Wallbridge Options 100% of the Beschefer Project near Fenelon Gold

Similar documents
Wallbridge Completes Successful Initial Drill Program at Beschefer

Canadian Gold Miner Grab Sample Returns 29.5 Grams per tonne Gold from South Kirkland Project

North American Palladium Announces Positive Exploration Results from Lac des Iles Mine

CHAMPION IRON REPORTS EXPLORATION RESULTS AT POWDERHORN PROJECT, NEWFOUNDLAND

Press Release Thunder Bay: August 2, 2018

Probe Metals Confirms Continuity of Gold Mineralization on its Val-d Or East Project And Increases 2017 Drill Program to 75,000 metres

EXCELLON ANNOUNCES LA PLATOSA EXPLORATION RESULTS: HIGH GRADES CONTINUE TO EXTEND MANTO SULPHIDES DRILL HOLE ENCOUNTERS SOURCE ENVIRONMENT INDICATORS

V Sample from C.O.D vein 15 metres southwest of V

EXCELLON DRILLS BROAD MINERALIZED ZONES AND EXPANDS DRILL PROGRAM ON NORTHERN FRESNILLO SILVER TREND

PRESS RELEASE. DUBUISSON NORTH DRILLING CUTS g/t AU OVER 5.0 METRES NEW S50 EAST DISCOVERY, 3.39 g/t AU OVER 25.9 METRES

MINERAL MOUNTAIN RESOURCES LTD. MMV.TSX-V

Assay Results Highlights (as of November 16, 2017) representing approximately 4,500 metres ( m ) of drilling:

Probe Metals Intersects 3.2 g/t Gold Over 45.5 Metres At Val-d Or East

Strategic Phase 2 Exploration Program Launched at Island Gold High-Grade Resource Potential Identified Laterally and at Depth

Interval (meters) To (meters)

NORTHERN SUPERIOR RESOURCES INC. 1351C Kelly Lake Road, Unit 7 Sudbury, Ontario, Canada P3E 5P5 Tel: (705) Fax: (705)

Probe Metals Continues to Intersect Significant Gold Mineralization in Expansion Drilling at Val-d Or East, including 4.1 g/t Gold Over 15.

October 8, 2015 News Release Brucejack Regional Drilling Intersects Over 8,000 Grams Per Tonne Gold

Probe Metals Discovers New High Grade Gold Zone on Val-d Or East Project: Intersects 12.6 g/t Gold Over 7.3 Metres

Probe Metals Continues to Expand Gold Zones At Val-d Or East

PRESS RELEASE WESDOME PLANS AGGRESSIVE DRILLING AND DEVELOPMENT PROGRAM IN 2011

MANN SILVER-COBALT MINE. PORE: TSXV PowerOre.com

EXPLOR INTERSECTS MULTIPLE COPPER ZONES GRADES UP TO 3.65% CU OVER 5.35 METERS ON THE CHESTER COPPER PROPERTY

QMX GOLD CONTINUES TO INTERSECT STRONG MINERALIZATION AT BONNEFOND, INTERSECTING 39.5 g/t Au OVER 2.4 METRES AND 31.5 g/t Au OVER 1.

DENISON ANNOUNCES 2018 EXPLORATION & EVALUATION PROGRAM FOCUSED ON HIGH PRIORITY PROPERTIES

Probe Metals Intersects 1,122 g/t Gold Over 0.7 Metres in New Zone at Val-d Or East

West Pender Street Vancouver, BC V6C 2V6 Tel: Fax: TSX-V: GBR NEWS RELEASE

NGEX ANNOUNCES COPPER GOLD DISCOVERY AT NACIMIENTOS PROJECT

Cordoba Minerals Provides an Update on Exploration Activities at the San Matias Copper-Gold Project in Colombia

AVION GOLD DJAMBAYE II ZONE, TABAKOTO PROJECT, MALI, RETURNS HIGH GRADE INTERCEPTS OF 7.56 G/T Au OVER 7.0 METRES AND G/T Au OVER 3.

