Exhibit A Description of Services Section 37 Floodplain Storage Design

Similar documents
RESOLUTION NO

FOR PROJECTS INITIATED AFTER NOVEMBER 1, 2008 ITEM 716 EMBANKMENT EARTH OUTLET SEDIMENT TRAP

APPLICATION TO AMEND THE FUTURE LAND USE MAP (FLUM) SMALL SCALE

Woodford County Erosion Prevention Plan and Permit. Application #

SAN FRANCISCO DISTRICT INFORMATION REQUESTED FOR VERIFICATION OF CORPS JURISDICTION

Chapter 7 Mudflow Analysis

ADDENDUM NO. 1 TO THE BIDDING /CONTRACT DOCUMENTS AND SPECIFICATIONS CITY OF COCOA BEACH BID NO: CB15-002

Internal Audit Report

Electronic Submission Format Guide Anthracite Preparation Plant Permit Application

Electronic Submission Format Guide Large Noncoal (Industrial Minerals) Mine Permit Application (5600-PM-BMP0315)

The following maps must be provided as a part of the ADA. The appropriate scale for each map should be determined at the pre application conference.

Minimum Standards for Wetland Delineations

LOCATED IN INDIAN RIVER COUNTY PREPARED FOR S.J.R.W.M.D. AND F.W.C.D. DECEMBER, 2003 Updated 2007 Updated May 2014 PREPARED BY

.. lomfanln. Commlllee Memben: Cn gory,... Chalnnon Polrlc:k Gte!ve, Membef. freosury

Electronic Submission Format Guide Bituminous Coal Surface Mine Permit Application (5600-PM-BMP0311)

APPROVED JURISDICTIONAL DETERMINATION FORM U.S. Army Corps of Engineers

December 16, Mr. Lee Hughes Southwest Florida Water Management District Tampa Service Office 7601 Highway 301 North Tampa, FL 33637

APPROVED JURISDICTIONAL DETERMINATION FORM U.S. Army Corps of Engineers

STORMWATER REPORT FRITO LAY SUBDIVISION NO. 3

3.11 Floodplains Existing Conditions

Chapter 7 Mudflow Analysis

County of San Diego, Planning & Development Services

APPROVED JURISDICTIONAL DETERMINATION FORM U.S. Army Corps of Engineers

APPROVED JURISDICTIONAL DETERMINATION FORM U.S. Army Corps of Engineers

APPROVED JURISDICTIONAL DETERMINATION FORM U.S. Army Corps of Engineers

APPROVED JURISDICTIONAL DETERMINATION FORM U.S. Army Corps of Engineers

Document Title. Estimating the Value of Partner Contributions to Flood Mapping Projects. Blue Book

REQUEST FOR PROPOSALS CLOSING DATE:

Design Idea C. Total SF: 893,347. Heights High 1680 Students Wiley Students Students Students.

RESOLUTION NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF SUPERVISORS OF THE CORKSCREW FARMS COMMUNITY DEVELOPMENT DISTRICT:

April 10, Mr. Curt Van De Walle, City Manager City of Castle Hills 209 Lemonwood Drive Castle Hills, Texas 78213

Information for File MVP RMM

Temple City Unified School District Committed to 21 st Century Academic Excellence

Required Documents. Title: Number: AEP Administration 2017 No. 1. Provincial Wetlands and Water Boundaries Section. Effective Date: September 1, 2017

McHenry County Property Search Sources of Information

APPROVED JURISDICTIONAL DETERMINATION FORM U.S. Army Corps of Engineers

Delaware Bay Dikes Repair and Prevention Project Preliminary Design for New Castle Dikes

HAPPY N6W Y6ARl. Committee Members: Gregory Pease. Chairman Patrick Grelve. Member. Treasury Jeff Close. Member. OGC. Subcommittee Members ThomosFomn

COMMUNITY DEVELOPMENT DEPARTMENT POLICY & PROCEDURE

BUILDING AND SAFETY FEE SCHEDULE (Effective July1, 2013)

APPROVED JURISDICTIONAL DETERMINATION FORM U.S. Army Corps of Engineers

McHenry County Property Search Sources of Information

Materials. Use materials meeting the following.

