Probe Metals Intersects 1,122 g/t Gold Over 0.7 Metres in New Zone at Val-d Or East

Similar documents
Probe Metals Continues to Expand Gold Zones At Val-d Or East

Probe Metals Continues to Intersect Significant Gold Mineralization in Expansion Drilling at Val-d Or East, including 4.1 g/t Gold Over 15.

Probe Metals Confirms Continuity of Gold Mineralization on its Val-d Or East Project And Increases 2017 Drill Program to 75,000 metres

Probe Metals Discovers New High Grade Gold Zone on Val-d Or East Project: Intersects 12.6 g/t Gold Over 7.3 Metres

Probe Metals Intersects 3.2 g/t Gold Over 45.5 Metres At Val-d Or East

QMX GOLD CONTINUES TO INTERSECT STRONG MINERALIZATION AT BONNEFOND, INTERSECTING 39.5 g/t Au OVER 2.4 METRES AND 31.5 g/t Au OVER 1.

At the contact, mineralization is associated with strong tourmalinization of the Bevcon Intrusion.

Detour Gold Reports Drilling Results from Lower Detour

Highlights include: Hole TTD050: 6.12 g/t Au over 7.00 metres from metres o Including g/t Au over 1.18 metres

MONETA INTERCEPTS g/t GOLD INCLUDING g/t GOLD AT SOUTH WEST

MONETA INTERCEPTS g/t GOLD INCLUDING g/t GOLD AND g/t GOLD INCLUDING g/t GOLD AT SOUTH WEST

INV METALS ANNOUNCES DRILL RESULTS AT LOMA LARGA AND INITIAL PROSPECTING RESULTS ON NEW REGIONAL PROPERTIES

QMX GOLD INTERSECTS 29.8 G/T AU OVER 3.0 METERS AND 19.3 G/T AU OVER 3.2 METERS AT BONNEFOND

NEWS RELEASE ORCA GOLD REPORTS CONTINUED SUCCESS AT GSS

OSISKO METALS INTERSECTS 10.49% ZINC+LEAD OVER METRES AND 12.15% ZINC+LEAD OVER METRES AT PINE POINT

Orford Intersects 41.1 m Grading 1.36 g/t Au at Jones Keystone Project in North Carolina

BALMORAL INTERSECTS g/t GOLD OVER 7.99 METRES, BUG LAKE SOUTH, DETOUR GOLD TREND PROJECT, QUEBEC

V Sample from C.O.D vein 15 metres southwest of V

FALCO PACIFIC COMPLETES INITIAL MODEL FOR THE HORNE 5 GOLD/SILVER/ZINC/COPPER DEPOSIT

TRENCHING AT LAS DOLORES EXTENDS STRIKE LENGTH TO OVER 1,000 METRES, INTERSECTING

Orford Completes Phase 1 Exploration Program and Generates High-Quality Drill Targets on its Carolina Gold Properties

News Release. Infill Drilling Program

NEWS RELEASE FULLER PROPERTY CONTINUES TO DELIVER GOOD RESULTS 2.53 GRAMS PER TONNE GOLD OVER METRES

55 Adelaide Street East, Suite St-Charles west, Suite 411, West Tower

NEWS RELEASE. FORAN INTERSECTS 9.4% ZINC OVER 6.1 METRES Feasibility Drilling Continues

West Pender Street Vancouver, BC V6C 2V6 Tel: Fax: TSX-V: GBR NEWS RELEASE

MINERAL MOUNTAIN RESOURCES LTD. MMV.TSX-V

BALMORAL ANNOUNCES SIGNIFICANT GOLD DISCOVERY ON DETOUR GOLD TREND IN QUEBEC

Drilling Highlights: Phase II BCV Infill Drilling

Assay Results Highlights (as of November 16, 2017) representing approximately 4,500 metres ( m ) of drilling:

NEWS RELEASE ORCA GOLD INDICATED AND INFERRED RESOURCES AT BLOCK 14 INCREASE BY 24% AND 48% RESPECTIVELY

NEWS RELEASE. Foran Mining Intersects High Grade Zinc at McIlvenna Bay. Results expand area of known mineralization

