SPIRAL 2 phase 1+/DESIR

Similar documents
Status of the DESIR facility

Bertram Blank CEN Bordeaux-Gradignan. Germanium detector calibration experimental studies: decay mirror decay future work

HIGH INTENSITY ION BEAMS AT GANIL F. Chautard, September 6th, Cyclotron 2010 Lanzhou, China, september F. Chautard

Performance of the ANL ECR Charge Breeder. with Low Mass Beams. Investigations with low mass species. Review of charge breeder design

TAMU-TRAP facility for Weak Interaction Physics. P.D. Shidling Cyclotron Institute, Texas A&M University

GANIL STATUS REPORT. B. Jacquot, F. Chautard, A.Savalle, & Ganil Staff GANIL-DSM/CEA,IN2P3/CNRS, BP 55027, Caen Cedex, France.

Bertram Blank CEN Bordeaux-Gradignan. Germanium detector calibration experimental studies: b decay mirror b decay future work

Report on novel techniques for the production and selection of ECRionized radioactive ions beams

P. Delahaye, F. De Oliveira, M. Fadil, H. Franberg - Delahaye, N. Lecesne, A. Pichard, MG Saint Laurent, JC Thomas, L. Serani, B.

SPIRAL2 at GANIL SPIRAL2 Phase 1 and Phase 2 New equipment at SPIRAL2 DESIR facility DESIR physics programme. Bertram Blank CEN Bordeaux-Gradignan

Recent developments at ISOL-based facilities. Piet Van Duppen KU Leuven, Belgium

The NFS project. Part of the SPIRAL-2 project built on the GANIL site, Caen, France. NFS is one of the two facilities of the LINAG Experimental Area

Opportunities with collinear laser spectroscopy at DESIR:

Status & Plans for the TRIUMF ISAC Facility

System Integration. E. Fagotti

STATUS REPORT ON SPIRAL1 F. Chautard October 2 nd, 2007

The SPIRAL2 Project and experiments with high-intensity rare isotope beams

Review of ISOL-type Radioactive Beam Facilities

Charge State Breeding for the. at TRIUMF

Report on PIAVE G. Bisoffi

HIGH INTENSITY ION BEAMS AT GANIL. ECOS facility meeting, may 16th 2013 GANIL - F. Chautard

OPERATION STATUS OF HIGH INTENSITY ION BEAMS AT GANIL

Development of the RFQ Cooler SHIRaC: beam transport and nuclearization

Physics with stopped beams at TRIP-TRAP Facility. P.D. Shidling Cyclotron Institute, Texas A&M University

Jlab FEL Photoemission DC Guns

SPIRAL-2 FOR NEUTRON PRODUCTION

Refurbishment of the Electrostatic Accelerators of ithemba LABS

two-proton radioactivity discovery of two-proton radioactivity experimental results with TPC s future studies

EBSS: Hands-on Activity #8. Operation of an electromagnetic isotope separator (EMIS) Dan Stracener Jon Batchelder

Il progetto SPES: produzione di fasci di ioni radioattivi ai Laboratori Nazionali di Legnaro.

Ion-atom interactions in a gas jet coupling of a gas catcher to a linear RFQ cooler. Emil Traykov SIMION day GANIL, 11/06/2015

DEVELOPMENT OF JINR FLNR HEAVY-ION ACCELERATOR COMPLEX IN THE NEXT 7 YEARS

Operation of the Coupled Cyclotron Facility at Michigan State University

The SPIRAL 2 Project at GANIL

Introduction Frankfurt Neutron Source at Stern-Gerlach-Zentrum FRANZ Development of new accelerator concepts for intense proton and ion beams. High in

Status of the EBIT in the ReA3 reaccelerator at NSCL

Pushing the boundaries of Penning trap mass spectrometry

OVERVIEW OF THE BEAM DIAGNOSTICS FOR THE DRIVER OF SPIRAL2

Trap assisted decay spectroscopy setup at ISOLTRAP

SPPS: The SLAC Linac Bunch Compressor and Its Relevance to LCLS

ISCC meeting, February 16, ISCC meeting, February 16, ISOLDE ISOLDE scientific scientific coordinator s s report

