Drilling Extending Mineralization in La Mina North Zone

Similar documents
Drilling Extending Mineralization in La Mina North Zone

Hole (93) From (m) To (m) m Au (g/t) Ag (g/t) Cu (%) Pb (%) Zn (%) CMLP

Toachi Mining Inc. Drills Four High Grade Gold-Copper-Zinc-Silver intercepts at the Gold-Rich La Plata VMS Project in Ecuador

First Phase Metallurgical Optimization Program Initiated

Toachi Mining Inc. Identifies High Priority Exploration Targets

SALAZAR ANNOUNCES AN UPDATED RESOURCE REPORT OF 5.53 MT INDICATED AND 1.46 MT INFERRED AT ITS HIGH GRADE VMS EL DOMO DEPOSIT

FALCO PACIFIC COMPLETES INITIAL MODEL FOR THE HORNE 5 GOLD/SILVER/ZINC/COPPER DEPOSIT

BOREAL EXPANDS DISCOVERY ZONE OF HIGH-GRADE ZINC, SILVER AND LEAD MINERALIZATION AT GUMSBERG PROJECT IN SWEDEN

Salazar intersects metres (13.07m true) averaging 2.65 g/t gold, g/t silver, 1.32% copper, 6.63% zinc at its Curipamba Project.

A B C PAD A HIGHLIGHTS

Probe Metals Continues to Expand Gold Zones At Val-d Or East

Probe Metals Intersects 3.2 g/t Gold Over 45.5 Metres At Val-d Or East

Probe Metals Continues to Intersect Significant Gold Mineralization in Expansion Drilling at Val-d Or East, including 4.1 g/t Gold Over 15.

(TSXV: GPLY, OTCQB: GLYXF

EXPLOR INTERSECTS MULTIPLE COPPER ZONES GRADES UP TO 3.65% CU OVER 5.35 METERS ON THE CHESTER COPPER PROPERTY

Spruce Ridge Resources Ltd Leslie Road West, Puslinch, ON N0B 2J0 Telephone: (519) , Fax: (519)

GOLDPLAY ANNOUNCES FURTHER SAMPLING RESULTS FROM SAN MARCIAL HISTORICAL CORE; CONFIRMS OPEN PIT TARGET NEAR SURFACE WITH gpt AgEq.

The Inferred Mineral Resource Statement prepared by SRK for the Talbot Deposit is detailed below.

GRAPHITE ONE DRILLS 165.3M of 4.23% GRAPHITE INCLUDING 46.4M OF 6.6%, 14.3M of 10.1% and 21M of 10.1% GRAPHITE

CARACARA SILVER INC. PLANNING DRILL PROGRAM AT PILUNANI ZINC-LEAD PROJECT IN PERU

Probe Metals Confirms Continuity of Gold Mineralization on its Val-d Or East Project And Increases 2017 Drill Program to 75,000 metres

QMX GOLD CONTINUES TO INTERSECT STRONG MINERALIZATION AT BONNEFOND, INTERSECTING 39.5 g/t Au OVER 2.4 METRES AND 31.5 g/t Au OVER 1.

REGULUS DISCOVERS NEW GOLD-RICH, HIGH-GRADE COPPER-GOLD ZONE AT RIO GRANDE

True Width (m) Carneritos to

EL CONDOR IN-FILL DRILLING INTERSECTS 26.9 METERS 2.19% CU & 0.58% NI

NEWS RELEASE. Foran Intersects Over 28 Metres of Copper Mineralization

SilverCrest Expands Babicanora High Grade Footprint to 600 metres; New High Grade Vein Discoveries Highlight District Scale Potential

North American Palladium Announces Positive Exploration Results from Lac des Iles Mine

Pahtavaara Drill Program Intersects 32.8 G/T Gold Over 2.0M And 2.1 G/T Gold Over 18.0M In The Karoliina Zone

AbraPlata defines gold-rich zone with up to 16.7g/t Au over 10.6m in the basement at its Diablillos property in Argentina

Rock sample A13479 from cleared surface exposure assaying: 0.36ppm Au, 21.3ppm Ag, 0.57%Cu, 0.1% Pb, 0.58% Zn 580 M

