HIGHLIGHTS INCLUDE: ^ Includes 466g/t Au Includes 153g/t Au + Includes 45.3g/t Au

Similar documents
ATLANTIC GOLD REPORTS ADDITIONAL RESULTS FROM THE PHASE 3 RESOURCE EXPANSION DRILL PROGRAM AT FIFTEEN MILE STREAM

ATLANTIC GOLD REPORTS ADDITIONAL RESULTS FROM THE PHASE 3 RESOURCE EXPANSION DRILL PROGRAM AT FIFTEEN MILE STREAM

ATLANTIC GOLD REPORTS ADDITIONAL RESULTS FROM THE RESOURCE DEFINITION DRILL PROGRAMS AT FIFTEEN MILE STREAM AND COCHRANE HILL

ATLANTIC GOLD ANNOUNCES MINERAL RESOURCE ESTIMATES FOR FIFTEEN MILE STREAM AND COCHRANE HILL DEPOSITS, NOVA SCOTIA

Probe Metals Continues to Intersect Significant Gold Mineralization in Expansion Drilling at Val-d Or East, including 4.1 g/t Gold Over 15.

Probe Metals Continues to Expand Gold Zones At Val-d Or East

Probe Metals Intersects 3.2 g/t Gold Over 45.5 Metres At Val-d Or East

IDM Mining s Underground Drilling Intersects g/t Au and g/t Ag over 6.80 Meters True Width at the Red Mountain Gold Project

ET and and and

ASANKO GOLD ANNOUNCES ENCOURAGING INITIAL DRILL RESULTS FROM NEW EXPLORATION TARGET

DRILLING AT ASCOT S PREMIER PROPERTY EXTENDS GOLD MINERALIZATION 150 METRES WEST TOWARDS UNDERGROUND PORTAL

OSISKO METALS INTERSECTS 10.49% ZINC+LEAD OVER METRES AND 12.15% ZINC+LEAD OVER METRES AT PINE POINT

V Sample from C.O.D vein 15 metres southwest of V

August 20, 2018 SBB NR SBB TSX

Probe Metals Confirms Continuity of Gold Mineralization on its Val-d Or East Project And Increases 2017 Drill Program to 75,000 metres

NEWS RELEASE ORCA GOLD INDICATED AND INFERRED RESOURCES AT BLOCK 14 INCREASE BY 24% AND 48% RESPECTIVELY

MONETA INTERCEPTS g/t GOLD INCLUDING g/t GOLD AND g/t GOLD INCLUDING g/t GOLD AT SOUTH WEST

MINERAL MOUNTAIN RESOURCES LTD. MMV.TSX-V

GOLDEN MINERALS DISCOVERS ADDITIONAL HIGH GRADE VEINS AT SANTA MARIA RESULTS UP TO 1.88 g/t Au and 648 g/t Ag

Highlights from the four holes announced in this news release include:

NEWS RELEASE ORCA GOLD REPORTS CONTINUED SUCCESS AT GSS

MONETA INTERCEPTS g/t GOLD INCLUDING g/t GOLD AT SOUTH WEST

Detour Gold Reports Drilling Results from Lower Detour

GOLDPLAY ANNOUNCES FURTHER SAMPLING RESULTS FROM SAN MARCIAL HISTORICAL CORE; CONFIRMS OPEN PIT TARGET NEAR SURFACE WITH gpt AgEq.

BK Copper Project Strong Copper Results Confirm and Extend BKM

Tickers: XTSX:GYA, FRAA:1ZT, PINX:GYNAF Tags: Mining

(TSXV: GPLY, OTCQB: GLYXF

June 4, 2015 News Release Valley of the Kings Underground Infill Drilling Underway

TRENCHING AT LAS DOLORES EXTENDS STRIKE LENGTH TO OVER 1,000 METRES, INTERSECTING

Monument Announces NOA 7/8 Drilling Program Results at Burnakura Gold Project

Suite 1800 Two Bentall Centre 555 Burrard Street Vancouver, BC V7X 1M9 Tel: (604) Tel: (888) April 8, 2018 SBB NR SBB TSX

COPPER MOUNTAIN COMPLETES PHASE 2 DRILL PROGRAM AT NEW INGERBELLE WITH CONTINUED POSITIVE RESULTS

Probe Metals Discovers New High Grade Gold Zone on Val-d Or East Project: Intersects 12.6 g/t Gold Over 7.3 Metres

News Release. Infill Drilling Program

EL CONDOR IN-FILL DRILLING INTERSECTS 26.9 METERS 2.19% CU & 0.58% NI

Goldcrest Resources Ltd.

