Remaining assay results Tisová Co Au Cu Project Czech Republic

Similar documents
For personal use only

For personal use only

Victory plans gravity survey for Bonaparte after encouraging rock-chip results

For personal use only

For personal use only

High Grade Gold Intersections at Harry Smith Prospect

For personal use only

For personal use only

MEDIA / ASX RELEASE JORC TABLE 1 ANNEXURE - REVISED. Tuesday 22 April 2014

ASX Announcement 29 July 2015

Hann Prospect New Gold Discovery Confirmed

For personal use only

For personal use only

HIGH-GRADE GOLD MINERALISATION CONTINUES ALONG STRIKE AT THE BODDINGTON SOUTH GOLD PROJECT

For personal use only

For personal use only

For personal use only

Market Release October

Narembeen Drilling Result. Assay results have been received from the diamond drilling program at Narembeen.

New Gold Target Identified at Leonora

Sulphide Mineralisation intersected in Alcoutim Cu-Zn Project

For personal use only

For personal use only

Norseman Gold Exploration Results

High Grade Gold Intercepts at Bangaba

Carrapateena Mineral Resources Explanatory Notes April OZ Minerals Limited. Carrapateena Mineral Resources Statement April

For personal use only

Table 1: Summary details of samples collected on surface at Bucks claims Sample ID. Sample Description

NEW COBAR-STYLE COPPER DISCOVERY IN NSW

Cobalt minerals identified in drilling Tisová Co Au Cu Project Czech Republic Tisová Highlights

Diamond Drilling to Commence in Axiom s Quang Tri Tenement, Vietnam

COPPER MOUNTAIN COMPLETES PHASE 2 DRILL PROGRAM AT NEW INGERBELLE WITH CONTINUED POSITIVE RESULTS

Alcoutim Cu-Zn Portugal Drilling and Technical Update

Further Outstanding Drill Results at Bygoo Tin

ASX Announcement ASX Code: MAR 10 April 2018

High-grade Gold in First Drilling Undertaken at Productora South

Hits of up to 123gpt show Chesterfield emerging as a high grade gold project

% zinc, 2.1% lead, 1.2% copper, g/t silver, 1.0 g/t gold from 236 metres (zinc equivalence of 19.8% Zn Eq).

Resource Diamond Drilling Commences at Productora. Strong results continue from Productora central area drilling

For personal use only

HIGH-GRADE LITHIUM CONFIRMED IN MINCOR S WIDGIEMOOLTHA PEGMATITES

EXPLORATION SUCCESS AT COYOTE GOLD MINE

STRONG GOLD IN SOIL ANOMALY OUTLINED AT MARY HARRISON PROJECT HIGHLIGHTS

Developing the +1.0Moz Pilbara Gold Project. Diamond Drilling confirms Thick High Grade Gold Zones. Highlights

Extensions confirmed at Wingina and Amanda

Drilling Commences at Telfer West Gold Project

STEP-OUT DRILLING EXTENDS HIGH GRADE COPPER ZONE AT SYNDICATED S 100% BARBARA SOUTH LODE

For personal use only

ENCOURAGING GOLD-BASE METALS AT MAY DAY, MOLY- GOLD AT ATTUNGA

For personal use only

LATEST DRILL RESULTS REVEALS MINERALISATION OPEN AT STRIKE AND DEPTH AT KATANNING GOLD DEPOSIT

For personal use only

For personal use only

For personal use only

For personal use only

ACQUISITION OF THE MCCLEERY COPPER-COBALT PROJECT, CANADA

Large coherent gold soil anomaly discovered at Naujombo

Cobalt up to 0.87% from drilling at Olary Project

For personal use only

For personal use only

High-grade Copper and Gold Discovered at Productora

For personal use only

EXPLORATION UPDATE CHANNEL SAMPLING AT HORN ISLAND CONFIRMS PREVIOUS HIGH GRADE RESULTS

Western Queen Gold Project Drilling Results

High Grade Gold Results from RAB Drilling at the Central Bore Prospect

D N HARLEY MANAGING DIRECTOR Attachment: Amended Consultant Report on MG 14 Mineral Resource Estimation.

