IAMGOLD INTERSECTS MINERALIZATION ALONG STRIKE OF THE SARAMACCA DEPOSIT AND REPORTS FIRST DRILL RESULTS FROM BROKOLONKO

Similar documents
IAMGOLD REPORTS FURTHER HIGH-GRADE INTERSECTIONS FROM INFILL AND EXPANSION DRILLING AT SARAMACCA

IAMGOLD REPORTS HIGH GRADE INTERSECTIONS FROM THE ONGOING DELINEATION DRILLING PROGRAM ON THE SARAMACCA PROJECT, SURINAME

IAMGOLD REPORTS ADDITIONAL HIGH GRADE INTERSECTIONS FROM THE DELINEATION DRILLING PROGRAM ON THE SARAMACCA PROJECT, SURINAME

IAMGOLD CONTINUES TO INTERSECT HIGH GRADES AT MONSTER LAKE

IAMGOLD PROVIDES UPDATE ON ADVANCED EXPLORATION PROJECT DIAMOND DRILLING RESULTS BOTO PROJECT, SENEGAL

IAMGOLD REPORTS HIGH-GRADE DRILL INTERSECTIONS FROM ITS 2017 DRILLING PROGRAM ON THE DIAKHA DEPOSIT, SIRIBAYA PROJECT IN MALI

IAMGOLD PROVIDES EXPLORATION UPDATE ON BOTO PROJECT IN SENEGAL

Probe Metals Continues to Expand Gold Zones At Val-d Or East

Probe Metals Continues to Intersect Significant Gold Mineralization in Expansion Drilling at Val-d Or East, including 4.1 g/t Gold Over 15.

Probe Metals Discovers New High Grade Gold Zone on Val-d Or East Project: Intersects 12.6 g/t Gold Over 7.3 Metres

Probe Metals Confirms Continuity of Gold Mineralization on its Val-d Or East Project And Increases 2017 Drill Program to 75,000 metres

IAMGOLD ANNOUNCES RESULTS FROM THE WESTWOOD-MOOSHLA EXPLORATION PROJECT

Probe Metals Intersects 3.2 g/t Gold Over 45.5 Metres At Val-d Or East

AVION GOLD DJAMBAYE II ZONE, TABAKOTO PROJECT, MALI, RETURNS HIGH GRADE INTERCEPTS OF 7.56 G/T Au OVER 7.0 METRES AND G/T Au OVER 3.

Assay Results Highlights (as of November 16, 2017) representing approximately 4,500 metres ( m ) of drilling:

Probe Metals Intersects 1,122 g/t Gold Over 0.7 Metres in New Zone at Val-d Or East

ET and and and

Detour Gold Reports Drilling Results from Lower Detour

AUGUSTINE VENTURES ANNOUNCES HIGH GRADE GOLD BEARING TENSION VEINS IN THE HANGING WALL OF THE SURLUGA DEPOSIT

BELO SUN RELEASES RESULTS FROM 65 DRILL HOLES FURTHER EXTENDING THE OURO VERDE DEPOSIT ALONG STRIKE NORTHWEST AND DOWN DIP

BALMORAL ANNOUNCES SIGNIFICANT GOLD DISCOVERY ON DETOUR GOLD TREND IN QUEBEC

San Gold Drills New Mine Horizon Adjacent to Rice Lake Mine, Returns 10.4 Metres Grading 25.7 g/t Au

BELO SUN DISCOVERS NEW MINERALIZED ZONE AT ITS VOLTA GRANDE GOLD PROJECT, BRAZIL

ANTLER GOLD EXPLORATION UPDATE, WILDING LAKE GOLD PROJECT, NEWFOUNDLAND

News Release. Infill Drilling Program

BELO SUN INTERSECTS NEW HIGH GRADE ZONE AT GROTA SECA AND EXPANDS GRANDE DEPOSIT

SAVARY GOLD DRILLING EXTENDS KNOWN ZONES AND INTERSECTS SIGNFICANT GOLD MINERALIZATION AT FOUR NEW TARGETS

V Sample from C.O.D vein 15 metres southwest of V

NEWS RELEASE ORCA GOLD INDICATED AND INFERRED RESOURCES AT BLOCK 14 INCREASE BY 24% AND 48% RESPECTIVELY

Melkior retains Geologica to complete a NI report on its Launay property, Québec

Marathon Announces Discovery of New High-Grade Gold Zone in Marathon Area and Sprite Zone Drilling Results, Valentine Lake Gold Camp

COPPER MOUNTAIN COMPLETES PHASE 2 DRILL PROGRAM AT NEW INGERBELLE WITH CONTINUED POSITIVE RESULTS

BELO SUN RELEASES RESULTS FOR 74 ADDITIONAL DRILL HOLES AT ITS VOLTA GRANDE PROJECT

MCEWEN MINING ANNOUNCES EXPLORATION UPDATE FOR EL GALLO 1, MEXICO

ASANKO GOLD ANNOUNCES ENCOURAGING INITIAL DRILL RESULTS FROM NEW EXPLORATION TARGET

Saramacca Project Updates September 2017 Suriname Exploration Team September 12 th, 2017

Northern Dynasty Minerals Ltd.

