PREPARING FOR PRODUCTION AT KARLAWINDA A rare opportunity in the WA gold sector

Similar documents
FIVE RIGS DRILLING AT KARLAWINDA

FIVE RIGS DRILLING AT KARLAWINDA

New Drilling Program Commences at Mutiny s Deflector Deposit

For personal use only

For personal use only

$2.5 Million Resource Drilling Program Commences at Siberia Mining Centre

Ausgold awarded EIS grant for Jinkas deep drilling

ASX:TLM. Closing in on world-class copper-gold deposits Resources Rising Stars, September 2011

ASX announcement 16 May 2016

FINANCIERS MANDATED FOR THE DALGARANGA GOLD PROJECT

Disclaimer. Forward-Looking Statements. Competent Person s Statement

ASX:TLM. Closing in on world-class copper-gold deposits Annual General Meeting, November 2011

October 2017 Investor Presentation. Moving to the next level: cash-flow, exploration and growth in WA s premier gold districts

STEP-OUT DRILLING EXTENDS HIGH GRADE COPPER ZONE AT SYNDICATED S 100% BARBARA SOUTH LODE

For personal use only OZ MINERALS CARRAPATEENA COPPER GOLD PROJECT SOUTH AUSTRALIA 27 MARCH 2012

New High Grade Gold-Copper Extensions At Mutiny s Deflector Deposit Highlight Project s Significant Growth Potential

Option agreement with Randgold set to commercialise Massigui Gold Project

March 26 th Expansive Exploration Target Defined at Leonora Gold Project

Annual General Meeting

2015 ANNUAL GENERAL MEETING PRESENTATION Malagasy Minerals Limited (ASX: MGY) A Golden Beginning

ACQUISITION OF THE MCCLEERY COPPER-COBALT PROJECT, CANADA

Intensive Field Based Exploration Program Commences at Dobsina Cobalt-Nickel-Copper Sulphide Project

Ulysses: Genesis of a significant new underground gold mine near Leonora, WA. Michael Fowler, Managing Director. 22 February 2018

Developing the +1.2Moz Pilbara Gold Project

King of the Hills Gold Project, Leonora, to commence production in Q2 2011

For personal use only

New High Grade Lode Discovered at Wagtail South

For personal use only

BUNDARRA RESOURCE UPDATE

ASX Announcements & Media Release

For personal use only

HERON ENTERS OPTION TO PURCHASE A1 GOLD MINE, EASTERN VICTORIA

Blox, Inc. Announces New Drilling Target Defined at Mansounia Gold Project.

For personal use only

MEDIA RELEASE OCEANAGOLD ANNOUNCES FURTHER DRILL RESULTS AND UPDATED RESOURCE FROM BLACKWATER HIGH-GRADE GOLD PROJECT

For personal use only

Annual General Meeting

HIGHLIGHTS. Strong drilling results and positive Scoping Study pave way for Underground Feasibility Study at Ulysses

For personal use only

Kalongwe High Grade Copper-Cobalt Project Katanga Province, DRC

Cash-flow, exploration and growth in WA s premier gold districts. Resources Rising Stars, May 2017 / Michael Fowler, Managing Director

2010 RIU Sydney Resources Round-up

NEWS RELEASE ORCA GOLD INDICATED AND INFERRED RESOURCES AT BLOCK 14 INCREASE BY 24% AND 48% RESPECTIVELY

Further High Grade Gold Mineralisation Intersected in Bonanza Zones at Mt Kare Gold/Silver Deposit PNG

MEDIA RELEASE OCEANAGOLD ANNOUNCES FURTHER DOWN DIP EXTENSIONS OF MINERALISATION AT PANEL 2: FRASERS UNDERGROUND MINE

For personal use only

For personal use only Heemskirk Tin Project - Tasmania

KINGSTON RESOURCES LIMITED

INFILL DRILLING EXPANDS MINERALIZATION IN HIGH-GRADE GOLD-COPPER CORE AT SOUTHWEST DISCOVERY ZONE TURQUOISE HILL PROJECT, MONGOLIA

Merger Presentation April 2009

Portia Gold Mine Update

SUMMARY HIGHL. The project is located close to road and gas pipeline infrastructure and a large service centre.

