Transition Metals and Implats Make Platinum Discovery at Sunday Lake, Intersecting 20.2 meters grading 3.22 Combined PGM s HIGHLIGHTS

Similar documents
Transition Continues to Intersect Significant Platinum-rich PGM Mineralization at Sunday Lake

Transition Hits 42.9 metres Grading 3.43 g/t PGM at Sunday Lake

Canadian Gold Miner Grab Sample Returns 29.5 Grams per tonne Gold from South Kirkland Project

Transition Metals Acquires Advanced Stage Ni-Cu-PGM Projects

Sudbury Platinum Discovers New Ni-Cu-PGM Mineralization at its Aer-Kidd Property

Sudbury Platinum intersects near surface Ni-Cu-Co-PGM mineralization at Aer-Kidd

Transition Vests 100% Interest in Key Gold Properties in the Abitibi and Provides an Update on Activities

Suite West Georgia Street Vancouver, B.C. V6E 4M3 NEWS RELEASE

North American Palladium Announces Positive Exploration Results from Lac des Iles Mine

REGULUS DISCOVERS NEW GOLD-RICH, HIGH-GRADE COPPER-GOLD ZONE AT RIO GRANDE

V Sample from C.O.D vein 15 metres southwest of V

EL CONDOR IN-FILL DRILLING INTERSECTS 26.9 METERS 2.19% CU & 0.58% NI

North American Palladium Signs Option Agreement for the Sunday Lake Project and Commences New Exploration Strategy

Drilling at Perseverance in Arizona, USA Suggests Proximity to Porphyry Copper System

CHAMPION BEAR RESOURCES

MINERAL MOUNTAIN RESOURCES LTD. MMV.TSX-V

News Release No GOLD AND COPPER MINERALIZATION DISCOVERED DURING PHASE 2 EXPLORATION AT THE MCBRIDE PROPERTY

A B C PAD A HIGHLIGHTS

SALAZAR ANNOUNCES AN UPDATED RESOURCE REPORT OF 5.53 MT INDICATED AND 1.46 MT INFERRED AT ITS HIGH GRADE VMS EL DOMO DEPOSIT

Highlights include: Hole TTD050: 6.12 g/t Au over 7.00 metres from metres o Including g/t Au over 1.18 metres

Spruce Ridge Resources Ltd Leslie Road West, Puslinch, ON N0B 2J0 Telephone: (519) , Fax: (519)

Pacific Empire Minerals Provides Copper King RC Drilling Results

Probe Metals Continues to Intersect Significant Gold Mineralization in Expansion Drilling at Val-d Or East, including 4.1 g/t Gold Over 15.

Hole (93) From (m) To (m) m Au (g/t) Ag (g/t) Cu (%) Pb (%) Zn (%) CMLP

West Pender Street Vancouver, BC V6C 2V6 Tel: Fax: TSX-V: GBR NEWS RELEASE

True Width (m) Carneritos to

NORTHERN SUPERIOR RESOURCES INC. 1351C Kelly Lake Road, Unit 7 Sudbury, Ontario, Canada P3E 5P5 Tel: (705) Fax: (705)

OSISKO METALS INTERSECTS 10.49% ZINC+LEAD OVER METRES AND 12.15% ZINC+LEAD OVER METRES AT PINE POINT

Probe Metals Confirms Continuity of Gold Mineralization on its Val-d Or East Project And Increases 2017 Drill Program to 75,000 metres

Drilling Extending Mineralization in La Mina North Zone

BALMORAL ANNOUNCES SIGNIFICANT GOLD DISCOVERY ON DETOUR GOLD TREND IN QUEBEC

Drilling Extending Mineralization in La Mina North Zone

Probe Metals Continues to Expand Gold Zones At Val-d Or East

BOREAL EXPANDS DISCOVERY ZONE OF HIGH-GRADE ZINC, SILVER AND LEAD MINERALIZATION AT GUMSBERG PROJECT IN SWEDEN

NEWS RELEASE August 10, 2017

Gungnir Resources Inc.