OSISKO METALS INTERSECTS 10.49% ZINC+LEAD OVER METRES AND 12.15% ZINC+LEAD OVER METRES AT PINE POINT

Highlights from the four holes announced in this news release include:

IDM Mining s Underground Drilling Intersects g/t Au and g/t Ag over 6.80 Meters True Width at the Red Mountain Gold Project

QMX GOLD CONTINUES TO INTERSECT STRONG MINERALIZATION AT BONNEFOND, INTERSECTING 39.5 g/t Au OVER 2.4 METRES AND 31.5 g/t Au OVER 1.

55 Adelaide Street East, Suite St-Charles west, Suite 411, West Tower

KIRKLAND LAKE GOLD ANNOUNCES 120 METRE DOWN-PLUNGE EXTENSION OF SWAN ZONE

April Exploring for Canadian Gold in the Rainy River District of Ontario

DRILLING AT ASCOT S PREMIER PROPERTY EXTENDS GOLD MINERALIZATION 150 METRES WEST TOWARDS UNDERGROUND PORTAL

KIRKLAND LAKE GOLD INTERSECTS NEW MINERALIZATION AT TAYLOR MINE, CONTINUES TO EXTEND PORPHYRY DEPOSITS TO DEPTH

SALAZAR ANNOUNCES AN UPDATED RESOURCE REPORT OF 5.53 MT INDICATED AND 1.46 MT INFERRED AT ITS HIGH GRADE VMS EL DOMO DEPOSIT

Plateau Extends Falchani East Lithium Deposit Community Agreements Executed and Three Drill Rigs Active at Falchani West

BALMORAL INTERSECTS g/t GOLD OVER 7.99 METRES, BUG LAKE SOUTH, DETOUR GOLD TREND PROJECT, QUEBEC

MONETA INTERCEPTS g/t GOLD INCLUDING g/t GOLD AT SOUTH WEST

Orsu Metals hits 2.62 g/t Au over 22.2 metres and proves higher gold grades at Zone 23, Sergeevskoe Gold Project, Russia

Hole (93) From (m) To (m) m Au (g/t) Ag (g/t) Cu (%) Pb (%) Zn (%) CMLP

The new sulphide mineralization lies within a 1.4 kilometer long east-west trending

NEWS RELEASE ORCA GOLD REPORTS CONTINUED SUCCESS AT GSS

Teranga s Golden Hill Drill Program Intersects High-Grade Gold and Expands Mineralized Zones at Peksou and Ma Prospects

ANTLER GOLD HIGHLIGHTS NEW GOLD-IN-SOIL ANOMALIES, CENTRAL NEWFOUNDLAND

FALCO PACIFIC COMPLETES INITIAL MODEL FOR THE HORNE 5 GOLD/SILVER/ZINC/COPPER DEPOSIT

INFILL DRILLING EXPANDS MINERALIZATION IN HIGH-GRADE GOLD-COPPER CORE AT SOUTHWEST DISCOVERY ZONE TURQUOISE HILL PROJECT, MONGOLIA

For Immediate Release ASCOT DRLLING AT UNICORN INTERSECTS MORE HIGH-GRADE GOLD

Orsu Metals completes Phase 2 drilling program and announces significant intercepts in drillhole SDH17-15 at Zone 23, Sergeevskoe Gold Project, Russia

CROCODILE GOLD CONTINUES POSITIVE EXPLORATION RESULTS INTERSECTS HIGH GRADE GOLD AT UNION REEFS PROJECT

MONETA INTERCEPTS g/t GOLD INCLUDING g/t GOLD AND g/t GOLD INCLUDING g/t GOLD AT SOUTH WEST

Sabina Gold & Silver Reports 2018 Drilling has Commenced at Back River Gold Project

NEWS RELEASE August 10, 2017

Drilling Highlights: Phase II BCV Infill Drilling

KIRKLAND LAKE GOLD EXPANDS NEW HIGH-GRADE ZONE BELOW TAYLOR MINE, REPORTS MINERALIZED EXTENSIONS ALONG STRIKE AND AT DEPTH

July Exploring for Canadian Gold in the Rainy River District of Ontario

West Pender Street Vancouver, BC V6C 2V6 Tel: Fax: TSX-V: GBR NEWS RELEASE

Strategic Phase 2 Exploration Program Launched at Island Gold High-Grade Resource Potential Identified Laterally and at Depth

Skeena Intersects g/t AuEq over metres at Eskay Creek

Queenston Announces 112% Increase in Indicated Resource (to 1.5 M oz. gold) and 16% Increase in Inferred Resource (to 0.7 M oz. gold) at Upper Beaver

NEWS RELEASE. Mountain Province Diamonds Completes the Kennady North Winter Exploration Program