For personal use only

60% upgrade of Flying Doctor Resource to 104,600 tonnes of contained zinc and lead.

Ulysses Gold Project, WA

For personal use only

EMU NL Annual General Meeting

ASX Announcement 24 December Drilling results confirm depth potential of Lamboo Project

MARCH 2010 QUARTERLY REPORT

CAUTIONARY STATEMENT

Nickel discovery in a world class region Gold discovery in a 20 million ounce Greenstone Belt. February 2013

LATEST DRILL RESULTS REVEALS MINERALISATION OPEN AT STRIKE AND DEPTH AT KATANNING GOLD DEPOSIT

ASX announcement. Mylo-Frontier Pilbara Gold Project acquisition. 27 November Summary

CORPORATE UPDATE. Feasibility Study being finalised for completion towards the end of April.

For personal use only

CENTAURUS EXPANDS JAMBREIRO STUDY WORK AS A RESULT OF EXCELLENT RESULTS IN SOUTH EAST EXTENSION ZONE

An ASX listed Perth-based gold explorer focused on Ghana in West Africa

EXPLORATION ACTIVITY TO RECOMMENCE AT KOURI GOLD PROJECT IN BURKINA FASO

News Release DRILLING STEPPED UP AT FORRESTANIA NICKEL PROJECT AND UPDATE ON DIGGERS SOUTH PRE - FEASIBILITY STUDY

SECOND ADVANCED GOLD PROJECT IDENTIFIED AT THREE RIVERS PROJECT

Symposium s Investor Roadshow Sydney 12 August 2014 Melbourne 13 August 2014

GASCOYNE RESOURCES LIMITED

SITE WORKS COMMENCE AT A1 GOLD MINE, EASTERN VICTORIA

Co-O MINE MINERAL RESOURCE UPDATE

Gold Discovery at Tasiast South in Mauritania. May 2012

For personal use only

DORAY MINERALS TO PRESENT AT THE AMEC CONVENTION 2013

ASX ANNOUNCEMENT 21 MARCH 2011

For personal use only

For personal use only

ASX/MEDIA RELEASE 25 November EMERGENT CONFIRMS MAJOR JORC RESOURCE UPGRADE TO 561Mt FROM PREVIOUS 127Mt AT BEYONDIE IRON PROJECT

MEDIA RELEASE OCEANAGOLD REPORTS ADDITIONAL HIGH-GRADE DRILL RESULTS AT WAIHI IN NEW ZEALAND

HIGH-GRADE GOLD MINERALISATION CONTINUES ALONG STRIKE AT THE BODDINGTON SOUTH GOLD PROJECT

High Grade Gold Intercepts at Bangaba

News Release. Infill Drilling Program

For personal use only

Carrapateena Mineral Resources Explanatory Notes April OZ Minerals Limited. Carrapateena Mineral Resources Statement April

HIGHLY SUCCESSFUL SEISMIC SURVEY DOUBLES SIZE OF DEEP PALAEOVALLEY AT LAKE WELLS POTASH PROJECT

For personal use only

ASX/Media Announcement

EXCELLENT FIRST DRILL RESULTS FROM WELD RANGE

More growth at Wa Gold Project as Julie-Collette resource increases to 410,700 ounces

CROCODILE GOLD FILES TECHNICAL REPORTS FOR FOSTERVILLE AND COSMO GOLD MINES AND PROVIDES ANNUAL GENERAL MEETING INFORMATION

Maximising Gold Resources in Senegal

New Gold Drilling Push in East Africa:

QUEEN SHEBA - RESOURCE TABLE: AUGUST 2011 RESOURCE CATEGORY. Tonnes Au Ag Cu (000) g/t g/t % GLOBAL RESOURCE TABLE: CONTAINED METAL

AVION GOLD DJAMBAYE II ZONE, TABAKOTO PROJECT, MALI, RETURNS HIGH GRADE INTERCEPTS OF 7.56 G/T Au OVER 7.0 METRES AND G/T Au OVER 3.