Rich Saddle North Au-Cu-Ag Porphyry Expands by 275m Along Strike and 250m Down-Dip

55 Adelaide Street East, Suite St-Charles west, Suite 411, West Tower

EXPLOR INTERSECTS MULTIPLE COPPER ZONES GRADES UP TO 3.65% CU OVER 5.35 METERS ON THE CHESTER COPPER PROPERTY

May 17, Two holes explored the extension at depth of the historic Sta Rosa vein

Cordoba Minerals Provides an Update on Exploration Activities at the San Matias Copper-Gold Project in Colombia

ET and and and

Minsud to recommence resource outline diamond drilling at the Chita Valley Cu- Au-Ag-Mo Project, San Juan, Argentina

NORTHQUEST LTD. ANNOUNCES DRILLING RESULTS FROM THE PISTOL BAY GOLD PROJECT, NUNAVUT, CANADA

Orsu Metals completes Phase 2 drilling program and announces significant intercepts in drillhole SDH17-15 at Zone 23, Sergeevskoe Gold Project, Russia

Salazar intersects metres (13.07m true) averaging 2.65 g/t gold, g/t silver, 1.32% copper, 6.63% zinc at its Curipamba Project.

NEWS RELEASE July 26, 2018

Orford Completes Phase 1 Exploration Program and Generates High-Quality Drill Targets on its Carolina Gold Properties

Wallbridge Completes Successful Initial Drill Program at Beschefer

Interval (meters) To (meters)

Orford Intersects 41.1 m Grading 1.36 g/t Au at Jones Keystone Project in North Carolina

Detour Gold Reports Drilling Results from Lower Detour

NEWS RELEASE August 8, 2018

Three High Priority Targets Identified Through Modeling of Electromagnetic Data From 2011 SkyTEM Survey

AUC.V PRESS RELEASE NO. 01/06

ANTLER GOLD EXPLORATION UPDATE, WILDING LAKE GOLD PROJECT, NEWFOUNDLAND

LH Property Update: Magnum Goldcorp Hits High Grade Gold 16.9 m of g/t, including 10.9 m of g/t, and as well, 11 m of 20.

Probe Metals Discovers New High Grade Gold Zone on Val-d Or East Project: Intersects 12.6 g/t Gold Over 7.3 Metres

Probe Metals Intersects 1,122 g/t Gold Over 0.7 Metres in New Zone at Val-d Or East

Probe Metals Intersects 3.2 g/t Gold Over 45.5 Metres At Val-d Or East

MONETA INTERCEPTS g/t GOLD INCLUDING g/t GOLD AT SOUTH WEST

October 8, 2015 News Release Brucejack Regional Drilling Intersects Over 8,000 Grams Per Tonne Gold

BALMORAL CONTINUES TO EXPAND GRASSET NI-CU-PGE DISCOVERY

EXPLORING NEW GOLD FRONTIERS IN CANADA

NEWS RELEASE LATEST EXPLORATION PROGRAM CONTINUES TO DEMONSTRATE NARANJILLO AS A HIGH GRADE SILVER HOST

URACAN/UEX REPORT URANIUM MINERALIZATION ON THE BLACK LAKE PROJECT; GROUND GEOPHYSICAL SURVEY UNDERWAY

FALCO PACIFIC COMPLETES INITIAL MODEL FOR THE HORNE 5 GOLD/SILVER/ZINC/COPPER DEPOSIT

NEWS RELEASE Ocean Park Ventures Identifies Large Multi-Structure Sulfide Mineralized System Trapper Gold Project, British Columbia

NEWS RELEASE NOVEMBER 15, 2018 HANNAN COMPLETES DRILLING AT BALLYHICKEY, DEFINES SIGNIFICANT ZINC TARGET AT KILMURRY, CO.