Drilling Extending Mineralization in La Mina North Zone

Highlights include: Hole TTD050: 6.12 g/t Au over 7.00 metres from metres o Including g/t Au over 1.18 metres

ANTLER GOLD DRILLS GRAMS PER TONNE GOLD OVER 5.35 METRES AT THE WILDING LAKE GOLD PROJECT, NEWFOUNDLAND

Drilling Extending Mineralization in La Mina North Zone

PRESS RELEASE WESDOME PLANS AGGRESSIVE DRILLING AND DEVELOPMENT PROGRAM IN 2011

North American Palladium Announces Positive Exploration Results from Lac des Iles Mine

Interval (meters) To (meters)

Pershing Gold Extends High-Grade Mineralization through Step-Out Drilling in Phase 1 and Initiates Phase 2 Drilling Program

Pershing Gold Hits Highest Grade Gold to Date in Relief Canyon with Grams per Tonne (3.618 Ounces per Ton) Intercept

GRAPHITE ONE DRILLS 165.3M of 4.23% GRAPHITE INCLUDING 46.4M OF 6.6%, 14.3M of 10.1% and 21M of 10.1% GRAPHITE

NEWS RELEASE. Evrim announces additional drilling results at Cuale Gold Project in Mexico

Canadian Gold Miner Grab Sample Returns 29.5 Grams per tonne Gold from South Kirkland Project

EXPLORATION NEWS RELEASE MAGISTRAL DISTRICT: MORE GROWTH, MORE GOLD, MORE SILVER

At the contact, mineralization is associated with strong tourmalinization of the Bevcon Intrusion.

EXCELLON ANNOUNCES LA PLATOSA EXPLORATION RESULTS: HIGH GRADES CONTINUE TO EXTEND MANTO SULPHIDES DRILL HOLE ENCOUNTERS SOURCE ENVIRONMENT INDICATORS

CROCODILE GOLD INTERSECTS 7.1 G/T AU OVER 4.5 METERS INCLUDING 11.2 G/T AU OVER 2.6 METERS AT THE UNION REEFS PROJECT, PROSPECT DEPOSIT

Bald Mountain APPENDIX A

MANDALAY RESOURCES CORPORATION INCREASES MINERAL RESOURCES AND RESERVES AT ITS BJÖRKDAL GOLD MINE

NEWS RELEASE. March 22, 2017

MANN SILVER-COBALT MINE. PORE: TSXV PowerOre.com

CALIFORNIA GOLD COMMENCES RESOURCE EXPANSION DRILLING AT NEW ZONE ON ITS FREMONT PROPERTY

NEWS RELEASE July 26, 2018

GOLDEN MINERALS DISCOVERS ADDITIONAL HIGH GRADE VEINS AT SANTA MARIA RESULTS UP TO 1.88 g/t Au and 648 g/t Ag

(TSXV: GPLY, OTCQB: GLYXF

Where Exploration Intersects Discovery

BALMORAL CONTINUES TO EXPAND GRASSET NI-CU-PGE DISCOVERY

Vendetta Reports Additional High Grade Drilling Results from Zones 2 and 3 at Pegmont Lead-Zinc Project

COMPASS GOLD: DRILLING SUCCESS AT FIRST OUASSADA BEDROCK GOLD TARGETS

Transcription:

TSX: IMG NYSE: IAG NEWS RELEASE IAMGOLD INTERSECTS MINERALIZATION ALONG STRIKE OF THE SARAMACCA DEPOSIT AND REPORTS FIRST DRILL RESULTS FROM BROKOLONKO Toronto, Ontario, November 8, 2018 IAMGOLD Corporation ( IAMGOLD or the Company ) today provided an update from its ongoing 2018 exploration drilling program along the Saramacca Brokolonko trend, located 25 kilometres southwest of its Rosebel Gold Mine ( RGM ) in Suriname. With the declaration of mineral reserves at the Saramacca deposit (see news release dated September 23, 2018) the Company has been conducting exploration drilling in selected target areas along the Saramacca Brokolonko trend with the objective to discover additional zones of mineralization. The Company is reporting results from 27 drill holes, totaling 4,643 metres, completed in 2018 to the northwest along strike of the Saramacca deposit, and results from relevant reconnaissance drilling and surface trenching carried out between 2014 and 2016 on the adjacent Sarafina-Moeroekreek concession. Reconnaissance drill holes and trenches reported herein consist of 16 holes, totaling 2,415 metres, and four trenches with a total length of 206 metres. Results from a further 45 drill holes, totaling 7,069 metres, completed in 2018 to test exploration targets on the Brokolonko concession are also disclosed. Assay intersections relating to this release are provided in Tables 1, 2 and 3. Saramacca Concession: Mineralization representing a potential new zone has been intersected by wide spaced drilling approximately 400 metres northwest along strike of the Saramacca deposit extending for at least 1,200 metres of strike length to the northwest onto the adjacent Sarafina - Moeroekreek concession. Highlights from the 2018 exploration program on Saramacca include: SMDD18-288: 10.5 metres grading 1.38 g/t Au SMDD18-290: 7.5 metres grading 1.11 g/t Au and 6.0 metres grading 3.90 g/t Au SMDD18-291: 7.5 metres grading 4.58 g/t Au and 10.5 metres grading 1.73 g/t Au SMDD18-292: 16.5 metres grading 1.12 g/t Au SMDD18-298: 16.8 metres grading 1.03 g/t Au Highlights from the 2014-2016 program on Sarafina - Moeroekreek include: MODD14-02: 12.8 metres grading 2.74 g/t Au MODD14-06: 10.5 metres grading 0.93 g/t Au and 10.5 metres grading 1.32 g/t Au MODD14-07: 4.5 metres grading 3.07 g/t Au 1