24 October Dear Shareholders, 2014 ANNUAL REPORT

For personal use only

MAJOR EXPLORATION SUCCESS AT JACK HILLS IRON ORE PROJECT EXPLORATION TARGET OF ADDITIONAL MILLION TONNES

Transcription:

PREPARING FOR PRODUCTION AT KARLAWINDA A rare opportunity in the WA gold sector Peter Langworthy Executive GM Geology Euroz 2017 Rottnest Conference 16 th March 2017 Definitive Feasibility Study by mid-2017 Fully-funded to decision to mine Significant upside on road to production

Disclaimer & Competent Person s Statement CAUTIONARY STATEMENT FORWARD LOOKING STATEMENTS This announcement may contain certain forward looking statements which may not have been based solely on historical facts, but rather may be based on the Company s current expectations about future events and results. Where the Company expresses or implies an expectation of belief as to future events or results, such expectation or belief is expressedingoodfaithandbelievedtohaveareasonable basis. The detailed reasons for that conclusion are outlined throughout this announcement and all Material Assumptions are disclosed. However, forward looking statements are subject to risks, uncertainties, assumptions and other factors, which could cause actual results to differ materially from future results expressed, projected or implied by such forward looking statements. Such risks include, but are not limited to resource risk, metals price volatility, currency fluctuations, increased production costs and variances in ore grade or recovery rates from those assumed in mining plans, as well as governmental regulation and judicial outcomes. For a more detailed discussion of such risks and other factors, see the Company s Annual Reports, as well as the Company s other filings. Readers should not place undue reliance on forward looking information. The Company does not undertake any obligation to release publically any revisions to any forward looking statement to reflect events or circumstances after the date of this announcement, or to reflect the occurrence of unanticipated events, except as may be required under applicable securities laws. CAUTIONARY STATEMENT PRELIMINARY NATURE OF STUDY This announcement has been prepared in accordance with the JORC Code (2012) and the ASX Listing Rules. The Company advises that the Scoping Study results contained in this announcement are preliminary in nature as the conclusions are based on low level technical and economic assessments, and are insufficient to support the calculation of Ore Reserves or to provide an assurance of economic development at this time. There is a low level of geological confidence associatedwithinferredmineralresourcesasusedinthisreportandthereisno certainty that further exploration work will result in the determination of Indicated Mineral Resources or that the outcomes of the Scoping Study will be realised. Accordingly, these Inferred Resources should not be relied on by investors when making investment decisions. ASX announcements are available on the Company s website at www.capmetals.com.au COMPETENT PERSON S STATEMENT The information in this report that relates to Exploration Results or MineralResourcesisbasedoninformationcompiledorreviewedbyMr.MichaelMartin who is Principal Resource Geologist at Perth based consultant group OMNI GeoX Pty Ltd and is a current Member of the Australian Institute of Geoscientists. Mr. Michael Martin acts as a consultant for Capricorn Metals Limited and has sufficient experience, which is relevant to the style of mineralisation and types of deposit under consideration and to the activities undertaken, to qualify as a Competent Personasdefinedinthe2012Editionofthe Australasian Code of Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr. Martin consents to the inclusion in the report of the matters based on the information in the form and context in which it appears. The information in this report that relates to Exploration Results or Mineral Resources is based on information reviewed by Mr. Peter Langworthy, Technical Director, who a current Member of the Australian Institute of Mining and Metallurgy. Mr. Peter Langworthy is a full time Executive Director of Capricorn Metals Limited and has sufficient experience, which is relevant to the style of mineralisation and types of deposit under consideration and to the activities undertaken, to qualify as a Competent Person as defined in the 2012 Edition of the Australasian Code of Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr. Martin consents to the inclusion in the report of the matters based on the information in the form and context in which it appears. 1 Page: 2

A Rare Opportunity in the WA Gold Sector A simple, straightforward development and growth opportunity 100%-owned Karlawinda Gold Project Large scale un-mined ~1Moz gold resource Expected high conversion rate into Ore Reserves Targeting significant production profile from single, large open pit Clear development pathway: Simple metallurgy, straightforward open pit mine plan Simple, near-term pathway to production and cash-flow: DFS by mid-2017 Fully-funded to decision to mine: $10M cornerstone investment New board and management structure set to deliver value No better time to build a gold mine in the Pilbara: Infrastructure and resources Low-risk jurisdiction Strong growth potential from new discoveries in under-explored goldfield Page: 3