NEWS RELEASE. Foran Intersects Over 28 Metres of Copper Mineralization

IDAHO CHAMPION INTERSECTS 4.80 GRAMS PER TONNE GOLD OVER 5.9 METRES IN HIGHLY OXIDIZED ZONE AT THE BANER PROJECT

CAUTIONARY STATEMENT

NORTHQUEST LTD. ANNOUNCES DRILLING RESULTS FROM THE PISTOL BAY GOLD PROJECT, NUNAVUT, CANADA

Canadian Gold Miner Grab Sample Returns 29.5 Grams per tonne Gold from South Kirkland Project

Plateau Extends Falchani East Lithium Deposit Community Agreements Executed and Three Drill Rigs Active at Falchani West

NEWS RELEASE LATEST EXPLORATION PROGRAM CONTINUES TO DEMONSTRATE NARANJILLO AS A HIGH GRADE SILVER HOST

CANARC RESOURCE CORP Howe Street Vancouver, BC V6C 2T6. News Release

Orsu Metals hits 2.62 g/t Au over 22.2 metres and proves higher gold grades at Zone 23, Sergeevskoe Gold Project, Russia

BK Copper Project Strong Copper Results Confirm and Extend BKM

MINERA ALAMOS TO COMMENCE DRILLING AIMED AT EXPANDING AREAS OF DEFINED GOLD MINERALIZATION AT SANTANA/LOS VERDES PROPERTY, SONORA, MEXICO

ANTLER GOLD EXPLORATION UPDATE, WILDING LAKE GOLD PROJECT, NEWFOUNDLAND

TROILUS GOLD CORP. INITIATES 30,000 METRE DRILL PROGRAM ON TROILUS PROPERTY

ATON RETURNS 22.2 METRES OF 2.77 GRAMS PER TONNE GOLD EQUIVALENT FROM HAMAMA WEST; VISIBLE GOLD DISCOVERED AT BOHLOG

MEDIA RELEASE OCEANAGOLD ANNOUNCES FURTHER DOWN DIP EXTENSIONS OF MINERALISATION AT PANEL 2: FRASERS UNDERGROUND MINE

Pacific Empire Minerals Provides Copper King RC Drilling Results

Asiamet Drilling Further Extends BKM Mineralisation

Hole (93) From (m) To (m) m Au (g/t) Ag (g/t) Cu (%) Pb (%) Zn (%) CMLP

ET and and and

Toronto, Canada March 4, 2013

Drilling Extending Mineralization in La Mina North Zone

Mineral Resource Estimate Comparison at 3 g/t Au cut-off

Drilling Extending Mineralization in La Mina North Zone

AbraPlata defines gold-rich zone with up to 16.7g/t Au over 10.6m in the basement at its Diablillos property in Argentina

Drilling at Perseverance in Arizona, USA Suggests Proximity to Porphyry Copper System

Pahtavaara Drill Program Intersects 32.8 G/T Gold Over 2.0M And 2.1 G/T Gold Over 18.0M In The Karoliina Zone

BALMORAL INTERSECTS 1,138 g/t (33 oz/ton) GOLD OVER 4.87 METRES, BUG LAKE FOOTWALL ZONE, DETOUR GOLD TREND PROJECT, QUEBEC

IAMGOLD PROVIDES UPDATE ON ADVANCED EXPLORATION PROJECT DIAMOND DRILLING RESULTS BOTO PROJECT, SENEGAL

KIRKLAND LAKE GOLD EXPANDS NEW HIGH-GRADE ZONE BELOW TAYLOR MINE, REPORTS MINERALIZED EXTENSIONS ALONG STRIKE AND AT DEPTH

BOREAL EXPANDS DISCOVERY ZONE OF HIGH-GRADE ZINC, SILVER AND LEAD MINERALIZATION AT GUMSBERG PROJECT IN SWEDEN

PRESS RELEASE. DUBUISSON NORTH DRILLING CUTS g/t AU OVER 5.0 METRES NEW S50 EAST DISCOVERY, 3.39 g/t AU OVER 25.9 METRES

Orsu Metals completes Phase 2 drilling program and announces significant intercepts in drillhole SDH17-15 at Zone 23, Sergeevskoe Gold Project, Russia

GOLDPLAY ANNOUNCES FURTHER SAMPLING RESULTS FROM SAN MARCIAL HISTORICAL CORE; CONFIRMS OPEN PIT TARGET NEAR SURFACE WITH gpt AgEq.

