UPGRADE AND COMMISSIONING OF THE PIAVE-ALPI ECR INJECTOR AT LNL

Similar documents
Operational Experience in PIAVI-ALPI Complex. E. Fagotti INFN-LNL

Report on PIAVE G. Bisoffi

DEVELOPMENT OF LARGE SCALE OPTIMIZATION TOOLS FOR BEAM TRACKING CODES*

ITEP HEAVY ION RFQ OUTPUT LINE UPGRADE FOR EXPERIMENTS OF REACTOR MATERIAL INVESTIGATION UNDER IRRADIATION*

PIAVE THE LEGNARO NEW POSITIVE ION INJECTOR BASED ON SUPERCONDUCTING RFQS

arxiv: v2 [physics.acc-ph] 21 Jun 2017

Diagnostics Requirements for the ARIEL Low Energy Beam Transport

Development of Large Scale Optimization Tools for Beam Tracking Codes

PIP-II Injector Test s Low Energy Beam Transport: Commissioning and Selected Measurements

Development and application of the RFQs for FAIR and GSI Projects

2.6 Electron transport lines

A Multi-beamlet Injector for Heavy Ion Fusion: Experiments and Modeling

Refurbishment of the Electrostatic Accelerators of ithemba LABS

Upgrade of the HIT Injector Linac-Frontend

The RI Beams from the Tokai Radioactive Ion Accelerator Complex (TRIAC)

The ISIS Penning H - SPS and Diagnostic Developments at RAL

A PRELIMINARY ALIGNMENT PLAN FOR RIA AT MSU

Diagnostics at SARAF

SPIRAL 2 Commissioning Status

Beam Diagnostics for RIBF in RIKEN

The heavy-ion magnetic spectrometer PRISMA

BEAM DYNAMICS ISSUES IN THE SNS LINAC

FLSR - Frankfurt Low-Energy Storage Ring

Developments of the RCNP cyclotron cascade

The accelerators at LNS - INFN and diagnostics aspects of the radioactive beams

Radiation protection considerations along a radioactive ion beam transport line

NEW DEVELOPMENT IN HIGH POWER RFQ ACCELERATORS*

Cryogenic and Electrical Test Results of a 30 M HTS Power Cable

The heavy ion irradiation facility at KVI-CART

Ultra-High Vacuum Technology. Sputter Ion Pumps l/s

Ion Beam Sources for Neutral Beam Injectors: studies and design for components active cooling and caesium ovens

Simulation of H ion source extraction systems for the Spallation Neutron Source with IBSimu

UPGRADE OF THE HIT INJECTOR LINAC-FRONTEND

HIRFL STATUS AND HIRFL-CSR PROJECT IN LANZHOU

EBSS: Hands-on Activity #8. Operation of an electromagnetic isotope separator (EMIS) Dan Stracener Jon Batchelder

SLS at the Paul Scherrer Institute (PSI), Villigen, Switzerland

Chopping High-Intensity Ion Beams at FRANZ

Lawrence Berkeley National Laboratory Lawrence Berkeley National Laboratory

D- Charge Exchange Ionizer for the JINR Polarized Ion Source POLARIS

O 2+ Pb 27+ O 3+ H dipole current (lower scale) mass/charge ratio (top scale)

HIGH CURRENT PROTON BEAM INVESTIGATIONS AT THE SILHI-LEBT AT CEA/SACLAY

UPGRADE OF THE HIT INJECTOR LINAC-FRONTEND

Beam Diagnostics and Instrumentation JUAS, Archamps Peter Forck Gesellschaft für Schwerionenforschnung (GSI)

RCNP cyclotron facility

ELECTRON COOLING EXPERIMENTS IN CSR*

Recent High Power RFQ Development

IFMIF High energy beam line design and beam expansion using non-linear multipole lenses and "step-like" magnet

IFMIF mini-workshop on Beam Instrumentation. Ciemat, Madrid (Spain) 2-3 July 2007

Beam diagnostics: Alignment of the beam to prevent for activation. Accelerator physics: using these sensitive particle detectors.

