Database for Scientists: Dr. Prabhat Kumar Mandal

Similar documents
1. Name: DR ARUN KUMAR SINGH

1. Name: DR ARUN KUMAR SINGH. 2. Date of Birth/Age: 45 years

Sl. No. Degree/ Year of University/ Subjects Certificate Passing Institute

Strata control monitoring in a contiguous seam depillaring working

Research Article Rock Load Estimation in Development Galleries and Junctions for Underground Coal Mines: A CMRI-ISM Rock Mass Rating Approach

List of Publications:

Evaluation of induced vertical stress during depillaring in blasting gallery panel workings

Analysis of strata control monitoring in underground coal mine for apprehension of strata movement


Design of Support System and Stability Evaluation for Underground Workings of Gare Palma Coal Mine A Case Study

DEPILLARING DEPILLARING OF THE ANJAN HILL 0 SEAM WORKINGS

Underground extraction of contiguous coal seams/sections consisting thin parting: a case study

Strong Weighting Events in Shallow Multi-seam Longwall Mining

Effect of in-situ block size and rock properties on blast induced rock fragmentation in surface mines

Stress Orientation in the Godavari Gondwana Graben, India

Name of the Faculty: Dr. (Mrs.) Shail Pandey Designation: DST INSPIRE Faculty Qualification: PhD Physics Area of the Interest: Plasma Physics Phone

Presidency University, 86/1 College Street, Kolkata , India

Licensed Science Officer Benchmark

STUDY OF STRATA BEHAVIOUR IN BLASTING GALLERY PANEL IN COAL MINES

STRATA CONTROL PROBLEMS OF UNDERGROUND COAL MINING VIS-À-VIS GEOTECHNICAL INSTURMENTATION AND NUMERICAL MODEL STUDIES

Bio-Data of Dr. R. K. Goel

Numerical Study on an Applicable Underground Mining Method for Soft Extra-Thick Coal Seams in Thailand

Calculation of periodic roof weighting interval in longwall mining using finite element method

Protection of Underground Mine Structures Due to Adjoining Open-pit Mine Blasting

DESTRESS BLASTING AS A PROACTIVE MEASURE AGAINST ROCKBURSTS. PETR KONICEK Czech Academy of Sciences, Institute of Geonics

ORGANIZATION OF STRATA MANAGEMENT CELL A VITAL REQUIREMENT FOR ALL UNDERGROUND COAL MINES

THE INFLUENCE OF ROOF BOLTS LOCATION ON ITS INTERACTION WITH THE ROCK MASS.

Geotechnical roof classification for an underground coal mine from borehole data

The Velenje mining method

Excel Geomatics: Offering Excellence with Unique Consultancy & Services

Successful Use of a Stress Relief Roadway at Appin Colliery

Employer Position held Place of work Duration Nature of work. JRF ISI, Kolkata SRF ISI, Kolkata

Loading capacity of yielding connections used in steel arch roadway supports

Blast design parameters and their impact on rock fragmentation

Licensed Science Officer Benchmark

RESUME PROFORMA. 4 Residential Address: Department of Mathematics, Jamia Millia Islamia, New Delhi Residential Phone :

M.Sc. (Applied Geology) from Aligarh Muslim University, Aligarh, U.P. India, with First division (72%) in the year 2008.

Multi-seam mining of the deep Waterberg resources

UNFC COAL MINES CASE STUDIES

C U R R I C U L U M V I T A E

Monitoring longwall weighting at Austar Mine using microseismic systems and stressmeters

Patrick Andrieux Principal Engineer

Programme Specification MSc in Cancer Chemistry

STUDY OF SUPPORT SYSTEM AND STRATA BEHAVIOUR ANALYSIS AROUND UNDERGROUND WORKINGS IN COAL DEPOSITS

A BOOKLET ON. T Rangasamy, A R Leach and A P Cook. Facilitating safety and health research in the South African mining industry

CURRICULUM VITAE PROF. KAZA SOMASEKHARA RAO,

The National Institute of Engineering, Mysore FACULTY PROFILE

Dr. K. Prabakaran Assistant Professor

Petroleum Engineering

Design considerations for pillar systems in deep mines. Tobias Ladinig Hannes Blaha Horst Wagner

Curriculum Vitae. 1. Bachelor of Science (Physics Hons.) in 1989 from St.Stephen s College, University of Delhi, Delhi (with 83.33% marks).

