SVOM Science Ground Segment

Similar documents
SVOM Science Ground Segment

SVOM in the multi-messenger area

The SVOM GRB mission. J-L Atteia IRAP Toulouse On behalf of the SVOM consortium

SVOM: a new mission for Gamma-Ray Bursts studies

Gamma-ray Bursts & SVOM

arxiv: v2 [astro-ph.im] 28 May 2010

Baseline for extp Preliminary Design

arxiv: v1 [astro-ph.im] 5 Feb 2018

China s Chang E Program

SVOM: Challenge of implementing a worldwide coverage VHF Network in the equatorial region

GWAC (Ground Wide Angle Cameras)

SVOM: alla ricerca dei GRB più distanti

ASI Science Data Center Community and User Support

Overview of the GRB observation by POLAR

LCO Global Telescope Network: Operations and policies for a time-domain facility. Todd Boroson

The Present and Future Real-Time Alerts from AMON

General architecture of ECLAIRs µsatellite

PoS(SWIFT 10)160. Broadband Transient Monitor using the Swift/BAT and the MAXI/GSC data. T. Sakamoto, Y. Oda and A. Yoshida

Progress of Solar Wind Magnetosphere Ionosphere Link Explorer (SMILE) Mission

ESASky, ESA s new open-science portal for ESA space astronomy missions

The Pierre Auger Observatory

Two Space High Energy Astrophysics Missions of China: POLAR & HXMT

The Zadko Telescope: the Australian Node of a Global Network of Fully Robotic Follow-up Telescopes

TÜBİTAK National Observatory (TUG)

INTEGRAL International Gamma-Ray Astrophysics Laboratory. Science Management Plan

Science Operations with the Square Kilometre Array

Space Astronomy Facilities

GAME: GRB and All-Sky Monitor Experiment

Operational Aspects of Space Weather-Related Missions

Brief Introduction to China s Space Astronomy Programs

Detection of transient sources with the ANTARES telescope. Manuela Vecchi CPPM

Announcement of Opportunity AKARI (ASTRO-F)

A Scientific Trigger Unit for Space-Based Real-Time Gamma Ray Burst Detection II - Data Processing Model and Benchmarks

The Transneptunian Automated Occultation Survey (TAOS II) Matthew Lehner ASIAA

ASI - Italian Space Agency The Space Science Data Center is a Research Infrastructure of the Italian Space Agency

The Swift GRB MIDEX. Neil Gehrels May 20, 2002

H.E.S.S. multi-messenger and real-time follow-up observations

Cleopatra. Connecting Locations of ESFRI Observatories and Partners in Astronomy for Timing and Real-time Alerts. Arpad Szomoru

Time Domain Astronomy in the 2020s:

Gamma-ray Astronomy Missions, and their Use of a Global Telescope Network

Astrophysical Multimessenger Observatory Network (AMON): Science, Infrastructure, and Status

Cherenkov Telescope Array ELINA LINDFORS, TUORLA OBSERVATORY ON BEHALF OF CTA CONSORTIUM, TAUP

Multi-wavelength follow-up observations of ANTARES neutrino alerts

Follow-up of high energy neutrinos detected by the ANTARES telescope

The CEA. Nicolas Alamanos FCPPL May 2018, Marseille, France

Recent Developments of the Real-Time Capabilities of IceCube

Figure 1. View of ALSAT-2A spacecraft

Space Ultra Long Wavelength Array

arxiv:astro-ph/ v1 28 Jun 2002

Data Management Plan Extended Baryon Oscillation Spectroscopic Survey

Megha-Tropiques Presentation by Indian Delegation at the 55th Session of UNCOPUOS Vienna 12 June 2012

Artificial Intelligence at the Jet Propulsion Laboratory. Jakub Hajic AI Seminar I., MFF UK

in the Mediterranean

LBT Italian Coordination Facility Centro Italiano di Coordinamento alle Osservazioni LBT

OTSUKIMI Moon-sighting Satellite Kyushu Institute of Technology. 3 rd Mission Idea Contest UNISEC Global