QMX GOLD INTERSECTS 29.8 G/T AU OVER 3.0 METERS AND 19.3 G/T AU OVER 3.2 METERS AT BONNEFOND

MONETA INTERCEPTS g/t GOLD INCLUDING g/t GOLD AND g/t GOLD INCLUDING g/t GOLD AT SOUTH WEST

June 4, 2015 News Release Valley of the Kings Underground Infill Drilling Underway

JUNE 25, 2015 TSX: WDO

Transition Metals Acquires Advanced Stage Ni-Cu-PGM Projects

Yellowknife Gold Project

North American Palladium Signs Option Agreement for the Sunday Lake Project and Commences New Exploration Strategy

BALMORAL INTERSECTS g/t GOLD OVER 7.99 METRES, BUG LAKE SOUTH, DETOUR GOLD TREND PROJECT, QUEBEC

MCEWEN MINING ANNOUNCES EXPLORATION UPDATE FOR EL GALLO 1, MEXICO

True Width (m) Carneritos to

AUGUSTINE VENTURES ANNOUNCES HIGH GRADE GOLD BEARING TENSION VEINS IN THE HANGING WALL OF THE SURLUGA DEPOSIT

NEWS RELEASE. Tigray Intersects 28.2 metres at 8.50 grams per tonne gold at Mato Bula, Adyabo Project, Northern Ethiopia

OSISKO METALS INTERSECTS 10.49% ZINC+LEAD OVER METRES AND 12.15% ZINC+LEAD OVER METRES AT PINE POINT

Fortuna provides review of Brownfields exploration programs

July 15, 2015 News Release Valley of the Kings Underground Infill Drilling Progresses

MONETA INTERCEPTS g/t GOLD INCLUDING g/t GOLD AT SOUTH WEST

Fission s Initial Resource Totals at PLS: 79.6M lbs Indicated and 25.9M lbs Inferred

TROILUS GOLD CORP. INITIATES 30,000 METRE DRILL PROGRAM ON TROILUS PROPERTY

EXPLORING NEW GOLD FRONTIERS IN CANADA

MINERA ALAMOS TO COMMENCE DRILLING AIMED AT EXPANDING AREAS OF DEFINED GOLD MINERALIZATION AT SANTANA/LOS VERDES PROPERTY, SONORA, MEXICO

EXPLORATION NEWS RELEASE MAGISTRAL DISTRICT: MORE GROWTH, MORE GOLD, MORE SILVER

Detour Gold Reports Drilling Results from Lower Detour

CANARC RESOURCE CORP Howe Street Vancouver, BC V6C 2T6. News Release

Highlights include: Hole TTD050: 6.12 g/t Au over 7.00 metres from metres o Including g/t Au over 1.18 metres

Sudbury Platinum Discovers New Ni-Cu-PGM Mineralization at its Aer-Kidd Property

Scadding Property Sudbury District, Ontario

Junior Uranium explorer in the Athabasca Basin. Patterson Claims

IAMGOLD ANNOUNCES RESULTS FROM THE WESTWOOD-MOOSHLA EXPLORATION PROJECT

Ongoing Drilling of Kiena Deep a Zone Confirms Multiple High Grade Lenses and Extends Zone Down Dip

NEWS RELEASE RNC MINERALS

At the contact, mineralization is associated with strong tourmalinization of the Bevcon Intrusion.

55 Adelaide Street East, Suite St-Charles west, Suite 411, West Tower

Hole (93) From (m) To (m) m Au (g/t) Ag (g/t) Cu (%) Pb (%) Zn (%) CMLP

Rich Saddle North Au-Cu-Ag Porphyry Expands by 275m Along Strike and 250m Down-Dip

CAUTIONARY STATEMENT

Drilling at Perseverance in Arizona, USA Suggests Proximity to Porphyry Copper System

News Release. Infill Drilling Program

FALCO PACIFIC COMPLETES INITIAL MODEL FOR THE HORNE 5 GOLD/SILVER/ZINC/COPPER DEPOSIT

Form F3 MATERIAL CHANGE REPORT

Drilling Extending Mineralization in La Mina North Zone

San Gold Drills New Mine Horizon Adjacent to Rice Lake Mine, Returns 10.4 Metres Grading 25.7 g/t Au

BOREAL EXPANDS DISCOVERY ZONE OF HIGH-GRADE ZINC, SILVER AND LEAD MINERALIZATION AT GUMSBERG PROJECT IN SWEDEN

A New Direction. Copper-Gold Deposit at Thor TSX.V:COL. August 11, May 2013

23 January, 2018 CSE: RFR For Immediate Release. Renforth extends Parbec Gold Deposit strike 60m with gold in all 7 drillholes

BELO SUN DISCOVERS NEW MINERALIZED ZONE AT ITS VOLTA GRANDE GOLD PROJECT, BRAZIL

SilverCrest Expands Babicanora High Grade Footprint to 600 metres; New High Grade Vein Discoveries Highlight District Scale Potential

A New Silver-Zinc Developer in Peru. July, 2013

BELO SUN RELEASES RESULTS FROM 65 DRILL HOLES FURTHER EXTENDING THE OURO VERDE DEPOSIT ALONG STRIKE NORTHWEST AND DOWN DIP