A1 GOLD MINE 14 LEVEL STOCK WORKS TARGET FURTHER HIGH GRADE DRILL INTERCEPTS

13 March 2017 Georgian Mining Corporation Further drill results from Kvemo Bolnisi East Gold Discovery

For personal use only

For personal use only

HIGH GRADE GOLD FROM RC DRILLING AT BARLEE

For personal use only

New High Grade Gold-Copper Extensions At Mutiny s Deflector Deposit Highlight Project s Significant Growth Potential

For personal use only

Drilling Program Commences on Iron Oxide Copper Gold Targets

For personal use only

High grade cobalt confirms Polinga Project as a significant new discovery

High Grade Lithium Samples from Solonopole

Anson Successfully Samples Clastic Zone 31 Brine

MARKET UPDATE ON URANIUM AND GOLD PROJECTS

Two New WA Projects Introduced into Newcrest Generation Alliance

Norwest successfully lists on ASX, Drilling commenced at Warriedar Gold Project

For personal use only

SUMBA EPITHERMAL GOLD SYSTEM

Bass Metals records further positive drill results & progress at 3 prospects.

For personal use only

Mt Jumbo East Maiden RC Drill programme Delivers 4g/t Gold from 8m in Hole MMJRC04

UP TO 17.20% COPPER IN DETAILED SAMPLING CONFIRMS CONTINUOUS HIGH GRADE COPPER ZONE AT EL ROBLE

High Grade Gold Drill Results and Successful Soil Sample Programme

For personal use only

De Grey Mining Ltd. High Grade Zinc mineralisation defined at Tabba Tabba Highlights. Turner River Unlocking Shareholder Value

For personal use only

Up to 75m wide quartz vein/stringer zone identified at Kamalingela, Moba Gold Project, DRC

Additional significant gold and copper intercepts obtained in Sweden

West Timor Copper Prospect Sample Results (Revised)

Lake Resources N L, Quarterly Report, January - March 2013 LAKE RESOURCES NL QUARTERLY REPORT JANUARY MARCH 2013

TWO HIGH-GRADE GOLD ZONES DISCOVERED AT HERMES GOLD PROJECT

Successful Exploration Program - Metallum Identifies Multiple Bedrock Conductors at Teutonic

Tel: (+61-8) Mob: (+61) (0)

For personal use only

Transcription:

8 January 2018 Market Announcements Platform ASX Limited Exchange Centre 20 Bridge Street Sydney NSW 2000 Remaining assay results Tisová Co Au Cu Project Czech Republic Auroch Minerals Limited (Auroch or the Company) advises that assay results from the final two (2) holes at Tisová (TIDD001 & TIDD004) have been received. While gold results were encouraging (up to 2.73/t Au) the cobalt and copper results are both: lower grade, and across narrower intervals than expected from the visual logging of the core. Results for target metals from all samples are presented in Table 2. CHAIRMAN Mr Glenn Whiddon said. While the results are not as hoped for, analysis of the drill core versus the previous grab samples suggest a different origin for the two sets of samples within the large Tisová deposit. We believe this to be a logical explanation for the drilling results based upon the historical mining, dating back to 1600 s. This implies that there remains a cobalt rich portion of the orebody that was not tested by our initial four drill holes and further investigation is warranted." As previously reported, the mineralisation in the drilling appears substantially different from grab samples collected from the Tisová mulloch dumps. This points to a strong metal zonation within the Tisová orebody. We will review the 3D model of the sulphides and look to investigate geophysical methods to identify further sulphide bodies as the source of Cobalt mineralisation sampled on the dumps. Auroch has been exploring at Tisová is under the terms of an Option Agreement that expires in March 2018. The Company has fulfilled its obligations under the agreement which included 4 drill holes for 1200m (1340m completed) to test the spatial distribution of Cobalt and Copper (also Au & Ag) at Tisová. Should Auroch elect to proceed with the acquisition there is a further Cash payment of A$75,000 and 4,375,000 fully paid ordinary shares to be issued. There is also a deferred consideration of 5,000,000 additional fully paid ordinary shares should certain conditions/performance targets be met (see ASX release 3/July/17) Table 1 Tisova (TIDD001 & TIDD004) Table of mineralised intercepts. Mineralised Intercepts Table TIDD004-0.4m @ 0.03% Co, 2.73g/t Au [114.4m] TIDD004-1m @ 0.1% Co, 1.13g/t Au, 0.5% Cu [155.1m]