Corporate Overview A well funded WA gold company with strong backing Corporate Information ASX Code CMM Shares on Issue 541.8m Share Price as at 13 th March 2017 13.5c Market Cap 13 th March 2017 Cash as at 31 st December 2016 Unlisted options CMM Share Price as at 13 March 2017 ~$73.1m $1.73m (+$10m) 37m Shareholding Distribution (as at 9 th March 2017) Page: 4

Board and Management Restructure: Team to Deliver A strong team with extensive experience in developing and operating mid tier mining projects Board of Directors Management Team Heath Hellewell Executive Chairman Geologist with +22 years experience in gold, base metals & diamonds Co founding Executive Director of Doray Minerals, and previous senior positions with Independence Group NL, Resolute Mining and DeBeers Australia Co winner of the 2014 AMEC Prospector of the Year award Guy LeClezio Non Executive Director 20 years experience in mining and exploration Previously an Executive Director of Eyres Reed Ltd and Canadian Imperial Bank of Commerce, both leading WA stockbrokers specialising in the mining industry Founding director of Madagascar Resources NL and previous director of Windy Knob Resources Ltd Stuart Pether Non Executive Director Mining Engineer with 25 years experience in project development, technical studies, mine operations and corporate management Vice President, Project Development with Evolution Mining Previous senior positions with Kula Gold, Catalpa Resources, CBH Resources, PacMin Mining Limited, Dominion Mining and Western Mining Corporation Peter Thompson Chief Operating Officer Geologist with extensive experience in gold, nickel and copper Previous senior roles with WMC, Anaconda Nickel, Jubilee Mines, St Barbara Ltd, Beaconsfield Gold and Central Asia Resources Significant experience in operating deep underground gold and heap leach start up operations Peter Langworthy General Manager Geology Geologist with 26 years experience in mineral exploration and project development in Australia and Indonesia Senior management roles with WMC Resources, PacMin Mining, Jubilee Mines and Talisman Mining Part of the corporate team responsible for the growth of Jubilee Mines until it was taken over by Xstrata for $23/share Jonathon Shellabear Chief Financial Officer 25 years experience as a senior corporate executive and investment banker specialising in the mining sector Senior investment banking positions with NM Rothschild & Sons, Deutsche Bank and Resource Finance Corporation Former Managing Director of Dominion Mining, and previous senior roles with Portman Limited and Heron Resources Page: 5

Karlawinda: Back to the Future in WA gold A straightforward gold project like dozens in the 1980 s KEY PROJECT ATTRIBUTES: 100% ownership Low-risk jurisdiction Tier-1 location: 60km from Newman Granted Mining Lease Native Title Agreement Environmental framework understood World-class infrastructure and support services Straightforward development Untouched resource (no legacy issues) Large-scale single, staged open pit Low strip ratio High margin laterite and oxide resources Page: 6

Counting Down to Karlawinda Rapid progress from project acquisition to the cusp of development MAJOR PROJECT BENCHMARKS ACHIEVED February 2016 Project acquired and initial funding secured June 2016 Resource expanded to 914,000oz following initial drilling July 2016 Positive Scoping Study completed August 2016 Definitive Feasibility Study commenced November 2016 Native Title Agreement signed, Mining Lease secured December 2016 75,000m in fill and extensional drilling program completed December 2016 Water borefield confirmed MAJOR PROJECT BENCHMARKS UPCOMING Feb March 2017 End March 2017 End April 2017 End June 2017 Late 2017 Late 2017 Balance of assay results from 2016 drill program Upgrade of current 914,000oz resource: Measured and Indicated Maiden Ore Reserve Definitive Feasibility Study Project funding Start of project construction Page: 7

Bibra Gold Deposit A Rare Opportunity in WA Gold Simple, predictable shear hosted mineralised system Large, Archaean mineralised system 1.1km strike length Drilled 800m down-dip: remains open Broad shear zones up to 50m wide strong high grade component Large laterite deposit near surface Page: 8