Accelerator Design and Construction Progress of TPS Project

The Booster has three magnet systems for extraction: Kicker Ke, comprising two identical magnets and power supplies Septum Se

STUDY ON SPACE CHARGE COMPENSATION OF LOW ENERGY HIGH INTENSITY ION BEAM IN PEKING UNIVERSITY*

Measurement of transverse Emittance

The scanning microbeam PIXE analysis facility at NIRS

Fall 2014 Mott Target Replacement and Ladder Position Re- Calibration JLAB- TN Joe Grames. September 17, 2014

POLARIZED DEUTERONS AT THE NUCLOTRON 1

Jumbo Cross Beam Ionizer

1 AT/P5-05. Institute of Applied Physics, National Academy of Sciences of Ukraine, Sumy, Ukraine

Developments for the FEL user facility

Bremsstrahlung and Ion Beam Current Measurements with SuSI ECR Ion Source

A Report On DESIGN OF NEUTRON SOURCES AND INVESTIGATION OF NEUTRON BASED TECHNIQUES FOR THE DETECTION OF EXPLOSIVE MATERIALS

CapaciTorr HV Pumps. making innovation happen,together

vacuum analysis plasma diagnostics surface science gas analysis

IRMS. perspective. Isotope Ratio Mass Spectrometry.

SURVEY AND ALIGNMENT FOR THE SYNCHROTRON LIGHT SOURCE ELETTRA

Introduction Frankfurt Neutron Source at Stern-Gerlach-Zentrum FRANZ Development of new accelerator concepts for intense proton and ion beams. High in

Accelerator Vacuum Technology Challenges for Next-Generation Synchrotron-Light Sources

LHC status & 2009/2010 operations. Mike Lamont

Optimization of the SIS100 Lattice and a Dedicated Collimation System for Ionisation Losses

SRF GUN CHARACTERIZATION - PHASE SPACE AND DARK CURRENT MEASUREMENTS AT ELBE*

New 2d Far Field Beam Scanning Device at DLR s Electric Propulsion Test Facility

Nano-ECRIS project: a new ECR ion source at Toyo University to produce endohedral fullerenes

MIDAS-NA: MInimization of Destructive plasma processes in ECR ion source

TEST MEASUREMENTS WITH THE REX-ISOLDE LINAC STRUCTURES*

Linac4: From Initial Design to Final Commissioning

Jlab FEL Photoemission DC Guns

SC-ECR ion source for RIKEN RIBF

Vacuum Chambers. Type DK /DK /DK

Accelerators and Lasers In Combined Experiments Susan Smith Daresbury Laboratory

OPTICS IMPROVEMENTS OF THE K500 AXIAL INJECTION LINE

Low Energy RHIC electron Cooling (LEReC)

THIN FLEXIBLE POLYMER SUBSTRATES COATED BY THICK FILMS IN ROLL-TO-ROLL VACUUM

Application Note GA-301E. MBMS for Preformed Ions. Extrel CMS, 575 Epsilon Drive, Pittsburgh, PA I. SAMPLING A CHEMICAL SOUP

CYCLOTRON-RESONANCE ION SOURCE (ECRIS) FOR THE PRODUCTION OF MULTIPLY CHARGED IONS

The Accelerator System for ReA3 the New Re-accelerated RIBs Facility at MSU

ACCELERATOR MASS SPECTROMETRY AT THE LUND PELLETRON ACCELERATOR

Recent development in ECR sources

BEAM TESTS OF THE LHC TRANSVERSE FEEDBACK SYSTEM

The Q Machine. 60 cm 198 cm Oven. Plasma. 6 cm 30 cm. 50 cm. Axial. Probe. PUMP End Plate Magnet Coil. Filament Cathode. Radial. Hot Plate.

Courtesy of ESS and TheRGA web pages part of a series of application and theory notes for public use which are provided free of charge by ESS.

TARGETS AND ION SOURCES DEVELOPMENT AT ISAC-TRIUMF*

Effect of Spiral Microwave Antenna Configuration on the Production of Nano-crystalline Film by Chemical Sputtering in ECR Plasma

Beam. RF antenna. RF cable

Proposal to convert TLS Booster for hadron accelerator

Performance of the ANL ECR Charge Breeder. with Low Mass Beams. Investigations with low mass species. Review of charge breeder design

This is an electronic reprint of the original article. This reprint may differ from the original in pagination and typographic detail.

