PRE FEASIBILITY REPORT. Quartz and Feldspar Sy No 119 & 126/3, Kambampadu Village A. Konduru Mandal, Krishna District, Andhra Pradesh

Similar documents
ANNEXURE I Site Location map of M/s. Stone Plus quarry lease A-1

Kurnool vide Proceedings No. 712/Q1/2012 dated Ulindakonda Village, Kallur Mandal, Kurnool District,

FOR Sand Stone Quarry Village : Chhirraleva Tehsil : Basna District : Mahasamund

FORM -1 MINING PLAN & PRE-FEASIBILITY REPORT FOR QUARRYING OF BLACK GRANITE

For Sale - 56 Acre Sandstone Quarry State Route 511, Oberlin/Kipton, OH 44075

EMP. In respect of. Cluster of Two Mines (Cluster area Ha)

Research and Reviews: Journal of Ecology and Environmental Sciences

SRI E.DEVARAJULU, S/O.E.Ramachandra Naidu, D.No: 26-39, Palamaner Road,Kajur, Chittoor (District), Andhara Pradesh State. Contact No:

FOR QUARRYING OF KAGANAM ROUGH STONE AND GRAVEL QUARRY

Granite Building Stone Quarry of Sri. Sajan Mani.

PRE-FEASIBILITY REPORT VASAI LIMESTONE MINE (APPLICANT: SHRI KHERAJBHA KARUBHA KER)

FORM -1 MINING PLAN & PRE-FEASIBILITY REPORT

Lessee. Sri.B.Srinivasa Rao S/o Seetha Ramaiah D.No:6-122/1 Guntupalli Village Ibrahimpatnam Mandal Krishna Dist.

Geology and the Aggregate Industry: The Role of Geologists

lit)'*'" m ( Reft- Representation received from M/s. Kasturi Granites and Exports, Proprietor Smt. C. Kasturibai Dated:

APPLICANT: M/s. Rock Sand & Minerals Pvt Ltd PRE-FEASIBILITY REPORT

Granite Building Stone Quarry of M/s Ulikkal Stone Crusher

Of Sri. Mohammad Akram. At Karigala Village, H.D. KoteTaluk, Mysore District, Karnataka Latitude & Longitude Piller Latitude Longitude Coordinates

Report for Area Drainage Studies for 1320 MW (2x660 MW) THERMAL POWER PROJECT AT MIRZAPUR, U.P.

SRI E.DEVARAJULU, S/O.E.Ramachandra Naidu, D.No: 26-39, Palamaner Road,Kajur, Chittoor (District), Andhara Pradesh State. Contact No:

APPLICANT: MD. SARFARAZ ANSARI & VIVEKA NAND RAY PRE FEASIBILITY REPORT PRE- FEASIBILITY REPORT

ENVIRONMENTAL MANAGEMENT (CLUSTER)

WHAT IS A ROCK? Granite. Muscovite. Orthoclase. Quartz. Feldspar. Biotite

MAPS AND THEIR CLASSIFICATION

IRUNGU PETER WACHIRA I13/3135/2008

5.11 MINERAL RESOURCES

THE MINISTRY OF ENERGY AND ENERGY INDUSTRIES MINERALS DIVISION MINE DESIGN TEMPLATE OPERATOR NAME: OPERATOR ADDRESS: PHONE NUMBER: FACSIMILE:

TABLE 1: Salient features of the project. Black Granite Mine of Sri D. Rama Rao GCP LATITUDE (N) LONGITUDE (E)

TABLE OF CONTENTS. 1.0 Introduction. 2.0 Geology, Exploration and Reserves. 3.0 Mining. 4.0 Blasting. 5.0 Mine Drainage. 6.