Minsud to recommence resource outline diamond drilling at the Chita Valley Cu- Au-Ag-Mo Project, San Juan, Argentina

NEWS RELEASE LATEST EXPLORATION PROGRAM CONTINUES TO DEMONSTRATE NARANJILLO AS A HIGH GRADE SILVER HOST

ATON RETURNS 22.2 METRES OF 2.77 GRAMS PER TONNE GOLD EQUIVALENT FROM HAMAMA WEST; VISIBLE GOLD DISCOVERED AT BOHLOG

Assay Results Highlights (as of November 16, 2017) representing approximately 4,500 metres ( m ) of drilling:

TROILUS GOLD CORP. INITIATES 30,000 METRE DRILL PROGRAM ON TROILUS PROPERTY

QMX GOLD INTERSECTS 29.8 G/T AU OVER 3.0 METERS AND 19.3 G/T AU OVER 3.2 METERS AT BONNEFOND

Highlights from the four holes announced in this news release include:

MONETA INTERCEPTS g/t GOLD INCLUDING g/t GOLD AT SOUTH WEST

OSISKO METALS INTERSECTS 10.49% ZINC+LEAD OVER METRES AND 12.15% ZINC+LEAD OVER METRES AT PINE POINT

SAVARY GOLD DRILLING EXTENDS KNOWN ZONES AND INTERSECTS SIGNFICANT GOLD MINERALIZATION AT FOUR NEW TARGETS

Canadian Gold Miner Grab Sample Returns 29.5 Grams per tonne Gold from South Kirkland Project

MONETA INTERCEPTS g/t GOLD INCLUDING g/t GOLD AND g/t GOLD INCLUDING g/t GOLD AT SOUTH WEST

West Pender Street Vancouver, BC V6C 2V6 Tel: Fax: TSX-V: GBR NEWS RELEASE

Detour Gold Reports Drilling Results from Lower Detour

Plateau Extends Falchani East Lithium Deposit Community Agreements Executed and Three Drill Rigs Active at Falchani West

Probe Metals Discovers New High Grade Gold Zone on Val-d Or East Project: Intersects 12.6 g/t Gold Over 7.3 Metres

Northern Dynasty Minerals Ltd.

Colt Resources intersects 17.4% Cu over 0.42 metres (0.32 m true width) at Miguel Vacas Copper Project in its Borba exploration concession in Portugal

MINERAL MOUNTAIN RESOURCES LTD. MMV.TSX-V

Suite West Georgia Street Vancouver, B.C. V6E 4M3 NEWS RELEASE

Form F3 MATERIAL CHANGE REPORT

ET and and and

The new sulphide mineralization lies within a 1.4 kilometer long east-west trending

Probe Metals Intersects 1,122 g/t Gold Over 0.7 Metres in New Zone at Val-d Or East

October 8, 2015 News Release Brucejack Regional Drilling Intersects Over 8,000 Grams Per Tonne Gold

Cordoba Minerals Provides an Update on Exploration Activities at the San Matias Copper-Gold Project in Colombia

Highlights include: Hole TTD050: 6.12 g/t Au over 7.00 metres from metres o Including g/t Au over 1.18 metres

55 Adelaide Street East, Suite St-Charles west, Suite 411, West Tower

NEWS RELEASE. Evrim announces additional drilling results at Cuale Gold Project in Mexico

Surface Trenching Highlights. Santos Target. To (m) Width (m) Au (g/t) Comment. (m) Santos (1)-includes internal dilution

TRENCHING AT LAS DOLORES EXTENDS STRIKE LENGTH TO OVER 1,000 METRES, INTERSECTING

NEWS RELEASE. Tigray Intersects 28.2 metres at 8.50 grams per tonne gold at Mato Bula, Adyabo Project, Northern Ethiopia

MINERA ALAMOS TO COMMENCE DRILLING AIMED AT EXPANDING AREAS OF DEFINED GOLD MINERALIZATION AT SANTANA/LOS VERDES PROPERTY, SONORA, MEXICO