Brokolonko Concession: Drilling has confirmed the presence of mineralization in the bed rock associated with an aerially extensive, historic auger geochemical anomaly and the site of widespread small-scale mining. Highlights include: BKDD18-009: 9.0 metres grading 0.96 g/t Au BKDD18-014: 3.0 metres grading 5.69 g/t Au and, 13.5 metres grading 0.51 g/t Au BKDD18-015: 1.5 metres grading 22.82 g/t Au BKDD18-019: 1.1 metres grading 88.55 g/t Au BKRC18-003: 8.0 metres grading 1.17 g/t Au BKRC18-018: 26.0 metres grading 0.59 g/t Au BKRC18-019: 4.0 metres grading 1.35 g/t Au and, 6.0 metres grading 2.72 g/t Au (Figures 1 and 2 show drill hole plan maps for the Saramacca and Brokolonko concessions) Craig MacDougall, Senior Vice President, Exploration for IAMGOLD, stated, While still early days, our ongoing exploration efforts targeting new areas along the Saramacca Brokolonko trend are already delivering encouraging results and confirm the regional potential for further discoveries. These initial results suggest the presence of a potential new zone of mineralization along strike of the Saramacca deposit, and have also yielded the first indications of gold bearing structures on the highly prospective Brokolonko concession. Added Steve Letwin, IAMGOLD s President and CEO, I can t begin to say how excited I am with the steady progress that s being made towards expanding resources at Saramacca. The continuation of positive results on the property, and now for the first time at Brokolonko further validate our strategy to transform Rosebel. 2018 Exploration and Development Program Exploration activities at the Saramacca Project culminated with the declaration of reserves in the third quarter 2018. As at September 23, 2018, Saramacca hosted estimated mineral reserves, on a 100% basis, comprising proven and probable reserves of 26.5 million tonnes, grading 1.8 g/t Au for 1.54 million ounces of contained gold. Also on a 100% basis, indicated resources (inclusive of reserves) were estimated at 27.9 million tonnes, grading 2.0 g/t Au for 1.76 million ounces of gold, and inferred resources, on a 100% basis, of 11.8 million tonnes, grading 0.7 g/t Au for 273,000 ounces of gold. (see news release dated September 23, 2018). An Environmental and Social Impact Study ( ESIA ) to support permitting has been submitted to Surinamese environmental regulators, and ongoing technical studies at various levels of advancement, ranging from pre-feasibility to detailed engineering continue. Construction has been initiated for various elements of the Project. Firm orders have been placed for the acquisition of the mine haulage fleet, and the haul road between the Saramacca deposit and RGM is currently in the final phases of detailed engineering. On-going optimization studies including pit slope dewatering, slope design improvements and metallurgical testing to further optimize recoveries will continue in the fourth quarter 2018. The Saramacca Project is on track, with mining expected to commence in the second half of 2019. Exploration drilling will continue to evaluate the resource potential of the new zone located northwest along strike of the Saramacca deposit, as well as to evaluate the underground potential of high-grade mineralization previously intersected below the current Saramacca resource pit shell. Regionally, exploration activities are continuing to explore the highly prospective Saramacca Brokolonko trend for additional zones of mineralization and to evaluate the resource potential of new discoveries as merited. 2