TATA CHEMICALS MAGADI LIMITED (Mining Section) TRONA CRUSHING PLANT AND PREWASH TANK FACILITY PROJECT

APPROVED JURISDICTIONAL DETERMINATION FORM U.S. Army Corps of Engineers

APPROVED JURISDICTIONAL DETERMINATION FORM U.S. Army Corps of Engineers

GOAL 7 AREAS SUBJECT TO NATURAL DISASTERS AND HAZARDS. To protect life and property from natural disasters and hazards.

LOMR SUBMITTAL LOWER NEHALEM RIVER TILLAMOOK COUNTY, OREGON

APPROVED JURISDICTIONAL DETERMINATION FORM U.S. Army Corps of Engineers

Template for Sediment and Erosion Control Plan General Instructions. Section Instructions

An Introduction to Field Explorations for Foundations

September 7, 2017 (Revised November 1, 2017)

Louisiana Transportation Engineering Conference. Monday, February 12, 2007

AM01 - System Offices. Purchase Order

APPROVED JURISDICTIONAL DETERMINATION FORM U.S. Army Corps of Engineers

TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M. To: Council Members AGENDA ITEM 4B10

MVP WMS, George Schorr

1.1 What is Site Fingerprinting?

Temple City Unified School District A District of High Achieving Schools

FINAL AESTHETICS RESOURCES STUDY PLAN. Takatz Lake Hydroelectric Project, FERC No Prepared by: City and Borough of Sitka Electric Department

ADDENDA #1 CONTRACT # C May 3, 2013 Page 1 of 1

PLANNING COMMISSION AGENDA

NORTH DAKOTA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TEMPORARY EROSION AND SEDIMENT BEST MANAGEMENT PRACTICES

The Role of Mapping, GPS, and GIS in Trail Design and Construction

Pierce County Department of Planning and Land Services Development Engineering Section

Yavapai County Flood Control District. Prescott Valley Mapping Activity Statement Activities (Zone A Floodplain Delineation and Base Map Updates)

Template for Sediment and Erosion Control Plan General Instructions

IC ARTICLE LAND SURVEYORS

YELLOWSTONE RIVER FLOOD STUDY REPORT TEXT

Information for File # MMJ; Trunk Highway (TH) 7 / Louisiana Ave. Interchange Project

Circular No.32/2017/TT/BCT Specifying and guiding the implementation of a number of articles of the Law on Chemicals and Decree No.

APPROVED JURISDICTIONAL DETERMINATION FORM U.S. Army Corps of Engineers

Discovery Data Questionnaire

THE MINISTRY OF ENERGY AND ENERGY INDUSTRIES MINERALS DIVISION MINE DESIGN TEMPLATE OPERATOR NAME: OPERATOR ADDRESS: PHONE NUMBER: FACSIMILE:


SURVEYING Chapter 1 Introduction

GUIDELINES FOR FILMING IN TOMBALL, TEXAS

7. New Business 7.1 New items that the Committee or District Staff would like to discuss.

DRAFT. PRELIMINARY LANDSLIDE MODELING for KRAMER AVENUE LANDSLIDE SITKA, ALASKA. Prepared for: Andrew Friske 210 Kramer Ave. Sitka, Alaska 99835

Request for Empanelment

AQUATIC RESOURCES DELINEATION REFRESHER

Edward R. Sajecki Commissioner of Planning and Building. Conservation Authority Regulations and Mapping

DE PUBLIC SERVICE COMPANY OF NEW HAMPSHIRE

APPROVED JURISDICTIONAL DETERMINATION FORM U.S. Army Corps of Engineers

UPPER COSUMNES RIVER FLOOD MAPPING

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/08/18 HIGHWAY: COUNTY: 10/25/2015 ESTIMATE PAID: AWARD DATE: 11/01/2015 ESTIMATE PERIOD:

HILLSIDE DEVELOPMENT APPLICATION CHECKLIST C (Proposal to create lots as of 9/12/2007)

Table 1 - Infiltration Rates

New Service Provided by State Agency in Oregon: Base Flood Elevation Determinations