Orsu Metals hits 2.62 g/t Au over 22.2 metres and proves higher gold grades at Zone 23, Sergeevskoe Gold Project, Russia

NEWS RELEASE FULLER PROPERTY CONTINUES TO DELIVER GOOD RESULTS 2.53 GRAMS PER TONNE GOLD OVER METRES

Pahtavaara Drill Program Intersects 32.8 G/T Gold Over 2.0M And 2.1 G/T Gold Over 18.0M In The Karoliina Zone

MONETA INTERCEPTS g/t GOLD INCLUDING g/t GOLD AND g/t GOLD INCLUDING g/t GOLD AT SOUTH WEST

NEWS RELEASE GOLD CANYON INTERCEPTS 286 METERS AT 1.03 GRAMS PER TONNE GOLD CONFIRMING NORTHEAST DIP OF PORTAGE ZONE AT SPRINGPOLE GOLD PROJECT

North American Palladium Provides Update on Lac des Iles Exploration Program

NEWS RELEASE. Tigray Intersects 28.2 metres at 8.50 grams per tonne gold at Mato Bula, Adyabo Project, Northern Ethiopia

NEWS RELEASE ORCA GOLD REPORTS CONTINUED SUCCESS AT GSS

QMX GOLD CONTINUES TO INTERSECT STRONG MINERALIZATION AT BONNEFOND, INTERSECTING 39.5 g/t Au OVER 2.4 METRES AND 31.5 g/t Au OVER 1.

NEWS RELEASE FOR IMMEDIATE RELEASE: MARCH 5, 2018

NEWS RELEASE. March 22, 2017

Wallbridge Options 100% of the Beschefer Project near Fenelon Gold

2. The latter two intersections occur outside the presently defined mineral resource.

NEWS RELEASE. Evrim announces initial drilling results at Cuale Gold Project in Mexico

(TSXV: GPLY, OTCQB: GLYXF

ANTLER GOLD HIGHLIGHTS NEW GOLD-IN-SOIL ANOMALIES, CENTRAL NEWFOUNDLAND

NEWS RELEASE July 13, 2018

Copper Lake Samples g/t Gold and g/t Gold from the Queen Alexandra Gold Mine Property

NEWS RELEASE ORCA GOLD INDICATED AND INFERRED RESOURCES AT BLOCK 14 INCREASE BY 24% AND 48% RESPECTIVELY

Discovering Canadian Gold and Diamonds. Oxford Lake Project, Manitoba

In addition, the survey has defined:

CROCODILE GOLD INTERSECTS 7.1 G/T AU OVER 4.5 METERS INCLUDING 11.2 G/T AU OVER 2.6 METERS AT THE UNION REEFS PROJECT, PROSPECT DEPOSIT

Surface Trenching Highlights. Santos Target. To (m) Width (m) Au (g/t) Comment. (m) Santos (1)-includes internal dilution

QMX GOLD INTERSECTS 29.8 G/T AU OVER 3.0 METERS AND 19.3 G/T AU OVER 3.2 METERS AT BONNEFOND

NGEX ANNOUNCES COPPER GOLD DISCOVERY AT NACIMIENTOS PROJECT

ANTLER GOLD DRILLS GRAMS PER TONNE GOLD OVER 5.35 METRES AT THE WILDING LAKE GOLD PROJECT, NEWFOUNDLAND

INV METALS ANNOUNCES DRILL RESULTS AT LOMA LARGA AND INITIAL PROSPECTING RESULTS ON NEW REGIONAL PROPERTIES

July Exploring for Canadian Gold in the Rainy River District of Ontario

NEWS RELEASE NOVEMBER 28th, 2017 Trading Symbols: TSX-V: AMZ; OTCQX: AXDDF

Plateau Extends Falchani East Lithium Deposit Community Agreements Executed and Three Drill Rigs Active at Falchani West

The updated model of the MSU, coupled with the new intercepts from drill holes 14TK0211 and 14TK0213, has:

Transcription:

Transition Metals and Implats Make Platinum Discovery at Sunday Lake, Intersecting 20.2 meters grading 3.22 Combined PGM s Sudbury, January 27, 2014 Transition Metals Corp. (XTM TSX.V) ( Transition, the Company ), is pleased to announce assay results from its drilling program at the company s 50% owned Sunday Lake Project, located near Thunder Bay, Ontario. The program was completed during the fall of 2013 in partnership with Impala Platinum Holdings Limited (Implats). Of the six diamond drill holes completed (2,546 meters in total), four returned intersections containing significant platinum-rich mineralization, including hole SL-13-002 which intersected 20.2 meters containing 3.22 g/t combined precious metals (Pt+Pd+Au or PGMs). HIGHLIGHTS Drilling has outlined a mineralized zone/zones containing >1 g/t PGMs up to 20 metres in thickness over a strike length of 800 metres between 150 and 500 metres below surface. Results include: 20.2 metres averaging 3.22 g/t PGMs, 0.26% copper (Cu) & 0.11% nickel (Ni) in SL-13-002. Including a higher grade section of 5.37 g/t PGMs, 0.45% Cu & 0.13% Ni over 3.0 metres. Semi-massive sulphide veins intersected along the basal contact returned up to 7.82 g/t PGMs, 1.98% Cu & 1.10% Ni over 0.4 metres. Footwall mineralization within thermally altered country rock immediately below the intrusion returned 1.7 metres averaging 4.83 g/t PGMs, 0.77% Cu & 0.05% Ni was intersected within a larger 9.7 metres zone grading >1.0 g/t PGMs. Mineralization has high Pt:Pd ratios, which are typically >1:1. The mineralization is associated with a buried Proterozoic aged mafic to ultramafic intrusive complex interpreted to be at least 3.5 kilometers in diameter. To date, only a small portion of the intrusive complex has been tested by drilling, with all holes that intersected the intrusion encountering elevated platinum group metals. Assay results from the 2013 drill program are summarized below: Table 1: Summary of Drill Intersections Drill Hole From (m) To (m) Length (m) Pt (g/t) Pd (g/t) Au (g/t) PGMs (Pt+Pd+Au) (g/t) SL-13-002 369.4 371.8 2.40 0.87 0.46 0.03 1.36 0.03 0.04 0.72 and 395.0 415.2 20.20 Cu (%) Ni (%) S (%) 2.11 0.95 0.16 3.22 0.26 0.11 1.22 including 410.0 413.0 3.00 3.41 1.68 0.28 5.37 0.45 0.13 1.23 SL-13-003 299.0 308.0 9.00 0.91 0.74 0.08 1.73 0.44 0.13 3.05 including 302.0 303.0 1.00 1.73 1.43 0.15 3.31 0.86 0.24 3.05

