Pershing Gold Concludes 2016 Phase 1 Drilling Program and Shifts Focus to Pre-Feasibility Study and Restart of Relief Canyon

Similar documents
Pershing Gold Extends High-Grade Mineralization through Step-Out Drilling in Phase 1 and Initiates Phase 2 Drilling Program

Pershing Gold Hits Highest Grade Gold to Date in Relief Canyon with Grams per Tonne (3.618 Ounces per Ton) Intercept

Pershing Gold Reports a 2.24 Ounce per Ton Gold Intercept Along With Other High-Grade Gold Intercepts at Relief Canyon

Probe Metals Continues to Expand Gold Zones At Val-d Or East

EXPLORATION NEWS RELEASE MAGISTRAL DISTRICT: MORE GROWTH, MORE GOLD, MORE SILVER

Probe Metals Continues to Intersect Significant Gold Mineralization in Expansion Drilling at Val-d Or East, including 4.1 g/t Gold Over 15.

Probe Metals Intersects 3.2 g/t Gold Over 45.5 Metres At Val-d Or East

NEWS RELEASE November 5, 2018

Assay Results Highlights (as of November 16, 2017) representing approximately 4,500 metres ( m ) of drilling:

CANARC RESOURCE CORP Howe Street Vancouver, BC V6C 2T6. News Release

- 2 - TABLE 1. INDICATED AND INFERRED GOLD AND SILVER RESOURCES. All Indicated

NEWS RELEASE TSX: ELD NYSE: EGO September 6, Eldorado Announces Drilling Results from KMC Project, Serbia

Probe Metals Confirms Continuity of Gold Mineralization on its Val-d Or East Project And Increases 2017 Drill Program to 75,000 metres

Highlights from the four holes announced in this news release include:

October 8, 2015 News Release Brucejack Regional Drilling Intersects Over 8,000 Grams Per Tonne Gold

North American Palladium Announces Positive Exploration Results from Lac des Iles Mine

Probe Metals Discovers New High Grade Gold Zone on Val-d Or East Project: Intersects 12.6 g/t Gold Over 7.3 Metres

Sabina Gold & Silver Reports 2018 Drilling has Commenced at Back River Gold Project

EXPLORATION NEWS RELEASE

July 15, 2015 News Release Valley of the Kings Underground Infill Drilling Progresses

ET and and and

The new sulphide mineralization lies within a 1.4 kilometer long east-west trending

CROCODILE GOLD INTERSECTS 7.1 G/T AU OVER 4.5 METERS INCLUDING 11.2 G/T AU OVER 2.6 METERS AT THE UNION REEFS PROJECT, PROSPECT DEPOSIT

June 4, 2015 News Release Valley of the Kings Underground Infill Drilling Underway

Cove Gold Project 2201 Discovery Update, May 2014

NEWS RELEASE FULLER PROPERTY CONTINUES TO DELIVER GOOD RESULTS 2.53 GRAMS PER TONNE GOLD OVER METRES

Probe Metals Intersects 1,122 g/t Gold Over 0.7 Metres in New Zone at Val-d Or East

Northern Dynasty Minerals Ltd.

CONTANGO ORE, INC. Contango ORE Announces Results of 2012 Exploration Program

MCEWEN MINING ANNOUNCES EXPLORATION UPDATE FOR EL GALLO 1, MEXICO

Orford Completes Phase 1 Exploration Program and Generates High-Quality Drill Targets on its Carolina Gold Properties

SABINA GOLD &SILVER REPORTS COMPLETION OF DRILLING AT ECHO DEPOSIT, BACK RIVER, NUNAVUT.

June 4, 2014 News Release Valley of the Kings Exploration Program Underway; Project Update

MEDIA RELEASE OCEANAGOLD ANNOUNCES FURTHER DOWN DIP EXTENSIONS OF MINERALISATION AT PANEL 2: FRASERS UNDERGROUND MINE

BELO SUN INTERSECTS NEW HIGH GRADE ZONE AT GROTA SECA AND EXPANDS GRANDE DEPOSIT

News Release. Canarc Continues to Intersect High-Grade Gold at Fondaway Canyon, Nevada, Including 3.24 Grams per Tonne Gold over 12.

