Goldgroup Drilling Continues to Extend the La Paila Zone at Caballo Blanco

Similar documents
Assay Results Highlights (as of November 16, 2017) representing approximately 4,500 metres ( m ) of drilling:

BELO SUN INTERSECTS NEW HIGH GRADE ZONE AT GROTA SECA AND EXPANDS GRANDE DEPOSIT

DRILLING AT ASCOT S PREMIER PROPERTY EXTENDS GOLD MINERALIZATION 150 METRES WEST TOWARDS UNDERGROUND PORTAL

V Sample from C.O.D vein 15 metres southwest of V

Probe Metals Continues to Expand Gold Zones At Val-d Or East

AVION GOLD DJAMBAYE II ZONE, TABAKOTO PROJECT, MALI, RETURNS HIGH GRADE INTERCEPTS OF 7.56 G/T Au OVER 7.0 METRES AND G/T Au OVER 3.

Probe Metals Continues to Intersect Significant Gold Mineralization in Expansion Drilling at Val-d Or East, including 4.1 g/t Gold Over 15.

OSISKO METALS INTERSECTS 10.49% ZINC+LEAD OVER METRES AND 12.15% ZINC+LEAD OVER METRES AT PINE POINT

555 Burrard Street, Suite 375, Vancouver, B.C. V7X 1M June 13, 2017 SBB NR SBB TSX

For Immediate Release ASCOT DRLLING AT UNICORN INTERSECTS MORE HIGH-GRADE GOLD

MONETA INTERCEPTS g/t GOLD INCLUDING g/t GOLD AND g/t GOLD INCLUDING g/t GOLD AT SOUTH WEST

NEWS RELEASE ORCA GOLD INDICATED AND INFERRED RESOURCES AT BLOCK 14 INCREASE BY 24% AND 48% RESPECTIVELY

MONETA INTERCEPTS g/t GOLD INCLUDING g/t GOLD AT SOUTH WEST

Suite 1800 Two Bentall Centre 555 Burrard Street Vancouver, BC V7X 1M9 Tel: (604) Tel: (888) April 8, 2018 SBB NR SBB TSX

Goldcrest Resources Ltd.

Probe Metals Intersects 3.2 g/t Gold Over 45.5 Metres At Val-d Or East

NEWS RELEASE November 5, 2018

NEWS RELEASE ORCA GOLD REPORTS CONTINUED SUCCESS AT GSS

BELO SUN RELEASES RESULTS FOR 74 ADDITIONAL DRILL HOLES AT ITS VOLTA GRANDE PROJECT

SABINA GOLD &SILVER REPORTS COMPLETION OF DRILLING AT ECHO DEPOSIT, BACK RIVER, NUNAVUT.

Detour Gold Reports Drilling Results from Lower Detour

Probe Metals Confirms Continuity of Gold Mineralization on its Val-d Or East Project And Increases 2017 Drill Program to 75,000 metres

CROCODILE GOLD CONTINUES POSITIVE EXPLORATION RESULTS INTERSECTS HIGH GRADE GOLD AT UNION REEFS PROJECT

NEWS RELEASE FULLER PROPERTY CONTINUES TO DELIVER GOOD RESULTS 2.53 GRAMS PER TONNE GOLD OVER METRES

Minsud to recommence resource outline diamond drilling at the Chita Valley Cu- Au-Ag-Mo Project, San Juan, Argentina

MCEWEN MINING ANNOUNCES EXPLORATION UPDATE FOR EL GALLO 1, MEXICO

NEWS RELEASE. Tigray Intersects 28.2 metres at 8.50 grams per tonne gold at Mato Bula, Adyabo Project, Northern Ethiopia

Atacama Pacific Drills 208 Metres Grading 0.60 g/t Gold at Cerro Maricunga. Reports Further Positive Metallurgical Test Results