Fission Increases Indicated Resource; Doubles Inferred Resource

Teranga s Golden Hill Drill Program Intersects High-Grade Gold and Expands Mineralized Zones at Peksou and Ma Prospects

May 12, 2016 News Release Valley of the Kings Infill Drilling Intersects 37,000 Grams Per Tonne Gold

Drilling Extending Mineralization in La Mina North Zone

MINERAL MOUNTAIN CONFIRMS PROOF OF CONCEPT IN THE HOMESTAKE GOLD BELT

OSISKO INTERSECTS 115 g/t Au OVER 8.4 METRES AT LYNX. Interval (m)

Sabina Gold & Silver Reports 2018 Drilling has Commenced at Back River Gold Project

MEDIA RELEASE OCEANAGOLD ANNOUNCES FURTHER DOWN DIP EXTENSIONS OF MINERALISATION AT PANEL 2: FRASERS UNDERGROUND MINE

Great Atlantic Rock Samples Return up to 5.8 oz. / ton Gold Golden Promise Property in Central Newfoundland

BELO SUN RELEASES RESULTS FOR 74 ADDITIONAL DRILL HOLES AT ITS VOLTA GRANDE PROJECT

DENISON ANNOUNCES SUMMER 2018 EXPLORATION PLANS FOR HIGH-PRIORITY PIPELINE PROJECTS

KIRKLAND LAKE GOLD ANNOUNCES 120 METRE DOWN-PLUNGE EXTENSION OF SWAN ZONE

BALMORAL ANNOUNCES SIGNIFICANT GOLD DISCOVERY ON DETOUR GOLD TREND IN QUEBEC

AbraPlata defines gold-rich zone with up to 16.7g/t Au over 10.6m in the basement at its Diablillos property in Argentina

PELANGIO ENTERS OPTION AGREEMENT TO ACQUIRE KEIGAT LAKE AREA CLAIMS SURROUNDING THE BIRCH LAKE PROPERTY

Underground Exploration Drilling Complete; Brucejack Mineralization Extends to the East

DENISON ANNOUNCES INTERSECTION OF HIGH-GRADE URANIUM MINERALIZATION NEAR THE GRYPHON DEPOSIT

CROCODILE GOLD INTERSECTS 7.1 G/T AU OVER 4.5 METERS INCLUDING 11.2 G/T AU OVER 2.6 METERS AT THE UNION REEFS PROJECT, PROSPECT DEPOSIT

Transition Continues to Intersect Significant Platinum-rich PGM Mineralization at Sunday Lake

BELO SUN INTERSECTS NEW HIGH GRADE ZONE AT GROTA SECA AND EXPANDS GRANDE DEPOSIT

Highlights from the four holes announced in this news release include:

The new sulphide mineralization lies within a 1.4 kilometer long east-west trending

Transcription:

Wallbridge Options 100% of the Beschefer Project near Fenelon Gold Toronto, Ontario October 17, 2018 Wallbridge Mining Company Limited (TSX:WM, FWB: WC7) ( Wallbridge or the Company ) is pleased to announce that it has entered into an option agreement (the Agreement ) to acquire 100% of the Beschefer property ( Beschefer or Beschefer Project ), from Lateegra Gold Corp., a wholly owned subsidiary of Excellon Resources Inc. ( Excellon TSX:EXN ). The Beschefer Project is an advanced gold exploration property located approximately 30 kilometres southwest of Wallbridge s Fenelon Gold property ( Fenelon ). Project Highlights Advanced gold exploration project with significant near-term resource potential Highlight intersections include 55.63 g/t gold over 5.57 metres in hole BE13-038, 13.07 g/t gold over 8.75 metres in hole B12-014, 10.28 g/t gold over 8.00 metres in hole B14-35, and 12.40 g/t gold over 3.78 metres in hole B11-003 The highest grade (BE13-038) and the deepest (BE13-045) intersection were both drilled during the most recent campaign by Excellon in 2013 (see Excellon Press Releases dated April 03, 2013 and April 25, 2013). Continuous large-scale gold-bearing structure (B-14 Zone) with known mineralized strike extent of 500 m and known down-dip continuity of 600 metres and additional known parallel mineralized shear zones. Located in a favorable orogenic gold setting 45 km northeast of the Casa Berardi Mine and 28 km southwest of Fenelon. Complementary to Fenelon in achieving strategy of sustained annual +100,000 ounce gold production by consolidating high quality development projects in the emerging Sunday Lake- Selbaie Belt We are pleased to have been able to add the Beschefer Project to our project pipeline as we grow our company stated Marz Kord, President & CEO of Wallbridge. While our immediate focus continues to be advancing and expanding Fenelon, exploring nearby high-potential gold properties such as Beschefer will increase Wallbridge s footprint in the district and support the future evaluation of a possible central processing plant. We will continue to review nearby properties to achieve our long-term goal of becoming a sustainable mid-sized gold producer. We are keen to start exploration on the Beschefer Project, which has demonstrated size and grade potential stated Attila Péntek, Vice-President, Exploration of Wallbridge. The B-14 Zone