July 15, 2015 News Release Valley of the Kings Underground Infill Drilling Progresses

For Immediate Release ASCOT DRLLING AT UNICORN INTERSECTS MORE HIGH-GRADE GOLD

Probe Metals Intersects 1,122 g/t Gold Over 0.7 Metres in New Zone at Val-d Or East

NEWS RELEASE. Tigray Intersects 28.2 metres at 8.50 grams per tonne gold at Mato Bula, Adyabo Project, Northern Ethiopia

The new sulphide mineralization lies within a 1.4 kilometer long east-west trending

June 4, 2014 News Release Valley of the Kings Exploration Program Underway; Project Update

555 Burrard Street, Suite 375, Vancouver, B.C. V7X 1M June 13, 2017 SBB NR SBB TSX

GRAPHITE ONE DRILLS 165.3M of 4.23% GRAPHITE INCLUDING 46.4M OF 6.6%, 14.3M of 10.1% and 21M of 10.1% GRAPHITE

NEWS RELEASE August 10, 2017

Salazar intersects metres (13.07m true) averaging 2.65 g/t gold, g/t silver, 1.32% copper, 6.63% zinc at its Curipamba Project.

SALAZAR ANNOUNCES AN UPDATED RESOURCE REPORT OF 5.53 MT INDICATED AND 1.46 MT INFERRED AT ITS HIGH GRADE VMS EL DOMO DEPOSIT

SAVARY GOLD DRILLING EXTENDS KNOWN ZONES AND INTERSECTS SIGNFICANT GOLD MINERALIZATION AT FOUR NEW TARGETS

NEWS RELEASE FULLER PROPERTY CONTINUES TO DELIVER GOOD RESULTS 2.53 GRAMS PER TONNE GOLD OVER METRES

Northern Dynasty Minerals Ltd.

BELO SUN INTERSECTS NEW HIGH GRADE ZONE AT GROTA SECA AND EXPANDS GRANDE DEPOSIT

NEWS RELEASE. March 22, 2017

San Gold Drills New Mine Horizon Adjacent to Rice Lake Mine, Returns 10.4 Metres Grading 25.7 g/t Au

Orsu Metals hits 2.62 g/t Au over 22.2 metres and proves higher gold grades at Zone 23, Sergeevskoe Gold Project, Russia

October 8, 2015 News Release Brucejack Regional Drilling Intersects Over 8,000 Grams Per Tonne Gold

NGEX ANNOUNCES COPPER GOLD DISCOVERY AT NACIMIENTOS PROJECT

Vendetta Reports Additional High Grade Drilling Results from Zones 2 and 3 at Pegmont Lead-Zinc Project

Goldplay President and CEO Marcio Fonseca commented

A B C PAD A HIGHLIGHTS

AUGUSTINE VENTURES ANNOUNCES HIGH GRADE GOLD BEARING TENSION VEINS IN THE HANGING WALL OF THE SURLUGA DEPOSIT

Assay Results Highlights (as of November 16, 2017) representing approximately 4,500 metres ( m ) of drilling:

CANARC RESOURCE CORP Howe Street Vancouver, BC V6C 2T6. News Release

CROCODILE GOLD INTERSECTS 7.1 G/T AU OVER 4.5 METERS INCLUDING 11.2 G/T AU OVER 2.6 METERS AT THE UNION REEFS PROJECT, PROSPECT DEPOSIT

- CHU PROJECT - MOLYBDENUM IN THE NECHAKO PLATEAU

Plateau Extends Falchani East Lithium Deposit Community Agreements Executed and Three Drill Rigs Active at Falchani West

NEWS RELEASE. FOR IMMEDIATE RELEASE Shares Outstanding: 35,190,286

FALCO PACIFIC COMPLETES INITIAL MODEL FOR THE HORNE 5 GOLD/SILVER/ZINC/COPPER DEPOSIT

RED EAGLE MINING INTERCEPTS 35.5 METRES AT 2.28 GRAMS GOLD PER TONNE AT SANTA ROSA

Monument Announces Significant Intercepts Assay Results at NOA7_8 in Burnakura

BALMORAL INTERSECTS g/t GOLD OVER 7.99 METRES, BUG LAKE SOUTH, DETOUR GOLD TREND PROJECT, QUEBEC

NEWS RELEASE August 8, 2018

NEWS RELEASE July 26, 2018

NEWS RELEASE. Mountain Province Diamonds Reports Additional Kimberlite Identified in Gahcho Kué Exploration Program