Table 2 Assay results for target metals in TIDD001 & TIDD004. Hole_ID From To Interval Co (ppm) Au (ppm) Cu (ppm) TIDD001 26.8 27.8 1 18 0.00 30 TIDD001 27.8 28.55 0.75 19 0.02 305 TIDD001 28.55 29 0.45 9 0.00 33 TIDD001 29 29.4 0.4 23 0.01 68 TIDD001 29.4 30.6 1.2 23 0.01 40 TIDD001 38 38.7 0.7 8 0.02 71 TIDD001 38.7 39.9 1.2 14 0.04 95 TIDD001 39.9 40.7 0.8 16 0.01 78 TIDD001 40.7 42 1.3 15 0.01 25 TIDD001 42 42.3 0.3 11 0.01 34 TIDD001 42.3 43.3 1 17 0.01 89 TIDD001 45.5 46.5 1 134 0.12 2400 TIDD001 46.5 47.5 1 98 0.06 1200 TIDD001 55 56 1 39 0.06 716 TIDD001 56 56.7 0.7 106 0.33 936 TIDD001 56.7 57.5 0.8 11 0.01 28 TIDD001 57.5 58 0.5 115 0.28 2000 TIDD001 58 59 1 43 0.23 207 TIDD001 59 60 1 54 0.07 277 TIDD001 60 61 1 27 0.03 224 TIDD001 61 62 1 32 0.01 170 TIDD001 62 63.5 1.5 20 0.01 261 TIDD001 63.5 64 0.5 95 0.07 885 TIDD004 40.1 41 0.9 18 0.01 103 TIDD004 41 42 1 16 0.00 65 TIDD004 58.5 59.5 1 18 0.01 37 TIDD004 59.5 60.5 1 17 0.01 27 TIDD004 64 65 1 15 0.01 22 TIDD004 65 66.2 1.2 17 0.01 38 TIDD004 66.2 66.5 0.3 19 0.01 123 TIDD004 66.5 67.7 1.2 11 0.00 16 TIDD004 67.7 68.3 0.6 13 0.01 21 TIDD004 68.3 69.1 0.8 13 0.01 21 TIDD004 69.1 70 0.9 32 0.05 235 TIDD004 70 71 1 18 0.02 55 TIDD004 71 72.2 1.2 15 0.01 20 TIDD004 72.2 73 0.8 27 0.06 70 TIDD004 73 73.7 0.7 41 0.09 222 TIDD004 73.7 74.9 1.2 14 0.01 129 TIDD004 74.9 75.9 1 55 0.08 3600 TIDD004 75.9 76.6 0.7 44 0.05 325

Hole_ID From To Interval Co (ppm) Au (ppm) Cu (ppm) TIDD004 76.6 77.6 1 63 0.12 482 TIDD004 114.35 114.75 0.4 252 2.73 66 TIDD004 114.75 115.75 1 27 0.15 172 TIDD004 115.75 116.75 1 24 0.11 65 TIDD004 116.75 117.5 0.75 27 0.14 127 TIDD004 149.7 150.7 1 17 0.00 29 TIDD004 150.7 151.7 1 116 0.08 297 TIDD004 151.7 152.7 1 33 0.01 142 TIDD004 152.7 153.7 1 43 0.02 260 TIDD004 153.7 154.4 0.7 39 0.02 345 TIDD004 154.4 154.7 0.3 106 0.15 3790 TIDD004 154.7 155.1 0.4 19 0.00 163 TIDD004 155.1 155.6 0.5 106 0.14 4380 TIDD004 161.6 162.6 1 920 1.13 4690 TIDD004 162.6 163.6 1 228 0.15 737 TIDD004 163.6 164.6 1 30 0.01 195 TIDD004 170.6 171.6 1 13 0.00 40 TIDD004 171.6 172.3 0.7 28 0.01 747 TIDD004 172.3 173.3 1 19 0.01 68 TIDD004 173.3 174.2 0.9 13 0.00 217 TIDD004 174.2 174.5 0.3 36 0.01 1130 TIDD004 174.5 175.5 1 16 0.01 17 Table 3 Tisova drill hole information. Hole_ID Hole_Type Depth East North RL (m) Dip Azimuth TIDD001 DD 79.3-873698 -994129 648-60 100 TIDD002 DD 496.8-874007.2-993414 734-80 113 TIDD003 DD 483.8-874200 -993655 697-90 360 TIDD004 DD 280-873750 -994190 666-70 290