BACKGROUND AND PROJECT DESCRIPTION

THE LAW OF THE REPUBLIC OF TAJIKISTAN ON GEODESY AND CARTOGRAPHY

SECTION DESCRIPTION PAGE I. BUDGET INTRODUCTION... 1 II. FISCAL YEAR 2017 BUDGET ANALYSIS... 2 III. PROPOSED OPERATING BUDGET... 3

DESIGN BULLETIN No. 39/2006 (Revised June 2007) June 2007 Amendment to Design Bulletin #39/2006

Identifying Trends in Exclusions and Feature Revisions to Promote Better Recon. Surface Water Status Monitoring Network

Sacramento River Bank Protection Project

GIS TECHNICIAN I GIS TECHNICIAN II

DRY LAND APPROVED JURISDICTIONAL DETERMINATION FORM 1 U.S.

Town of Taos Request for Proposal Historic Preservation GIS Geodatabase Project April 2007

NODE. Reconnaissance Inventory of Wetland and Sedimentation Basin Sites New and Alamo Rivers Volume lof2

Big Rivers Electric Corporation Disposal of Coal Combustion Residuals (CCR) from Electric Utilities Final Rule CCR Impoundment Liner Assessment Report

Transcription:

Exhibit A Description of Services Section 37 Floodplain Storage Design Singhofen & Associates, Inc. (SAI, Consultant) is pleased to present this scope of services to the City of Palm Coast Engineering and Stormwater Department (City) for design and permitting services for stormwater improvements within Section 37. The Consultant has identified several locations along the Bellaire Canal for possible design solutions to create floodplain storage (refer to Figure 1). The intent of the project is to prepare construction plans, construction cost estimates, and provide permitting services for the proposed design solutions. The floodplain storage areas include three general locations which cover five individual parcels along the Bellaire Canal in Section 37 of the City. Two parcels are private property, all or part of which are to be acquired by the City for the project. The remaining three parcels are already owned by the City. This scope of services is separated into two phases. Phase 1 includes initial survey, environmental, and geotechnical services as well as a preliminary layout of the proposed design. Phase 2 includes finalizing the proposed design along with preparation of construction plans and permitting services. PHASE 1: Task 1. Data Collection and Surveying. This task primarily includes work to gather information and create a preliminary drawing for use in create the design solution and construction plans. Task 1.1 Data Collection and Site Reconnaissance. Most of the available information has already been obtained by the Consultant during the Section 31 & 37 Stormwater Management Master Plan (SWMMP) project. This task also includes field reconnaissance efforts. The Consultant shall conduct a reconnaissance trip by key design members to observe current site conditions and to inspect areas of special concern with respect to necessary design and permitting requirements. Task 1.2 Survey Services. Topographic survey will be required at the three locations in order to update the stormwater model and prepare the design. Survey information shall include topographic information on a 50 grid for each parcel. Survey services will be performed by CPH Inc. Note that no boundary survey, title work, right-of-ways, or surveyed wetland locations are included in this phase of the scope of work. A formal proposal from CPH has currently not been prepared. A scope of work for the survey services will be prepared by CPH and provided to the City prior to beginning work on the project. The cost included in the price schedule for the survey work is an estimate based on preliminary discussions between the City and CPH. Task 1.3 Environmental Study. An environmental report addressing wetland evaluations and endangered species assessments will be necessary during