Cooling Water Flow Regulator

ICP-MS. High Resolution ICP-MS.

RussianSEE test approach: available standards, test variables, difficulties and future trends

PERSPECTIVE STABLE ISOTOPE RATIO MS

Transcription:

UPGRADE AND COMMISSIONING OF THE PIAVE-ALPI ECR INJECTOR AT LNL A. Galatà, M. Sattin, L. Bertazzo, L. Boscagli, S. Contran, A. Dainese, A. Lombardi, D. Maniero, M. Poggi, F. Scarpa, A. Facco, INFN-LNL, viale dell'universita` 2, I-35020 Legnaro, Italy T. Kulevoy, ITEP, Bolshaja Cheremushkinskaja n. 25, Moscow, Russia Abstract The positive ion injector for the PIAVE-ALPI complex consists of an ECR ion source placed on a high voltage platform. A 14.4 GHz ECRIS named Alice [1], designed and constructed at LNL in the early 90, reliably delivered gaseous beams to the Superconducting RFQ PIAVE for nuclear physics experiments until 2008 [2]. The requests for heavy ion beams of increased current and energy, needed to perform the experiments planned for the next years with the AGATA demonstrator, prompted us to upgrade our injector with a new ECR source capable of higher output beam currents and higher charge states. This activity started in 2008 and was completed at the beginning of 2009. A 14.5 GHz, SUPERNANOGAN type ECRIS built by Pantechnik [3], was installed in our refurbished high voltage platform in July 2008. The space available for maintenance in the platform was increased and a new lead shielding for X-rays has been set up. The water cooling circuits have been redesigned to deliver different fluxes and inlet pressures to the equipment mounted on the platform (plasma chamber, extraction electrodes, bending dipole and power supply). A new safety system has been implemented in order to cope with new and more demanding safety rules. A lot of attention has been paid to the optimisation of the injection line with new diagnostic devices for beam characterisation (movable slits, emittance measurement tools). Commissioning of the new source and injector with beams has started and first results will be reported. ECR SOURCE AND RELATED EQUIPMENT The new ECR ion source, named LEGIS (LEGnaro ecris) is a full permanent magnet source working at 14.5 GHz. Good performance and low power consumption make it well suited for operation on a high voltage platform. The source is equipped with a DC Bias tube, which works as biased disk and coaxial tube for microwave coupling; a 1500 C resistive oven to evaporate solid material like silver or gold; a movable sputtering or direct insertion system to evaporate samples of refractory metals like tantalum. The maximum microwave power that can be injected into the source is 700W with a water flow for cooling of 200l/h at an input pressure of 3 bars. The beam is extracted from the source through a four electrodes system: the extraction electrode (V max =30kV), which gives the beam energy; the puller electrode (V= - 5000 0 V); the focus electrode (V = -5000 5000 V) to directly couple the extracted beam to the bending dipole; the ground electrode. The source and its beam line are controlled via National Instruments FieldPoint modules that acquire all parameters and display them by a LabView interface. All the beam line from the source to the accelerating tube has been redesigned in order to have good flexibility and complete beam characterization: to this scope, two independent movable slits (for beam shaping in both horizontal and vertical plane) and transverse emittance measurements device have been installed (see Figure 1). Figure 1: The complete beam line on the high voltage platform and its equipment. Each slit consists of two water cooled tantalum plates, moved together by a stepper motor. Each plate has a current pickup in order to monitor the beam current lost on it. The aperture plates goes from 37 mm to 2 mm, with steps down to 0.1 mm. Both slits are software controlled in a LINUX environment. The emittance measurement device consists of a slitgrid system (see Figure 2). A common support holds a 0.12mm copper slit with a tantalum shield and an 80 wires grid, with 0.5 mm spacing, 280 mm apart. They are centered and moved together by a remotely controlled motor. The maximum stroke of the system is ± 30 mm while the maximum divergence that can be measured is more than 70 mrad. The resolution of the system (without