About the Saramacca Brokolonko Projects The Saramacca Brokolonko concessions are strategically located approximately 25 to 30 kilometres southwest of the RGM milling facility, which, together with the Sarafina - Moeroekreek concession, cover approximately 24 kilometres of the regional northwest trending Saramacca shear zone which hosts the Saramacca deposit and is believed to be an important deformation zone for the localization of gold mineralization. The concessions fall within the UJV area as defined in an Agreement with the Government of Suriname announced on April 15, 2013. The Agreement commits the parties to establishing a joint venture growth vehicle under which RGM would hold a 70% participating interest and the Government will acquire a 30% participating interest on a fully-paid basis. Qualified Persons and Technical Information The drilling results contained in this news release have been prepared in accordance with National Instrument 43-101 Standards of Disclosure for Mineral Projects ("NI 43-101"). The "Qualified Person" responsible for the supervision of the preparation, verification and review of the technical information in this release is Caroline Laplante, P. Geo., Country Exploration Manager of the regional exploration team at the Rosebel Gold Mine in Suriname. She is considered a "Qualified Person" for the purposes of National Instrument 43-101 with respect to the technical information being reported on. The technical information has been included herein with the consent and prior review of the above noted Qualified Person. The information in this news release was reviewed and approved by Craig MacDougall, P.Geo., Senior Vice President, Exploration for IAMGOLD. Mr. MacDougall is a Qualified Person as defined by National Instrument 43-101. The sampling of, and assay data from, drill core and surface grab and trench chip samples are monitored through the implementation of a quality assurance - quality control (QA-QC) program designed to follow industry best practice. Drill core (HQ and NQ size) samples are selected by the IAMGOLD geologists and sawn in half with a diamond saw at the Rosebel mine site. Half of the core is retained at the site for reference purposes. Sample intervals may vary from half a metre to three meters depending on the geological observations with the majority of samples being one and a half metres in length. RC samples (5 5/8 bit) are collected using a cone splitter, weighted at the rig with chip samples taken from the material for geological description and future reference. Samples are transported in sealed bags to FILAB in Paramaribo, Suriname, an independent commercial representative lab of ALS with an ISO 9001 (2015) certification. Samples are weighed and coarse crushed to <2.5 mm, and 350-450 grams is pulverized to 85% passing <100 μm. Samples are analyzed for gold using standard fire assay technique with a 50 gram (or 30 gram for 2014-2016 recon work in Moeroekreek) charge and an Atomic Absorption (AA) finish, and since phase II 2017 a gravimetric finish when grade exceeds 5 ppm. IAMGOLD inserts blanks and certified reference standard for quality control. All results stated in this announcement have passed IAMGOLD quality assurance and quality control protocols. Forward Looking Statement This news release contains forward-looking statements. All statements, other than of historical fact, that address activities, events or developments that the Company believes, expects or anticipates will or may occur in the future (including, without limitation, statements regarding expected, estimated or planned gold production, cash costs, margin expansion, capital expenditures and exploration expenditures and statements regarding the estimation of mineral resources, exploration results, potential mineralization, potential mineral resources and mineral reserves) are forward-looking statements. Forward-looking statements are generally identifiable by use of the words will, should, continue, expect, estimate, believe, plan or project or the negative of these words or other variations on these words or comparable terminology. Forward-looking statements are subject to a number of risks and uncertainties, 3

many of which are beyond the Company s ability to control or predict, that may cause the actual results of the Company to differ materially from those discussed in the forward-looking statements. Factors that could cause actual results or events to differ materially from current expectations include, among other things, without limitation, failure to meet expected, estimated or planned gold production, cash costs, margin expansion, capital expenditures and exploration expenditures and failure to establish estimated mineral resources, the possibility that future exploration results will not be consistent with the Company's expectations, changes in world gold markets and other risks disclosed in IAMGOLD s most recent Form 40-F/Annual Information Form on file with the United States Securities and Exchange Commission and Canadian provincial securities regulatory authorities. Any forward-looking statement speaks only as of the date on which it is made and, except as may be required by applicable securities laws, the Company disclaims any intent or obligation to update any forward-looking statement. About IAMGOLD IAMGOLD (www.iamgold.com) is a mid-tier mining company with four operating gold mines on three continents. A solid base of strategic assets in North and South America and West Africa is complemented by development and exploration projects and continued assessment of accretive acquisition opportunities. IAMGOLD is in a strong financial position with extensive management and operational expertise. For further information please contact: Ken Chernin, VP Investor Relations, IAMGOLD Corporation Tel: (416) 360-4743 Mobile: (416) 388-6883 Laura Young, Director, Investor Relations, IAMGOLD Corporation Tel: (416) 933-4952 Mobile: (416) 670-3815 Martin Dumont, Senior Analyst Investor Relations, IAMGOLD Corporation Tel: (416) 933-5783 Mobile: (647) 967-9942 Toll-free: 1-888-464-9999 info@iamgold.com Please note: This entire news release may be accessed via fax, e-mail, IAMGOLD's website at www.iamgold.com and through Newsfile s website at www.newsfilecorp.com. All material information on IAMGOLD can be found at www.sedar.com or at www.sec.gov. Si vous désirez obtenir la version française de ce communiqué, veuillez consulter le http://www.iamgold.com/french/accueil/default.aspx. 4