SL-13-005 164.6 170.60 6.00 0.40 0.31 0.04 0.75 0.13 0.04 0.59 including 167.6 168.6 1.00 0.66 0.59 0.09 1.34 0.31 0.07 0.97 SL-13-006 567.0 575.0 8.00 1.23 0.72 0.09 2.04 0.20 0.08 0.48 and 595.7 602.4 6.70 0.87 0.68 0.05 1.60 0.32 0.17 2.36 including 602.0 602.4 0.40 3.94 3.82 0.06 7.82 1.98 1.10 18.3 and 602.4 612.1 9.70 0.75 0.49 0.06 1.30 0.21 0.04 0.95 including 607.4 609.1 1.70 2.84 1.74 0.25 4.83 0.77 0.05 1.11 Please refer to Figures 1 through 4 which present the generalized location of the Sunday Lake project, a plan map depicting the location of the grids and drill holes on a backdrop of total field magnetics, a long sectional view depicting the relative position of intercepts, and an interpreted geological cross section. If you are having difficulties viewing the figures please visit the Sunday Lake project section at www.transitionmetalscorp.com or use the following link: http://www.transitionmetalscorp.com/images/stories/news/sunday_lake_discovery.pdf to download the pdf version of this release. Commenting on the program, CEO Scott McLean stated We are extremely pleased with this new platinum discovery. While still at an early stage of exploration, positive features include; the large size of the intrusion, the widespread occurrences of multiple mineralized environments and high Pt tenors. We consider these factors to be very encouraging and believe that we may have discovered a large scale mineralized system. Discussion of Results SL-13-001 (251m: 300 /-60 ): The hole failed to intersect mineralization but did intersect several narrow mafic dikes (<1 metre) that have geochemically been shown to be related to the Sunday Lake Intrusion (SLI). SL-13-002 (529m: 180 /-75 ): The hole intersected a 150.7m wide zone of intensely brecciated and altered country rock followed by 118.1 metres of the SLI. The intrusion ranged in composition from gabbro through to pyroxenite and contained a 20.2 metres zone of sulphide mineralization from 395.0-415.2 metres that contained 3.22 g/t PGMs including a higher grade zone that contained 5.37 g/t PGMs 3.0 metres. SL-13-003 (356m: 280 /-60 ): The hole intersected 95.6 metres of the SLI from 212.2-307.8 metres and contained a 9.8 metre wide zone from 299.0-308.8 metres of coarse-grained blebby chalcopyrite (cpy)+pyrhhotite (po) in a fine-grained gabbro that returned assay values of 1.64 g/t PGMs. SL-13-004 (509m: 190 /-80 ): Due to excessive deviation in the hole, the hole failed to intersect the main intrusion. The hole did intersect several narrow mafic dikes (<1 metre) that have geochemically been shown to be related to the SLI. SL-13-005 (239m: 135 /-85 ): The hole intersected 68.1 metres of the SLI from 117.7-185.8 metres and contained a 6.0 metre wide zone from 164.6-170.6 metres of coarse-grained blebby cpy+po in a variable textured hornblende-gabbro to fine-grained gabbro that returned assay values of 0.75 g/t PGMs including 1.0 metre grading 1.34 g/t PGMs. SL-13-006 (662m: 235 /-75 ): The hole intersected 194.6 metres of the SLI from 407.8-602.4 metres and contained three distinct zones of PGE-bearing sulphide mineralization. Coarse-grained blebby cpy-po, hosted within a vari-textured hornblende-gabbro to fine-grained gabbro was intersected over 8.0 metres from 567.0-575.0 metres and returned 2.04 g/t PGMs. Peridotite-hosted sulphide mineralization containing 1.6 g/t PGMs

was encountered over a 6.7 metre interval from 595.7-602.4 metres along the basal contact of the intrusion. Included in this interval was a 0.40 metre zone of semi-massive sulphide (cpy+po) which returned 7.82 g/t PGMs, 1.98% Cu and 1.1% Ni. In the footwall immediately adjacent to the intrusion a 9.7 metre zone of sulphide mineralization was intersected that contained 1.3 g/t PGMs. The mineralization was dominated by coarse-grained blebby sulphide (cpy-po) as well as stringers of sulphides (cpy-po) hosted within thermally altered metasediments. Included within this interval were higher grade sections that returned 4.83 g/t PGMs, 0.77% Cu & 0.05% Ni over 1.7m. 2014 Round-up Conference in Vancouver Polished specimens of Sunday Lake drill core and some posters will be on display by company representatives in the AMEBC Core Shack venue at the Westin Bayshore hotel in Vancouver this week on Tuesday January 28 th, 2014 at 1601 Bayshore Drive. Conference participants are encouraged to drop by the core shack. 2014 Exploration Program The Company is working with partner Implats to follow-up on these encouraging results by expanding geophysical coverage over the property and by completing borehole electromagnetic surveys in preparation for additional drilling. Objectives for the next phase of work at Sunday Lake include testing of other defined geophysical targets and follow-up drilling to further define the extent and continuity of intersected mineralization. About the Sunday Lake Property The Sunday Lake Property is located approximately 25 km north of Thunder Bay and 25 km west of Panoramic Resources Limited s, Thunder Bay North deposit and consists of staked claims and privately owned land optioned in 2013 from Rio Tinto Exploration Canada Inc. (RTEC) and other property holders. The property covers a 3.5 km diameter circular reversely-polarized magnetic anomaly associated with the large buried mafic-ultramafic intrusion interpreted to be Proterozoic in age and related to the Midcontinental Rift (MCR). The MCR is a 2,000 km long geological rift in the center of North America that formed when the North American craton, began to split apart about 1.1 billion years ago. Early phases ( early-rift ) of mafic to ultramafic intrusive rocks, with high associated PGMs occur within the MCR. In recent years, several deposits have been discovered in the MCR, including: Lundin Mining Corporation s Eagle deposit: 5.33 Mt @ 3.1% Ni, 2.5% Cu, 1.32 g/t PGM (Probable) ¹ Panoramic Resource Limited s Thunder Bay North deposit: 9.83 Mt @ 2.87 g/t Pt-Eq for 0.741 Moz Pt- Eq (Indicated) + 0.53 Mt @ 2.87 g/t Pt-Eq for 0.05 Moz Pt-Eq (Inferred)² Qualified Person The technical elements of this press release have been approved by Mr. Grant Mourre, P.Geo. (APGO), a Qualified Person under National Instrument 43-101. All samples were analyzed in Vancouver by ALS Chemex. Platinum, palladium and gold values were determined together using standard lead oxide collection fire assay and ICP-AES finish. Base metal values were determined using lithium metaborate fusion and ICP-MS. Standards and blanks are submitted with each sample batch. 1 Resource reported by Lundin Mining, July 2013 NI 43-101 Technical Report on the Eagle Mine, Upper Peninsula of Michigan, USA