Laser Spectroscopy on Bunched Radioactive Ion Beams

Progress of SPIRAL2 project

SuperNEMO Double Beta Decay Experiment. A.S. Barabash, ITEP, Moscow (on behalf of the SuperNEMO Collaboration)

In-trap decay and trap-assisted decay spectroscopy at ISOLTRAP

The Neutrons For Science facility

IAP NAN of Ukraine activity in. Possible areas of cooperation in. Roman Kholodov, PICS Meeting, Basivka, Ukraine,

The Accelerator System for ReA3 the New Re-accelerated RIBs Facility at MSU

Lecture 22 Ion Beam Techniques

RNB at GANIL from SPIRAL to SPIRAL 2

High efficiency 3 He neutron detector TETRA for DESIR.

Dependency of Gabor Lens Focusing Characteristics on Nonneutral Plasma Properties

LIGO workshop What Comes Next for LIGO May 7-8, 2015, Silver Spring, MD KAGRA KAGRA. Takaaki Kajita, ICRR, Univ. of Tokyo for the KAGRA collaboration

A PRELIMINARY ALIGNMENT PLAN FOR RIA AT MSU

The FAIR Accelerator Facility

SPIRAL 2 Commissioning Status

LHC Status and CERN s future plans. Lyn Evans

Experience on Coupling Correction in the ESRF electron storage ring

DIANA A NEXT GENERATION DEEP UNDERGROUND ACCELERATOR FACILITY

TRIUMF The TITAN EBIT: Status & Research Plans

Heavy Ion Accelerators for RIKEN RI Beam Factory and Upgrade Plans. Upgrade Injector

Alex M Imai, Y. Ohta and A. Itoh Department of Nuclear Engineering, Kyoto University

Present ISOLDE facility Aims of HIE-ISOLDE upgrade First steps towards HIE-ISOLDE

DUBNA CYCLOTRONS STATUS AND PLANS

Mass Analyzers. mass measurement accuracy/reproducibility. % of ions allowed through the analyzer. Highest m/z that can be analyzed

ATLAS Tile Calorimeter Calibration and Monitoring Systems

GANIL/SPIRAL2 The adventure continues

LIST - Development at Mainz for ISOLDE

ECOS-LINCE PROJECT: A highintensity light- and heavy-ion facility for nuclear structure and reactions

Measurements of liquid xenon s response to low-energy particle interactions

Progress of the interaction between e - and molecule in Fudan University

Introduction to REX-ISOLDE concept and overview of (future) European projects

Towards TASCA

In-Flight Fragment Separator and ISOL Cyclotron for RISP

Low slice emittance preservation during bunch compression

Laser spectroscopy and resonant laser ionization atomic tools to probe the nuclear landscape. Iain Moore University of Jyväskylä, Finland

Development of Large Scale Optimization Tools for Beam Tracking Codes

NSCL and Physics and Astronomy Department, Michigan State University Joint Institute for Nuclear Astrophysics

The accelerators at LNS - INFN and diagnostics aspects of the radioactive beams

G SI Darmstadt. TASCA TransActinide Separator and Chemistry Apparatus

Beam Diagnostics and Instrumentation JUAS, Archamps Peter Forck Gesellschaft für Schwerionenforschnung (GSI)

Ion Polarization in RHIC/eRHIC

Recent SPIRAL 2 News (1)

PIP-II Injector Test s Low Energy Beam Transport: Commissioning and Selected Measurements

Fission Fragment characterization with FALSTAFF at NFS

CHAPTER VI RIB SOURCES

Overview of the EURISOL post-accelerator design and studies

1.1 Atomic structure

DEVELOPMENT OF LARGE SCALE OPTIMIZATION TOOLS FOR BEAM TRACKING CODES*

The ACTAR project at SPES Status and perspectives

BALKAN PHYSICS LETTERS Bogazici University Press 15 November 2016 BPL, 24, , pp , (2016)