Name : Dr. Shivajirao Nivrutti Thore Designation : Principal College : M.S.P.Mandal s, Deogiri College, Aurangabad. (MS) INDIA Date of Birth : 25

EXAMINATION PAPER NUMBER OF PAGES: 4

27th Seismic Research Review: Ground-Based Nuclear Explosion Monitoring Technologies SOURCE PARAMETERS OF SEISMIC EVENTS IN A COAL MINE IN INDIA

MIC- 401 MINE SURVEYING II

Venue of the Symposium Auditorium Gong, Lower Area of Vitkovice

Request for Empanelment

5 Further Case Histories

1984 Gold medal, Khosla Research Award Silver medal, Khosla Research Award Indian Society of Earthquake Technology Award.

SHALE GAS/ OIL: OPPORTUNITIES CMPDI S ENDEAVOURS

Engineering Geology at University Complutense of Madrid: 30 years of postgraduate courses

3-D numerical modelling of stresses around a longwall panel with top coal caving

Numerical modelling for estimation of first weighting distance in longwall coal mining - A case study

American Journal of Engineering Research (AJER) 2013

Geotechnical & Mining Engineering Services

CURRICULUM VITAE Roman V. Krems

WEIR INTERNATIONAL, INC. Mining, Geology and Energy Consultants

Rock Mechanics Research at Nottingham. Rod Stace, Associate Professor, Nottingham Centre for Geomechanics

Investigation into strata behaviour and fractured zone height in a high-seam longwall coal mine

Journal of Geology & Geophysics

JOB DESCRIPTION. Research Associate - Urban Economy and Employment

Forces on piles preventing debris slope slips

Further Research into Methods of Analysing the October 2000 Stability of Deep Open Pit Mines EXECUTIVE SUMMARY

Chemists Do you have the Bayer Spirit?

APPIN MINE 708D PRESSURE BUMPS

Rajesh Kumar Pandey. PDPM Indian Institute of Information Technology, Design & Manufacturing, Airport Road, Khamariya, Ph. (+91)

Geospatial Science and Technology Model Courses and Certificate:

25th International Conference on Ground Control in Mining

Table of Contents Development of rock engineering 2 When is a rock engineering design acceptable 3 Rock mass classification

Geological Careers: Renewable Energy & Unconventional Oil and Gas. Dr Catherine Isherwood Senior Hydrogeologist RSKW, Stirling

Finite difference modelling in underground coal mine roadway

ROCK MASS CHARATERISATION: A COMPARISON OF THE MRMR AND IRMR CLASSIFICATION SYSTEMS. G P Dyke AngloGold Ashanti 1

Geotechnical Considerations for Longwall Top Coal Caving at Austar Coal Mine

Coal Mining Methods. Underground Mining. Longwall & Room and Pillar Mining. Fig. 1: Longwall Mining

COAL EXPLORATION & RESOURCES

Indian Scenario. Experience Sharing on Coalbed Methane, Underground Coal Gasification and Coal Extraction Methodology. SAARC Training Workshop Program

Curriculum Vitae. Previous Work Experience. Eaton Technologies Pvt. Ltd., Pune, India Division. Tata Motors Pvt. Ltd., Pune, India Division

Milenko Ljubojev *#, Mirko Ivković **, Jovo Miljanović ** and Lidija Đurđevac Ignjatović *

Understanding the Causes of Roof Control Problems on A Longwall Face from Shield Monitoring Data - a Case Study