GOLDPLAY ANNOUNCES FURTHER SAMPLING RESULTS FROM SAN MARCIAL HISTORICAL CORE; CONFIRMS OPEN PIT TARGET NEAR SURFACE WITH gpt AgEq.

QUITO PROJECT. December Northwest Mining Association Annual Conference. Austin, Nevada BVA:TSX.V BRT: FSE

GOLDEN MINERALS DISCOVERS ADDITIONAL HIGH GRADE VEINS AT SANTA MARIA RESULTS UP TO 1.88 g/t Au and 648 g/t Ag

BELO SUN RELEASES RESULTS FROM 65 DRILL HOLES FURTHER EXTENDING THE OURO VERDE DEPOSIT ALONG STRIKE NORTHWEST AND DOWN DIP

Update on Columbus Gold's Eastside Gold Discovery in Nevada

Queenston Announces 112% Increase in Indicated Resource (to 1.5 M oz. gold) and 16% Increase in Inferred Resource (to 0.7 M oz. gold) at Upper Beaver

AVION GOLD DJAMBAYE II ZONE, TABAKOTO PROJECT, MALI, RETURNS HIGH GRADE INTERCEPTS OF 7.56 G/T Au OVER 7.0 METRES AND G/T Au OVER 3.

DRILLING AT ASCOT S PREMIER PROPERTY EXTENDS GOLD MINERALIZATION 150 METRES WEST TOWARDS UNDERGROUND PORTAL

MONETA INTERCEPTS g/t GOLD INCLUDING g/t GOLD AND g/t GOLD INCLUDING g/t GOLD AT SOUTH WEST

IAMGOLD ANNOUNCES RESULTS FROM THE WESTWOOD-MOOSHLA EXPLORATION PROJECT

MANDALAY RESOURCES ANNOUNCES HIGH-GRADE DRILL INTERCEPTS IN FABIOLA AND YASNA VEINS UNDER LAGUNA VERDE AT ITS CERRO BAYO SILVER-GOLD MINE, CHILE

ANTLER GOLD EXPLORATION UPDATE, WILDING LAKE GOLD PROJECT, NEWFOUNDLAND

CROCODILE GOLD INTERSECTS GRAMS PER TONNE GOLD OVER 2.05 METERS BELOW THE PROSPECT DEPOSIT AT UNION REEFS

NEWS RELEASE. Mountain Province Diamonds Completes the Kennady North Winter Exploration Program

POSITIVE RESULTS FROM FIRST PHASE OF CORE DRILLING AT JEFFERSON PROJECT, SOUTH CAROLINA FOR NEAR-SURFACE GOLD MINERALIZATION

FURTHER EXPANSION OF GOLD DISCOVERY AT COLUMBUS PROJECT REPORTED BY IRELAND INC.

CENTRAL ZONE CONTINUES TO EXPAND AT EL GALLO 1 MINE REGIONAL DRILLING DELIVERS HIGH SILVER GRADES OVER GOOD WIDTHS NEW RESOURCE UPDATE PENDING

NEWS RELEASE ORCA GOLD INDICATED AND INFERRED RESOURCES AT BLOCK 14 INCREASE BY 24% AND 48% RESPECTIVELY

Table 1 Updated Mineral Resource Tabulation for the Vertikalny Deposits of the Mangazeisky Property. Contained Metal Ag (koz)

Coeur Mining Provides Silvertip Exploration Update

DRILLING FURTHER EXTENDS MINERALIZATION AT EXETER S CASPICHE GOLD-COPPER PORPHYRY PROJECT IN CHILE

TRENCHING AT LAS DOLORES EXTENDS STRIKE LENGTH TO OVER 1,000 METRES, INTERSECTING

INFILL DRILLING EXPANDS MINERALIZATION IN HIGH-GRADE GOLD-COPPER CORE AT SOUTHWEST DISCOVERY ZONE TURQUOISE HILL PROJECT, MONGOLIA