permitting of the project. This task includes an environmental assessment and wetland delineations and will be performed by CPH Inc. to assist in project permitting as needed. Refer to Attachment 1 for more detailed information on the scope of these services. Task 1.4 Geotechnical Services. This task includes geotechnical evaluation for analysis of the subsurface soil conditions in the project areas in order to determine the quality and value of fill that will result from the project. The geotechnical analysis will be performed by Universal Engineering Sciences, Inc. and shall include a total of 4 borings along with the associated laboratory testing. Refer to Attachment 2 for more detailed information on the scope of these services. Task 2 Stormwater System Design. This task primarily includes work to update and finalize the stormwater model that was previously prepared during the Section 37 Stormwater Management Master Plan update. Task 3. Construction Documents. The Consultant shall prepare 30% construction drawings for review and approval by the City. The drawings shall include the existing topography prepared by CPH along with a preliminary layout of the proposed ponds. This scope of work does not include revisions to the 30% plans as a result of site conditions or changes by the City. Task 4. Meetings. This task includes one (1) pre-application meeting with St. Johns River Water Management District (SJRWMD) to discuss the proposed design and any anticipated permitting issues associated with the project. PHASE 2: Upon approval by the City of the proposed design from Phase 1, the Consultant will proceed with the Phase 2 work as listed below: Task 5. Supplemental Surveying. Additional construction level survey information will be required in order to finalize the design and complete the construction plans. Supplemental survey information will include wetland locations, parcel boundaries, rightof-ways, easements, and utilities. A scope of work for the survey services will be prepared by CPH and provided to the City prior to beginning work on the project. The cost included in the price schedule for the Phase 2 survey work is an estimate based on preliminary discussions between the City and CPH. Task 6. Construction Documents. The Consultant shall prepare drawings and documents suitable for construction and review by the jurisdictional agencies as described below. Task 6.1. Construction Plans. The Consultant shall prepare construction plans in general conformance with the FDOT Roadway Plans and Preparation Manual and shall be 22 x34. All three design locations will be included in one set of plans. This task includes a 90% plan set and 100% plan set submittals.

Upon completion of the 90% plan set, one electronic copy in PDF format will be provided to the City for review and comment. Upon completion of the City s review, the Consultant will prepare and submit three (3) sets of 100% construction plans at 11 x17 (half scale) for review and comments, along with an electronic copy in PDF format. Task 6.2. Quantities and Construction Cost Estimates. The Consultant shall prepare a detailed quantity estimate of each bid item using the FDOT Basis of Estimates Handbook in an Excel Spreadsheet and provide it to the City with the 90% submittal. SAI will revise the quantity estimate for submittal with the 100% submittal. Cost estimates shall likewise be provided at the 90% and 100% submittals. Task 7. Regulatory Permitting. This task includes permitting through SJRWMD. All three locations are to be permitted as a single project (i.e., a single permit/application to include all three locations). The Consultant shall prepare and submit the required permit application. This will include preparation of a drainage report for the stormwater models updated as a part of the Phase 1 work. A maximum of two (2) responses to request for additional information (RAIs) are included in this task. The City shall be responsible for all permit fees.

95 1 City of Palm Coast Map Document: (O:\COPC_SWMMP\Section 31 & 37\ArcView\COPC_Section37_35_Drummond_Parcels.mxd) 4/6/2015 -- 6:14:03 PM Bellaire Canal - Flood Storage Augmentation FIGURE: 1

Price Schedule Section 37 Floodplain Storage Design PHASE 1 Task Task Description 1 Data Collection and Surveying Project Manager Engineer III Engineer II Unreg. Engineer I Tech. Supervisory Tech. Technician Admin III Total Hours Labor Costs Hourly Rate $ 145.00 $ 145.00 $ 120.00 $ 90.00 $ 85.00 $ 65.00 $ 50.00 $ 70.00 1.1 Data Collection and Site Reconnaissance 8.00 16.00 24.00 $ 2,200.00 1.2 Survey Services See subconsultant fees below Coordination w/ Surveyor 2.00 4.00 4.00 10.00 $ 1,110.00 1.3 Environmental Study See subconsultant fees below Coordination w/ Environmental Consultant 2.00 4.00 2.00 8.00 $ 900.00 1.4 Geotechnical Services See subconsultant fees below Coordination w/ Geotech Consultant 2.00 4.00 2.00 8.00 $ 900.00 2 Stormwater System Design Subtotal = 0.00 14.00 12.00 0.00 4.00 20.00 0.00 0.00 50.00 $ 5,110.00 Stormwater Model Updates 16.00 20.00 16.00 52.00 $ 5,760.00 3 Construction Documents Subtotal = 16.00 0.00 20.00 0.00 0.00 16.00 0.00 0.00 52.00 $ 5,760.00 Incorporate Survey Drawing(s) 8.00 8.00 $ 680.00 Prepare Base Drawing 4.00 4.00 24.00 32.00 $ 4,040.00 30% Construction Plans 2.00 24.00 12.00 38.00 $ 4,190.00 4 Regulatory Permitting Subtotal = 4.00 6.00 48.00 0.00 20.00 0.00 0.00 0.00 78.00 $ 8,910.00 Pre-application Meeting 4.00 4.00 8.00 $ 1,060.00 Subtotal = 4.00 0.00 4.00 0.00 0.00 0.00 0.00 0.00 8.00 $ 1,060.00 Phase 1 Total Estimated Labor Costs 24.00 20.00 84.00 0.00 24.00 36.00 0.00 0.00 188.00 $ 20,840.00 Estimated Reimbursable Direct Costs Bond Plots (24" x 36") 3 plan sets = 30 sheets @ $ 2.50 = $ 75.00 Bond Plots (1/2 scale) 3 plan sets = 30 sheets @ $ 2.50 = $ 75.00 Bond Plots (permitting) 0 sheets @ $ 2.50 = $ - Photocopies (8 1/2" x 11") 25 sheets @ $ 0.15 = $ 3.75 Color Photocopies (8 1/2" x 11") 10 sheets @ $ 0.55 = $ 5.50 Travel (2 - meetings @ City & field recon) 200 miles @ $ 0.55 = $ 110.00 Shipping = $ 50.00 Survey Subconsultant (CPH) = $ 7,200.00 Geotechnical Consultant (Universal) = $ 2,905.00 Environmental Consultant (CPH) = $ 6,385.00 Phase 1 Total Estimated Reimbursable Direct Costs $ 16,809.25 Phase 1 Total Maximum Compensation $ 37,649.25 Singhofen Associates, Inc. Page 1 of 2

