Agenda for the meeting to discuss Revision of LTA quantum in respect of Kudgi STPS 1. LTA pertaining to Kudgi STPS a. KSEB vide letter dated 25-09-2017 (ANNEXURE A) had stated that with installed capacity of 2400 MW and Normative Auxiliary Consumption of 5.75 %, the ex-bus capability of Kudgi STPS works out to only 2262 MW. Accordingly, share of the beneficiaries needs to be analyzed. It was also stated that as per Clause (6) of CERC (Sharing of ISTS Charges and Losses) third amendment, 2015, in case the commissioning of a generating station or a unit thereof is delayed, the generator shall be liable to pay withdrawal charges corresponding to its long Term Access from the date the LTA is granted by CTU becomes effective. b. 36 th CCM opined that NTPC (applicant) may have to approach CTU for surrender of additional capacity. It shall be required to relinquish the capacity in accordance with the Connectivity Regulations. c. NTPC (Applicant) was requested to approach CTU for revising the LTA quantum by relinquishing the excess LTA quantum of 130.49 MW. d. SRPC vide letter dated 03.01.2018 had taken up the issue with NTPC. NTPC vide letter dated 02.01.2018 (ANNEXURE B) had taken up the issue of LTA revision to 2,262 MW (against the granted LTA of 2392.49 MW) with COO, CTU. e. Further, NTPC, vide letter dated 7.2.2018 (ANNEXURE C), requested beneficiaries to take up the matter with CTU for revision/relinquishment of LTA for Kudgi STPS. ***
सत सच च/ 1. Address List ख य अवभय त व वण य), एप प स स, ह दर ब द Chief Engineer (Comml.), APPCC, Hyderabad. 2. अपर वनद शक वपररय जन ),प स क ल, क र भ न, ब गल र Additional Director (Proj.), PCKL, Kaveri Bhavan, Bengaluru. 3. ल ख वनय त रक, एसएलड स -ट ब स -क प ट स एल, ब गल र Controller of Accounts, SLDC- TBC, KPTCL, Bangalore. 4. श र आर ददल प क र, अ क षक अवभय त, एसएलड स, क प ट स एल, ब गल र Shri R.V. Dilip Kumar, Superintending Engineer, SLDC, KPTCL, Bengaluru. 5. क यसक र अवभय त वएलड ) एसएलड स, क एसईब, कल स र Executive Engineer (LD), SLDC, KSEB, Kalamassery. 6. अ क षक अवभय त वएलड ज ओ) ट नट र न द क, च न द न Superintending Engineer (LD & GO), TANTRANSCO, Chennai. 7. क यसक र अवभय त वव ड), ट नट र न द क, च न द न Executive Engineer (Grid), TANTRANSCO, Chennai. 8. ख य अवभय त व वण य), ट एसप स स, ह दर ब द Chief Engineer (Comml.), TSPCC, Hyderabad 9. ह प रब क व वण य) स स, एनट प स, क प क ल क स, नई ददल ल General Manager (Comml.), CC, NTPC, SCOPE Complex, New Delhi. 10. ह प रब क, एसआरएलड स, प स क, ब गल र General Manager, SRLDC, POSOCO, Bengaluru व त त प र ख, एसआरएलड स, प स क, ब गल र Head of Finance, SRLDC, POSOCO, Bengaluru 12. General Manager, Kudgi STPS, State Highway 124, Kudgi, Karnataka 586216 General Manager (Comml.), Southern Region Head Quarters, MCH Commercial Complex, 13. Rashtrapati Road, Gandhi Nagar, Secunderabad, Telangana- 500003 ह प रब क व वण य), दक ष -, प रव ड, स क द ब द 14. General Manager (Comml.), SRTS-I, PGCIL, Secunderabad 11. 15. सह. ह प रब क व वण य), दक ष -, प रव ड, ब गल र AGM (Comml.), SRTS-II, PGCIL, Bengaluru
ANNEXURE A (1/2) ANNEXURE B (1/2) KERALA STATE ELECTRICITY BOARD Ltd. Office of the Chief Engineer(Transmission System OPeration) LD Centre, H.M.T.Colony P"O., Kalamassery - 683 503. 2555965,255595A,9496019100 Fax: 0484 2543850 i nf,orre: O48 4 i Email : cesoklslr@gmail.com ceso@kreb.in 424 i Website: www.kseb.in, CIN :U40100K12011SGC02V i No. CESO/EELDIIIAEELD3/RTA I K udgi t2017-11t Q-, Dt 2s0e"2017 4-L To, The Member SecretarY SRPC Bangalore Sub: Transmission charges pertaining to Kudgi STPS -reg' Ref:- 1. Corrigendum to RTA for Aug,2017 Vide Ltr no. SRPC/SE-1/5(RTA)12017 dtd 5.9.17 2. Letter No. C/ENG /SEFITAILS/10/013-R1 dtd 23.01.15 of PGCIL Attention is invited to the corrigendum to the RTA for the month of August 2OL7 dated 5.g.L7 under the reference cited No.1 wherein it is mentioned that the corrigendum is issued subsequent to the letter of CTU for including the entire LTA quantum of Kudgi STPS of 2392.49MW and in that the MW apportioned to Kerala by CTU is 123.21MW. it is seen that the quantum of 2392.49 MW is exceeding the ex-bus capability of the station. Also on examining the LTA granted by ctu is for On scrutiny 23gZ.4gMW and the quantum against Kerala is given as 119.18 MW. With Installed Capacity of 2400MW (BO0*3) and Normative Auxiliary consumption of 5.75olo, the Ex-Bus capability of Kudgi is only 2262MW. Hence the corresponding share of Kerala is only 101.63MW. Further the power evacuated through Karnataka stu is also to be considered while finalising the LTA quantum' Vydyuthi ehavanam, Pattom, Thi ruvananthapuram Cl N :U40100KL2OL1SG CO27 424 We bsite: w@, R"glrt"*d Offi.": - 695004
ANNEXURE 7A(2/2) Only one unit at Kudgi has declared commercial operation. The COD of other two units are delayed. As per clause (6) of CERC (Sharing of ISTS charges and losses) or unit thereof is delayed, the generator shall be liable to pay withdrawal charges corresponding to its long Term Access from the date the LTA is granted by CTU becomes effective," Hence the transmission charges for the third amendment 2OL5" in case the commissioning of a generating station capacity under COD is only to be paid by the beneficiaries. The matter may kindly be examined and RTA of August 2OL7 may please be revised. faithfully r?l Transmission QVstem i*- f:11 fr': " Operation k&: Coy submitted to :-The CE (Commercial & Tariff), KSEB Ltd, Vydyuthi Bhavanam, Pattom Th iruvanathapu ram for information. Registered Office: VydyuthiBhavanam, Pattom, Thiruvananthapuram We bsite : www. kseb.i n, Cl N : U40100Kt201 1SG C O27 424-695004
ANNEXURE B B
ANNEXURE C