is a large-scale structure located in a favorable orogenic gold setting which shows good continuity, consistent thickness and hosts high grade mineralization. To date it has only been tested by wide-spaced historic drilling with holes 75-100 metres apart. Our strategy will be similar to that which we executed successfully at Fenelon. Initially, we will be tightening the drill pattern to test the continuity of the known high-grade shoots, following which we will explore for additional parallel high-grade zones within the B-14 Zone structure and other nearby shear zones in an effort to drill off a significant underground gold resource. About the Beschefer Project The Beschefer Project covers 647 hectares and is located in the Northern Abitibi Greenstone Belt, 14 km east of the past-producing polymetallic Selbaie Mine, 45 km northeast of the Casa Berardi Mine and 28 km from Wallbridge s Fenelon Gold Property. Historically, the area has mainly been explored for volcanogenic massive sulfide deposits similar to the Matagami camp and the Selbaie Mine. Gold mineralization was discovered in the B-14 Zone in 1995 by Billiton Canada Inc. and the property has seen very limited exploration before the involvement by Excellon in 2011, which completed approximately 17,000 metres up to 2013. Excellon s programs produced very positive results, extending the B-14 mineralization down to almost 600 m vertical depth, discovering the upper shear zone and intersecting the highest-grade intersections on the property, including 55.63 g/t Au over 5.57 metres and 13.07 g/t gold over 8.75 metres. Excellon s primary focus is on production and exploration at its Platosa Mine and Miguel Auza Property in Mexico. There has been no exploration at Beschefer since 2013. Terms of the Agreement The Option to acquire Beschefer (the Option ) may be exercised by the Company by incurring and funding aggregate exploration expenditures on the project ( Expenditures ) in the following amounts and issuing common shares in the capital of the Company ( Common Shares ) over a three- year period, as follows: (a) the Company shall issue 500,000 Common Shares promptly following execution of this Agreement on October 16, 2018 (the Effective Date ); (b) the Company shall incur C$500,000 in Expenditures on or before the first anniversary of the (c) the Company shall issue 1,000,000 Common Shares promptly after the first anniversary of the (d) the Company shall incur C$2,000,000 in Expenditures on or before the second anniversary of the (e) the Company shall issue 2,000,000 Common Shares promptly after the second anniversary of the (f) the Company shall incur C$2,000,000 in Expenditures on or before the third anniversary of the and (g) the Company shall issue 3,500,000 Common Shares on or before the third anniversary of the Effective Date.

Wallbridge may accelerate Expenditures and the Option will be effectively exercised when Wallbridge has funded and incurred Expenditures which total C$4,500,000 and issued Common Shares which total 7,000,000 Common Shares. A summary of historic drill hole results is reported in Table 1 and also shown on the Figures below. Drill Hole From To Length Table 1. Beschefer Project Historic Assay Highlights True Width Au Zone Year Company (m) (m) (m) (m) (g/t) BE13-038 323.36 328.93 5.57 5.41 55.63 B-14 2013 Excellon BE12-014 220.75 229.50 8.75 7.80 13.07 B-14 2012 Excellon including... 228.00 229.50 1.50 1.34 58.50 B-14 2012 Excellon B14-35 204.00 212.00 8.00 7.28 10.28 B-14 1997 Les Mines Selbaie including... 204.40 205.00 0.60 0.55 86.74 B-14 1997 Les Mines Selbaie BE11-003 179.42 183.20 3.78 3.69 12.40 B-14 2011 Excellon B14-6 156.10 184.10 28.40 28.22 3.56 B-14 1996 Les Mines Selbaie including... 178.60 184.10 5.50 5.47 7.42 B-14 1996 Les Mines Selbaie BE13-042 454.93 463.65 8.72 8.00 5.16 B-14 2013 Excellon including... 459.37 459.67 0.30 0.28 91.4 B-14 2013 Excellon BE13-043 117.61 120.10 2.49 2.30 6.65 Upper 2013 Excellon SBJ-06-01 201.80 211.80 10.00 9.03 4.46 B-14 2006 Seagreen BE12-006 114.95 122.75 7.80 6.89 4.54 B-14 2012 Excellon BE12-030 362.94 369.00 6.06 5.98 3.56 B-14 2012 Excellon B14-43 187.30 187.80 0.50 0.50 29.71 Upper 1997 Les Mines Selbaie B14-4 159.90 160.70 0.80 0.79 16.94 B-14 1996 Les Mines Selbaie BE11-001 185.46 194.84 9.38 9.24 3.01 B-14 2011 Excellon BE13-045 559.20 570.30 11.10 9.40 3.03 B-14 2013 Excellon including... 564.30 570.30 6.00 5.08 4.25 B-14 2013 Excellon