CALIFORNIA GOLD COMMENCES RESOURCE EXPANSION DRILLING AT NEW ZONE ON ITS FREMONT PROPERTY

Detour Gold Reports Drilling Results from Lower Detour

News Release. Infill Drilling Program

ASANKO GOLD ANNOUNCES ENCOURAGING INITIAL DRILL RESULTS FROM NEW EXPLORATION TARGET

23 January, 2018 CSE: RFR For Immediate Release. Renforth extends Parbec Gold Deposit strike 60m with gold in all 7 drillholes

FALCO PACIFIC COMPLETES INITIAL MODEL FOR THE HORNE 5 GOLD/SILVER/ZINC/COPPER DEPOSIT

NEWS RELEASE ORCA GOLD REPORTS CONTINUED SUCCESS AT GSS

NEWS RELEASE. Gold Canyon Encounters Meters at 1.81 Grams per Tonne Gold at its Springpole Gold Project

San Gold Drills New Mine Horizon Adjacent to Rice Lake Mine, Returns 10.4 Metres Grading 25.7 g/t Au

Bellhaven Announces Updated NI Mineral Resource for La Mina Project, Colombia

MONETA INTERCEPTS g/t GOLD INCLUDING g/t GOLD AT SOUTH WEST

December 7, 2011 NEWS RELEASE. Gold Canyon Intersects 257 Meters at 1.48 Grams per Tonne Gold at the Springpole Gold Project

September 24, 2012 #

Corvus Gold Drills g/t Gold, Extends Mother Lode Sediment Hosted Gold System to at Least 450 Metres Along Strike

555 Burrard Street, Suite 375, Vancouver, B.C. V7X 1M June 13, 2017 SBB NR SBB TSX

BELO SUN DISCOVERS NEW MINERALIZED ZONE AT ITS VOLTA GRANDE GOLD PROJECT, BRAZIL

KIRKLAND LAKE GOLD ANNOUNCES 120 METRE DOWN-PLUNGE EXTENSION OF SWAN ZONE

NEWS RELEASE. Mountain Province Diamonds Reports Additional Kimberlite Identified in Gahcho Kué Exploration Program

Underground Exploration Drilling Complete; Brucejack Mineralization Extends to the East

OSISKO METALS INTERSECTS 10.49% ZINC+LEAD OVER METRES AND 12.15% ZINC+LEAD OVER METRES AT PINE POINT

INV METALS ANNOUNCES DRILL RESULTS AT LOMA LARGA AND INITIAL PROSPECTING RESULTS ON NEW REGIONAL PROPERTIES

Gold Canyon Announces Completed Results of Gold Assays from its 2011 Resource Drill Program at the Springpole Gold Project

NEWS RELEASE. Gold Canyon Encounters Meters at 1.47 Grams per Tonne Gold at its Springpole Gold Project

EXPLORATION NEWS RELEASE EL GALLO EXPANDED AT DEPTH & TO THE WEST SEVERAL ZONES MERGING TOGETHER RESOURCE ESTIMATE 2 WEEKS

QMX GOLD CONTINUES TO INTERSECT STRONG MINERALIZATION AT BONNEFOND, INTERSECTING 39.5 g/t Au OVER 2.4 METRES AND 31.5 g/t Au OVER 1.

Argonaut Gold announces San Agustín resource of 845,000 gold ounces and 28.3 million silver ounces (1,280,000 gold equivalent ounces)

930 West 1 st Street, Suite 202, North Vancouver, BC V7P 3N4. Tel: (604) Tel:

IAMGOLD PROVIDES UPDATE ON ADVANCED EXPLORATION PROJECT DIAMOND DRILLING RESULTS BOTO PROJECT, SENEGAL

Seafield Announces the Discovery of a New Porphyry-Style Drill Target at its Quinchía Gold Project in Risaralda, Colombia

Mineral Resource Estimate Comparison at 3 g/t Au cut-off

August 20, 2018 SBB NR SBB TSX

True Width (m) Carneritos to

Strategic Phase 2 Exploration Program Launched at Island Gold High-Grade Resource Potential Identified Laterally and at Depth

