Second Annual Monitoring Report Tidal Wetland Restoration 159 Long Neck Point Road, Darien, CT NAE

Similar documents
Third Annual Monitoring Report Tidal Wetland Restoration 159 Long Neck Point Road, Darien, CT NAE

Habitat Monitoring Update Hudson River CAG November 16, 2017

Taunton River Salt Marsh Assessment Results from 2014 season

3.7 VISUAL RESOURCES Environmental Setting

4.2 Tidal Wetlands. Phragmites Australis

Factors Governing Successful Tidal Wetland Mitigation. Walter I. Priest, III Wetland Design and Restoration ASWM Webinar 16 July 2018

East Branch Grand Calumet River Great Lakes Legacy Act Sediment Remediation and Restoration Project

FOR PROJECTS INITIATED AFTER NOVEMBER 1, 2008 ITEM 716 EMBANKMENT EARTH OUTLET SEDIMENT TRAP

Woodstock, Route 26 Stream Relocation Project

Wetland Sediment Dynamics at Crissy Field Marsh Annual Report

PLANT COMMUNITY COMPOSITION OF THE BUCKTOWN CREATED MARSH:

Beneficial Reuse of Dredge Material for Salt Marsh Restoration: Early Recovery of Vegetation and Epifaunal Macroinvertebrate

Use of Bioengineering Techniques for Revegetation of Riparian Areas: Colomac Mine Remediation Project, NWT

CCR Rule Annual Inspection Report (cont.) 2

Stabilization Study. Prepared For: The Town of Bethlehem. Henry Hudson Park Shoreline Stabilization Study. June 2011

Connecticut Coastal Management Program

Woodford County Erosion Prevention Plan and Permit. Application #

Sunset Harbour / Huntington Harbour Maintenance Dredging and Waterline Installation Project. CMANC 21 January 2016

Purple Loosestrife Project Biocontrol Sites:

NORTHUMBERLAND COUNTY, PA

Minimum Standards for Wetland Delineations

Types of Wetlands. Tidal Systems

Subtidal permanently flooded with tidal water. Irregularly exposed surface exposed by tides less often than daily

Adjacent Sewage Treatment Plant

Converse Consultants Geotechnical Engineering, Environmental & Groundwater Science, Inspection & Testing Services

Husky Oil Operations Limited

Oyster Reef for Shoreline Stabilization and Restoration. Jason Kirkpatrick Conservation Program Manager MacDill AFB Tampa, Florida

Saganashkee Slough - McMahon Woods Section 506 Great Lakes Fishery & Ecosystem Restoration Study

exposed has to the this soil lowest water salinity. However in the fall, following a lot of Underground

Specifications Whitcomb Elementary School Demolition January 15, 2016

MEMORANDUM FOR SWG

Project No India Basin Shadow Study San Francisco, California, USA

The following maps must be provided as a part of the ADA. The appropriate scale for each map should be determined at the pre application conference.

EROSIONAL RATES IN THE POINT AUX CHENES BAY AREA, MISSISSIPPI: Kathleen P. Wacker G. Alan Criss INTRODUCTION

APPENDIX E. GEOMORPHOLOGICAL MONTORING REPORT Prepared by Steve Vrooman, Keystone Restoration Ecology September 2013

December 11, 2006 File:

Tenmile Lakes Delta Building Study

1.0 INSPECTION ANNUAL INSPECTION, JUNE 29, 2011 CARMACKS COPPER PROJECT, CARMACKS, YUKON. Dear Mr. West-Sells,

NEWS RELEASE UNDER SECTION 404 OF THE CLEAN WATER ACT (33 USC 1344) ACTION NUMBER SPA ABQ

Relatively little hard substrate occurs naturally in the

APPROVED JURISDICTIONAL DETERMINATION FORM U.S. Army Corps of Engineers

Seagrass Transplantation & Environmental & Marine Consulting Services, Inc. Drew Campbell, Vice President & Lead Scientst.