AVION GOLD DJAMBAYE II ZONE, TABAKOTO PROJECT, MALI, RETURNS HIGH GRADE INTERCEPTS OF 7.56 G/T Au OVER 7.0 METRES AND G/T Au OVER 3.

Rich Saddle North Au-Cu-Ag Porphyry Expands by 275m Along Strike and 250m Down-Dip

KIRKLAND LAKE GOLD INTERSECTS NEW MINERALIZATION AT TAYLOR MINE, CONTINUES TO EXTEND PORPHYRY DEPOSITS TO DEPTH

GRAPHITE ONE DRILLS 165.3M of 4.23% GRAPHITE INCLUDING 46.4M OF 6.6%, 14.3M of 10.1% and 21M of 10.1% GRAPHITE

RED EAGLE MINING INTERCEPTS 35.5 METRES AT 2.28 GRAMS GOLD PER TONNE AT SANTA ROSA

Pershing Gold Hits Highest Grade Gold to Date in Relief Canyon with Grams per Tonne (3.618 Ounces per Ton) Intercept

NEWS RELEASE FORAN INTERSECTS 27 METRES OF CONTINUOUS MINERALIZATION

PRESS RELEASE WESDOME PLANS AGGRESSIVE DRILLING AND DEVELOPMENT PROGRAM IN 2011

Melkior retains Geologica to complete a NI report on its Launay property, Québec

CROCODILE GOLD INTERSECTS 7.1 G/T AU OVER 4.5 METERS INCLUDING 11.2 G/T AU OVER 2.6 METERS AT THE UNION REEFS PROJECT, PROSPECT DEPOSIT

Eloro Outlines Major New Mineralized Trend on La Victoria Project, Peru; Sample Results Return Values To 33 Grams Gold Per Tonne

Minsud to recommence resource outline diamond drilling at the Chita Valley Cu- Au-Ag-Mo Project, San Juan, Argentina

NEWS RELEASE. March 22, 2017

(TSXV: GPLY, OTCQB: GLYXF

Aurelian Intersects Metres Grading 7.71 g/t of Gold in Infill Drilling and Metres Grading 8.13 g/t of Gold at the Eastern Edge of FDN

SAVARY GOLD DRILLING EXTENDS KNOWN ZONES AND INTERSECTS SIGNFICANT GOLD MINERALIZATION AT FOUR NEW TARGETS

KIRKLAND LAKE GOLD ANNOUNCES 120 METRE DOWN-PLUNGE EXTENSION OF SWAN ZONE

NEWS RELEASE August 10, 2017

NEWS RELEASE. Tigray Intersects 28.2 metres at 8.50 grams per tonne gold at Mato Bula, Adyabo Project, Northern Ethiopia

IAMGOLD REPORTS HIGH-GRADE DRILL INTERSECTIONS FROM ITS 2017 DRILLING PROGRAM ON THE DIAKHA DEPOSIT, SIRIBAYA PROJECT IN MALI

Table 1 Updated Mineral Resource Tabulation for the Vertikalny Deposits of the Mangazeisky Property. Contained Metal Ag (koz)

True Width (m) Carneritos to

Monument Announces NOA 7/8 Drilling Program Results at Burnakura Gold Project

June 4, 2014 News Release Valley of the Kings Exploration Program Underway; Project Update

EXCELLON ANNOUNCES LA PLATOSA EXPLORATION RESULTS: HIGH GRADES CONTINUE TO EXTEND MANTO SULPHIDES DRILL HOLE ENCOUNTERS SOURCE ENVIRONMENT INDICATORS