Minsud to recommence resource outline diamond drilling at the Chita Valley Cu- Au-Ag-Mo Project, San Juan, Argentina

- 2 - TABLE 1. INDICATED AND INFERRED GOLD AND SILVER RESOURCES. All Indicated

Corvus Gold Drills g/t Gold, Extends Mother Lode Sediment Hosted Gold System to at Least 450 Metres Along Strike

Vendetta Reports Initial Results from 2017 Pegmont Program with High Grade Zone 3 Step Out Drilling

LH Property Update: Magnum Goldcorp Hits High Grade Gold 16.9 m of g/t, including 10.9 m of g/t, and as well, 11 m of 20.

Orsu Metals completes Phase 2 drilling program and announces significant intercepts in drillhole SDH17-15 at Zone 23, Sergeevskoe Gold Project, Russia

Interval (meters) To (meters)

QMX GOLD CONTINUES TO INTERSECT STRONG MINERALIZATION AT BONNEFOND, INTERSECTING 39.5 g/t Au OVER 2.4 METRES AND 31.5 g/t Au OVER 1.

Golden Predator Intersects 7.5 m of 33 g/t Gold at the 3 Aces Project; Discovers Significant Stockwork Mineralization

GOLDEN RIDGE RESOURCES DRILLS 60.27m of 2.60 G/T AUEQ AT THE HANK PROJECT IN BC S GOLDEN TRIANGLE

Pahtavaara Drill Program Intersects 32.8 G/T Gold Over 2.0M And 2.1 G/T Gold Over 18.0M In The Karoliina Zone

SABINA GOLD &SILVER REPORTS COMPLETION OF DRILLING AT ECHO DEPOSIT, BACK RIVER, NUNAVUT.

West Pender Street Vancouver, BC V6C 2V6 Tel: Fax: TSX-V: GBR NEWS RELEASE

MANDALAY RESOURCES CORPORATION INCREASES MINERAL RESOURCES AND RESERVES AT ITS BJÖRKDAL GOLD MINE

Where Exploration Intersects Discovery

Great Atlantic Rock Samples Return up to 5.8 oz. / ton Gold Golden Promise Property in Central Newfoundland

Ausgold awarded EIS grant for Jinkas deep drilling

CROCODILE GOLD CONTINUES POSITIVE EXPLORATION RESULTS INTERSECTS HIGH GRADE GOLD AT UNION REEFS PROJECT

Asiamet Drilling Further Extends BKM Mineralisation

Sabina Gold & Silver Reports 2018 Drilling has Commenced at Back River Gold Project

TROILUS GOLD CORP. INITIATES 30,000 METRE DRILL PROGRAM ON TROILUS PROPERTY

Skeena Intersects g/t AuEq over metres at Eskay Creek

Golden Predator Intersects 6.86 m of g/t Gold at the 3 Aces Project; Jack and Ace of Spades Zones Merging

BELO SUN RELEASES RESULTS FROM 65 DRILL HOLES FURTHER EXTENDING THE OURO VERDE DEPOSIT ALONG STRIKE NORTHWEST AND DOWN DIP

News Release. Canarc Continues to Intersect High-Grade Gold at Fondaway Canyon, Nevada, Including 3.24 Grams per Tonne Gold over 12.

NEWS RELEASE November 5, 2018

IAMGOLD PROVIDES UPDATE ON ADVANCED EXPLORATION PROJECT DIAMOND DRILLING RESULTS BOTO PROJECT, SENEGAL

Transcription:

Atlantic Gold Announces Additional Drill Results From Resource Extension Drilling At The Cochrane Hill Gold Deposit HIGHLIGHTS INCLUDE: COCHRANE HILL GOLD DEPOSIT 11m @ 43.65 g/t Au from 227m^ 7m @ 23.69 g/t Au from 285m 2m @ 31.95 g/t Au from 127m + 19m @ 2.34 g/t Au from 240m 37m @1.09 g/t Au from123m 11m @ 2.81 g/t Au from 212m 14m @2.00 g/t Au from 231m ^ Includes 1m @ 466g/t Au Includes 1m @ 153g/t Au + Includes 1m @ 45.3g/t Au February 6, 2019 Vancouver, British Columbia Atlantic Gold Corporation (TSX-V: AGB) ("Atlantic" or the "Company") is pleased to provide an update of results for its resource extension drilling program at Cochrane Hill Gold Deposit ( Cochrane Hill ). The recently completed diamond drilling at Cochrane Hill continues to confirm extensions to the mineralization defined by the Phase 3 Resource Definition drill program, completed earlier in 2018 and supports other recently published results from the program. Cochrane Hill is located approximately 80km northeast of the Company s central processing facility at the Moose River Consolidated Gold Mine. Cochrane Hill s current Measured and Indicated Mineral Resources stand at 10.66 million tonnes at 1.16 g/t Au for 398,000 oz. at a 0.35g/t Au cut-off grade. Inferred Mineral Resources amount to 1.63 million tonnes at 1.32 g/t Au for 69,000 oz. at a 0.35g/t Au cut-off grade (see the Company s announcement on January 29, 2018) 1. The Phase 3 Resource Expansion drilling program at Cochrane Hill was completed in January 2018, with 44 holes for 6,900m having been drilled. The Cochrane Hill deposit is a fairly predictable and continuous tabular body dipping about 70 o to the north with an average true

width of approximately 20 to 25m. Holes were drilled on 25m x 20m centers to test for resource extensions of this mineralization eastwards and at depth to the northeast. The results of this program were announced in prior news releases; however, these results were not included in the resource estimation referred to above (See Company announcements on March 15, 2018, and April 4, 2018). Particularly notable from the results of the Phase 3 drill program is a robust zone of mineralization over at least a 300m strike length (at approximately Section 3050E to 3350E) below the current pit design and about 180m vertically below surface. Mineralized intervals within this zone have a combined down-hole width per drill hole averaging 30m (true width of about 22m) and a weighted average grade of 2.75g/t Au. This zone was interpreted to be open at depth and to the east. It is also interpreted to have the potential to add high value ounces to further expand the current in-pit resource and potentially result in deepening of the relatively shallow pit designed in the January 2018 Pre-Feasibility Study which has a maximum vertical depth of 175m (See News Release dated January 29, 2018). Recent drilling, totaling 16,242m in 70 holes, was designed to test potential extensions to defined resources. This was completed over a 475m strike length between Sections 2975E 3450E. Initial assay results were included in previous news releases (See the Company s announcements on December 5, 2018 and January 21, 2019). The results for additional holes are included herein (Table 1) and shown on the attached cross-sections. The final drill results are expected shortly and will be released when received. As previously reported, mineralization typical of Cochrane Hill has been observed in most drill holes. The host rocks are moderately silicified greywacke and argillite protoliths metamorphosed to upper amphibolite facies, with frequent layer-parallel quartz veining. Gold mineralization, including frequently visible gold specks, is associated with pyrrhotite and arsenopyrite. Assay results received to date indicate significant mineralization with average true widths of 15 to 20m, being intersected at depth beneath previous drilling: 75 to 100m below the previous drilling in the western area (between Sections 2975E to 3100E); at depths of 100 to 125m below the previous drilling in the central zone (between Sections 3050E to 3350E); and, at depths of 50 to 75 m below the previous drilling in the eastern area (between Sections 3375E to 3450E). Generally, gold assays are distributed evenly across the mineralized zones. However, as in the case of drill hole CH-18-317, several intersections do include single metre assays with elevated gold values (CH 18-317 includes a 1m assay of 466g/t Au within a broader zone of 11m averaging 43.65g/t Au). These higher-grade assays are frequently associated with visible gold that occurs on the margins of bedding parallel quartz veins within the argillite host rock. 2