V Sample from C.O.D vein 15 metres southwest of V

Goldplay President and CEO Marcio Fonseca commented

NEWS RELEASE FULLER PROPERTY CONTINUES TO DELIVER GOOD RESULTS 2.53 GRAMS PER TONNE GOLD OVER METRES

NEWS RELEASE August 10, 2017

NEWS RELEASE. FORAN INTERSECTS 9.4% ZINC OVER 6.1 METRES Feasibility Drilling Continues

NEWS RELEASE NOVEMBER 15, 2018 HANNAN COMPLETES DRILLING AT BALLYHICKEY, DEFINES SIGNIFICANT ZINC TARGET AT KILMURRY, CO.

NEWS RELEASE. Foran Completes Winter Program with High-Grade Copper and/or Zinc in All Holes Drilled at Bigstone

NEWS RELEASE. March 22, 2017

Barsele Expansion drill hole AVA18013 at the Avan Zone intersects 21.0 metres grading 3.68 g/t gold.

Melkior retains Geologica to complete a NI report on its Launay property, Québec

June 4, 2015 News Release Valley of the Kings Underground Infill Drilling Underway

GOLDPLAY OUTLINES FIVE NEW EXPLORATION TARGETS AT THE SAN MARCIAL PROJECT IN MEXICO

NEWS RELEASE. FOR IMMEDIATE RELEASE Shares Outstanding: 35,190,286

MEXICAN GOLD SAMPLES G/T GOLD AND 37.2 G/T SILVER OVER 0.42 METRES AT PUEBLO NUEVO HISTORICAL MINES

Hole ID From (m) To (m) Interval (m) Au (g/t) Ag (g/t) AuEq (g/t)* Zn (%)

Queenston Announces 112% Increase in Indicated Resource (to 1.5 M oz. gold) and 16% Increase in Inferred Resource (to 0.7 M oz. gold) at Upper Beaver

23 January, 2018 CSE: RFR For Immediate Release. Renforth extends Parbec Gold Deposit strike 60m with gold in all 7 drillholes

PUMA EXPLORATION AND TREVALI MINING CORPORATION DRILLED 13.1% Zn, 4.8% Pb OVER 27.0 METERS AT MURRAY BROOK DEPOSIT

NEWS RELEASE TSX-V Ticker: SWA 23 April 2013 SWA.WT SARAMA RESOURCES EXTENDS HIGH-GRADE MINERALISATION AT MM PROSPECT IN BURKINA FASO

Bisha: Untapped Exploration Potential. TSX: NSU NYSE MKT: NSU February 2016

Vendetta Reports Additional High Grade Drilling Results from Zones 2 and 3 at Pegmont Lead-Zinc Project

Vendetta Reports Initial Results from 2017 Pegmont Program with High Grade Zone 3 Step Out Drilling

July 15, 2015 News Release Valley of the Kings Underground Infill Drilling Progresses

Zinc One Reports Additional High-Grade Zinc Results From Surface Samples at Bongará Zinc Mine Project

NEWS RELEASE August 8, 2018

ANTLER GOLD EXPLORATION UPDATE, WILDING LAKE GOLD PROJECT, NEWFOUNDLAND

Rockcliff Expands Talbot Copper Deposit to 4.2Mt at 3.4% Copper Equivalent (1.6% Copper, 1.8 g/t Gold, 1.4% Zinc, 28.0g/t Silver)

NEWS RELEASE July 26, 2018

Toronto, Canada March 4, 2013

PROJECT 81 Lucas Gold Deposit 2018 Winter Drilling Program Assay Results

ADDITIONAL SAMPLING IDENTIFIES VEINS WITH UP TO 240 G/T GOLD AND 2,479 G/T SILVER AT INV METALS TIERRAS COLORADAS DISCOVERIES

CHAMPION IRON REPORTS EXPLORATION RESULTS AT POWDERHORN PROJECT, NEWFOUNDLAND

NEWS RELEASE. Evrim announces initial drilling results at Cuale Gold Project in Mexico