ANNEXURE-I (AS PER FORMAT ISSUED BY BIHAR-SEIAA)

PRE FEASIBILITY REPORT OF QUARTZ & FELDSPAR MINING PROJECT (ML No- 80/03) FOR TERMS OF REFERENCE

LANDSLIDE SUSCEPTIBILITY MAPPING USING INFO VALUE METHOD BASED ON GIS

MCDR INSPECTION General. Date of Inspection Name of the Mine Bhatbhera Limestone Mine 2 Total Lease Area (Ha)

PRE FEASIBILITY REPORT. Kuppilli, Koyyam, Dharmavaram, Village Bonthalakoduru villages Mandal Etcherla District Srikakulam State Andhra Pradesh

KRISHNA MERCHANTS PVT. LTD.

SIXTH SCHEDULE REPUBLIC OF SOUTH SUDAN MINISTRY OF PETROLEUM, MINING THE MINING (MINERAL TITLE) REGULATIONS 2015

C. SHASHI KUMAR. Mine lease area Ha. in Sy. No. 120/1, Mailaram Village, Balmoor Mandal, Nagarkurnool District, Telangana

Meghalaya. Mining their own business. Arwat Challam

Over an extent of Hectares in Sy. No. 01 of Kachavaram (V), Ibrahimpatnam (M), Krishna District, Andhra Pradesh State

ENVIRONMENTAL MANAGEMENT PLAN

Geological Report on Limestone Exploration Of Bhatvadiya B Block Of EXECUTIVE SUMMARY

O and Si make up % of all atoms available to make minerals in the Earth's crust.

INDEX. Environmental Management Plan

Over an extent of 9.28 Acres in Sy. No. 72 / P of Jangameswarapuram (V), Martur (M), Prakasam District, Andhra Pradesh State

Hope Brook gold mine, NL - Copper, then switched to gold

PW 001 SNOW REMOVAL AND SANDING FOR ROADWAYS AND SIDEWALKS October 6, 2014 (#223-14) Original October 19, 2015; October 15, 2018 Public Works

MCDR INSPECTION REPORT

GROUNDWATER CONFIGURATION IN THE UPPER CATCHMENT OF MEGHADRIGEDDA RESERVOIR, VISAKHAPATNAM DISTRICT, ANDHRA PRADESH

PRE - FEASIBILITY REPORT Shri Santosh Kumar Dwivedi S/o Shri Goverdhan Dwivedi R/o Village Adampur Saibasi Majre

HISTORY & GEOGRAPHY 702 (NEW EDITION)

MCDR INSPECTION REPORT

Geography Class XI Fundamentals of Physical Geography Section A Total Periods : 140 Total Marks : 70. Periods Topic Subject Matter Geographical Skills

Silver City Minerals

MAP STUDY: INTERPRETATION OF SURVEY MAPS

5. Environmental Analysis

City of Laramie, Wyoming SNOW AND ICE POLICY

Investigation of Rainfall Trend in Jorhat Town, Assam, India

Smt. M. Hari Chandana

GOVERNMENT OF MADHYA PRADESH WATER RESOURCES DEPARTMENT HANOTA MAJOR PROJECT PRE FEASIBILITY REPORT. ESTIMATED COST : Rs

UNIT 11 SOUTH ASIA SG 1 - PHYSICAL GEOGRAPHY & THE ENVIRONMENT

Unit 7.2 W.E.D. & Topography Test

JAI MAA SHARDA STONE CRUSHING

MINING PLAN FORMAT (A & B CATEGORY MINES) As per MCDR,1988

Geological report on Limestone Exploration of Goyla Block, Abadasa Taluka, Kachchh District, Gujarat. Executive Summary

M/s BENITA INDUSTRIES LIMITED

The role of the Competent Person. Neil Wells, CRIRSCO Deputy Chair, Yogyakarta, 31 October 2017

MCDR INSPECTION REPORT. S. N. Particulars Details 1 Name of the Mine, Inspecting officer with Designation, Date of Inspection

D D Matyanga Mineral Economist and Technical Advisor

QUARRY PLAN FOR LIMESTONE SLABS

SITE SELECTION CRITERIA FOR A SOLAR PV PLANT. Under The Guidence of SOHEL PATEL

The following Environmental Management Programme (EMP) was also approved in terms of the issuing of the above-mentioned mining right:

INDIAN BUREAU OF MINES MINERALS DEVELOPMEMT AND REGULATION DIVISION MCDR INSPECTION REPORT. Chennai regional office

Tell me what the word aggregate means and at least three things aggregate is used to make.