May 17, Two holes explored the extension at depth of the historic Sta Rosa vein

BELO SUN DISCOVERS NEW MINERALIZED ZONE AT ITS VOLTA GRANDE GOLD PROJECT, BRAZIL

Hole ID From (m) To (m) Interval (m) Au (g/t) Ag (g/t) AuEq (g/t)* Zn (%)

BELO SUN INTERSECTS NEW HIGH GRADE ZONE AT GROTA SECA AND EXPANDS GRANDE DEPOSIT

NEWS RELEASE. September 30 th, Trading Symbols: GTP (TSX-V) P01 (FRANKFURT) COLTF (OTC Pink)

Vendetta Reports Additional High Grade Drilling Results from Zones 2 and 3 at Pegmont Lead-Zinc Project

23 January, 2018 CSE: RFR For Immediate Release. Renforth extends Parbec Gold Deposit strike 60m with gold in all 7 drillholes

REGULUS DISCOVERS NEW GOLD-RICH, HIGH-GRADE COPPER-GOLD ZONE AT RIO GRANDE

August 20, 2018 SBB NR SBB TSX

IDM Mining s Underground Drilling Intersects g/t Au and g/t Ag over 6.80 Meters True Width at the Red Mountain Gold Project

Transcription:

NEWS RELEASE 06/2017 Symbol: TSX-V: PRB Shares Issued: 92,851,188 Probe Metals Intersects 1,122 g/t Gold Over 0.7 Metres in New Zone at Val-d Or East Toronto, March 6, 2017 PROBE METALS INC. (TSX-V: PRB) ( Probe or the Company, is pleased to announce results from an additional nine holes on its 100% owned Val-d Or East project (the "Project") located near Val-d Or, Quebec. The results represent the remaining holes drilled during the 11,500-metre 2016 program. In addition to follow-up drilling of the new gold discovery in Hole PC-16-90 (see News Release dated December 6, 2016) and further definition and delineation of the New Beliveau gold-bearing quartz-tourmaline vein system, drilling was also successful in discovering a new, high-grade gold zone hosted in diorite dyke 300 metres west of the former Beliveau Mine. Hole PC-16-100 intersected an impressive zone of quartz-tourmaline veining, which included an interval of 1,122 g/t gold ( Au ) over 0.7 metres. The hole represents the most westerly step-out that the Company has drilled on the New Beliveau Mine and the highest grades encountered on the property, to date. The new results indicate increased potential for both near-surface bulk tonnage and deeper, higher grade mineralized systems. Results also demonstrate the continuity of the gold mineralization and therefore the potential for growth of the resource to the west and at depth of known mineralization. Highlights from new drilling include: - Discovery of a new high-grade gold zone hosted by diorite dyke in Hole PC-16-100, which returned two intervals of 1,122 g/t Au uncut over 0.7 metres and 25.5 g/t Au over 0.8 metres forming part of a larger interval of vein mineralization averaging 92.7 g/t Au over 8.7 metres. Mineralization was intersected between 272 and 281 metres depth and represents the richest drilling intercept ever encountered on the property. - Holes PC-16-102, -103, -104 & -105 also intersected significant gold mineralisation returning intercepts of up to 6 g/t Au over 3 metres, 1.7 g/t Au over 15 metres 7.2 g/t Au over 3.6 metres and 4.2 g/t Au over 11.5 metres, respectively. Drill hole PC-16-100, initially designed to delineate the high-grade gold zone discovered at depth by drill hole PC-16-90 (12.6 g/t Au over 7.3 metres; see new release dated December 6, 2016), intersected a new diorite dyke containing quartz-tourmaline veins with zones of significant disseminated pyrite mineralization and visible gold at 272 metres down-hole before reaching its intended target. This new zone represents a further expansion of the New Beliveau deposit to the west, with mineralization remaining open in all directions. In addition to the new high-grade zone, the quartz-tourmaline vein mineralization originally targeted at depth was also intersected in holes PC-16-100, returning 4.2 g/t Au over 8 metres at 716 metres downhole. Hole PC-16-105 also intersected the deeper zone returning 4.2 g/t Au over 11.5 metres between 665 and 676.5 metres