3.0 ROBERTS BANK TIDAL FLAT MORPHOLOGY

Appendix E: Cowardin Classification Coding System

October 26, Ms. Aimee Zack Canadian Pacific 120 S. Sixth Street Suite 900 Minneapolis, Minnesota 55402

Shoreline and Climate Change Adaptation Alternatives for The Letter Parcel, Bolinas Lagoon

January 16, Re: Soo Line Dump Site 2018 Annual Soil Cover Inspection. Dear Mr. Nichols:

Briggs Lake Water Quality Report 2014

Flowering Rush Hand Removal. Lake Minnetonka Pilot Program

APPROVED JURISDICTIONAL DETERMINATION FORM U.S. Army Corps of Engineers

GROUND DISTURBANCE AND REVEGETATION GUIDELINES

ATTACHMENT D SNOW REMOVAL AND DE-ICING PROCEDURES

Case Study 2: Twenty-mile Creek Rock Fords

Assessment. Assessment

Northeast Aquatic Research

Appendix G.19 Hatch Report Pacific NorthWest LNG Lelu Island LNG Maintenance Dredging at the Materials Offloading Facility

MAINTENANCE DREDGE BENTHIC ASSESSMENT SUNSET POINT FARM LLC LONG POINT KEY MONROE COUNTY, FLORIDA. Prepared by:

September 21, 2004 GeoInsight Project

ADDENDA #1 CONTRACT # C May 3, 2013 Page 1 of 1

HISTORY OF CONSTRUCTION FOR EXISTING CCR SURFACE IMPOUNDMENT PLANT GASTON ASH POND 40 CFR (c)(1)(i) (xii)

Illinois Drought Update, December 1, 2005 DROUGHT RESPONSE TASK FORCE Illinois State Water Survey, Department of Natural Resources

Descriptions and Performance

TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M. To: Council Members AGENDA ITEM 4B10

Missouri River Basin Water Management

Giant Salvinia Overview & History Restore America s Estuaries & The Coastal Society 2016 Summit December 15, 2016

Waterbury Dam Disturbance Mike Fitzgerald Devin Rowland

Template for Sediment and Erosion Control Plan General Instructions. Section Instructions

Stephen J. Souza, Ph.D. Princeton Hydro, LLC

Imagine the result Sediment Sampling Plan. 1½-Mile Reach of the Housatonic River. General Electric Company Pittsfield, Massachusetts

REDWOOD VALLEY SUBAREA

Report on Reliability of ComEd Electrical Service within Downers Grove. Prepared November 13, 2015

UTILITY REPORT FOR THORNTON SELF STORAGE THORNTON, COLORADO

CE415L Applied Fluid Mechanics Laboratory

design, construction, operation, and maintenance of the BAP is consistent with recognized and generally accepted good engineering standards.

EEC Modification Project. Initial Draft Resource Report 10 Alternatives. 569 Brookwood Village Suite 749 Birmingham, Alabama 35209

Background and Purpose of Meeting. River Towers Meeting. Flood Risk Management Study Alternatives Overview

Inversion Oxygenation and Bio augmentation Reduces Invasive Eurasian Watermilfoil Growth in Four Michigan Inland Lakes

7.34 Spartina (Spartina anglica)

VEGETATION EVA BOEHRINGER

Range Cattle Research and Education Center January CLIMATOLOGICAL REPORT 2016 Range Cattle Research and Education Center.

Effect of wrack accumulation on salt marsh vegetation, Baruch Institute, Georgetown County, South Carolina

Mr. Michael Malone CPS Energy 145 Navarro Street San Antonio, Texas Project No

Mandatory Mitigation for Expanding Legal Pre-existing Structures What is mitigation?

Carbon Sequestration Potential from Coastal Wetlands Restoration Sites

Variability of Crested Wheatgrass Production

Sediment Control Log (SCL)

Template for Sediment and Erosion Control Plan General Instructions

Becky Bolinger Water Availability Task Force November 13, 2018

Geoduck Floating Nursery Monitoring Plan, Quarterly Reporting

Sediment Management in the Coastal Bays

APPENDIX B. NMFWRI Field Inventory Summary for Three L Canyon, pre-treatment (2008 and 2009) and post-treatment (2013)

EXHIBIT H LOT 317 GRADING AND SITE PLAN

Required Documents. Title: Number: AEP Administration 2017 No. 1. Provincial Wetlands and Water Boundaries Section. Effective Date: September 1, 2017

3. MARINE HABITAT RESTORATION

EROSION PREVENTION AND SEDIMENT CONTROL (EPSC) SPECIALIST INSPECTION REPORT

Fiscal Year 2017: 3 rd Quarter Status Report. 01 April 30 June, 2017

Freshwater Mussel Surveys in Mystic Lake and Middle Pond: (Barnstable, Massachusetts)

Savannah District s Revised SOP: Moving Towards A Functional Approach. US Army Corps of Engineers BUILDING STRONG

APPENDIX F SEDIMENT DEPOSITION AND HABITAT CONVERSION ANALYSIS

Materials. Use materials meeting the following.