Bibra Gold Deposit A Rare Opportunity in WA Gold Simple, predictable shear hosted mineralised system Large, Archaean mineralised system 1.1km strike length Drilled 800m down-dip: remains open Broad shear zones up to 50m wide strong high grade component Large laterite deposit near surface Page: 9

Bibra Gold Deposit De Risked Following Major Drill Campaign Low risk development, well understood: large, quality datasets Drill spacing 25 x 25m and 25 x 50m 909 Reverse Circulation drill holes: 130,086m 83 resource diamond holes: 12,700m 17 metallurgical holes: 6,234m 5 geotechnical diamond holes: 1,115m Page: 10

Bibra Gold Deposit Resource Upgrade Imminent Resource upgrade on track for completion by end March 2017 June 2016 Inferred Resource Laterite Domain 2.1 million tonnes @ 1.3g/t for 85,000oz Oxide & Transitional Domain 5.8 million tonnes @ 1.1g/t for 200,000oz Fresh Domain 17.6 million tonnes @ 1.1g/t for 629,000oz TOTAL INFERRED RESOURCE: 25.5 million tonnes @ 1.1g/t Au for 914,000oz Pit constraint: A$1,750 per ounce Lower cut: 0.5g/t Page: 11

Bibra Gold Deposit Strong Open Pit Gold Endowment Resource upgrade on track for completion by end March 2017 June 2016 Inferred Resource Laterite Domain 2.1 million tonnes @ 1.3g/t for 85,000oz Oxide & Transitional Domain 5.8 million tonnes @ 1.1g/t for 200,000oz Fresh Domain 17.6 million tonnes @ 1.1g/t for 629,000oz TOTAL INFERRED RESOURCE: 25.5 million tonnes @ 1.1g/t Au for 914,000oz Pit constraint: A$1,750 per ounce Lower cut: 0.5g/t Page: 12

Bibra Gold Deposit Upside Project anatomy Laterite Domain High Grade Zones Delineated over 1.1km by 500m Thickness up to 21m Robust high grade core Resource upgrade to M+I Excellent metallurgical characteristics Consistent thick zones of shear zone hosted mineralisation Multiple stacked lodes Strong high grade component: 13 metres @ 3.3g/t Au 14 metres @ 3.1g/t Au 9 metres @ 3.8g/t Au Page: 13

Straightforward Mining and Processing Mining and Processing Mining Studies Significant production profile from single open pit source Large scale, staged open pits Early robust cash flows Attractive stripping ratios Favourable geotechnical conditions Processing Studies Simple metallurgy: Conventional CIL processing Preliminary results: 91 93% recoveries 30% gravity recoverable Coarse grind size (106 125 micron) 3Mtpa plant: Design work by Mintrex Good quality water Page: 14

Major Resource Expansion Opportunity Massive potential for a major new discovery Page: 15

Major Resource Expansion Opportunity How big is the gold system? EASKEY TREND KBRC019: 12m @ 1.5g/t Au KBRC570: 8m @ 2.6g/t Au KBRC150: 7m @ 1.3g/t Au KBAC389: 10m @ 1.5g/t Au PORTRUSH TREND KBRC366: 11m @ 1.00g/t Au KBRC367: 7m @ 1.40g/t Au KBAC377: 8m @ 1.15g/t Au KBRC150: 17m @ 1.00g/t Au KBRC071: 12m @ 1.02g/t Au Page: 16

Capricorn Metals Key Investment Takeaways A rare opportunity in the WA gold sector Simple, well-understood WA gold project Disciplined, high-quality work: major de-risking of project Substantial open pit production profile Clear development path and timing: DFS: Mid-year 2017 Project Funding: End 2017 Commence Construction: End 2017 Fully-funded to decision to mine Scale and optionality Experienced management team Page: 17

CONTACT DETAILS: PETER LANGWORTHY EGM, Geology Perth Office 15 Lovegrove Close, MOUNT CLAREMONT, WA 6010 T +61 8 9384 3284 / F +61 8 9284 3801 Page: 19