downhole. Drilling on both of the new high-grade discovery zones is continuing and results will be announced as soon as they are available. Table 1: Val-d Or East Project Drilling Results Hole Number From (m) To (m) Length (m) Au (g/t) Host Rock PC-16-98 108.6 110.2 1.6 8.9 Int. Volcanics PC-16-99 2.7 3.7 1.0 9.9 Int. Volcanics 648.1 660.0 11.9 1.1 Diorite Dyke PC-16-100 272.3 281.0 8.7 92.7 Diorite Dyke including 272.3 273.1 0.8 25.5 Diorite Dyke including 279.2 279.9 0.7 1,122 Diorite Dyke 716.8 724.8 8.0 4.2 Int. Volcanics PC-16-101 210.3 211.8 1.5 5.7 Int. Volcanics PC-16-102 119.0 120.5 1.5 16.8 Int. Volcanics 749.0 752.0 3.0 6.0 Int. Volcanics PC-16-103 235.0 250.0 15.0 1.7 Int. Volcanics PC-16-104 41.7 42.7 1.0 16.8 Int. Volcanics 140.5 156.5 16.0 1.6 Int. Volcanics 299.9 303.5 3.6 7.2 Diorite Dyke 369.3 371.5 2.2 7.8 Int. Volcanics PC-16-105 623.0 630.0 7.0 3.4 Int. Volcanics 665.0 676.5 11.5 4.2 Diorite Dyke (1) For intervals within diorite, true thickness is not known. Additional drilling is planned for the immediate area which will enable the true width determination (2) For all other rock types, true thickness is currently estimated to be between 70% to 90% of drill length. Figure 1: Surface Map New Beliveau Area

Figure 2: New High Grade Discovery West of New Beliveau East-West Drill Section For complete drilling results, click link below: https://probemetals.com/site/assets/files/1278/table_assay_results_pr-march-2017.pdf David Palmer, President and CEO of Probe, states: We are very encouraged by the early results from our drilling on New Beliveau. The discovery of two new high-grade gold zones within the first 17 holes of the program has increased our confidence in the expansion potential of the deposit. With the successful completion of the Val-d Or East land consolidation strategy we will now be focused on exploration and 2017 will be a busy year for the project as we ramp up our operations on the momentum generated by these results. Although resource expansion is a priority we are also expanding our greenfields exploration work to encompass all of the ground acquired in the past seven months and expect to generate a significant number of satellite and regional drill targets before the end of the year. Following the discovery of the new high grade zone, surface drilling has been expanded to better delineate this mineralization and test for its extensions west of the known resources at New Beliveau. The results announced today are from 5,178 metres of drilling, representing 9 drill holes. The 2017 drill program of 50,000 metres that was announced in January is underway and results will be disclosed as they become available. Four drill rigs are currently in operation on site testing the Pascalis Gold Trend, which hosts the New Beliveau deposit.