Transcription:

1) Project Overview Second Annual Monitoring Report Tidal Wetland Restoration 159 Long Neck Point Road, Darien, CT NAE-2007-1130 December 13, 2013 This is the second year of a five year monitoring program designed to monitor the restoration of an approximate ¼± acre tidal wetland within a protected cove at 159 Long Neck Point Road in Darien, CT. A monoculture of common reed (Phragmites australis) had taken over the tidal wetland along the southwestern shoreline of Ziegler s Cove in Darien, CT. The Phragmites population was approximately ¼ acre in size and situated along the northern side of a stone wall associated with an access way to Hay Island and west of a residential wooden dock. The objective of the tidal restoration plan was to employ all practical efforts to control the Phragmites population within the tidal restoration area and to allow a stable population of native shoreline vegetation to establish naturally. This included the application of herbicide and the removal of accumulated sediment to lower the substrate elevation up to 18 inches to restore tidal flushing. This restoration activity was conducted as compensation for the construction of an adjacent residential dock to the east and to restore the wetland s functions and aesthetics. Photographs prior to and after the physical restoration activity are located in Appendix C. This restoration plan was approved by the USACE in permit NAE-2007-1130 on December 15, 2010 and by the then named Connecticut Department of Environmental Protection under permit 201101116-KR dated June 17, 2011. Mitigation success shall be achieved after: the 5 year mitigation monitoring, the implementation of any corrective measures, the submittal of any needed mitigation monitoring reports, and a final wetland assessment. This year s monitoring found the Spartina population naturally recolonizing the restoration area and the Phragmites population was controlled with the exception of a narrow area along the stone wall. No major issues were observed. 2) Requirements The restoration plan consists of four components: A) herbicide application and physical removal of Phragmites australis; B) lowering of the substrate by 12-18 to provide tidal flushing allowing brackish water to flow into the tidal wetland and over the former Phragmites population; C) planting of native shrub species within the narrow area along the stone wall to accelerate colonization of native species and, D) monitoring of the restoration area for 5 years.

Tidal Wetland Restoration Second Annual Monitoring Report December 13, 2013 159 Long Neck Point Road, Darien, CT Page 2 Components A and B were completed in 2011, shrub planting (Component C) was conducted in August 2012. The monitoring phase began in the fall of 2012. Follow up spraying was conducted this summer. As stated in last year s report, item C (native shrub planting) was re-evaluated. Native shrubs were planted right after tidal flushing was restored and before a full understanding of the restored tidal penetration could be understood. Much of the area planted was too wet. It was determined last year that it would be better to wait and see if vegetation establishes naturally and then decide in year four if additional plantings are needed. Data from the second year of the monitoring program showed that the removal of sediment and the regrading of the tidal wetland was successful. The 2013 data showed a substantial increase in Spartina density from last year. The majority of the tidal wetland is being colonized by Spartina from existing seed sources dormant in soil or from the adjacent population. Stem counts from the test and control plots are presented in the Summary Data section. Photos showing the recolonization are presented in Appendix C. The invasive Phragmites population has been reduced to a small area, approximately 12 feet wide along the waterside of the stonewall. This population was spot treated with Polaris in September 9, 2013, and will continue to be spot treated as necessary next year. 3) Summary Data Site visits to inspect the progress of the restoration effort were conducted on June 28 and September 13, 2013. The June 28 th site visit found Spartina alterniflora recolonizing approximately 20% of the restoration area. A small depression located along the eastern edge of the restoration area, contained little to no Spartina growth. The Phragmites population was successfully controlled within the basin however Phragmites had regrown within a narrow 12 foot wide area along the waterward side of the wall. A few of the northern bayberry (Myrica pensylvanica) planted in September 2012 in the western end of the restoration area were doing well with little evidence of stress but as reported in last year s report, most of the other native shrubs planted in 2012 have died. September 9, 2013 The invasive Phragmites population along the waterward side of the wall was sprayed with herbicide by a licensed applicator. A follow up site visit was conducted on September 13, 2013. During this visit 2 one square meter test plots were established in the wetland restoration area and 1 control plot was established just beyond the restoration area in an undisturbed area of Spartina. A wooden stake was placed in the southeast corner of each of the plots in order to revisit them in future years. During the September 9 th inspection, the Spartina population covered approximately 40 to 50% of the restoration area. The western portion and the lower areas were just starting to colonize. Abundant Atlantic marsh fiddler crabs (Uca pugnax) and burrows were visible. The approximate locations of the test and control plots are shown in the Tidal Restoration plan shown in Section 4. The number of Spartina stems and fiddler crab burrows were counted in each of the test and control plots. The results are presented below.