For reporting purposes, individual assays greater than 20.0g/t Au that are included in the averages shown are separately identified in Table 1. No top cut has been applied to these assays in determining the reported average value for the mineralized intersection. Geological interpretation of the data collected in the current program, including recent assay results, is progressing well and will result in a better understanding of the geological controls on grade distribution. This will assist in targeting further down-dip and strike extensions of the deposit, particularly to the east where initial observations indicate that drilling may have overshot the target due to changes in the plunge of the mineralization. Mineralization remains open to depth on all sections drilled. Hole ID Easting Northing Dip Az. Table 1 Significant Drill Results (Gold Assay (g/t Au) * Sample Length 3.0g/t Au * m) COCHRANE HILL GOLD DEPOSIT February 1, 2019 Depth From Significant Intervals** To Width Grade (g/t Au) CH-18-274 3125 3242-57 180 308 235 238 3 1.17 242 252 10 0.83 CH-18-275 3000 3200-70 180 299 193 197 4 1.25 212 223 11 2.81 incl. 215 216 1 21.8 231 245 14 2.00 incl. 231 232 1 20.80 CH-18-276 3200 3240-60 180 311 244 260 16 1.12 CH-18-282 3250 3207-65 180 275 194 195 1 3.24 202 238 36 0.67 255 256 1 3.11 CH-18-289 3000 3140-67 180 182 119 122 3 2.83 CH-18-290 3225 3250-56 180 290 219 220 1 34.1 228 236 8 1.37 240 249 9 0.65 CH-18-292 3075 3140-65 180 182 108 111 3 2.64 123 160 37 1.09 CH-18-296 3100 3140-62.5 180 182 92 94 2 4.98 101 105 4 1.10 121 124 3 1.34 132 149 17 1.38 3

166 168 2 2.64 CH-18-299 3250 3260-60 180 305 240 259 19 2.34 incl. 244 245 1 28.90 272 275 3 2.82 285 292 7 23.69 incl. 285 286 1 153.00 CH-18-300 3325 3180-60 180 230 146 147 1 7.99 168 175 7 1.53 189 196 7 0.57 CH-18-303 3125 3170-68 180 254 149 153 4 1.08 176 201 25 0.96 CH-18-304 3175 3250-60 180 311 262 267 5 2.03 274 287 13 0.99 CH-18-305 3050 3220-60 180 269 213 221 8 0.67 226 231 5 0.70 CH-18-307 3095 3199-71 177.5 293 225 238 13 1.34 242 247 5 1.27 252 253 1 41.90 261 262 1 7.69 CH-18-308 3050 3220-70 180 299 254 271 17 0.65 287 292 5 1.76 CH-18-313 3025 3210-70 180 287 203 204 1 6.75 218 219 1 11.55 239 245 6 1.00 258 262 4 0.92 273 278 5 3.15 CH-18-317 3375 3200-60 180 251 199 212 13 0.91 227 238 11 43.65 incl. 236 237 1 466.00 CH-18-318 3400 3137-50 180 161 97 101 4 1.56 108 116 8 0.70 127 129 2 31.95 incl. 128 129 1 45.30 143 145 2 3.59 CH-18-330 3425 3160-61 180 212 170 171 1 7.12 CH-18-333 3625 3050-45 180 60 28 29 1 3.72 48 49 1 5.44 Notes: Table includes all assay results which are deemed significant, with [Sample Length * Gold Assay (g/t Au) 3.0g/t Au*m] and received subsequent to News Release dated January 21, 2019 **Significant Intervals are the calculation of the average assay results across the given width for samples which are 0.5g/t Au allowing for zones of up to 3m length (3 x 1m-length samples) where the assay values are <0.5g/t Au. Assay values are not cut for the purposes of reporting in this table and some intervals include ( incl ) higher grade individual assay values, as shown All assay results are Fire Assays of 50g charge from 1kg pulverized sub-sample split from ~2mm crushed parent of sawn 4

half 1m NQ core True width of mineralized intersections reported varies between 70-80% of reported widths The accompanying drill plan and cross sections can be viewed here: https://mma.prnewswire.com/media/818325/atlantic_gold_corporation_atlantic_gold_announces_add itional_dri.pdf 1 The Mineral Resource estimate for the Cochrane Hill Gold Deposit is quoted at a cut-off grade of 0.35g/t. It has an effective date of July 20, 2017 and was prepared as part of a technical report entitled (Moose River Consolidated Project, Nova Scotia Canada, NI 43-101 Technical Report on Moose River Consolidated Phase 1 and Phase 2 Expansion), in accordance with NI 43-101 by Mr. Neil Schofield, a principal of FSSI (Australia) Pty Ltd, released on March 15, 2018, on SEDAR. Technical Disclosure All assays reported are 50g charge fire assays of 1kg pulverized sub-sample split from -2mm of crushed parent of sawn half 1m NQ core, with 1-in-10 duplicate assays of the same pulp. Certified standards prepared by a third-party laboratory and blind blanks are routinely inserted. Sample preparation and assaying are conducted at the Sudbury and Vancouver laboratories of ALS Canada Ltd, an entity having no other relationship with the Company. ALS employs a standard routine of duplicate and check assays and reference standards. Standards, blind blanks, and duplicate assay results are within an acceptable range of tolerance. The Company completes a monthly review of QAQC on all assay results which is reviewed by the Qualified Person. Core recovery is estimated for each meter and averages 96%. Douglas A Currie, P. Geo., General Manager-Exploration, a Qualified Person (QP) as defined by National Instrument 43-101 ("NI 43-101"), has reviewed, verified and approved the contents of this news release. Further updates will be provided in due course and as new information comes to hand. On behalf of the Board of Directors, Steven Dean Chairman and Chief Executive Officer For further information about Atlantic, please contact: Maryse Bélanger (President and COO) +1 604 689-5564 Sean Thompson (Director Investor Relations) Toll Free: 1 877 689-5599 5