In addition to drilling, a second phase of a property-scale IP survey has commenced on the southern part of the Project and is expected to be completed by the beginning of Q2-2017. A VTEM survey over the northern part of the Project and the Cadillac Break East claims will be completed during the same period. The New Beliveau Gold Deposit The New Beliveau deposit consists predominantly of a series of parallel, east-west trending, moderately dipping, mineralized zones hosting gold-bearing quartz-pyrite-tourmaline veins. Gold mineralization occurs in the veins but also in their immediate wall rocks. The sulphide content is generally 1 to 5%, but may reach up to 10% in the higher-grade sections. The extent of the alteration zone, which consist of a mixture of quartz, tourmaline, dolomite, albite, and euhedral pyrite is commonly twice the thickness of the vein itself. The north-south-trending diorite dykes also contain significant gold with gold grades typically increasing in areas where the dykes are intersected by the east-west quartz-tourmaline veins. Wall rocks for both systems consist of intermediate volcanics rock. Together with the Highway and North Zones, the New Beliveau Deposit host a NI 43-101 inferred resources of 770,000 ounces at 2.6 g/t gold calculated at a 1.0 g/t cut-off above 350 metres depth and 1.5 g/t cut-off below 350 metres depth (see NI 43-101 technical report: Mineral Resource Val-d Or East Property - January 4, 2013). Qualified Persons The scientific and technical content of this press release has been reviewed, prepared and approved by Mr. Marco Gagnon, P.Geo, Executive Vice-President, and Mr. Denis Chenard, P.Geo., Senior Geologist of the Val-d Or East Project, who are "Qualified Persons" as defined by National Instrument 43-101 - Standards of Disclosure for Mineral Projects ("NI 43-101"). Quality Control During the last drilling program, assay samples were taken from the NQ core and sawed in half, with one-half sent to a certified commercial laboratory and the other half retained for future reference. A strict QA/QC program was applied to all samples; which includes insertion of mineralized standards and blank samples for each batch of 20 samples. The gold analyses were completed by fire-assayed with an atomic absorption finish on 50 grams of materials. Repeats were carried out by fire-assay followed by gravimetric testing on each sample containing 5.0 g/t gold or more. Total gold analyses (Metalic Sieve) were carried out on the samples which presented a great variation of their gold contents or the presence of visible gold. About Probe Metals: Probe Metals Inc. is a leading Canadian gold exploration company focused on the acquisition, exploration and development of highly prospective gold properties. The Company is well-funded and controls a strategic land package of over 1,000-square-kilometres of exploration ground within some of the most prolific gold belts in Ontario and Quebec: Val d Or, West Timmins, Casa-Berardi and Detour Quebec. The Company is committed to discovering and developing high-quality gold projects, including its key asset the Val-d Or East Gold Project. The Company was formed as a result of the

sale of Probe Mines Limited to Goldcorp Inc. in 2015. Goldcorp currently owns a 13.9% stake in the Company. On behalf of Probe Metals Inc., Dr. David Palmer, President & Chief Executive Officer For further information: Please visit our website at www.probemetals.com or contact: Patrick Langlois, Vice President, Corporate Development Tel: (416) 777-9470 Email: patrick@probemetals.com Karen Willoughby, Director of Corporate Communications Tel: (866) 936-6766 Email: kwilloughby@probemetals.com Forward-Looking Statements Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release. This News Release includes certain "forward-looking statements" which are not comprised of historical facts. Forward-looking statements include estimates and statements that describe the Company s future plans, objectives or goals, including words to the effect that the Company or management expects a stated condition or result to occur. Forward-looking statements may be identified by such terms as believes, anticipates, expects, estimates, may, could, would, will, or plan. Since forward-looking statements are based on assumptions and address future events and conditions, by their very nature they involve inherent risks and uncertainties. Although these statements are based on information currently available to the Company, the Company provides no assurance that actual results will meet management s expectations. Risks, uncertainties and other factors involved with forward-looking information could cause actual events, results, performance, prospects and opportunities to differ materially from those expressed or implied by such forward-looking information. Forward looking information in this news release includes, but is not limited to, the Company s objectives, goals or future plans, statements, exploration results, potential mineralization, the estimation of mineral resources, exploration and mine development plans, timing of the commencement of operations and estimates of market conditions. Factors that could cause actual results to differ materially from such forward-looking information include, but are not limited to failure to identify mineral resources, failure to convert estimated mineral resources to reserves, the inability to complete a feasibility study which recommends a production decision, the preliminary nature of metallurgical test results, delays in obtaining or failures to obtain required governmental, environmental or other project approvals, political risks, inability to fulfill the duty to accommodate First Nations and other indigenous peoples, uncertainties relating to the availability and costs of financing needed in the future, changes in equity markets, inflation, changes in exchange rates, fluctuations in commodity prices, delays in the development of projects, capital and operating costs varying significantly from estimates and the other risks involved in the mineral exploration and development industry, and those risks set out in the Company s public documents filed on SEDAR. Although the Company believes that the assumptions and factors used in preparing the forward-looking information in this news release are reasonable, undue reliance should not be placed on such information, which only applies as of the date of this news release, and no assurance can be given that such events will occur in the disclosed time frames or at all. The Company disclaims any intention or obligation to update or revise any forward-looking information, whether as a result of new information, future events or otherwise, other than as required by law.