GOLD REACH (GRV) ANNOUNCES A 141% INCREASE IN INDICATED AND 91% INCREASE IN INFERRED RESOURCES AT SEEL

NEWS RELEASE. Evrim and Harvest Gold Complete Drilling at Cerro Cascaron

Nevsun Extends Harena 150 Metres Beyond Current Resource and Identifies New Regional Targets from VTEM Survey

Transcription:

Toachi Mining Inc. Intersects 5.42 m grading 4.35 g/t Au, 77.34 g/t Ag, 7.48% Cu, 4.24% Zn and 0.22% Pb at the Gold-Rich La Plata VMS Project in Ecuador Drilling Extending Mineralization in La Mina North Zone Toronto, Ontario April 12, 2017 Toachi Mining Inc., ( Toachi or the Company ) (TSX-V: TIM) is pleased to announce results from on-going drilling at its La Plata gold-rich volcanogenic massive sulphide ( VMS ) project in Ecuador. Program Highlights Hole CMLP-17-45 intersected 5.42 metres (m) of massive and disseminated sulphide mineralization grading 4.35 grams per tonne (g/t) gold, 77.34 g/t silver, 7.48% copper, 4.24% zinc and 0.22% lead from 69.26 m in the La Mina North zone of the La Mina deposit. Hole CMLP-17-42, drilled on the same section as CMLP-17-45, intersected 18.25 m of massive and disseminated sulphide mineralization grading 1.57 g/t gold, 12.14 g/t silver, 3.44% copper, 1.06% zinc and 0.15% lead from 138 m. Hole CMLP-17-42 included a high grade intersection of 6.38 m grading 2.4 g/t gold, 16.33 g/t silver, 4.9% copper, 1.99% zinc and 0.24% lead from 142 m. Hole CMLP-17-41 intersected 0.66 m grading 24.26 g/t gold, 200 g/t silver, 1.94% copper, 31.27% zinc and 9.57% lead from 5.44 m in La Mina North.

Drilling Highlights Hole (36)(37)(40) (41)(42)(45)(47) From (m) To (m) m Au (g/t) Ag (g/t) Cu (%) Pb (%) Zn (%) CMLP-17-36 106.2 107.48 1.28 2.27 35 7.71 0.41 2.48 CMLP-17-37 29.66 31 1.34 8.90 71 4.37 0.77 10.84 CMLP-17-40 104.23 105.09 0.86 0.96 26 5.77 0.11 0.99 CMLP-17-41 4.57 6.9 2.33 10.00 92 1.06 4.14 10.75 including 5.44 6.1 0.66 24.26 200 1.94 9.57 31.27 CMLP-17-42 138 156.25 18.25 1.57 12 3.44 0.15 1.06 including 142 148.38 6.38 2.40 16 4.90 0.24 1.99 CMLP-17-45 69.26 74.68 5.42 4.35 77 7.48 0.22 4.24 78 81.24 3.24 1.11 13 2.49 0.05 0.59 CMLP-17-47 64.17 71.63 7.46 1.68 152 2.98 0.10 0.86 Core widths in CMLP-17-36, CMLP-17-37 and CMLP-17-45 are considered to be true widths. Core widths in CMLP-17-40, CMLP-17-41 and CMLP-17-47 are considered close to true widths. CMLP-17-42 was drilled obliquely to the zone with a true width of 8.5 m. Gold assay composites were calculated using uncut assays. A complete list of all intersections is available in Table 1 below along with a plan map and cross section of CMLP-17-40, CMLP-17-42, CMLP-17-45 and CMLP-17-47. Program Results The drill program, which began in August 2016, is designed to validate the historic drilling database at the La Plata project. The drilling program is also intended to infill and expand known resources in the main La Mina VMS lenses leading to the completion of a National Instrument 43-101 resource estimate later this year. Modelling of historic and current drill results by Toachi staff has delineated four discrete mineralized zones which define the La Mina North and La Mina South blocks. For a 3-D graphic of the wireframed zones, please visit our website at www.toachimining.com and see our latest presentation. Holes CMLP-17-36, CMLP-17-40, CMLP-17-42, CMLP-17-45 and CMLP-17-47 were collared in the southern part of the La Mina North block and were designed to test the southern extension of the VMS mineralization in Zone 1. These holes were successful in identifying high grade VMS mineralization and extended the mineralized envelope down dip, up to near-surface and to the south. 2