Figure 1: Regional Geology Map Figure 2: Beschefer Inclined Long Section

Figure 3: Beschefer Cross Section The Qualified Persons responsible for the technical content of this press release are Marz Kord, P. Eng., M. Sc., MBA, President & CEO and Attila Péntek, P.Geo., Ph.D., Vice President Exploration for Wallbridge Mining Company Limited. About Wallbridge Mining Wallbridge is establishing a pipeline of projects that will support sustainable production and revenue as well as organic growth through exploration and scalability. Wallbridge is currently developing its 100%-owned high-grade Fenelon Gold property in Quebec with ongoing exploration and a bulk sample in 2018. Wallbridge is also pursuing other additional advancedstage projects which would add to the Company's near-term project pipeline. These discussions benefit from the operating capabilities Wallbridge demonstrated by safely and efficiently mining the Broken Hammer deposit in Sudbury, which was completed in October 2015. Wallbridge is also continuing partner-funded exploration on its large portfolio of nickel, copper, and PGM projects in Sudbury, Ontario, with a focus on its high-grade Parkin project. Wallbridge also has exposure to exploration for copper and gold in Jamaica and British Columbia through its 11.3% ownership of Carube Copper Corp. (CUC:TSX-V, formerly Miocene Resources Limited, a Wallbridge spin-out of its BC assets). For Further Information Please visit the Company's website at www.wallbridgemining.com or contact:

Wallbridge Mining Company Limited Marz Kord, P. Eng., M. Sc., MBA President & CEO Tel: (705) 682-9297 ext. 251 Email: mkord@wallbridgemining.com David Ellis Investor Relations Tel: (416) 704-0937 Email: dellis@wallbridgemining.com This press release may contain forward-looking statements (including "forward-looking information" within the meaning of applicable Canadian securities legislation and "forward-looking statements" within the meaning of the US Private Securities Litigation Reform Act of 1995) relating to, among other things, the operations of Wallbridge and the environment in which it operates. Generally, forward-looking statements can be identified by the use of words such as "plans", "expects" or "does not expect", "is expected", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates" or "does not anticipate", or "believes", or variations of such words and phrases or statements that certain actions, events or results "may", "could", "would", "might" or "will be taken", "occur" or "be achieved". Wallbridge has relied on a number of assumptions and estimates in making such forward-looking statements, including, without limitation, the costs associated with the development and operation of its properties. Such assumptions and estimates are made in light of the trends and conditions that are considered to be relevant and reasonable based on information available and the circumstances existing at this time. A number of risk factors may cause actual results, level of activity, performance or outcomes of such exploration and/or mine development to be materially different from those expressed or implied by such forward-looking statements including, without limitation, whether such discoveries will result in commercially viable quantities of such mineralized materials, the possibility of changes to project parameters as plans continue to be refined, the ability to execute planned exploration and future drilling programs, the need for additional funding to continue exploration and development efforts, changes in general economic, market and business conditions, and those other risks set forth in Wallbridge's most recent annual information form under the heading "Risk Factors" and in its other public filings. Forward-looking statements are not guarantees of future performance and such information is inherently subject to known and unknown risks, uncertainties and other factors that are difficult to predict and may be beyond the control of Wallbridge. Although Wallbridge has attempted to identify important risks and factors that could cause actual actions, events or results to differ materially from those described in forward-looking statements, there may be other factors and risks that cause actions, events or results not to be as anticipated, estimated or intended. Consequently, undue reliance should not be placed on such forward-looking statements. In addition, all forward-looking statements in this press release are given as of the date hereof. Wallbridge disclaims any intention or obligation to update or revise any forward-looking statements, whether as a result of new information, future events or otherwise, save and except as may be required by applicable securities laws. The forward-looking statements contained herein are expressly qualified by this disclaimer.