Diagnostics Requirements for the ARIEL Low Energy Beam Transport

The KATRIN experiment

BEAM DYNAMICS ISSUES IN THE SNS LINAC

Recycling Ring. on behalf of the Recycling Ring Design Group (Quasar, Musashi & Ullrich groups) TCP 2010 Conference 12 April 2010

DARWIN: dark matter WIMP search with noble liquids

Gamma Spectroscopy at IPN Orsay Present and Future

GSI. Overview of last years activities: technical developments and investigations mass measurements. TRAPSPEC related tasks and issues

THE ACCULINNA AND ACCULINNA-2 RADIOACTIVE ION BEAM FACILITY AT DUBNA: STATUS AND PERSPECTIVES

Beam Dynamics and Emittance Growth

Transcription:

SPIRAL 2 phase 1/DESIR Laurent Serani On behalf of SFRE

Outline Perimeter of PHASE1 Development program Status of Design of equipment Status of building definition Time schedule

Perimeter of SPIRAL2 / phase1 Ø Incorporation of DESIR in the SPIRAL2 Phase 1 project as a and delay in the construction of SPIRAL2 Phase 2 u DESIR EQUIPEX embedded in the SFRE group: ü Building & beam lines work packages managed by SFRE (Tech. coord.) u Integration of the purification tool (RFQ-SHIRaC2&HRS) in the beam transport tunnels u New specifications of the DESIR hall to reduce costs (Dec 2013)

Beam lines : WBS Perimeter of Phase 1 WP 8534 HRS CENBG WP 8537 DESIR hall IPNO CENBG WP 8533 SHIRaC LPC WP 8535 MIPPS GANIL WP 8531 S3- DESIR IPNO CENBG WP 8532 S1- DESIR IPNO CENBG

Outline Perimeter of PHASE1 Development program Status of Design of equipment Status of building definition Time schedule

Development plan Organisation SPIRAL2 Management SFRE Division DESIR tech. coord. DESIR EQUIPEX DESIR Collaboration DESIR scientific coord. Steering Committee DECA Scientific program Experimental equipment DESIR facility coord. French Partners: IPNO - Optics design and mechanical design - In charge of the coordination of beam line production CENBG - Control system - HRS LPC - RFQ-SHIRaC International partners: BARC-India- part of beam line construction - under discussion

Operational chart for SP2 / SFRE / ph.1 Development plan Responsable / Resp. adj : F.Varenne / L.Serani - Beam Transp. Coord. : H.Franberg - System Engeneering : F.Varenne (equipment) / L.Serani (transverse) Interface transverse projet SPIRAL2 Interface group system / AMOA : System Engeneering phase 1 (SYS) Interface group SRE : Resp. Nuclear safety ph.1 (SRE) Interface building / MOE : Building construction Engeneer (BIS)

Outline Perimeter of PHASE1 Development program Status of Design of equipment Status of building definition Time schedule