Tidal Wetland Restoration Second Annual Monitoring Report December 13, 2013 159 Long Neck Point Road, Darien, CT Page 3 Test plot 1. Test plot #1 contained a monoculture of Spartina alterniflora. The visible coverage was approximately 50%. The one square meter square plot contained approximately 98± Spartina stems and 65± fiddler crab burrows. Test plot 2. This plot contained 84± Spartina stems (an approximate 40% coverage) and 28 common glasswort (Salicornia depressa) stems. Control plot. The control plot contained an established population of Spartina. The plants were slightly taller and contained 140± stems with a visual coverage of approximately 70% coverage. These plots will be re-inspected in the next three years to document the status of recolonization by tidal vegetation. Remedial actions were limited to the September 9, 2013 application of herbicide (Polaris ) by a licensed applicator to control the narrow band of Phragmites australis that has reestablished along the waterward side of the wall. The Phragmites were sprayed only four days prior to the September site inspection so no visible signs of stress were observed at that time.

Tidal Wetland Restoration Second Annual Monitoring Report December 13, 2013 159 Long Neck Point Road, Darien, CT Page 4 4) Maps/Plans Approved Tidal Wetland Restoration Plan Revised to Show Photograph Views and Plot Locations Referenced in Report.

Contol Plot Test Plots 1 2 C Photo 6 Photos 1, 2 & 3 Photos 4 & 5

Tidal Wetland Restoration Second Annual Monitoring Report December 13, 2013 159 Long Neck Point Road, Darien, CT Page 6 5) Conclusion Overall, the restoration area continues to be successful. The data collected from the 2012 and 2013 growing seasons show that the vast majority of the Phragmites population is under control with the exception of a narrow band along the waterward side of the wall. This population will continue to be watched and spot treated with herbicide as needed over the next few years in order to control this remaining population. The Spartina population is recolonizing well within the restoration area. The test plots showed a recolonization of 98 and 84 stems per square meter in this second growing season in comparison to the 140 stems per square meter in the undisturbed Spartina population of the control plot. These data will be compared to data from years 3 and 4 to determine the percentage of Spartina regrowth in each plot. During year four, the data will be evaluated to determine if the Spartina colonization needs to be accelerated through the installation of plugs. The planted shrubs that died along the stone wall were not be replanted in 2013. The narrow area of soil adjacent to and waterward of the stone wall will be watched to determine if native vegetation colonizes the area or if planting of different species will be needed. 6) Appendices Appendix C Site Photos Appendix E Mitigation Report Transmittal and Self-Certification Appendix F Mitigation Report Project Overview Form

Tidal Wetland Restoration Annual Monitoring Report December 13, 2013 159 Long Neck Point Road, Darien, CT Appendix A Appendix C Site Photos.

Tidal Wetland Restoration Annual Monitoring Report February 15, 2013 159 Long Neck Point Road, Darien, CT Appendix C Photo 1 Tidal restoration area facing west. Photo Taken January 6, 2011 Prior to Restoration Work. Photo shows Phragmites Population and Ground Elevation. Photo 2 Phragmites Population in Tidal Restoration Area on July 26, 2011 after Initial Herbicide Application but Prior to Regrading.

Tidal Wetland Restoration Annual Monitoring Report February 15, 2013 159 Long Neck Point Road, Darien, CT Appendix C Photo 3 - Post Restoration, Facing West on November 28, 2012. Photo 4 Spartina Starting to Recolonize the Wetland on June 28, 2013. Phragmites Population Present along Waterward Side of Wall.

Tidal Wetland Restoration Annual Monitoring Report February 15, 2013 159 Long Neck Point Road, Darien, CT Appendix C Photo 5 Facing West on September 13, 2013. Phragmites Population at Far Left, Spartina Recolonization in Center and Undisturbed Spartina Population to Right. Photo 6 Facing North on September 13, 2013. Phragmites Along Wall in Foreground, Recolonizing Population in Middle and Undisturbed Spartina Population in Background. Stake for Test Plot #2 is Observable Just Beyond the Phragmites

APPENDIX F MITIGATION REPORT PROJECT OVERVIEW FORM Corps Permit No.: Mitigation Site Name(s): Monitoring Report : of Name and Contact Information for Permittee and Agent: Name of Party Responsible for Conducting the Monitoring: Date(s) of Inspection(s): Project Summary: [include purpose of approved project, acreage and type of aquatic resources impacted, and mitigation acreage and type of aquatic resources authorized to compensate for the aquatic impacts] Location of and Directions to Mitigation Site(s): Start and Completion Dates for Mitigation: Performance Standards are/are not being met: [describe how] Dates of Corrective or Maintenance Activities Conducted Since Last Report: Recommendations for Additional Remedial Actions: -94-