SOUTH AFRICAN NATIONAL INSTITUTE OF ROCK MECHANICS CHAMBER OF MINES OF SOUTH AFRICA CERTIFICATE IN ROCK MECHANICS PART 3-2 SOFT ROCK TABULAR MINING

Science Academies Education Programmes Lecture Workshop on Recent Trends in Chemistry with Reference to Teaching and Research

ECTS CREDITS ALLOCATION FOR THE ERASMUS+ PROGRAMME-SCHOOL OF MINING AND METALLURGICAL ENGINEERING ECTS ALLOCATION AS FOLLOWS:

ASSAM UNIVERSITY, SILCHAR Faculty Profile

Longwall Caving in Potash Mining Geomechanical Assessment of Damage and Barrier Integrity

Curriculum Vitae. Phone : (O) (H) (M)

Update on Green Chemistry Education

Carborough Downs LW 4 Salvage Roof Fall and Recovery. February 2014

Curriculum Vitaé. Personal Information. Academic Qualifications. Awards and Achievements

Faculty Details Performa for Department Website

Research Article Mechanisms of Mining Seismicity under Large Scale Exploitation with Multikey Strata

Transcription:

Database for Scientists: Dr. Prabhat Kumar Mandal 1) Name : Dr. Prabhat Kumar Mandal 2) ID No. : Internal ID: 501, ERP ID: 9D34 3) Name of the Research Group : Mining Methods and Design Simulation 4) Date of Birth : 01/05/1968 5) Date of joining CSIR-CIMFR : 10/05/1994 6) Present position : Senior Principal Scientist Gr. IV (5) 7) Education Qualification: Degree/Diploma/Certificate Subject(s) Year University/ Institute B. E. Mining Engineering 1993 Calcutta University / Bengal Engineering College, Shibpur (Presently IIEST, Shibpur) M. TECH. Mining Engineering 1997 Indian Institute Of Technology (IIT), Kharagpur Ph.D. Mining Engineering 2010 Bengal Engineering And Science University, Shibpur (Presently IIEST, Shibpur) 8) Area of Research: Rock Mechanics, Ground Control, Underground Mining Methods and Numerical Modelling. 9) Professional carrier: Designation Institution/company From To Nature of work Group IV (1) Scientist B Group IV (2) Scientist C Group IV (3) Scientist EI Group IV (4) Principal Scientist Group IV (5) Senior Principal CSIR-CIMFR, Dhanbad 10-05-1994 09-05-1999 R&D work CSIR-CIMFR, Dhanbad 10-05-1999 09-05-2003 R&D work CSIR-CIMFR, Dhanbad 10-05-2003 09-05-2007 R&D work CSIR-CIMFR, Dhanbad 10-05-2007 09-05-2011 R&D work CSIR-CIMFR, Dhanbad 10-05-2011 Till date R&D work