Status of equipment design Beam lines Main caracteristics electrostatic lines, point-to-point transport beams of 10-60 kev, 3-80 π.mm.mrad (2 RMS) S3-LEB->DESIR: 44 m, 2 levels SPIRAL1 -> DESIR: 50 m, 1 level Beam envelop simulations IPN Orsay 122Sn1 @ 60 kev 80 π.mm.mrad - Revue of Preliminary Optical Design made on last September. Résultats lignes comp - Consolidation will be made until March S3-DESIR : - Start of donc detailed Nous allons comparerdesign dans un 1er phase temps les configurations tout hard-edge et ce progressivement et alternativement : 1. Tous éléments d optiques (déflecteurs, quadrupôles et steerers) à bords droits (hard-edge) Résultats lignes complètes 2. Déflecteurs avec cartes de champs (pas 5mm) et quadrupôlessteerers à bords droits 3. Déflecteurs à bords droits avec quadrupôlessteerers en cartes de champs (pas 5mm) S3-DESIR : er temps les configurations tout hard-edge et celle introduisant les cartes deen 4. un 1Tous éléments d optiques (déflecteurs, quadrupôles et steerers) cartes de champs (pas 5m Nous allons donc comparer dans champ progressivement et alternativement : 1. 2. 3. 4. Tous éléments d optiques (déflecteurs, quadrupôles et steerers) à bords droits (hard-edge) Déflecteurs avec cartes de champs (pas 5mm) et quadrupôlessteerers à bords droits Déflecteurs à bords droits avec quadrupôlessteerers en cartes de champs (pas 5mm) Tous éléments d optiques (déflecteurs, quadrupôles et steerers) en cartes de champs (pas 5mm) 1 S3-LEB -> DESIR (44 m)spiral1 -> DESIR (50 m) 2 Prototype of a quad triplet steerer sectiondesign of a 45 deflector 3 4 Courtesy of L. Perrot IPNO L. Perrot, SPIRAL2 Week 2014 Oct. 6/9, 2014 CAEN SPIRAL2 phase 1, lignes de transfert DESIR -18/09/2014 SPIRAL2-Phase 1/DESIR L. Perrot, Page 34 Laurent Serani SPIRAL2 phase 1, lignes de transfert DESIR -18/0

Status of equipment design-production site Objective: take care of optical interface according building design and transportation with as low as possible lose of RIB GANIL production site: SPIRAL1 upgrade ECR: Ne, Ar, Kr, N, O, F Surface Ionization : Li, Na, K, Rb FEBIAD: Mg, Al, P, S, Cl, Fe, Cu <10-8 mbar SPIRAL2 production site: S 3 -LEB Isotopic selection (Z) Gas Thermalizat cell ion Neutralizati on 500 mbar S 3 beams S-shaped RFQ buncher Pulsed drift HT=5-10kV H T DESIR Pulsed drift tube 4keV beam Quad deflect or S 3 Decay station HT=40-60kV Courtesy of B. Bastin Courtesy of P. Delahaye MR- ToF-MS Extraction RFQ RFQ DC repulsion QMS tension Gas jet Laser beam (in-gas-jet mode) Laser beam (in-gas-cell mode) H T

Status of equipment design Purification tool DESIR Building S1 beam line S3 beam line Purification tool area SPIRAL2 Week 2014 Oct. 6/9, 2014 CAEN SPIRAL2-Phase 1/DESIR Laurent Serani 11

Status of equipment design RFQ-SHIRaC2 RFQ- SHIRAC2 To be done: - New design of a «ALARA» vacuum chamber - Continue performance test New diagnostics set-up New design of CEM shielding for 60 kv

RFQ- SHIRaC2 Latest development Status of equipment design RFQ-SHIRaC2 Energy spread measurement with a new detector. Goal: Better sensitivity Beam Beam Detector principle Detector Results Specification for HRS - energy spread of 1eV sensitivity~0.6ev

Status of equipment design HRS HRS-Construction phase More or less 50% of investment are done HRS Magnets delivered to GANIL last July Pumping system Integration and test of an EMS SP2 at Bordeaux HV power supply Stability of 2. 10-5 Vnom PLC system SPIRAL2 Week 2014 Oct. 6/9, 2014 CAEN SPIRAL2-Phase 1/DESIR Laurent Serani

Outline Perimeter of PHASE1 Development program Status of Design of equipment Status of building definition Time schedule

Status of Building Definition December 2013 Modification of DESIR building Program June 2014 2D plans produce by INGEROP June/September 2014 Analyse of propositions October 2014 executive summary by the SFRE and DESIR collaboration supplies, technical rooms, accesses building infrastructure: pillars? equipment handling (cranes) Expected: Beginning of APS Phase in January 2015

Outline Perimeter of PHASE1 Development program Status of Design of equipment Status of building definition Time schedule

Time Schedule 2014 2015 2016 2017 2018

Thank you for listening