Swift Mission Requirements Document

Credit: ESO/B. Tafreshi (twanight.org) Operating the Very Large Telescope

Machine Learning Applications in Astronomy

Orbital Orbital Chara Char cte act ristics eristics of the Helios of the Helio sy s s s y te st m Orbit : Low: Sun-synchronous: Quasi-polar: Phased:

an NSF Facility Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array

Update on the In-orbit Performances of GIOVE Clocks

PREDICTING THE ATMOSPHERIC RE-ENTRY OF SPACE DEBRIS THROUGH THE QB50 ENTRYSAT MISSION

GLAST Large Area Telescope Monthly Mission Review

Gravitational Wave Detectors: Back to the Future

BRITE One Year in Orbit

Applying for Time at the Very Large Telescope Interferometer (VLTI) Christian Hummel (ESO, User Support Department)

Current status of KAGRA data analysis, detector characterization. Kazuhiro Hayama (NAOJ)

Apache Point Observatory

QUESS Operations at Chinese Space Science Mission Center

Gamma Ray Physics in the Fermi era. F.Longo University of Trieste and INFN

Atmosphere-Space Interactions Monitor (ASIM) on the International Space Station

Stefanie Milam Deputy Project Scientist for Planetary Science NASA GSFC January 12, 2017

DEVELOPMENT OF A DMT MONITOR FOR STATISTICAL TRACKING OF GRAVITATIONAL-WAVE BURST TRIGGERS GENERATED FROM THE OMEGA PIPELINE

Kepler: A Search for Terrestrial Planets

ADCSS 2017: Sodern presentation

IXYZ Frank Marshall NASA/GSFC 25 April April 25, 2012 Implementing Portals of the Universe

The Swift GRB MIDEX Mission, A Multi-frequency, Rapid-Response Space Observatory

Observe a ToO following an alert from gravitational wave observatories

Overview of the Current Baseline of the Solar-C Spacecraft System

P.N. Lebedev Physical Institute Astro Space Center Russian Academy of Sciences S.A. Lavochkin Association, Roscosmos RADIOASTRON

An optimal search strategy for Trojan asteroids and science follow-up of GAIA alerts with the Zadko Telescope, Western Australia

Reduction of the Response Time of Earth Observation Satellite Constellations using Inter-satellite Links

Eutelsat practice & views on long term sustainability. COPUOS/SCST - LTS Workshop Vienna, 14 February 2013

Multi-frequency. Observations Using REM at la Silla. Filippo Maria Zerbi INAF Osservatorio di Brera On behalf of the REM/ROSS team

SciBox, a Proven Automated Planning and Commanding System

1 Searching for Optical counterparts of Gravitational

TOR. Exploring dissipation in solar wind turbulence

RESERVE THALES ALENIA SPACE CHANGE RECORDS ISSUE DATE DESCRIPTION OF CHANGES AUTHOR

DAMPE Operations at Chinese Space Science Mission Center

High-energy astrophysics data provision at Leicester Julian Osborne. Open Universe ASI: Tor Vergata April 2017 JO

A very wide field focusing telescope for Synoptic studies in the soft X-ray band

The next-generation Infrared astronomy mission SPICA Space Infrared Telescope for Cosmology & Astrophysics

Time-domain astronomy with the Fermi Gamma-ray Burst Monitor

Astronomy of the Next Decade: From Photons to Petabytes. R. Chris Smith AURA Observatory in Chile CTIO/Gemini/SOAR/LSST

Hinode mission status

Newsletter of the INTEGRAL Science Operations Centre

Europe to the Moon. BHF 10 Feb 2005 SPC

The WSO-UV mission. B. Shustov, A.I. G'omez de Castro and the WSO-UV team

SP-1291 June Mars Express. The Scientific Investigations

Status of AGILE (and gravitational wave source search)

Transcription:

SVOM Science Ground Segment Maohai Huang National Astronomical Observatories, CAS on behalf of the SVOM Ground Segment team 2016-10-11 Hotwiring the Transient Univserse V, Villanova, M. Huang 1

GRB Mission SVOM The Space-based multiband astronomical Variable Object Monitor (SVOM) is a collaborative project between China and France to detect, localize and study of ~60 Gamma Ray Bursts (GRBs) per year. SVOM is being transformed into a time-domain orbital observatory. Passed PDR and goes into Phase C starting 2017. Planned to be launched to a low inclination, low earth orbit in 2021, with a life of 3-5 years. 2016-10-11 Hotwiring the Transient Univserse V, Villanova, M. Huang 2