Table 1: Diamond Drill Hole Assay Results from the 2018 Saramacca Exploration Drilling Program Local UTM grid, Zone 21 N End of hole To Width Au (g/t) SMDD18-275 677949 545167 70.536 258.0 215-50 202.5 206.6 4.10 3.16 0.34 SMDD18-276 677992 545194 68.023 204.0 35-50 133.5 136.5 3.0 1.87 5.71 SMDD18-277 678377 544907 170.767 294.0 35-50 0 22.5 22.5 12.72 0.74 SMDD18-277 61.0 67.5 6.5 3.74 0.71 SMDD18-278 678970 543927 361.165 126.0 35-50 0.00 10.50 10.50 5.81 0.41 SMDD18-279 679384 543299 359.100 150.0 35-50 No significant interval SMDD18-280 679345 543245 347.864 153.0 35-50 No significant interval SMDD18-281 679317 542858 431.806 180.0 35-50 151.5 157.50 6.00 3.05 0.55 SMDD18-282 679373 542935 413.146 165.0 35-50 58.5 67.50 9.00 4.45 1.02 SMDD18-283 677834 545354 108.089 150.0 215-50 No significant interval SMDD18-284 677835 545353 108.103 156.0 35-50 No significant interval SMDD18-285 677793 545300 114.322 150.0 215-50 127.0 133.50 6.50 4.62 2.75 SMDD18-286 677997 545054 115.134 219.0 215-50 178.5 184.50 6.00 4.12 1.34 SMDD18-287 677142 545761 289.82 151.5 35-50 No significant interval SMDD18-288 677201 545826 274.33 196.5 35-50 156.0 166.5 10.50 5.80 1.38 SMDD18-289 677245 545889 268.62 192.0 35-50 85.50 88.50 3.00 1.62 0.87 SMDD18-290 677304 545991 257.32 160.5 35-50 54.00 61.50 7.50 4.27 1.11 66.00 72.00 6.00 3.41 3.90 151.5 156.00 4.50 2.52 1.79 SMDD18-291 677354 546071 243.64 165.0 35-50 28.50 36.00 7.50 4.08 4.58 49.50 52.50 3.00 1.64 2.79 66.00 76.50 10.50 5.70 1.73 91.50 96.00 4.50 2.45 0.78 118.5 121.50 3.00 1.62 1.04 133.5 138.00 4.50 2.43 0.49 SMDD18-292 677411 546149 216.59 150.0 35-50 34.50 51.00 16.50 9.05 1.12 SMDD18-293 677604 545728 218.02 157.5 35-50 94.50 97.60 3.10 1.60 0.45 SMDD18-294 677557 545661 256.60 153.0 35-50 79.50 82.50 3.00 1.60 0.96 SMDD18-295 677505 545591 253.25 154.5 35-50 15.00 18.00 3.00 1.64 0.81 SMDD18-296 677440 545503 236.95 180.0 35-50 121.5 124.50 3.00 1.62 1.36 159.0 162.00 3.00 1.68 0.72 SMDD18-297 677393 545434 250.24 150.0 35-50 No significant interval SMDD18-298 677596 545351 219 150.0 35-50 76.50 81.00 4.50 2.45 0.67 87.00 103.80 16.80 8.72 1.03 SMDD18-299 677636 545431 178 150.0 35-50 No significant interval SMDD18-300 677685 545502 192 150.0 35-50 No significant interval SMDD18-301 677745 545577 187 177.0 35-50 No significant interval Notes: 1. Drill hole intercepts are calculated using a 0.30 g/t Au assay cut-off and 3m minimum length, with no assay capping. 5

2. widths are estimated from intersected geometries. Table 2: Diamond and Reverse Circulation Drill Hole and Surface Exploration Trench Assay Results from the 2014-2016 Exploration Program on Sarafina - Moeroekreek Concession. Moeroekreek (Tigri) Exploration DDH Drilling, years 2014-2015 Local UTM grid, Zone 21 N End of hole To Width Au (g/t) MODD14-01 677251 546390 122 54.0 215-50 No significant interval MODD14-02 677188 546311 165 156.0 35-50 3.0 6.0 3.0 1.64 0.33 53.25 66.0 12.75 6.96 2.74 MODD14-03 677320 546541 65 150.0 35-50 No significant interval MODD14-04 677053 546753 93 153.0 35-50 No significant interval MODD14-05 677015 546678 126 150.0 35-50 No significant interval MODD14-06 677187 546311 165 150.0 215-50 18.0 28.5 10.5 7.06 0.93 80.5 84.0 3.5 2.35 0.49 103.0 113.5 10.5 7.11 1.32 MODD14-07 676953 546604 130 153.0 35-50 117.0 121.5 4.5 2.46 3.07 MODD14-08 676905 546526 133 153.0 35-50 46.5 54.0 7.5 4.01 0.47 90.0 94.5 4.5 2.40 0.46 MODD14-09 676862 546452 172.8 177.0 35-50 130.0 134.0 4.0 2.16 0.25 MODD14-10 676813 546385 177 162.0 35-50 No significant interval MODD14-11 676753 546308 183 156.0 35-50 No significant interval MODD15-18 677094 546485 145 153 35-50 52.5 55.5 3.0 1.46 0.87 81.0 84.0 3.0 1.47 1.96 MODD15-19 677050 546407 135 183 35-50 No significant interval MODD15-20 676999 546345 104 165 35-50 No significant interval Moeroekreek (Tigri) Exploration RC Drilling, year 2015 Local UTM grid End of hole To Width 3 Au (g/t) MORC15-25 677300 546478 99 150 35-50 No significant interval MORC15-26 677294 546465 85 150 215-50 No significant interval Moeroekreek (Tigri) Exploration Trenches, year 2016 Local UTM grid Length To Width 3 Au (g/t) MOTR16-11 677112 546271 153.53 80 10.0 14.0 4.0 3.65 0.62 48.0 52.0 4.0 3.66 7.76 56.0 66.0 10.0 9.07 3.34 70.0 74.0 4.0 3.59 0.87 MOTR16-12 677260 546450 88.01 62 No significant interval MOTR16-13 677406 546615 101.69 24 No significant interval MOTR16-14 677353 546625 93 40 No significant interval Notes: 1) The 2014-2016 drill hole and trench intercepts are uncapped with no minimal length applied. 6