Over an extent of 1.36 Hectares in Sy. No. 60 / 33 Vennaram (V), Dornakal (M), Mahabubabad District, Telangana State

About places and/or important events Landmarks Maps How the land is, hills or flat or mountain range Connected to maps World Different countries

Submitted to: Central Coalfields Limited Ranchi, Jharkhand. Ashoka & Piparwar OCPs, CCL

Nursery. Reception. Year 1

Guidelines for preparation of Mining Plans for Coal/Lignite Blocks

[Penumaka, 7(1): January-March 2017] ISSN Impact Factor

SCRUTINY COMMENTS ON DRAFT REVIEW OF MINING PLAN IN RESPECT OF GHATKURI IRON ORE MINE (149. A. TEXT:

data becomes available to us. We already have crude maps of the Mars and the Moon. A map gives a picture of one or several of the elements of the

Practice Questions for Lecture 5 Geology 1200

Geo-hazard Potential Mapping Using GIS and Artificial Intelligence

GENERAL EDUCATION AND TRAINING SOCIAL SCIENCES

Grade Five Social Studies Assessment Regions/Native Americans

PRE-FEASIBILITY REPORT

Environmental Science Institute The University of Texas - Austin

UNIVERSITY OF CAMBRIDGE INTERNATIONAL EXAMINATIONS International General Certificate of Secondary Education

WEIR INTERNATIONAL, INC. Mining, Geology and Energy Consultants

Meteorology. Chapter 15 Worksheet 1

Dawood Public School Secondary Section Class VII

Section 5 TERMS OF REFERENCE (ToR) For Topographical Surveying, Geological Study, and Final Mining Feasibilitiy Study

BOY SCOUTS GEOLOGY MERIT BADGE

5. Environmental Analysis

QUARRYING PLAN FOR. PARATAPUR SAND MINING BLOCK - 2 EXTENT Acres (4.93 Hectare)

NOA ASSESSMENT HARRIS QUARRY MENDOCINO COUNTY, CALIFORNIA TABLE OF CONTENTS

CARTER METALLURGICAL COAL PROJECT. Endurance Gold Corporation (EDG)

CONTOUR MAPS This Enrichment4You e-guide provides a brief overview of contour maps In this e-guide you will: Sample file

Urban Hydrology - A Case Study On Water Supply And Sewage Network For Madurai Region, Using Remote Sensing & GIS Techniques

HISTORY OF CONSTRUCTION FOR EXISTING CCR SURFACE IMPOUNDMENT PLANT GASTON ASH POND 40 CFR (c)(1)(i) (xii)

Transcription:

PRE FEASIBILITY REPORT Of Quartz and Feldspar Sy No 119 & 126/3, Kambampadu Village A. Konduru Mandal, Krishna District, Andhra Pradesh Area of Mining Lease 2.720 Ha For 1, 09,055.08 MT/Annum OF Quartz and Feldspar Production By M/s Aparna Enterprises Limited

EXECUTIVE SUMMARY S. No Parameter Details 1 Name & Address of the Applicant M/s Aparna Enterprises Limited, #8-2-293/82/A,1214, Road No.60, Jubilee Hills, Hyderabad -500033. Mobile No +91 7995082023 Email: - krcreddy@viterotiles.com 2 Total Extent of the 2.720 Ha project 3 Location of the 119 & 126/3 project 4 Geo Co-ordinates B.P No LATITUDE LONGITUDE a N16 59'37.650" E080 38'14.020" b N16 59'36.350" E080 38'16.970" c N16 59'34.400" E080 38'16.300" d N16 59'34.040" E080 38'16.500" e N16 59'34.370" E080 38'17.010" f N16 59'34.270" E080 38'17.480" g N16 59'33.910" E080 38'17.480" h N16 59'33.590" E080 38'18.060" i N16 59'32.620" E080 38'20.760" j N16 59'30.340" E080 38'20.360" k N16 59'31.480" E080 38'18.500" l N16 59'28.900" E080 38'18.030" m N16 59'31.400" E080 38'14.210" n N16 59'35.310" E080 38'15.350"