Scientist 10) Awards / Recognition: Year Name of Award/Honour Name of Organisation 2012 Only Ph.D. thesis selected from India and nominated for Rocha Medal of ISRM International Society Rock Mechanics (ISRM), Portugal in the year 2012. 2007-08 Hindustan Zinc Award Institution of Engineers (India), Kolkata 2000-2001 CSIR Golden Jubilee CMRI Whitaker Award CMRI, Dhanbad 2001-02 Awards for Patents CMRI, Dhanbad 11) List of Publication in SCI Journals with full details: Total publications: 119 (Book: 1, Journals: 40, Seminars/symposia/conferences etc.: 78) a) In SCI Journals 1. A. K. Singh, Rajendra Singh, J. Maiti, Rakesh Kumar, P. K. Mandal, 2011. Assessment of mining induced stress development over coal pillars during depillaring, International Journal of Rock Mechanics & Mining Sciences, UK, 48(2011): 805 818. 2. R. Singh, A. K. Singh, J. Maiti, P. K. Mandal, Rashmi Singh and R. Kumar, 2011. An observational approach for assessment of dynamic loading during underground coal pillar extraction, International Journal of Rock Mechanics and Mining Sciences, UK, 48(2011): 794-804. 3. R. Singh, P. K. Mandal, A.K. Singh, R. Kumar and A. Sinha. 2011. Coal pillar extraction at deep cover: with special reference to Indian coalfields, International Journal of Coal Geology, The Netherlands, 86(2-3): 276-288. 4. P. K. Mandal, R. Singh, J. Maiti, A. K. Singh, R. Kumar and A. Sinha, 2008. Underpinningbased simultaneous extraction of contiguous sections of a thick coal seam under weak and laminated parting, International Journal of Rock Mechanics & Mining Sciences, UK, 45(1):11-28. 5. R. Singh P. K. Mandal, J. Maiti, A. K. Singh, R. Kumar and A. K. Ghosh, 2008. Upshot of strata movement during underground mining of a thick coal seam below hilly terrain, International Journal of Rock Mechanics & Mining Sciences, UK, Vol. 45(1):29-46. 6. R. Singh, P. K. Mandal and A. K. Singh, R. Kumar and A. Sinha, 2007. Optimal underground extraction of coal at shallow cover beneath surface/subsurface objects: Indian practices, Rock Mechanics and Rock Engineering, The Netherlands, 41(3):421-444. 7. R. Singh, A. K. Singh and P. K. Mandal, 2002. Cuttability of coal seams with igneous intrusion, Engineering Geology, an International Journal, The Netherlands, 67(1&2):127-

137. 8. A. K. Singh, R. Singh, M. Sarkar, P. K. Mandal and D. Sharma, 2002. Inclined slicing of a thick coal seam in ascending order A case study, The Canadian Mining and Metallurgical (CIM) Bulletin, 95(1059):124-128. 9. R. Singh, P. K. Mandal, A. K. Singh and T. N. Singh, 2001. Cable-bolting-based semimechanised depillaring of a thick coal seam, International Journal of Rock Mechanics & Mining Sciences, UK, 38(2): 245-257. 10. T. N. Singh, B. K. Dubey and P. K. Mandal, 1999. A method for depillaring of thick seams standing on pillars with cable bolt support, Journal of Scientific and Industrial Research, Vol. 58, June, New Delhi, pp. 422-430. b) Books/Monographs: A. J. Das and P. K. Mandal, 2015. Underground extraction of Locked-Up coal: Numerical modelling based study, 1 st Edition, LAP Lambert Academic Publishing, Germany, ISBN: 978-3-659-80250-8, 172 pages. c) Total Citation : 154 12) Patents filed & granted (India & International) Sl. No. Title of the patent Country Application No Patent No. Names of other inventors 1 A novel method for underground extraction of coal from contiguous seams / sections India 1120/DEL/2000 222430 T. N. Singh B. K Dubey A. K. Singh 2 A novel method of mining for underground extraction of coal from a critically thick coal seam standing on pillars and development made along the roof horizon India 120/DEL/2002 215649 R. Singh A. K. Singh 3. Wireless Strata Information System for Underground Openings India 2993/DEL/2013 A. Kushwaha P. K. Mishra A. Sinha