First Cobalt Extends Iron Creek 100 Metres Downdip in Central Area

MANDALAY RESOURCES CORPORATION INCREASES MINERAL RESOURCES AND RESERVES AT ITS BJÖRKDAL GOLD MINE

MINERAL MOUNTAIN RESOURCES LTD. MMV.TSX-V

CAUTIONARY STATEMENT

36 Holes drilled in an approximate 100 meter by 100 meter grid covering an area of 1,000 meters long by 400 meters depth

CANDENTE UPDATES CAÑARIACO NORTE MINERAL RESOURCE ESTIMATE

U3O8 Corp. reports results of infill drilling at Aricheng C in the Kurupung Project, Guyana

CROCODILE GOLD CONTINUES POSITIVE EXPLORATION RESULTS INTERSECTS HIGH GRADE GOLD AT UNION REEFS PROJECT

Transcription:

Pershing Gold Concludes 216 Phase 1 Drilling Program and Shifts Focus to Pre-Feasibility Study and Restart of Relief Canyon LAKEWOOD, Colo., Jan 9, 217 (PR NEWSWIRE) Pershing Gold Corporation (NASDAQ:PGLC) (TSX: PGLC) (FWB:7PG1) ("Pershing Gold" or the "Company"), the emerging Nevada gold producer, today provides an update on the progress towards production at its Relief Canyon Mine in Pershing County, Nevada. With the recent volatility in the gold price, the economics for Relief Canyon remain strong as a low cost, low CAPEX project in comparison with our North American peers, stated Stephen D. Alfers, Pershing Gold President, CEO, and Executive Chairman. Early this year the Company plans to publish a third-party Pre-Feasibility Study on Relief Canyon. This study is expected to continue to bolster the confidence in the Relief Canyon project, Alfers explained. Additionally, we have completed the 216 Phase 1 Drilling Program at Relief Canyon, which successfully extended high-grade mineralization with step-out drilling to the west. We also report promising results with our Phase 2 drilling, south of Relief Canyon. We are currently evaluating the results of this drilling in consideration of follow up drilling programs. That said, our main focus will be re-starting the Relief Canyon mine, said Alfers. Pre-Feasibility Study and Progress Towards Production Pershing Gold is nearing the completion of the third-party Pre-Feasibility Study ( PFS ) on the Relief Canyon mine that it initiated earlier this year. The PFS will refine the underlying assumptions used in the 216 Preliminary Economic Assessment ( PEA ) on Relief Canyon, which is available on the Company s website at www.pershinggold.com. Mine Development Associates, McLelland Laboratories, Inc. and Kappes, Cassiday and Associates, all of Reno, NV, have been commissioned to complete the PFS. Pershing Gold expects the PFS to be published in early 217. The PFS is a key step to allow the Company to define reserves at Relief Canyon under Canadian National Instrument 43-11 and is expected to provide a higher degree of confidence in the Relief Canyon project. Key components of the PFS include the following: Incorporation of a geotechnical pit slope evaluation completed by Golder Associates of Reno, NV. Evaluation of an updated resource model incorporating new exploration drilling. Detailed capital and operating cost comparison of contract versus self-mining. Detailed capital and operating cost comparison of truck stacking versus conveyor stacking of crushed and agglomerated ore on the leach pad. Incorporation of additional metallurgical testing to establish ore agglomeration parameters. Trade-off study of line versus generated electrical power. Additionally, the PFS will provide refined costs for all capital and operating expenses for the 1