Payload instruments ÉCLAIRs, dedicated to GRB trigger and localization, having a large field of view (FOV) which can detect GRBs in the hard X-ray energy band (CNES, IRAP, CEA, APC) GRM (Gamma Ray Monitor) dedicated to measurement of gamma-ray in high energy band (IHEP) VT (Visible Telescope ) an optical instrument dedicated to GRB follow-up observation on board (XIOPM) MXT (Micro-Channel X-ray Telescope) dedicated to GRB follow-up observation in soft X-ray band (CNES, CEA, LAL, UL, MPE). Ground based instruments C-GFT, the Chinese ground follow-up telescope 400-1000nm 26 26 GWAC, an array of ground wide angle cameras 400-900nm 5000 SqDeg F-GFT, the French ground follow-up telescope 400-1700nm 25 25 X-band antenna STR GRD VT GPS antenna Eclairs S-band antenna MXT VHF antenna STR Platform 2016-10-11 Hotwiring the Transient Univserse V, Villanova, M. Huang 3

Overview of SVOM ground segment French Ground Segment Chinese Ground Segment VHF network French X band station French S band station (ToO prog) CLTU, PDP, RAF Chinese S band station S band raw data,tc FGFT GFTs Instrument Burst Advocate GRB Alert French Science ECLAIRs instrument center VHF data MXT instrument center GRB notices and circulars Level 1, 2 and 3 French Network Operation French Payload Operation Orbit, pass-req, PLTM... L0c, Aux data, TC logbook Scientific products L1, L2, L3 Work Plan FPL TC plan, TC Logbook. FPL HK L0c, FPL S band HK0 Aux Data Chinese X band station X band raw data Mission X band raw data, S band HK0, Aux data, TC logbook, Space Science Data Science products SVOM users GRB worldwide network (GCN, VO) S band HK0, TC, Orbit,... Workplan, orbital events CPL TC plan Pointing TC plan L0c, Aux data, TC logbook Scientific products L1, L2, L3 Chinese Control Chinese Science GRB notices and circulars related to GRM and C-GOS General program : Call for OBS GWAC C-GOS SVOM PIs CGFT Pointing request : GRB Revisit, ToO OBS program TBC SVOM users Robotic telescopes Satellites SVOM users 2016-10-11 Hotwiring the Transient Univserse V, Villanova, M. Huang 4

SVOM Observing Programs Core Programs (GRB) General Programs ToO Programs Nominal ToO (including revisit of GRBs) Exceptional ToO 2016-10-11 Hotwiring the Transient Univserse V, Villanova, M. Huang 5

Core Program actions and time requirements from satellite to VOEvent network / GCN Data acquisition on board T0+22 sec Onboard instruments X-band and S- band telemetry VHF Network Ground Stations VHF Data (All onboard instruments) 5 sec GRB Notices 5 sec VOEnet, GCN FSC (CEA, Saclay) FGFT Alert notice 5 sec CSC (NAOC, Beijing) Alert notice 2 sec Mission Space Sci. Data L0 data T0+4 to +14 hour Final Products T0+24 hour Responsible Science (CSC or FSC) GRB Community GRB Notices and Circulars As soon as available Burst Advocate and Instr. Scientists and Engrs GFT Observing results 5 min GWAC results -5 min CGFT GWAC Many telescopes can be added to follow-up networks with flexibility. 2016-10-11 Hotwiring the Transient Univserse V, Villanova, M. Huang 6

GRB (Core) Program 2016-10-11 Hotwiring the Transient Univserse V, Villanova, M. Huang 7

General Programs 1. PIs issue call for proposal once a year for ÉCLAIRs, VT, MXT, and ground instruments 2. Observers write and submit proposal with tools supported by the Science s 3. TAC evaluates, selects and allocates time, and form a one-year Pre-Planned Target 4. PPT executed by the Mission, subject to interruption and re-scheduling due to Core and ToO activities 5. Once observed, data are processed in standard pipeline and released to observer. the details are being refined. 2016-10-11 Hotwiring the Transient Univserse V, Villanova, M. Huang 8

GP and ToO workflow as of PDR 2016-10-11 Hotwiring the Transient Univserse V, Villanova, M. Huang 9