Table 3: Diamond and Reverse Circulation Drill Hole Assay Results from the 2018 Brokolonko Drilling Program. Brokolonko Exploration DDH Drilling, year 2018 (*) Local UTM grid, Zone 21 N End of hole To Width Au (g/t) BKDD18-001 661100 555780 108.22 150 30-50 3.60 7.50 3.90 2.22 0.51 BKDD18-002 661148 555865 88.03 171 30-50 159.0 163.5 4.50 2.76 1.87 BKDD18-003 661327 555764 60.79 153 30-50 No significant interval BKDD18-004 661082 555332 64.15 165 30-50 No significant interval BKDD18-005 661173 555499 73.58 159 30-50 0.0 3.0 3.0 1.71 0.50 BKDD18-006 661208 555579 78.68 180 30-50 No significant interval BKDD18-007 661273 555671 59.34 150 30-50 0.0 7.50 7.50 4.27 0.43 BKDD18-008 661234 555240 50.37 150 30-50 No significant interval BKDD18-009 661126 555422 63.39 150 30-50 127.5 136.5 9.0 5.11 0.96 BKDD18-010 661369 555322 57.94 150 30-50 0.0 3.0 3.0 1.71 0.37 117.2 122.9 5.7 3.32 0.35 130.5 133.5 3.0 1.76 0.52 BKDD18-011 661402 555441 53.05 171 30-50 6.0 9.0 3.0 1.74 0.38 147.0 150.0 3.0 1.73 0.95 BKDD18-012 661536 555309 95.64 150 30-50 54.0 60.0 6.0 3.10 0.49 BKDD18-013 661471 555230 77.08 150 30-50 46.5 52.5 6.0 3.43 0.19 BKDD18-014 661427 555140 48.08 180 30-50 72.0 75.0 3.0 1.92 5.69 151.5 165.0 13.5 8.22 0.51 BKDD18-015** 662100 555112 65.90 213 30-50 148.5 150.0 1.5 22.82 BKDD18-016 662048 555023 70.62 180 30-50 No significant interval BKDD18-017 661996 554943 62.50 150 30-50 No significant interval BKDD18-018 661950 554855 50.28 159 30-50 No significant interval BKDD18-019** 661897 554769 47.47 153 30-50 47.0 48.1 1.1 88.55 BKDD18-020 661718 554840 48.34 150 30-50 No significant interval BKDD18-021 661544 554924 48.92 179 30-50 No significant interval BKDD18-022 661769 554931 51.95 180 30-50 No significant interval BKDD18-023 661820 555008 74.90 183 30-50 0.0 6.0 6.0 3.44 0.69 BKDD18-024 661659 555158 72.09 171 30-50 0.0 7.5 7.5 4.29 0.24 BKDD18-025 661661 555160 72.12 180 210-50 9.0 15.0 6.0 4.24 0.29 Brokolonko Exploration RC Drilling, year 2018 Local UTM grid, Zone 21 N End of hole To Width Au (g/t) BKRC18-001 660361 554901 51.13 130.0 30-50 50.00 54.00 4.00 2.42 0.46 BKRC18-002 660409 554980 39.93 128.0 30-50 No significant interval BKRC18-003 660356 555301 105.16 150.0 30-50 16.0 24.0 8.0 4.84 1.17 30.0 44.0 14.0 8.28 0.40 7

