Coro Reports a Significantly Increased Resource Estimate for the Marimaca Claim

Similar documents
Coro Reports Maiden Resource Estimate for the Marimaca Project

News Release September 6, 2016 TSX SYMBOL: COP

News Release February 27, 2014 TSX SYMBOL: COP

News Release October 4, 2016 TSX SYMBOL: COP

Minsud to recommence resource outline diamond drilling at the Chita Valley Cu- Au-Ag-Mo Project, San Juan, Argentina

Bellhaven Announces Updated NI Mineral Resource for La Mina Project, Colombia

SALAZAR ANNOUNCES AN UPDATED RESOURCE REPORT OF 5.53 MT INDICATED AND 1.46 MT INFERRED AT ITS HIGH GRADE VMS EL DOMO DEPOSIT

News Release. Infill Drilling Program

MEDIA RELEASE OCEANAGOLD ANNOUNCES FURTHER DOWN DIP EXTENSIONS OF MINERALISATION AT PANEL 2: FRASERS UNDERGROUND MINE

CANDENTE UPDATES CAÑARIACO NORTE MINERAL RESOURCE ESTIMATE

The new sulphide mineralization lies within a 1.4 kilometer long east-west trending

OSISKO METALS INTERSECTS 10.49% ZINC+LEAD OVER METRES AND 12.15% ZINC+LEAD OVER METRES AT PINE POINT

NEWS RELEASE. Foran Mining Intersects High Grade Zinc at McIlvenna Bay. Results expand area of known mineralization

LUNA GOLD INCREASES MEASURED AND INDICATED RESOURCES TO 3.63 MILLION OUNCES AND INFERRED RESOURCES TO 1.04 MILLION OUNCES AT AURIZONA

GOLD REACH (GRV) ANNOUNCES A 141% INCREASE IN INDICATED AND 91% INCREASE IN INFERRED RESOURCES AT SEEL

Table 1 Updated Mineral Resource Tabulation for the Vertikalny Deposits of the Mangazeisky Property. Contained Metal Ag (koz)

DRILLING FURTHER EXTENDS MINERALIZATION AT EXETER S CASPICHE GOLD-COPPER PORPHYRY PROJECT IN CHILE

Detour Gold Reports Drilling Results from Lower Detour

GoviEx completes acquisition of African Energy s Zambian uranium assets

CROCODILE GOLD FILES TECHNICAL REPORTS FOR FOSTERVILLE AND COSMO GOLD MINES AND PROVIDES ANNUAL GENERAL MEETING INFORMATION

MANDALAY RESOURCES CORPORATION INCREASES MINERAL RESOURCES AND RESERVES AT ITS BJÖRKDAL GOLD MINE

V Sample from C.O.D vein 15 metres southwest of V

Canadian Gold Miner Grab Sample Returns 29.5 Grams per tonne Gold from South Kirkland Project

Highlights from the four holes announced in this news release include:

SABINA GOLD &SILVER REPORTS COMPLETION OF DRILLING AT ECHO DEPOSIT, BACK RIVER, NUNAVUT.

Interval (meters) To (meters)

Form F3 MATERIAL CHANGE REPORT

Asiamet Drilling Further Extends BKM Mineralisation

Pershing Gold Extends High-Grade Mineralization through Step-Out Drilling in Phase 1 and Initiates Phase 2 Drilling Program

- 2 - TABLE 1. INDICATED AND INFERRED GOLD AND SILVER RESOURCES. All Indicated

CROCODILE GOLD INTERSECTS 7.1 G/T AU OVER 4.5 METERS INCLUDING 11.2 G/T AU OVER 2.6 METERS AT THE UNION REEFS PROJECT, PROSPECT DEPOSIT

This area in SE Sullivan Gulch was never mined by previous operators

Fortuna Updates Reserves and Resources

Press Release Thunder Bay: August 2, 2018

CROCODILE GOLD INTERSECTS GRAMS PER TONNE GOLD OVER 2.05 METERS BELOW THE PROSPECT DEPOSIT AT UNION REEFS

Assay Results Highlights (as of November 16, 2017) representing approximately 4,500 metres ( m ) of drilling:

NEWS RELEASE. FORAN INTERSECTS 9.4% ZINC OVER 6.1 METRES Feasibility Drilling Continues

REGULUS DISCOVERS NEW GOLD-RICH, HIGH-GRADE COPPER-GOLD ZONE AT RIO GRANDE

Table 1: Mineral Resources at Costerfield, Inclusive of Mineral Reserves as of December 1, 2018 and December 31, 2017.