Figure 1 Tisová licence outline with drill hole location plan on Google Earth imagery (collars from current drilling program highlighted). For further information visit www.aurochminerals.com or contact: Auroch Minerals Limited Glenn Whiddon Executive Chairman T: +61 8 9486 4036

Competent Persons Statement The information in this report that relates to Exploration Results is based on information compiled by Mr Peter Sheehan and represents an accurate representation of the available data. Mr Sheehan (Member of the Australian Institute of Mining and Metallurgy) is the Company s Chief Geological Officer and has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Sheehan consents to the inclusion in the report of the matters based on his information in the form and context in which it appears. JORC Code, 2012 Edition Table 1 Section 1 Sampling Techniques and Data (Criteria in this section apply to all succeeding sections.) Criteria Sampling techniques Drilling techniques Drill sample recovery Logging Sub-sampling techniques and sample preparation Quality of assay data and laboratory tests Verification of sampling & assaying Location of data points Data spacing and distribution Orientation of data in relation to geological structure Sample security Audits or reviews Commentary Diamond drilling was used to collect samples The core was split in half prior to sampling Sampling was to geologic boundaries (minimum 20 cm) Diamond drilling used a WL Christensen 140C rig, with HQ & NQ diameter core Drill recoveries are logged and all core photographed All Auroch drilling is logged by professional Geologists Intervals are selected for assay based on geological logging Core is sawn in half Half core is submitted to lab Half core is retained for assay verification if required All assays for Auroch sampling completed by ALS Minerals - Romania Standard methods including XRF for major elements, ICP-AES and ICP MS and fire assay were used as appropriate For Auroch sampling blanks or field duplicates are submitted - ALS runs internal QAQC protocols including, lab duplicates and standards were utilised Auroch drill collars are located using DGPS Historic Drilling was located by traditional surface and underground survey Historic work has been completed on local grids however all data will be transformed in UTM WGS 84 Zone 33 North during digital capture of historic records Holes were designed to test thickest portions of sulphide mineralisation defined in historic drilling Drilling is generally vertical which is appropriate for shallow dipping mineralisation Hole TIDD004 was drilled sub optimally due to access issues Samples were collected by field geologist, numbered and bagged, collected by DHL, and delivered to assay laboratory Not completed

Section 2 Reporting of Exploration Results (Criteria listed in the preceding section also apply to this section.) Criteria Commentary Mineral tenement and land tenure status Exploration done by other parties Geology Drill hole Information Data aggregation methods Relationship between mineralisation widths and intercept lengths Diagrams Balanced reporting Other substantive exploration data Tisová exploration rights held under Tisová license, No.77533/ENV/14, 2091/530/14; issued 28th May 2015, valid till 30.6.2020 There are three Exploration Licence applications in the Czech Republic See Figure 2. There is no guarantee applications will be granted Tisová was an operating mine between 1959 to 1973 Production was 561Kt of ore @ 0.68% Cu as detailed in 1984 P. Kozubek et al. Tisová Copper Mine Final Report Rudné doly Příbram np. Reports of previous exploration are stored at the Geological Survey Czech Republic see references The deposit is formed by a number of concordant ore lenses within a sequence of phyllitic metasediments, with interbedded metabasic layers, between the Karlovy Vary and the Smrciny granite plutons. The metasediments are assigned to the Kraslice sequence of the upper part of the Raun Group of Saxothuringikum of Upper Cambrian age. Sulfide horizons containing the orebodies occurred in the lower part of the sequence above the quartzite horizon and below the metabasic rocks. The host rocks are characterized by chlorite-sericite and sericite-chlorite phyllites. RL Hole_ID Hole_Type Depth East North (m) Dip Azimuth TIDD001 DD 79.3-873698 -994129 648-60 100 TIDD002 DD 496.8-874007.2-993414 734-80 113 TIDD003 DD 483.8-874200 -993655 697-90 360 TIDD004 DD 280-873750 -994190 666-70 290 No data has been aggregated Drilling is generally normal to the mineralisation so intercept widths are generally reflective of true widths. Hole TIDD004 was drilled sub optimally due to access issues and intercept widths will be greater than true widths See report Complete summary logs are presented The Tisová Cu mine operated over a long period and was detailed in the final report. 1984 P. Kozubek et al. Tisová Copper Mine Final Report Rudné doly Příbram np. However this report refers to the copper mining history and exploration and Tisová other elements such as Cobalt and Gold were not regularly sampled for or documented

Further work Data review