² Resource reported by Panoramic Resources, Thunder Bay North deposit: 2011 JORC compliant mineral resources estimate prepared by AMEC Americas Ltd. About Transition Metals Corp Transition Metals Corp (XTM -TSX.V) is a Canadian-based, multi-commodity project generator that specializes in converting new exploration ideas into Canadian discoveries. The award-winning team of geoscientists has extensive exploration experience in established, emerging and historic mining camps, and actively develops and tests new ideas for discovering mineralization in places that others have not looked, which often allows the company to acquire properties inexpensively. The team is rigorous in its fieldwork, and combines traditional techniques with newer ones to help unearth compelling prospects and drill targets. Transition uses the project generator business model to acquire and advance multiple exploration projects simultaneously, thereby maximizing shareholder exposure to discovery and capital gain. Joint venture partners earn an interest in the projects by funding a portion of higher-risk drilling and exploration, allowing Transition to conserve capital and minimize shareholder s equity dilution. The company, which went public in 2011, has an expanding portfolio that currently includes 30 gold, copper, nickel and platinum projects primarily in Ontario, Nunavut and Saskatchewan. Cautionary Note on Forward-Looking Information Except for statements of historical fact contained herein, the information in this news release constitutes forward-looking information within the meaning of Canadian securities law. Such forward-looking information may be identified by words such as plans, proposes, estimates, intends, expects, believes, may, will and include without limitation, statements regarding estimated capital and operating costs, expected production timeline, benefits of updated development plans, foreign exchange assumptions and regulatory approvals. There can be no assurance that such statements will prove to be accurate; actual results and future events could differ materially from such statements. Factors that could cause actual results to differ materially include, among others, metal prices, competition, risks inherent in the mining industry, and regulatory risks. Most of these factors are outside the control of the Company. Investors are cautioned not to put undue reliance on forward-looking information. Except as otherwise required by applicable securities statutes or regulation, the Company expressly disclaims any intent or obligation to update publicly forward-looking information, whether as a result of new information, future events or otherwise. Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release. Further information is available at www.transitionmetalscorp.com or by contacting: Scott McLean President and CEO Transition Metals Corp. Tel: (705) 669-0590 Robert Thaemlitz Financial Communications Renmark Tel. (514) 939-3989

Figure 1. Location of the Sunday Lake Project

Figure 2. Plan Map Depicting Location of Drill Holes on TFM Image

Figure 3. Inclined Long-Section Looking North Hole 12SL0002 drilled by RTEC in 2012 - Interpretation based on logs filed for assessment with the Ontario Department of Mines AFRI file 2.5355

Figure 4. Cross Section Looking Northeast Hole 12SL0002 drilled by RTEC in 2012 - Interpretation based on logs filed for assessment with the Ontario Department of Mines AFRI file 2.53552