restart of Relief Canyon. Permitting On December 22, 216, the Nevada Division of Environmental Protection ( NDEP )/Bureau of Mining Regulation and Reclamation Phase issued the Reclamation Permit for Phase I expansion of the Relief Canyon Mine. With the receipt of this permit, along with the Bureau of Land Management ( BLM ) approval of the Relief Canyon Mine Expansion announced in August of 216, Pershing Gold has received the principal permits to initiate the restart and expansion of the Relief Canyon Mine. Similar to the previously approved BLM Plan of Operation, the NDEP Reclamation Permit authorizes Pershing Gold to create 68.7 acres of surface disturbance on public and private land, expand and deepen the open-pit mine, construct a new waste rock storage area, and significantly increase the exploration drilling area to allow testing of high-priority targets around the existing pit. Other key items in the ongoing process of permitting the Relief Canyon Mine include water pollution control and air quality permits. On December 21, 216, NDEP issued a public notice stating that they had made the tentative decision to approve Pershing Gold s application to modify and renew the current Water Pollution Control Permit. With this announcement, NDEP started the 3-day public comment period for this permit. The comment period will end on January 2, 217. Pershing Gold anticipates that the NDEP will issue the Water Pollution Control Permit modification and renewal shortly thereafter. Pershing Gold is working closely with NDEP s Bureau of Air Pollution Control to finalize the air quality permitting process. The Company expects that NDEP will issue the air quality permits in the first quarter of 217. 216 Drilling Program Phase 1 Final Results Pershing Gold has received the final results from Phase 1 of its 216 Drilling Program (the Program ), listed in Table 1 below. A complete list of results received to date is available on our website at www.pershinggold.com. Results are reported in feet ( ft ) and meters ( m ), and in grams per tonne ( gpt ) and ounces per ton ( oz/ton ) of gold ( Au ) or silver ( Ag ). Notable intercepts from RC16-49 include: o RC16-49 including: 24.1 ft (7.3 m), 1.83 gpt,.53 oz/ton Au including: 5. ft (1.5 m), 13.933 gpt,.47 oz/ton Au The Phase 1 Drilling Program was designed to extend the western boundary of economic mineralization at Relief Canyon. RC16-49 continues to confirm that significant portions of the western margin of the mineral zones remain open to the west. RC16-49 is a 55 ft (167.6 m) offset to RC16-462 and a 29 ft (88.4 m) offset to RC16-475. The intercept in RC16-462 includes eight zones totaling 166.3 ft (5.7 m) with an average grade of 1.597 gpt,.46 oz/ton Au, and 23.5 gpt,.7 oz/ton Ag that the Company reported on September 9, 216. A plan view including these drill holes is shown below in Figure 1. 2

The Phase 1 drilling successfully expanded the North target area resource to the west and southwest where it remains open. This drilling continued to support the dominance of relatively low angle structural controls and continuity of mineralization and grade down dip. The Lower and Jasperoid Zones continue to produce high grades of gold with very good cyanide soluble results at depths to >9 ft (274 m). Table 1: Phase 1 Results Drill From To Width gpt oz/ton gpt Hole feet gold gold silver RC16-49 54 521.4 17.4.21.6 849 873.1 24.1 1.83.53 7 894 899. 5. 13.933.47 2 1113.9 112.2 6.3.522.15 1 *True width is greater or equal to 9% of the intercept width. oz/ton silver.2.6.3 Phase 1a Drilling Program The Company is now evaluating results from the 15,164 ft (4,622 m) of core drilling in the 216 Drilling Programs to follow-up on the successes there. This Phase 1a Program and other follow up programs could include step-out drilling to continue following the mineralization from Relief Canyon down dip to the west and southwest as well as infill drilling to expand the current economic pit limit at Relief Canyon. Geologic modeling of the higher grades encountered in the area of RC16-462 is currently in progress with additional drilling under consideration for 217. Phase 2 Drilling Program Pershing Gold has initiated Phase 2 of its 216 Drilling Program. Phase 2 is focused on extending mineralization south of the South Pit and the Lightbulb Pit, as well as on discovering satellite deposits that could be processed at the existing heap leach and ADR facilities at Relief Canyon. Table 2: Phase 2 Results Drill From To Width gpt oz/ton gpt Hole feet gold gold silver RC16-493 39 395 5.548.16 12 RC16-496 398 43 5.514.15 428 443 15.323.9 RC16-498 424 434.1 1.3 1.13.33 2 456 468.2 12.2.343.1 *True width is greater or equal to 9% of the intercept width. oz/ton silver.35.6 Phase 2 drilling at Pershing Gold Corporation s Relief Canyon Mine has identified potential mineable grade intervals of gold in drill hole RC16-498 with 1.1 ft (3.14 m) intervals averaging 1.13 gpt,.33 oz/ton Au, and 12.2 ft (3.7 m) at.343 gpt,.1 oz/ton Au. The Company is encouraged by the two intervals in hole RC16-498 because they occur along the 3