considering mechanical errors) is 0.36 π mm mrad. The current collected by each wire is preamplified, acquired and processed by a program made in house. The gain of the preamplifiers can be varied in order to characterize beams with different intensities. GRID SLIT points. To start the system, two sensors have to be activated but just one is sufficient to switch off the electrical power on the platform. The vacuum system is now hardware-protected by means of relays: for each turbo pump, dry contacts coming from the vacuum gauge and the controllers have been put in series with +24V power supply, in order to automatically close all the valves when the vacuum exceeds the operating threshold. X-rays coming from the source during operation are stopped by a lead shielding (from the ion source to the bending dipole, see Figure 4) designed at LNL and built by a local company. A SOURCE Figure 2: Detail of the slit-grid system for emittance measurement. Two systems (one for each transverse plane) are mounted on a stainless steel box (Figure 3) which houses also a Faraday Cup and a collimator (an elliptical aperture with vertical axis of 24 mm and horizontal axis of 12 mm) mounted on CF flanges. B C DIPOLE INJECTION LINE Figure 3: View of the stainless steel box for emittance measurement. A) slit-grid system mounted on a rectangular flange; B) horizontal mounting for Faraday Cup; C) vertical mounting flange for collimator. In order to protect all the equipment mounted on the platform, a fire-fighting system that uses a mixture of water and nitrogen has been implemented. Sensors and expellers have been positioned close to all the critical Figure.4: Lead shielding for the source line up to the bending dipole. The all beam line has been surrounded by aluminum profiles, creating three boxes. Two of them (one for the source and one for the bending dipole) have been covered with 1 cm thick lead shielding, sandwiched between two steel plates. Each face of the boxes (except for the upper parts) has two extendable shielding plates, forming a sort of window, in order to have easy access to the source for maintenance. The windows have micro switches which allow, when in closed position, high voltage and microwave feeding to the source.

ALIGNEMENT [4] During installation of the new source and its beam line it became necessary to check, and eventually improve, the alignment of the transfer line going from the source to the first dipole (PD1 from now on) which bends the beam towards the injection line of the PIAVE superconducting RFQ. As a first step, the reference line of PD1 and the two 90 degrees line of the source dipole (LBD from now on) have been defined. Very precise tools (precision ± 0.005 mm) have been machined, controlled on a bench in the LNL workshop, and mounted on the two dipoles. Two optical levels (model WILD NAK2) have been used; the first one to define the injection axis in LBD; the second one to align the extraction axis from LBD to the reference line of PD1. The tolerance requested by the beam dynamics calculations was ±0.2 mm and 0.4 mrad at the injection in PD1. For each optical and beam diagnostic element (source electrodes, emittance measurement device, einzel lenses) special aluminum tools have been machined to house very precise (precision better than 0.1 mm) optical marks for the definition of the alignment axis. When the use of these tools was not possible, due to mechanical restrictions (selection slits, accelerating tube, electrostatic triplet and first diagnostic box out from the platform), crosses with a 80μm tungsten wire have been paced on the flanges. Independent supports (see Figure 5) have been mounted at both ends of each beam line component (except for the emittance measurement device and the electrostatic triplet, hold by a single support). Each support allows a rough regulation in height by means of M10 screws. The beam line component itself is supported by an aluminum plate with a fine regulation in all three directions: three vertical screws for the horizontal plane and 8 more screws for back-forth and left-right regulation. Once centered, the tube is fixed in position by aluminum cover. At the end of the work the precision requested was reached. ACCEPTANCE TESTS In order to have a proof of good source performances, some requirements for beam intensity and quality have been put in the contract. They regarded the production of two gaseous beams (O 6+ and Ar 9+ ), three metallic beams from an oven (Ag 21+, Au 26+ and Au 30+ ) and one metallic beam with a sputtering system (Ta 24+ ). Table 1 summarizes the requests for beam intensity. gaseous beams Table 1: LNL Current Requests Ion Current [μa] O 6+ 200 Ar 9+ 100 Ag 21+ 3 metals with oven Au 26+ 10 Au 30+ 1 metals with sputtering Ta 24+ 1 For each one of the ions listed in table 1 a 2 hours test of the beam current stability had to be repeated two times, first at Pantechnik site and finally at LNL site after final installation. The current had to stay within ±5% of the reference value for the 98% of testing time. A normalized 4*RMS emittance of less than 0.3 p*mm*mrad for the 90% of the beam was also required for the two gaseous beams. A brief description of the acceptance tests hold at Pantechnik site will be given in the following. The extraction voltage was fixed at 24kV for all the beams produced; the test bench used was made by the source directly coupled to a 90 bending dipole and an horizontal emittance measurement device consisting of a slit and a scanning wire. Gaseous Beams For both Ar 9+ and O 6+ beams the current stability and the emittance test results were satisfactory. Figures 6 and 7 show spectra acquired during the acceptance test. Even if not so high microwave power was used (about 170W for both beams) more than 10μA of O 7+ and slightly less than 20 μa of Ar 11+ were recorded. Looking at the emittance measurements (see Figure 8) we saw that the beam parameters slightly changed during stability tests, showing that the source was still not totally conditioned due to the limited operation time. Figure 5: Special support for each part of the beam line.