Drilling at Perseverance in Arizona, USA Suggests Proximity to Porphyry Copper System

North American Palladium Announces Positive Exploration Results from Lac des Iles Mine

INV METALS ANNOUNCES DRILL RESULTS AT LOMA LARGA AND INITIAL PROSPECTING RESULTS ON NEW REGIONAL PROPERTIES

NEWS RELEASE. Foran Intersects Over 28 Metres of Copper Mineralization

MCEWEN MINING ANNOUNCES EXPLORATION UPDATE FOR EL GALLO 1, MEXICO

Fortuna provides review of Brownfields exploration programs

MINERA ALAMOS TO COMMENCE DRILLING AIMED AT EXPANDING AREAS OF DEFINED GOLD MINERALIZATION AT SANTANA/LOS VERDES PROPERTY, SONORA, MEXICO

NEWS RELEASE. Mountain Province Diamonds Completes the Kennady North Winter Exploration Program

KIRKLAND LAKE GOLD ANNOUNCES 120 METRE DOWN-PLUNGE EXTENSION OF SWAN ZONE

To date 4 holes have been completed from 1070 level in Contacto Oriental Area

Red Pine Releases Inferred Resource Report Improves Grade and Tonnage for Wawa Gold Project

FILO MINING REPORTS UPDATED MINERAL RESOURCE ESTIMATE FOR THE FILO DEL SOL PROJECT

PRESS RELEASE NEW MINERAL RESOURCE UPDATE AT PRAIRIE CREEK MINE. Measured + Indicated and Inferred Resource Tonnages Increased

GRAPHITE ONE DRILLS 165.3M of 4.23% GRAPHITE INCLUDING 46.4M OF 6.6%, 14.3M of 10.1% and 21M of 10.1% GRAPHITE

Junior Uranium explorer in the Athabasca Basin. Patterson Claims

FIRST MAJESTIC SILVER CORP. NEWS RELEASE

NEWS RELEASE. Mountain Province Diamonds Reports Additional Kimberlite Identified in Gahcho Kué Exploration Program

Sept 20, 2012 TSX Venture Exchange Tier 1 Trading Symbol: OK

DRILLING AT ASCOT S PREMIER PROPERTY EXTENDS GOLD MINERALIZATION 150 METRES WEST TOWARDS UNDERGROUND PORTAL

MCEWEN MINING EXPANSION DRILLING INTERSECTS 0.53% COPPER OVER 351 METERS AT THE LOS AZULES PROJECT

Plateau Extends Falchani East Lithium Deposit Community Agreements Executed and Three Drill Rigs Active at Falchani West

FOR IMMEDIATE RELEASE August 9 th, 2018 (VTT2018 NR #7)

Wesdome Announces Interim Mineral Resource Estimate for Kiena Mine Complex and Continued Drilling Extends Kiena Deep A Zone Along Plunge

A B C PAD A HIGHLIGHTS

Strategic Phase 2 Exploration Program Launched at Island Gold High-Grade Resource Potential Identified Laterally and at Depth

Fission s Initial Resource Totals at PLS: 79.6M lbs Indicated and 25.9M lbs Inferred

Arctic Star Commences Exploration at the Timantti Diamond Project, Finland Home 2017 Arctic Star Commences Exploration at

September 24, 2012 #

Fura Gems Inc. FURA ANNOUNCES MAIDEN MINERAL RESOURCE ESTIMATE FOR THE COSCUEZ EMERALD MINE, A FIRST FOR THE COLOMBIAN EMERALD SECTOR

BELO SUN DISCOVERS NEW MINERALIZED ZONE AT ITS VOLTA GRANDE GOLD PROJECT, BRAZIL

Queenston Announces 112% Increase in Indicated Resource (to 1.5 M oz. gold) and 16% Increase in Inferred Resource (to 0.7 M oz. gold) at Upper Beaver

Surface Trenching Highlights. Santos Target. To (m) Width (m) Au (g/t) Comment. (m) Santos (1)-includes internal dilution

FILO MINING DRILLS 50 METRES OF G/T SILVER, 0.56% COPPER, 0.50 G/T GOLD AND 36 METRES OF 1.45% COPPER AT FILO DEL SOL

NEWS RELEASE ORCA GOLD INDICATED AND INFERRED RESOURCES AT BLOCK 14 INCREASE BY 24% AND 48% RESPECTIVELY

BK Copper Project Strong Copper Results Confirm and Extend BKM

Monument Announces NOA 7/8 Drilling Program Results at Burnakura Gold Project

BENTON ADVISED THAT CORO INTERSECTS 0.71%CuT AND 0.99%CuT AT ITS EL DESESPERADO PROJECT, IN THE CHUQUICAMATA DISTRICT, CHILE

Northern Dynasty Minerals Ltd.