contact of the South Humboldt Thrust where deformed siliciclastics of the Grass Valley Formation are in thrust contact with the underlying carbonates of the Cane Springs Formation. Both of these intervals are found along altered gabbro contacts, which are illustrated in Figure 2 below. Figure 1 These structural contacts are key elements controlling the distribution of gold in the resource at Relief Canyon. Surface geological mapping and resistivity psuedosections indicate the intercepts in drill hole RC16-498 are located along a steepened thrust ramp. The depth to the South Humboldt Thrust shallows and flattens to the northeast as noted in Section 17-1 in Figure 2 below. Another key element to potential for resource growth at Relief Canyon is the 4

presence of a strong N4W structural corridor that cuts through the southeast extension target area. This N4W structural corridor is a significant structural control on gold at the Relief Canyon project. The Phase 2 drilling program is wide spaced, with the drill hole spacing averaging from 5 to 1,2 ft (152 to 366 m). This drilling is testing coincident geological, geochemical, and geophysical targets south and southeast of the old Relief Canyon Mine pits. The great majority of this highly prospective area has not previously been drilled. Phase 2 drilling completed to date has vectored toward the Southeast Extension target area (Figure 1). Figure 2 About Pershing Gold Corporation Pershing Gold is an emerging gold producer whose primary asset is the Relief Canyon Mine in Pershing County, Nevada. Relief Canyon includes three historic open-pit mines and a state-ofthe-art, fully permitted and constructed heap-leach processing facility. Pershing Gold is currently permitted to resume mining at Relief Canyon under the existing Plan of Operations. Pershing Gold's landholdings cover approximately 25, acres that include the Relief Canyon Mine asset and lands surrounding the mine in all directions. This land package provides Pershing Gold with the opportunity to expand the Relief Canyon Mine deposit and to explore and make new discoveries on nearby lands. Pershing Gold is listed on the NASDAQ Global Market and the Toronto Stock Exchange under the symbol PGLC and on the Frankfurt Stock Exchange under the symbol 7PG1. 5

Scientific and Technical Data All scientific and technical information in this press release has been reviewed and approved by Larry L. Hillesland, Certified Professional Geologist #1172, who is a Qualified Person under the definitions established by Canadian National Instrument 43-11. Drill core at Relief Canyon is boxed and sealed at the drill rig and moved to the Relief Canyon logging and sample preparation facilities by trained personnel. The core is logged and split down the center using a typical table-fed circular rock saw. One half of the core is sent for assay to McClelland Laboratories, Inc.of Sparks, Nevada, while the other half is returned to the core box and stored at Relief Canyon in a secure, fenced-off, area. Pershing Gold Corporation QA/QC includes the regular use of blanks, standards, and duplicate samples. Legal Notice and Safe Harbor Statement This press release contains "forward-looking statements" within the meaning of the safe harbor provisions of the U.S. Private Securities Litigation Reform Act of 1995 and applicable Canadian securities laws. All statements, other than statements of historical fact, are "forward-looking statements," including the timing for the release of a Pre-Feasibility Study on the Relief Canyon mine and the expected contents and results of that study; the interpretation of Phase 1 results including confirmation that the deposit remains open to the west and southwest; the timing of of the issuance of the Water Pollution Control Permit modification and air quality permits; Although the Company's management believes that such forward-looking statements are reasonable, it cannot guarantee that such expectations are, or will be, correct. These forwardlooking statements involve a number of risks and uncertainties, which could cause the Company's future results to differ materially from those anticipated. Potential risks and uncertainties include, among others, interpretations or reinterpretations of geologic information, unfavorable exploration results, inability to obtain permits required for future exploration, development or production, general economic conditions and conditions affecting the industries in which the Company operates; the uncertainty of regulatory requirements and approvals; and fluctuating mineral and commodity prices. Additional information regarding the factors that may cause actual results to differ materially from these forward-looking statements is available in the Company's filings with the Securities and Exchange Commission, including the Annual Report on Form 1-K for the year ended December 31, 215, and on SEDAR at www.sedar.com. The Company assumes no obligation to update any of the information contained or referenced in this press release. Contact Information For more information, please contact: Stephen Alfers, Executive Chairman, President and CEO Jack Perkins, Vice President, Investor Relations 72.974.7254 investors@pershinggold.com www.pershinggold.com 6