o N16 59'35.280" E080 38'15.150" p N16 59'34.950" E080 38'14.810" q N16 59'35.700" E080 38'13.320" 5 Total Mineable 6,92,545.46 MT Reserves 6 Proposed 1,09,055.08 MT -Average annual production Production 7 Life of the Mine 20 years 8 Method of Mining Open Cast Semi Mechanized Method 9 Employment 52 persons 10 Water Requirement 10 KLD 1. INTRODUCTION OF THE PROJECT/BACKGROUND INFORMATION (i) Identification of project and project proponent. In case of mining project, a copy of mining lease/ letter of intent should be given M/s Aparna Enterprises Limited has been granted a quarry lease for Quartz & Feldspar over an extent of 2.720 Ha in Sy. No s 119 & 126/3 of Kambampadu (V), A. Konduru (M), Krishna District Andhra Pradesh State by Ass Director of Mines & Geology, Vijayawada, Notice No. 1648 / Q / 2018 dated 22-11-2018. The copy of the lease letter is enclosed as annexure. (ii) Brief description of the nature of the project The proposed project is a Quartz & Feldspar over an extent of 2.720 Ha in Sy. No s 119 & 126/3 of Kambampadu (V), A. Konduru (M), Krishna District Andhra Pradesh State, The applicant proposed to produce 1,39,124.3 MT per annum from the subject quarry. (iii) Need for the project & its importance to the country and or region Quartz & Feldspar are used widely in the glass and ceramics industries. Albite, or soda spar as it is known commercially, is used in ceramics. The feldspar-rich rocks larvikite and a few anorthosites are employed as both interior and exterior facing slabs. Quartz & Feldspar has been used for hard stone carvings, sandpapers, sandblasting, and abrasives things. Demand- Supply Gap The Quartz & Feldspar which is produced from the subject Quarry will be used in ceramic and glass industry and used for abrasive mineral. (iv) imports vs. Indigenous production

The Quartz & Feldspar will be consumed in the domestic as well as international market (v) Export possibility The Quartz & Feldspar of this area will be sold to the Ferro Alloy Industries, Foundries, Ceramics and to Glass Industries, Located in and around Telangana and Andhra Pradesh. Quartz & Feldspar and Feldspar will be consumed in the domestic as well as international market hence it is export products. (vi) Domestic/Export Markets There is a possibility of Export. The Quartz & Feldspar will be consumed in the domestic and International market also (vii) Employment generation (direct and indirect) due to the project About 52 persons will be employed directly and indirect employment will also be provided I the form of helpers, drivers etc., It will provide employment to the people residing in vicinity. 2. PROJECT DESCRIPTION (i) Type of Project Including Interlinked And Independent Projects, If Any The Subject project is a Quartz & Feldspar Quarry project located over an extent of extent of 2.720 Ha in Sy. No s 119 & 126/3 of Kambampadu Village, A.konduru Mandal, Krishna District Andhra Pradesh State, The applicant proposed to produce 1,09,055.08 MT per annum of the subject quarry. Open Cast Semi Mechanized Method of Mining will be adopted. (ii) Location (map showing general location, specific location, and project boundary & project site layout) with coordinates

(iii) Details of Alternate Sites Considered and the basis of selecting the proposed site, particularly the environmental considerations gone into should be highlighted. No Alternative sites were considered as it is site specific project. (iv) Size or Magnitude of Operation The total extent of the quarry lease area is 2.720 Ha and it is proposed to produce 1,09,055.08 MT per annum from this quarry.