Details of the NI compliant mineral resource estimate are as follows. Total Inferred 7,603,

June 4, 2015 News Release Valley of the Kings Underground Infill Drilling Underway

August 20, 2018 SBB NR SBB TSX

NEWS RELEASE FORAN INTERSECTS 27 METRES OF CONTINUOUS MINERALIZATION

LUNDIN MINING ANNOUNCES EAGLE EAST MINERAL RESOURCE, PEA RESULTS AND PROJECT COMMENCMENT

July 15, 2015 News Release Valley of the Kings Underground Infill Drilling Progresses

CROCODILE GOLD CONTINUES POSITIVE EXPLORATION RESULTS INTERSECTS HIGH GRADE GOLD AT UNION REEFS PROJECT

930 West 1 st Street, Suite 202, North Vancouver, BC V7P 3N4. Tel: (604) Tel:

TROILUS GOLD CORP. INITIATES 30,000 METRE DRILL PROGRAM ON TROILUS PROPERTY

FALCO PACIFIC COMPLETES INITIAL MODEL FOR THE HORNE 5 GOLD/SILVER/ZINC/COPPER DEPOSIT

BELO SUN RELEASES RESULTS FROM 65 DRILL HOLES FURTHER EXTENDING THE OURO VERDE DEPOSIT ALONG STRIKE NORTHWEST AND DOWN DIP

Suite 1800 Two Bentall Centre 555 Burrard Street Vancouver, BC V7X 1M9 Tel: (604) Tel: (888) April 8, 2018 SBB NR SBB TSX

News Release TSX:RMX NYSE AMEX:RBY November 29, 2010

PRESS RELEASE. DUBUISSON NORTH DRILLING CUTS g/t AU OVER 5.0 METRES NEW S50 EAST DISCOVERY, 3.39 g/t AU OVER 25.9 METRES

MARENGO RELEASES RESULTS FOR RECENT SAMPLING AND EXPLORATION DRILLING AT RIMA PROSPECT

NGEX ANNOUNCES COPPER GOLD DISCOVERY AT NACIMIENTOS PROJECT

News Release B2Gold Announces Updated Higher Grade Gold Resource at Wolfshag Zone, Otjikoto Mine, Namibia

Pacific Empire Minerals Provides Copper King RC Drilling Results

PRESS RELEASE WESDOME PLANS AGGRESSIVE DRILLING AND DEVELOPMENT PROGRAM IN 2011

IDM Mining s Underground Drilling Intersects g/t Au and g/t Ag over 6.80 Meters True Width at the Red Mountain Gold Project

GlobeStar Mining Corporation Cumpié Sector Cumpié Hill Nickel Laterite Project in the Dominican Republic:

April Exploring for Canadian Gold in the Rainy River District of Ontario

MINERAL RESERVE AND MINERAL RESOURCE STATEMENT PROVEN AND PROBABLE MINERAL RESERVES

Transcription:

News Release TSX: COP www.coromining.com Suite 1280 625 Howe St Vancouver, B.C. V6C 2T6 Coro Reports a Significantly Increased Resource Estimate for the Marimaca Claim April 12, 2018 - Coro Mining Corp. ( Coro or the Company ) (TSX Symbol: COP) is pleased to announce a significantly increased resource estimate for its Marimaca claim, located 22 kilometres east of the port of Mejillones in the II Region of Chile, (Fig. 1). The updated resource estimate will be used to inform the feasibility study that Coro is completing as part of its earn in requirement to acquire a 75% interest in the Marimaca claim, and in turn inform the strategic review of the group asset portfolio. Highlights Contained copper tonnes (CuT) in the measured and indicated categories increased 103% to 303,698 tonnes compared to previous January 2017 resource estimate. Excellent conversion of resources to higher confidence categories as a result of infill drilling. Updated resources do not include potential upside results from drilling completed earlier this year on the neighbouring La Atomica claim, nor from holes drilled elsewhere on the Marimaca claim. Feasibility study covering the Marimaca claim due for completion in coming weeks Commenting on the announcement, Luis Tondo, President & CEO of Coro said: I m delighted to report that the updated measured and indicated resource estimate for the Marimaca claim has more than doubled to over 300,000 tonnes of copper. The work completed so far will enable us to move ahead with the feasibility study, which we anticipate completing in the coming weeks. Even at this early stage, the results at the Marimaca claim have been encouraging and exceeded our expectations. Consequently, we look forward to restarting our drilling program once we have finalised the consolidation of the Marimaca district announced earlier this year, confident that there is more upside potential to be proven still. Resource Estimate The resource estimate was completed by a third-party, NCL Ingeniería y Construcción at a variety of cut-off grades and the resources at a 0.20% CuT cut-off grade, presented in the following table: Category tonnes Cu tonnes %CuT %CuS x 1000 CuT CuS Measured 22,407 0.70 0.49 156,398 108,672 Indicated 24,347 0.61 0.39 147,300 95,197 Measured + Indicated 46,754 0.65 0.44 303,698 203,869 Inferred 11,043 0.48 0.28 52,894 30,367 CuT: total copper tonnes CuS: acid soluble copper tonnes Page 1

In Pit Resource To demonstrate the potential economic viability of the Marimaca claim resource, a series of Whittle pit optimizations was completed utilizing appropriate operating costs, results obtained from metallurgical test work, and a variety of copper prices. The resources were estimated only for oxide and mixed-enriched copper mineralization which can be processed by heap leaching (HL) and run of mine (ROM) leaching to produce cathode copper. Due to their differing metallurgical characteristics, the resources were categorised according to mineral type. No resources were estimated for primary sulphide mineralization, occurring in deeper portions of the deposit. At a $3.50/lb long term copper price, the in pit resource was estimated to be: Category tonnes Cu tonnes %CuT %CuS x 1000 CuT CuS Measured Brochantite 11,009 0.85 0.62 93,469 68,147 Chrysocolla 6,240 0.61 0.47 38,252 29,391 Wad 2,919 0.31 0.18 9,048 5,342 Mixed-Enriched 1,288 0.99 0.33 12,700 4,199 Total 21,456 0.72 0.50 153,469 107,079 Indicated Brochantite 10,044 0.81 0.54 81,457 54,639 Chrysocolla 6,077 0.53 0.40 32,209 24,491 Wad 4,230 0.30 0.18 12,776 7,403 Mixed-Enriched 1,204 0.88 0.32 10,582 3,889 Total 21,555 0.64 0.42 137,023 90,422 Measured & Indicated Brochantite 21,053 0.83 0.58 174,925 122,787 Chrysocolla 12,317 0.57 0.44 70,461 53,882 Wad 7,149 0.31 0.18 21,824 12,745 Mixed-Enriched 2,492 0.93 0.32 23,282 8,088 Total 43,012 0.68 0.46 290,492 197,501 Inferred Brochantite 2,134 0.72 0.40 15,406 8,557 Chrysocolla 2,664 0.53 0.35 14,174 9,405 Wad 698 0.27 0.15 1,878 1,054 Mixed-Enriched 189 0.70 0.37 1,315 691 Total 5,685 0.58 0.35 32,773 19,706 Page 2

As with the 2017 resource estimate, the in pit resource is constrained by the Marimaca property limits, such that all blocks occurring outside the property were assigned a 0%CuT grade. Accordingly, the pit contains 68,271kt of waste and has a strip ratio of 1.4:1. Parameters Used in the Estimation of the Mineral Resource The mineral resource estimate was prepared in accordance with NI 43-101 and was based on a total of 27,606 meters of drilling in 129 holes, including 113 holes, 23,548 meters of reverse circulation drilling and 16 holes, 4,058 meters of diamond drill drilling. The mineral resource estimate has been generated from drill hole assay results and the interpretation of a geologic model which relates to the spatial distribution of copper in the deposit. Four leachable copper mineralization types were identified during geological mapping and drill hole logging, namely; brochantite, chrysocolla, and copper wad dominant oxides; and mixed oxides & sulphide, including enriched material. Resources were estimated for each mineralization type. Grades were capped according to the following criteria: Mineral Type %CuT %CuS Capped at Capped at Brochantite 8 5.1 Chrysocolla 4 2.5 Wad 1.6 1.6 Mix-Enrich 7 1.8 Grade estimates were made using ordinary kriging with nominal block size measuring 5 meters long, 5 meters wide and 5 meters in height. Resources have been classified by their proximity to sample locations and are reported according to CIM standards on Mineral Resources and Reserves. The in pit mineral resource was constructed according to the following technical and economic parameters: Item Cost Unit Mining cost $2.80 US$/t HL Process Cost including G&A $11.30 US$/t ROM Process Cost including G&A $4.90 US$/t Selling Cost $0.07 US$/lb Heap Leach Recovery 75% ROM Recovery 37% Copper Price $3.50 US$/lb Based on geotechnical studies completed to date, the pit slope varies from 44-46 o. Page 3