Holes CMLP-17-37, CMLP-17-41 and CMLP-17-44 were collared in the northern part of the La Mina North block around the old open pit area and were designed to test the northern extension of the near-surface VMS mineralization in Zone 1. These holes were successful in identifying high grade VMS mineralization and confirming continuity of the VMS mineralization in this area. Nick Tintor, President and CEO, stated, Our drilling continues to generate exceptional gold, copper and zinc values over good widths at the La Plata project. This drill program is being successful in not only verifying the high grade nature of the project but in extending mineralized envelopes as well. See the longitudinal section below for the location of the pierce points of these holes in relation to historic resource blocks. A list of drill results, cross section and plan map with collar locations is also available at the end of this press release. Management believes the La Plata project, which is characterized by geology typical of major gold-rich VMS camps around the world, hosts excellent potential for the discovery of additional discrete VMS zones amongst the 14 exploration targets identified to date. La Plata Deposit Geology Gold-bearing sulphide mineralization at La Plata occurs as compositional banding composed of chalcopyrite, sphalerite and pyrite laminae with barite occurring as clasts and also as thin layers. Base and precious metal mineralization at La Plata is interpreted to have formed as part of multiple volcanic episodes that created a stacked volcanic-exhalite hydrothermal sequence which is considered favorable for hosting multiple VMS lenses. Examples of this exclusive group of gold-rich VMS camps include Noranda, Doyon-Bousquet- LaRonde and the Flin Flon camps in Canada. Toachi s exploration staff has identified more than 14 discrete exploration targets across the property concessions which extend for more than 9 kilometres, attesting to the potential of this emerging district. 3

The La Plata Project Toachi entered into an option agreement with a private Ecuadorean company to earn between a 60% to 75% interest in the La Plata gold-copper-silver-zinc VMS project, located 85 km south of Quito, Ecuador. For complete terms of the transaction, please see our press release dated February 11, 2016 which is available on our website at www.toachimining.com or on www.sedar.com. La Plata is a gold-rich volcanogenic massive sulphide deposit which was the subject of small scale mining from both an open pit and underground workings from 1975-1981. From 1996 to 2000, Cambior Inc., a Canadian mining company, completed 8,628 metres of drilling and a preliminary resource estimate totaling 840,000 tonnes grading 4.8 grams gold per tonne, 4.1% copper, 54.4 grams silver per tonne and 0.7% lead and 4.2% zinc per tonne in 1999, according to a report completed by AMEC Foster Wheeler, a mining consulting firm, in March 2015. Following a drill program by Cornerstone Capital Resources Inc., which included 5,933 metres of drilling from 2006-2007, a revised mineral resource estimate totaling 913,977 tonnes grading 8.01 grams gold per tonne, 88.3 grams silver per tonne, 5.01% copper, 6.71% zinc and 0.78% lead per tonne in the inferred category was completed. The resource estimates described above are historical estimates as defined by National Instrument 43-101 Standards of Disclosure for Mineral Projects S.2.4 ( NI 43-101 ). Toachi has not completed the work required to independently analyze and verify the results of the previous operators nor has a qualified person completed sufficient work to classify the estimates as current mineral resources or mineral reserves. With respect to the Cambior estimate, the Company is also not aware of what categories were used in the estimate. As a result, Toachi is not treating these estimates as current mineral resources or mineral reserves. The Company believes these historic results provide an indication of the potential of the property and are relevant from an on-going exploration perspective. 4