a cylinder of 1 mm diameter. The sample is carefully placed closer and closer to the plasma until the evaporation starts and metallic ion can be seen in spectra. The tests with both methods were satisfactory, especially the direct insertion method which revealed to be very easy and fast. Figure 9 shows the spectrum acquired after stability tests for gold: it can be seen that current for both 26+ and 30+ ions are well above the requests. Figure 6: spectrum acquired at the end of stability test for O 6+. Figure 9: spectrum acquired after stability tests for gold. Figure 7: spectrum acquired at the end of stability test for Ar 9+. ION SOURCE AND INJECTOR COMMISSIONING5 Once completed the installation, first tests with oxygen beam have been done on the new source. The attention paid on the cleaning of each component put under vacuum played an important role on source conditioning. Figure 10 shows an oxygen spectrum acquired in December 2008: it can be seen that more than 270μA of O 6+ and 16μA of O 7+ have been obtained with 325W of microwave power. Non contaminants are present in the spectra. Figure 8: gaseous beams emittance plots. Metallic Ion Beams The new source is equipped with two different systems for production of ion beams from metallic elements: A resistive oven, consisting of a tungsten wire heating an alumina crucible containing the sample to be evaporated. Such an oven can produce metallic vapours from elements which reach a vapour pressure of 1 Pa for T< 1500 C. A plasma heating or direct insertion method. It consists of a long movable rod which holds at its extremity the sample to be evaporated in the shape of Figure 10: first oxygen beam extracted from the new source mounted on the HV platform. After source conditioning for some days with oxygen, the commissioning of the injector started in March 2009. The beam chosen was Ar 9+ with a current between 1 and 3μA; the voltage applied to the platform was about 140kV to meet the right velocity for injection into the RFQ PIAVE. The most part of the work was done the first days: once fixed the voltages on the lenses to couple the beam to the injection line and on the electrostatic quadrupole, the

values of the magnetic lenses and of the phases and amplitudes of accelerating cavities have been optimized. Thanks to the good emittance coming from the source (about 0.05 π*mm*mrad norm. rms in both transverse planes) and to the good job in improving alignment we had an improvement of 10% in transmission at the entrance of the LINAC ALPI. Moreover, the beam characteristics were reproducible in the following days: in fact putting exactly the same parameters for source tuning and the same values for the magnetic lenses, the beam was transmitted through the injector exactly with the same transmission as the previous days, except for a slightly adjustment of the field of the dipoles. The injection and complete acceleration in the ALPI LINAC, together with the production of Xe, Sm, Sn and Ca beams are foreseen for the next moths. REFERENCES [1] M. Cavenago, T. Kulevoy, Rev. Sci. Instrum. 71(2000), 758. [2] A. Galatà et al., LNL report 2007. [3] http://www.pantechnik.fr/joomla/. [4] A. Galatà et al., LNL internal document. [5] E. Fagotti et al., these proceedings.