less than the savings. 7 COMMENTS In this case, the initial geotechnical investigation was not able to properly assess the rock strength and defects within the bedrock because no coring of the rock was undertaken. Therefore it was not possible to assign rock classes to the bedrock. The cored bores, although more expensive to drill, provides a better assessment of the rock strength and allows for viewing the defects of the in situ rock. Once this information is obtained, it is possible to assign rock classes to the bedrock using the Pells et al method and provide more appropriate design parameters. The initial design had a number of piles founded at depths greater than the depth of the initial investigation It would have been assumed that, based on the initial investigation, the sockets would be in medium to high strength rock although the design of the piles was based on design parameters appropriate for extremely low strength rock. The additional investigation established that the initial design would involve drilling sockets into high strength sandstone. This would have resulted in slower drilling rates, more time on site and a possible variation claim for different ground conditions to that reported in the initial investigation. The original investigation was commissioned by the end client. In arriving at a decision, the client should be aware of the other factors such as long term cost implications, timing, availability, etc rather than just comparing prices. If in doubt, the client should ask his structural or civil engineers for advice and not be driven by price alone. In most things, you get what you pay for. A limited geotechnical investigation will generally provide limited advice or recommendations. In most cases, a client will not realise the long term implications of his initial cost savings because he has nothing to compare it. He only has the recommendations of the one investigation and does not have the luxury of another, possibly dearer, investigation to compare other possible recommendations. It raises the dilemma of how much do geotechnical engineers reduce the price (and consequently the scope of works) of geotechnical investigation to win a proposal knowing that it will probably cost the client more in the long run. In such cases, a geotechnical engineer should explain its limitations in the proposal. If a client is totally price driven, he should be comparing apples with apples and provide a detailed schedule of rates rather than asking for a price for a geotechnical investigation. 8 CONCLUSION It was only the astuteness of the piling contractor in this case which provided a cost saving of a significant amount of money. How the saving is distributed is another question and not discussed in this paper. The above example shows the savings in investigation costs of approximately $5 000 nearly lead to costly foundation solutions, some $200 000 more expensive than necessary. Often, many clients are mislead in thinking that they are saving money, but as they do not carry out the comparison, they are unaware of the potential cost saving which can be made in the long run. In addition to the actual cost of piling, there are also other factors such as site costs and construction program which can be adversely affected by savings made during the geotechnical investigation stage.

Each project is different and therefore the quantities will vary, but the principle is the same. However, it can be said that savings on many medium to large sized geotechnical investigations is often a false economy. The above case reconfirms the conclusion of Phillips et al (1990), Competent geotechnical input can provide significant cost savings during the course of a project, both at the feasibility and design stage, and during construction. The preparation of reliable and comprehensive site information will increase contractor confidence and reduce the risk of construction costs." REFERENCES Andrews, P., The hidden cost of Geotechncial Investigations, Australian Geomechnaics, Volume 41 No 4, December 2006 Pells, P. J. N., Douglas, D. J., Rodway, B., Thorne, C. and Burgess, B. K. (1978) Design Loadings for Foundations on Shale and Sandstone in the Sydney Region. Australian Geomechanics Journal, Volume G8, 31-39, 1978 Pells, P. J. N., Mostyn, G. And Walker, B. F. (1998) Design Loadings for Foundations on Shale and Sandstone in the Sydney Region. Australian Geomechanics, Number 33 Part 3 December 1998. Phillips, A. B., Douglas, B. J., Fell, R., McMahon, M., Pells, P. J. N., Thorne, C., Turner., R., Walker, B., The Geotechnical Consultant, The Institution of Engineers, Australia, Civil College Technical Report April 6 1990.