54.0 60.0 6.0 3.59 0.42 BKRC18-004 660304 555223 64.72 150.0 30-50 No significant interval BKRC18-005 660173 555347 53.56 150.0 30-50 32.0 46.0 14.0 8.54 0.49 54.0 68.0 14.0 8.57 0.48 76.0 84.0 8.0 4.96 0.91 BKRC18-006 660113 555272 46.49 134.0 30-50 No significant interval BKRC18-007 660218 555445 66.43 150.0 30-50 No significant interval BKRC18-008 660458 555071 53.86 150.0 30-50 No significant interval BKRC18-009 660508 555145 52.81 150.0 30-50 52.0 56.0 4.0 2.32 0.97 BKRC18-010 660545 555232 55.60 150.0 30-50 No significant interval BKRC18-011 660649 555015 87.33 150.0 30-50 38.0 44.0 6.0 3.66 0.71 BKRC18-012 660748 555076 110.74 150.0 30-50 No significant interval BKRC18-013 660782 555171 124.36 150.0 30-50 102.0 108.0 6.0 3.37 0.31 BKRC18-014 660805 555255 108.23 150.0 30-50 6.0 18.0 12.0 7.38 0.50 BKRC18-015 660374 555403 103.52 150.0 30-50 28.0 32.0 4.0 2.50 1.10 36.0 40.0 4.0 2.52 0.33 44.0 48.0 4.0 2.54 0.54 BKRC18-016 660752 555585 113.13 150.0 30-50 No significant interval BKRC18-017 660809 555662 115.97 150.0 30-50 No significant interval BKRC18-018 660954 555528 122.53 150.0 30-50 90.0 116.0 26.0 17.45 0.59 BKRC18-019 660999 555614 112.71 150.0 30-50 122.0 126.0 4.0 2.59 1.35 132.0 138.0 6.0 3.88 2.72 142.0 148.0 6.0 3.88 0.83 BKRC18-020 661053 555698 96.45 150.0 30-50 0.0 8.0 8.0 4.71 0.92 Notes: 1) Drill hole intercepts are calculated using a 0.30 g/t Au assay cut-off and 3m minimum length. 2) Intercepts with a value of 5g/t have been analyzed by gravimetric and included in the table. 3) widths are estimated from intersected geometries considering a 125/85 structure. 4) No minimal length applied to BKDD18-015 and BKDD18-019 8

Figure 1: Saramacca Northwest Extension Drill Hole Plan with Significant Intersects MODD14-07 4.5m at 3.07 g/t Au MODD15-18 3.0m at 0.87 g/t Au 3.0m at 1.96 g/t Au MODD14-06 10.5m at 0.93 g/t Au 10.5m at 1.32 g/t Au MODD14-02 12.75m at 2.74 g/t Au SMDD18-291 7.5m at 4.58 g/t Au 3.0m at 2.79 g/t Au 10.5m at 1.73 g/t Au 4.5m at 0.78 g/t Au 3.0m at 1.04 g/t Au MOTR16-11 (trench) 4.0m at 0.62 g/t Au 4.0m at 7.76 g/t Au 10.0m at 3.34 g/t Au 4.0m at 0.87 g/t Au SMDD18-292 16.5m at 1.12 g/t Au SMDD18-290 7.5m at 1.11 g/t Au 6.0m at 3.90 g/t Au 4.5m at 1.79 g/t Au SMDD18-289 3.0m at 0.87 g/t Au SMDD18-288 10.5m at 1.38 g/t Au SMDD18-276 3.0m at 5.71 g/t Au SMDD18-286 6.0m at 1.34 g/t Au SMDD18-294 3.0m at 0.96 g/t Au SMDD18-295 3.0m at 0.81 g/t Au SMDD18-277 22.5m at 0.74 g/t Au 6.5m at 0.71 g/t Au IAMGOLD DRILLHOLES 2018 DDH DDH (PREVIOUSLY DRILLED) RC (PREVIOUSLY DRILLED) GEOLOGY Main fault zone (Main Mineralization) Tuff Pillow basalt PIT OUTLINE Amygdaloidal basalt Massive basalt Planned pit 1500$ CONCESSION Saramacca-Moeroekreek concession boundary SMDD18-296 3.0m at 1.36 g/t Au 3.0m at 0.72 g/t Au SMDD18-298 4.5m at 0.67 g/t Au 16.8m at 1.03 g/t Au Kilometer Scale 1:10,000 SMDD18-285 6.5m at 2.75 g/t Au 9

Figure 2: Brokolonko Drill Hole Plan with Significant Intersects from Year 2018 Drilling Program BKRC18-003 8.0m at 1.17 g/t Au 14.0m at 0.40 g/t Au 6.0m at 0.42 g/t Au BKRC18-015 4.0m at 1.10 g/t Au 4.0m at 0.54 g/t Au BKRC18-019 4.0m at 1.35 g/t Au 6.0m at 2.72 g/t Au 6.0m at 0.83 g/t Au BKDD18-002 4.5m at 1.87 g/t Au BKRC18-020 8.0m at 0.92 g/t Au BKRC18-018 26.0m at 0.59 g/t Au BKRC18-005 14.0m at 0.49 g/t Au 14.0m at 0.48 g/t Au 8.0m at 0.91 g/t Au BKDD18-009 9.0m at 0.96 g/t Au BKDD18-011 3.0m at 0.95 g/t Au BKDD18-014 3.0m at 5.69 g/t Au 13.5m at 0.51 g/t Au BKRC18-014 12.0m at 0.50 g/t Au IAMGOLD DRILLHOLES 2018 DDH 2018 RC GEOLOGY BKRC18-009 4.0m at 0.97 g/t Au BKRC18-011 6.0m at 0.71 g/t Au Colluvium Duricrust BKDD18-015 1.5m at 22.82 g/t Au Graphitic Shale Felsic Intrusive Meta-basalt Kilometer Scale1:10,000 BKDD18-019 1.1m at 88.55 g/t Au 10