Qualified Persons The mineral resource estimates contained in this news have been prepared in accordance with National Instrument 43-101 Standards of Disclosure for Mineral Projects ("NI 43-101"). The technical information in this news release, including the information that relates to geology, drilling and mineralization of the Marimaca claim, was prepared under the supervision of, or has been reviewed by Sergio Rivera, Vice President of Exploration, Coro Mining Corp, a geologist with more than 36 years of experience and a member of the Colegio de Geologos de Chile and of the Institute of Mining Engineers of Chile, and who is the Qualified Person for the purposes of NI 43-101 responsible for the design and execution of the drilling program. The independent Qualified Person responsible for the resource estimate at Marimaca is Luis Oviedo Hannig, a geologist with more than 41 years of experience at NCL Ingeniería y Construcción S.A. He is a member of the Colegio de Geologos de Chile and the Institute of Mining Engineers of Chile and registered with the Qualification Commission of Resources and Mining Reserves (CRISCO, CMC, Membership Number 013), and with a postgraduate degree in "Certification and Validation of Mining Assets from Queens University and PUVC. Alan Stephens, FIMMM, Executive Director of Coro Mining Corp, a geologist with more than 43 years of experience, and a Qualified Person for the purposes of NI 43-101, is responsible for the contents of this news release. Figure 1: Location of Marimaca Page 4

Figure 2: Final Pit Boundary - showing drill holes used in estimate in red and cross section in green Page 5

Figure 3: Cross Section Through Block Model - looking to NE For further information please contact of visit www.coromining.com or contact: Nicholas Bias, VP Corporate Development & Investor Relations (604) 682 5546 x 202 or +44 (0)7771 450 679 nbias@coromining.com Email us at investor.info@coromining.com Follow us on Twitter @coromining This news release includes certain "forward-looking statements" under applicable Canadian securities legislation.forward-looking statements in this press release relate to, among other things completion of a feasibility study for the Marimaca claim. Statements concerning mineral resource estimates may also be deemed to constitute forward-looking information to the extent that they involve estimates of the mineralization that will be encountered if the Maricunga claim is developed. Actual future results may differ materially. There can be no assurance that such statements will prove to be accurate, and actual results and future events could differ materially from those anticipated in such statements. Forward-looking statements reflect the beliefs, opinions and projections on the date the statements are made and are based upon a number of assumptions and estimates that, while considered reasonable by Coro, are inherently subject to significant business, economic, competitive, political and social uncertainties and contingencies. Many factors, both known and unknown, could cause actual results, performance or achievements to be materially different from the results, performance or achievements that are or may be expressed or implied by such forward-looking statements and the parties have made assumptions and estimates based on or related to many of these factors. Such factors include, without limitation: the Page 6

occurrence of unexpected financial obligations, fluctuations in the price of commodities; fluctuations in the currency markets; changes in national and local government, legislation, taxation, controls, regulations and political or economic developments; risks and hazards associated with the business of mineral exploration, development and mining (including environmental hazards, industrial accidents, unusual or unexpected formations, pressures, cave-ins and flooding); the presence of laws and regulations that may impose restrictions on mining and employee relations as well as those factors disclosed in the Company's documents filed from time to time with the securities regulators in the Provinces of British Columbia, Alberta, Saskatchewan, Manitoba, Ontario, New Brunswick, Nova Scotia, Prince Edward Island and Newfoundland and Labrador. Accordingly, readers should not place undue reliance on forward-looking statements. Coro undertakes no obligation to update publicly or otherwise revise any forward-looking statements contained herein whether as a result of new information or future events or otherwise, except as may be required by law. Page 7