13) Projects (More than 10 Lakhs) for last 10 years A. Grant-in-Aid (GAP) /Network Projects 1. Mining method for final extraction of a critically thick coal seam standing on pillars and the development made along the roof horizon (funded by Ministry of Coal, Govt. of India). 2. Rock mechanics investigations to meet challenges of strata control of deep underground coal mining (under bilateral exchange programme in between CSIR, India and ACSR, the Czech Republic). 3. Development of tele-robotics and remote operation technology for underground coal mines (funded by Ministry of Coal, Govt. of India). 4. To find a methodology of safe liquidation in thick seams of Raniganj Coalfields: Design, development & show-casing demonstrative trials at Khottadih Colliery, ECL (funded by Coal India Limited R&D Board). 5. Development of a Technology for Optimal Extraction of Locked-up Coal from Underground Mines using Artificial Pillars (a CSIR network project). 6. Robotics and Micro Machines, (a CSIR network project), Task title: Development of a system for early detection of fire including real time monitoring of fire associated gases for underground coal mines. 7. Development of suitable design methodology for extraction of coal at greater depths (>300 m) for Indian geomining conditions (a CSIR network project), Task title: Establishment of a state-of-the-art rock mechanics laboratory and numerical modeling of longwall mining (LWM) method. B. Sponsored (SSP) Projects 1. Scientific study for cavability aspect of massive Deccan trap roof formation and installation of suitable geotechnical instruments at Mauri Mine, Kanhan Area, WCL. 2. Strata behaviour study for the extraction of developed pillars in 124 LE panel of Churcha (RO) Mine, SECL with continuous miner deployment and support design. 3. Instrumentation plan and strata monitoring during extraction of pillars BG U-S panel using blasting gallery methods at 21 Incline Yellandu Area SCCL. 4. Assessment and Advice on Strata behaviour during extraction of developed pillars in CMP-9A, 9B(1) and 9B(2) panels using CM Technology at VK7 Incline, SCCL. C. Consultancy (CNP) Projects 1. Advice for safe working of continuous miner depillaring panel of No. 1 seam at GDK- 11A Incline mine Ramagundem Area-1, SCCL through underground instrumentation and monitoring. 2. Advice for safe working of CM depillaring panel B3 of no. 1 seam at GDK-11 incline

mine, RG-I area, SCCL. 3. Design of suitable method of depillaring including widening and heightening of existing galleries for working of panel B4 of no. 1 seam at GDK-11 incline mine, RG-I area, SCCL along with underground instrumentation and monitoring during extraction of the panel. 4. Scientific investigation and advice for feasibility of the proposed Ring Road alignment over coal bearing areas around Dhanbad. 5. Instrumentation and monitoring in 3 seam of BG-4, BG-5 and BG-6 panels and in 4 seam SS-1 sand stowing panel during extraction at Vakilpalli Mine, RG II Area, SCCL. 6. Scientific study for method of working and sequence of extraction of existing developed and virgin section of HR seam at Hirakhand Bundiya Mine, Orient Area, MCL. 7. Geotechnical monitoring of U/G workings stability at Rampura Agucha Mine, HZL and Audit of RA U/G Mine for Ground Control Management Plan at HZL. 8. Design of Extraction Pattern for Developed Pillars of Panel CMP-8 in King Seam lying below Caved Goaf of Top Seam using CM Technology at VK-7 Incline, Kothagudem Area, SCCL. 9. Scientific study for designing a suitable method for systematic liquidation of already developed contiguous working and further development of Orient Colliery Mine No. 3, Orient Area, MCL. 10. Scientific study for design of continuous miner panels in No. 2 seam and Salarjung seam of Shantikhani mine, Mandamari Area, SCCL. 11. Scientific study for designing method of extraction, support system and strata monitoring during extraction in the proposed BG U and S panels at 21 Incline, Yellandu Area, SCCL. 12. Scientific study for feasibility of extraction of developed pillars in the proposed in the CMP-9 panel [sub-panels CMP-9A(1) and CMP-9A(2)] in King seam using CM Technology at VK-7 Incline, SCCL. 13. Scientific study to examine the feasibility of extraction of coal in 1 seam and 2 seam below Bhupalpalli village having surface structure and residential buildings and give the suitable method of extraction, support design at KTK 2 Incline, Bhupalpalli area, SCCL. 14. Advice for extraction of developed pillars by the Continuous Miner in the proposed CM Sub Panels-14, 15 & 16 in R-VII Seam of Sarpi Project, SSPur Colliery, Bankola Area, ECL. 15. Scientific study for Review of Ground Control Management Plan, of Rampura Agucha Mines of M/S Hindustan Zinc Limited, Rajasthan, India. 16. Scientific Study for auditing of Ground Control Management Plan of Kayad Mine