QA/QC Sampling and Core Sampling Protocols Before sampling, a centreline, representing bottom of hole (or a reference line when this is not known) is marked on the drill core. The core is cut and sampled, always sampling the right-hand side of the drill core. Samples are selected based on logged geological features, such as rock type, mineralization, alteration, veining etc. Sample length does not exceed 1.2 m nor is smaller than 20 cm. In areas of similar geological characteristics, sample length is, in general, 1 m. A total of 10% of the samples submitted are certified blanks and standards and field duplicates with, as a minimum, one blank submitted at the beginning of each sample batch. Certified standards are submitted at an average of 6% of the samples submitted. Field duplicates are taken at a rate of 1 in 20 of the samples taken. Drill hole analysis was completed by MS Analytical in Canada. The analysis was completed by MS Analytical in Canada with preparation performed by Ecuadorian partner, LAC y Asociados. Both LAC y Asociados and MSA are ISO 9001:2008 registered companies. MS Analytical also meets the requirements as outlined in ISO/IEC 17025. Qualified Person Phil Fox, MAIG, a Qualified Person as defined by NI 43-101, has reviewed and approved the contents of this press release. About Toachi Mining Inc. Toachi brings a disciplined and veteran team of project managers together with a high grade gold-copper-silver-zinc project at La Plata in Ecuador. Toachi is focused on and committed to the development of advanced stage mineral projects throughout the Americas using industry best practices combined with a strong social license from local communities. Toachi Mining has 51,653,935 shares issued and outstanding. 5

Forward Looking Statements Certain statements contained in this news release may constitute forward-looking information as such term is used in applicable Canadian securities laws. Forward-looking information is based on plans, expectations and estimates of management at the date the information is provided and is subject to certain factors and assumptions, including, that the Company s financial condition and development plans do not change as a result of unforeseen events and that the Company obtains regulatory approval. Forward-looking information is subject to a variety of risks and uncertainties and other factors that could cause plans, estimates and actual results to vary materially from those projected in such forward-looking information. Factors that could cause the forward-looking information in this news release to change or to be inaccurate include, but are not limited to, the risk that any of the assumptions referred to prove not to be valid or reliable, that occurrences such as those referred to above are realized and result in delays, or cessation in planned work, that the Company s financial condition and development plans change, and delays in regulatory approval, as well as the other risks and uncertainties applicable to the Company as set forth in the Company s continuous disclosure filings filed under the Company s profile at www.sedar.com. The Company undertakes no obligation to update these forward-looking statements, other than as required by applicable law. FOR ADDITIONAL INFORMATION PLEASE CONTACT Nick Tintor, President and CEO Telephone: 416 987 0855 Mobile: 416 953 4244 Email: ntintor@rgmi.ca Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release. 6

Table 1 La Mina Drill Results Au Ag Cu Pb Zn Drill Hole From (m) To (m) m (g/t) (g/t) (%) (%) (%) CMLP-17-36 106.2 107.48 1.28 2.27 35 7.71 0.41 2.48 CMLP-17-37 29.66 31 1.34 8.90 71 4.37 0.77 10.84 CMLP-17-40 104.23 105.09 0.86 0.96 26 5.77 0.11 0.99 CMLP-17-41 4.57 6.9 2.33 10.00 92 1.06 4.14 10.75 including 5.44 6.1 0.66 24.26 200 1.94 9.57 31.27 CMLP-17-42 126 128 2 1.31 58 0.15 0.34 0.67 138 156.25 18.25 1.57 12 3.44 0.15 1.06 including 142 148.38 6.38 2.40 16 4.90 0.24 1.99 CMLP-17-44 37.25 39.62 2.37 1.17 12 0.36 0.07 1.07 CMLP-17-45 69.26 74.68 5.42 4.35 77 7.48 0.22 4.24 78 81.24 3.24 1.11 13 2.49 0.05 0.59 CMLP-17-47 64.17 71.63 7.46 1.68 152 2.98 0.10 0.86 7

Cross Section La Mina North Zone 1 8

Plan Map 9

Longitudinal Section The resource estimates in the longitudinal section above are historical estimates as defined by National Instrument 43-101 Standards of Disclosure for Mineral Projects S.2.4 ( NI 43-101 ). Toachi has not completed the work required to independently analyze and verify the results of the previous operators nor has a qualified person completed sufficient work to classify the estimates as current mineral resources or mineral reserves. As a result, Toachi is not treating these estimates as current mineral resources or mineral reserves. The Company believes these historic results provide an indication of the potential of the property and are relevant from an on-going exploration perspective. 10