Exceptional ToO Obs Proposal Exceptional ToO Obs Proposal PI ToO obs feasibility OK System tool PI T0 ToO obs feasibility ToO Request T0 + 2h OK System tool Exceptional ToO OCG approval Exceptional ToO observation: from obs. proposal to satellite execution T0 T0 + 4h T0 + 6h ToO Request FPL command Plan Development French Payload Operation Mission Merging of French and Chinese PL Command Plans OK ToO Work plan Elaboration CPL Command Plan Development Mission ToO Obs plan ID ToO Type Mission Horizon Targets ID Targets Coordinates. PF Command Plan Development Chinese Control Mission Merging of all command plans Satellite Command T0 + 7h Plan upload Chinese Control Satellite command Plan Chinese Control Satellite Command Plan upload Chinese Ground Station French Ground Station Chinese Control Chinese Ground Station French Ground Station Maxi T0 + 12h Maxi T0 + 12h Satellite On board execution Satellite On board execution 2016-10-11 Hotwiring the Transient Univserse 10 V, Villanova, M. Huang

ToO Summary ToO Approval From acceptance/ trigger GRB interruption ToO-NOM PI <48h Yes ToO-EX PI <12h No Frequency Duration MAX 1/day => 5/day Tiling process Science product availablity VHF Canal VHF data 1 orbit No 24h No - MAX 1/month 1-14 orbits No 24h No - ToO-MM Automatic +PI <12h No MAX 1/month 1-14 orbits Yes, 3 tiles/orbit VHF<1h BX 24h Yes MXT photon-list ToO-NOM : ToO-CP (GRB revisit) ToO-GP-PP (Pre-plannedGeneral Program targets) ToO-GP-NP (General Program targets not planned) ToO-EX : for exceptional astrophysical events ToO-MM : search for EM counterpart to multi-messenger alert 2016-10-11 Hotwiring the Transient Univserse V, Villanova, M. Huang 11

Ground telescopes SVOM to use External large and robotic telescopes and missions VHF alerts, Circulars VOENet GCN GWAC FSC Burst Advocate CSC VOE Node VTP/XMPP/ZMQ Data Server F-GFT VOE Node Data Prod. VOE Node VOE Node Internet VTP/XMPP/ZMQ C-GFT Data Server Data I/O Server Data I/O Server FTP VOE Node San Pedro Martir Obs. (Mexico ) FTP Data Server Dynamic expandable GFT network. Baseline location at Xinglong Two base-line ground follow-up telescopes with guaranteed fast (T0+5 min) turn around photometric results. More telescopes can and will join the network with flexibility (implementing a standard interface). A wide angle camera array as a time-machine (T0-5 min) Burst Advocates (BAs) will coordinate extensive use external large telescopes and missions for multiband and spectroscopic follow-ups. 2016-10-11 Hotwiring the Transient Univserse V, Villanova, M. Huang 12

Overall development approach There is significant risk in SGS readiness if a Water Fall development approach is adopted, where a full functional system only come into existence at the end of Satellite/System development. To mitigate the risk, the Science s are to follow an iterative approach to develop a Basic simulation system, a Core function system, and a Full system in Phase B, C, D, respectively. The goal is that by the time of launch, the SGS will be highly mature. It will have been used by its users for years to process simulation data, ground instrument data, and payload testing data during development phases. There will be a smooth, seamless transition between mission phases. 2016-10-11 Hotwiring the Transient Univserse V, Villanova, M. Huang 13

summary SVOM ground segment is being designed to offer guaranteed followup capabilities, quick reaction time, a flexible architecture, and essential infrastructure to meet the requirements of SVOM observation programs as time-domain astronomy enters a rapidly expanding period. Wishes A pool of follow-up telescopes implementing a standard interface (data, control, condition), ready to observe with little human negotiation. Automated broker/aggregator to provide not only all available data of a given position with error box, but also all scheduled observation of that position in a given time window in near future. APIs need to be in place by telescope facilities for this. A mobile multimedia platform to connect BAs, IS/IEs (instr. Scientists and experts), proposal observers, and anyone who has observed the target, and make result sharing easy. 2016-10-11 Hotwiring the Transient Univserse V, Villanova, M. Huang 14

Thank you 2016-10-11 Hotwiring the Transient Univserse V, Villanova, M. Huang 15