M/S Hindustan Zinc Limited, Rajasthan, India. 17. Scientific study for depillaring of panels with hydraulic sand stowing using LHD/SDL/Manual loading in XVI seam at Digwadih colliery, Tata Steel. 14) Significant contribution and achievement I feel proud to work in this institute where research is going on in the diversified field of mining. I have got chance to work for development and application of new mining technologies and innovative techniques for optimal extraction of coal from thick, contiguous and difficult coal seams resulting increase in production, productivity, conservation and safety of the mine. It is also a major thrust area of the institute and obviously need of the day for the coal mining industry. Under my leadership, a number of underground mining technologies for extraction of thick, difficult and contiguous coal seams have been developed and practised successfully in underground coal mines. I contributed significantly for excellence of the coal mining industry in the country through contribution for development of different new mining technologies like cable bolting based depillaring method for thick seams, underpinning based depillaring method for thick and contiguous seams/sections under weak and laminated partings, wide stall method for partial extraction of coal seams lock-up under surface/sub-surface features and staggered development based depillaring of thick seam in a single lift by blasting gallery method. These technologies were adopted at different collieries under different geo-mining conditions. I have played active role in designing of a number of continuous miner faces in India for mechanised extraction of coal seams from underground mines. My contribution in the coal mining industry may help a bit to meet the energy security of the country. About one of our developed methods and practiced by industry to extract locked-up coal, Chief General Manager, Chirimiri Area, SECL writes:...in addition to safety and productivity, coal valued Rs. 133,56,93,000/- has been extracted and coal valued Rs. 33,10,00,000/- are likely to be extracted in future.... The Chief Editor of the International Journal of Rock Mechanics writes about one of our papers: It is exactly the type of paper that we like to publish in the Journal because the work is of high quality and.. I have taken leading role for formulation and submission of a number of R&D projects networking/collaborating with different CSIR laboratories and other institutes which have long impact on industry when successfully implemented. I have observed that the technological advancement in many branches of engineering and industries is quite rapid. However, in case of Indian underground coal mining industry, the progress is not so visible as expected and still mine management is forced to use the conventional mining methods/systems except a few. An effort has been made to introduce remote operation technology in underground coal mines through a Grant-in-Aid Project from Ministry of Coal titled Development of tele-robotics and remote operation technology for underground coal mines as a Project Leader. Through my effort as Nodal Officer/Project Leader, the institute has received a prestigious and challenging 12 th Five Year Plan Project Development of a technology for optimal extraction of locked-up coal from underground mines using artificial pillars acronymed as DeCoalArt. If a suitable technology is developed under this project, then around 3000 million tons of locked-up coal can be extracted. I am also associated as Project Leader/Task Leader of another two 12 th Five Year Plan Projects. My R&D efforts and

organizational skill to lead a team resulted successful completion of more than 80 R&D, inhouse, industry-sponsored projects and consultancy projects. I have taken active role for starting and successful running of AcSIR Courses at CSIR-CIMFR, Dhanbad. I received CSIR Golden Jubilee-CMRI Whitaker Award, Silver Medal of the MGMI award, Hindustan Zinc Award of Institution of Engineers (India) and appreciat ions from the industry, academicians and foreign experts. I have more than 100 research papers to my credit published in various national and international journals, seminars, symposia and workshops volumes besides a number of patents including one book. My R&D effort and its contribution made in the thrust area of rock mechanics for underground exploitation of thick, contiguous and difficult coal seams and consistently good academic and professional career has, probably, enhance the prestige of the laboratory. 15) PhD supervisions: Ongoing- 01 Name of student: Raja S. University: Indian School of Mines, Dhanbad Topic of PhD Thesis: Investigation and simulation of bumps for improved strata management during underground extraction of coal Subject: Mining Engineering Screenshot from Google Scholar for Citation