Year The year wise production proposed is shown in the following table. YEAR WISE PRODUCTION FOR 4 YEARS (Quartz & Feldspar) Sectional Quartz Feldspar Influence Volume Quartz Feldspar Area T.F. (2.7) T.F. (2.6) (M 2 ) (M) (M 3 ) @ R.P (M 3 ) @ R.P (M 3 ) Tons Tons Total Volume In T.F. 2 nd Year 2018-19 3 rd Year 2019-20 4 th Year 2020-21 5 th Year 2021-22 385 25 9,625 @30% 2,887.5 @70% 6,737.5 7,796.25 17,517.5 25,313.75 253 25 6,325 @30% 1,897.5 @70% 4,427.5 5,123.25 11,511.5 16,634.75 982 48 47,136 @10% 4,713.6 @90% 42,422.4 12,726.72 1,10,298.24 1,23,024.96 Total 53,461 6,611.1 46,849.9 17,849.97 1,21,809.74 1,39,659.71 1292 44 56,848 @10% 5,684.8 @90% 51,163.2 15,348.96 1,33,024.32 1,48,373.28 640 73 46,720 @30% 14,016 @70% 32,704 37,843.2 85,030.4 1,22,873.6 SUB-TOTAL 1,66,654 29,199.4 1,37,454.6 78,838.38 3,57,381.96 4,36,220.34 AVERAGE 41,663.5 7,299.85 34,363.65 19,709.59 89,345.49 1,09,055.08

(v) Project Description with Process Detail (a schematic diagram/ flow chart showing the project layout, components of the project etc. should be given) The Mineral in the quarry lease applied area is proposed to quarry the sheet by Open Cast Semi Mechanized Method by deploying an Excavator will be deployed to slice the mineral vein (from one end to another) and load into trucks. (vi) Demands-Supply Gap The demand for Quartz & Feldspar has been steadily increasing over the years to the requirement of Ferro-silicon, silica refractories, glass and for moulding and casting purposes. The requirements of these products except glass are linked directly with iron & steel industry including alloy steel production. Further, setting up foundries and enhancing their capacities are also linked with metallurgical industry. It is reported that glass industry is expected to grow by 10% every year due to rapid rise in infrastructural activities in the country. At present the domestic market for Quartz & Feldspar crystal components of the annual demand is about 13 ~ 1.6 billion, annual growth rate of nearly 20%. (vii) Availability of Water Its Source, Energy /Power Requirement and Source The total water requirement of the project is 10KLd which will be used for Dust Suppression, Green Belt Development and Domestic Purposes. This water will be sourced from water tankers. (viii) Exploration already carried in the area: Applied area for grant of mining lease was demarcated on the ground with reference to revenue pillars. Later the topographical survey of the area was carried out by ETS. SITE ANALYSIS (i) Connectivity (ii) The location of quarry is well connected with good infrastructure as National Highway connecting to A. Konduru town is at 10 Km away from the quarry and adequate availability of skilled manpower is available for quarry operations.

(iii) Land Form, Land Use and Land Ownership The mining lease is located in govt land. The QL applied area is a flat area in the form of Topography along with Map The quarry lease applied area is located on a part of plain land over the clay silty outcrop with a maximum elevation of less than 7 M above ground level within the quarry lease applied area. The lowest contour is 92 M and highest contour is 99 M in topo plan (iv) Soil Classification The soil observed in the area is Clay Sand Soil (v) Climatic Data from Secondary Sources The area is falling under semi-arid tropical zone. The area is having dry climate. The temperature recorded in this area is 25 C in winter and about 48 C in summer seasons. The wind direction is in SW to NE. The average annual rainfall of the area is 1000 mm. (vi) Environmental Requirements: Proper planning of Approach Roads, Crushing Plant with green belt management and water sprinkling of haul roads will achieve hygienic quarry. Closure and Reclamation program shall be strictly implemented after exhaustion of ore in the quarry. (vii) Legal Parameters and Others : The quarry lease is valid up to 20 Years and granted over in Govt. Land. The quarry is under operation without any hindrances, which indicates the public acceptance for quarrying. The quarry is providing an employment for local labour of about 25 members. The quarry authorities / owner has to strictly adhere to future forthcoming any new rules and regulations. The area is not situated in tribal area and any national parks are not situated in the surrounding area.