Price Schedule Section 37 Floodplain Storage Design PHASE 2 Task Task Description Project Manager Engineer III Engineer II Unreg. Engineer I Tech. Supervisory Tech. Technician Admin III Total Hours Labor Costs Hourly Rate $ 145.00 $ 145.00 $ 120.00 $ 90.00 $ 85.00 $ 65.00 $ 50.00 $ 70.00 5 Supplemental Surveying Survey Services See subconsultant fees below Coordination w/ Surveyor 1.00 2.00 2.00 5.00 $ 555.00 6 Construction Documents Subtotal = 0.00 1.00 2.00 0.00 2.00 0.00 0.00 0.00 5.00 $ 555.00 6.1 Construction Plans 0.00 $ - Incorporate Survey Drawing(s) 4.00 4.00 $ 340.00 90% Construction Plans 4.00 16.00 60.00 16.00 96.00 $ 11,460.00 100% Construction Plans 2.00 8.00 32.00 20.00 62.00 $ 6,990.00 6.2 Quantities and Construction Cost Estimates 4.00 24.00 8.00 4.00 40.00 $ 4,440.00 7 Regulatory Permitting Subtotal = 6.00 28.00 116.00 8.00 40.00 4.00 0.00 0.00 202.00 $ 23,230.00 Drainage Report 12.00 12.00 4.00 8.00 2.00 38.00 $ 4,180.00 ERP Application Package 4.00 8.00 4.00 8.00 16.00 2.00 42.00 $ 3,360.00 RAI Response (2 anticipated) 4.00 2.00 8.00 8.00 12.00 4.00 38.00 $ 3,230.00 Subtotal = 20.00 2.00 28.00 4.00 4.00 24.00 28.00 8.00 118.00 $ 10,770.00 Phase 2 Total Estimated Labor Costs 26.00 31.00 146.00 12.00 46.00 28.00 28.00 8.00 325.00 $ 34,555.00 Estimated Reimbursable Direct Costs Bond Plots (24" x 36") 8 plan sets = 160 sheets @ $ 2.50 = $ 400.00 Bond Plots (1/2 scale) 3 plan sets = 60 sheets @ $ 2.50 = $ 150.00 Bond Plots (permitting) 0 sheets @ $ 2.50 = $ - Photocopies (8 1/2" x 11") 50 sheets @ $ 0.15 = $ 7.50 Color Photocopies (8 1/2" x 11") 25 sheets @ $ 0.55 = $ 13.75 Shipping = $ 50.00 Survey Subconsultant (CPH) = $ 2,465.00 Phase 2 Total Estimated Reimbursable Direct Costs $ 3,086.25 Phase 2 Total Maximum Compensation $ 37,641.25 Total Compensation (Phases 1 and 2) = $ 75,290.50 Singhofen Associates, Inc. Page 2 of 2