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accept responsibility for the adequacy or accuracy of this release. About Atlantic: Atlantic is a well-financed, growth-oriented gold development group with a long term strategy to build a mid-tier gold production company focused on manageable, executable projects in mining-friendly jurisdictions. Atlantic is focused on growing gold production in Nova Scotia beginning with its MRC phase one open-pit gold mine which declared commercial production in March 2018, and its phase two Life of Mine Expansion at industry lowest decile cash and all-in-sustaining-costs (as stated in the Company s news releases dated January 16, 2019 and January 29, 2018). Atlantic is committed to the highest standards of environmental and social responsibility and continually invests in people and technology to manage risks, maximize outcomes and returns to all stakeholders. Forward-Looking Statements: This release contains certain forward looking statements and certain forward-looking information as defined under applicable Canadian and U.S. securities laws. Forward-looking statements and information can generally be identified by the use of forward-looking terminology such as may, will, expect, intend, estimate, anticipate, believe, continue, plans or similar terminology. Forward-looking statements and information are not historical facts, are made as of the date of this press release, and include, but are not limited to, statements regarding discussions of future plans, guidance, projections, objectives, estimates and forecasts and statements as to management's expectations with respect to, among other things, the activities contemplated in this news release and the timing and receipt of requisite regulatory, and shareholder approvals in respect thereof. Forward looking information, including future oriented financial information (such as guidance), provide investors with an improved ability to evaluate the underlying performance of the Company. Forward-looking statements in this news release include, without limitation, statements related to proposed exploration and development programs, grade and tonnage of material and resource estimates. These forward-looking statements involve numerous risks and uncertainties and actual results may vary. Important factors that may cause actual results to vary include without limitation, the timing and receipt of certain approvals, changes in commodity and power prices, changes in interest and currency exchange rates, risks inherent in exploration estimates and results, timing and success, inaccurate geological and metallurgical assumptions (including with respect to the size, grade and recoverability of mineral reserves and resources), changes in development or mining plans due to changes in logistical, technical or other factors, unanticipated operational difficulties (including failure of plant, equipment or processes to operate in accordance with specifications, cost escalation, unavailability of materials, equipment and third party 6

contractors, delays in the receipt of government approvals, industrial disturbances or other job action, and unanticipated events related to health, safety and environmental matters), political risk, social unrest, and changes in general economic conditions or conditions in the financial markets. In making the forward-looking statements in this press release, the Company has applied several material assumptions, including without limitation, the assumptions that: (1) market fundamentals will result in sustained gold demand and prices; (2) the receipt of any necessary approvals and consents in connection with the development of any properties; (3) the availability of financing on suitable terms for the development, construction and continued operation of any mineral properties; and (4) sustained commodity prices such that any properties put into operation remain economically viable. Information concerning mineral reserve and mineral resource estimates also may be considered forward-looking statements, as such information constitutes a prediction of what mineralization might be found to be present if and when a project is actually developed. Certain of the risks and assumptions are described in more detail in the Company's audited financial statements and MD&A for the year ended December 31, 2017, and for the quarter ended September 30, 2018, on the Company s SEDAR profile at www.sedar.com. The actual results or performance by the Company could differ materially from those expressed in, or implied by, any forward-looking statements relating to those matters. Accordingly, no assurances can be given that any of the events anticipated by the forward-looking statements will transpire or occur, or if any of them do so, what impact they will have on the results of operations or financial condition of the Company. Except as required by law, the Company is under no obligation, and expressly disclaim any obligation, to update, alter or otherwise revise any forward-looking statement, whether written or oral, that may be made from time to time, whether as a result of new information, future events or otherwise, except as may be required under applicable securities laws. 7