NGEX INTERSECTS 1.45% COPPER OVER 97.6 METRES AND G/T SILVER OVER 36 METRES AT FILO DEL SOL PROJECT

IAMGOLD PROVIDES UPDATE ON ADVANCED EXPLORATION PROJECT DIAMOND DRILLING RESULTS BOTO PROJECT, SENEGAL

NGEX DRILLS 42 METRES OF 1.13 G/T GOLD AND G/T SILVER AT FILO DEL SOL PROJECT

Sabina Gold & Silver Reports 2018 Drilling has Commenced at Back River Gold Project

Blox, Inc. Announces New Drilling Target Defined at Mansounia Gold Project.

August 20, 2018 SBB NR SBB TSX

KIRKLAND LAKE GOLD ANNOUNCES 120 METRE DOWN-PLUNGE EXTENSION OF SWAN ZONE

FILO EXPANDS OXIDE COPPER AND GOLD ZONES - DRILLING INTERSECTS 0.77% COPPER OVER 102 METRES AND 0.73 G/T GOLD OVER 112 METRES

BELO SUN RELEASES RESULTS FROM 65 DRILL HOLES FURTHER EXTENDING THE OURO VERDE DEPOSIT ALONG STRIKE NORTHWEST AND DOWN DIP

COPPER MOUNTAIN COMPLETES PHASE 2 DRILL PROGRAM AT NEW INGERBELLE WITH CONTINUED POSITIVE RESULTS

San Gold Drills New Mine Horizon Adjacent to Rice Lake Mine, Returns 10.4 Metres Grading 25.7 g/t Au

GOLDPLAY ANNOUNCES FURTHER SAMPLING RESULTS FROM SAN MARCIAL HISTORICAL CORE; CONFIRMS OPEN PIT TARGET NEAR SURFACE WITH gpt AgEq.

Probe Metals Discovers New High Grade Gold Zone on Val-d Or East Project: Intersects 12.6 g/t Gold Over 7.3 Metres

News Release. Infill Drilling Program

(TSXV: GPLY, OTCQB: GLYXF

CANARC RESOURCE CORP Howe Street Vancouver, BC V6C 2T6. News Release

ET and and and

The new sulphide mineralization lies within a 1.4 kilometer long east-west trending

Queenston Announces 112% Increase in Indicated Resource (to 1.5 M oz. gold) and 16% Increase in Inferred Resource (to 0.7 M oz. gold) at Upper Beaver

Coeur Mining Provides Silvertip Exploration Update

BELO SUN DISCOVERS NEW MINERALIZED ZONE AT ITS VOLTA GRANDE GOLD PROJECT, BRAZIL

CHAMPION IRON REPORTS EXPLORATION RESULTS AT POWDERHORN PROJECT, NEWFOUNDLAND

Argonaut Gold announces San Agustín resource of 845,000 gold ounces and 28.3 million silver ounces (1,280,000 gold equivalent ounces)

Probe Metals Intersects 1,122 g/t Gold Over 0.7 Metres in New Zone at Val-d Or East

July 15, 2015 News Release Valley of the Kings Underground Infill Drilling Progresses

Highlights from the four holes announced in this news release include:

North American Palladium Announces Positive Exploration Results from Lac des Iles Mine

IDM Mining s Underground Drilling Intersects g/t Au and g/t Ag over 6.80 Meters True Width at the Red Mountain Gold Project

Monument Announces Significant Intercepts Assay Results at NOA7_8 in Burnakura

CROCODILE GOLD INTERSECTS 7.1 G/T AU OVER 4.5 METERS INCLUDING 11.2 G/T AU OVER 2.6 METERS AT THE UNION REEFS PROJECT, PROSPECT DEPOSIT

September 24, 2012 #

October 8, 2015 News Release Brucejack Regional Drilling Intersects Over 8,000 Grams Per Tonne Gold

Fortuna provides review of Brownfields exploration programs

Highlights include: Hole TTD050: 6.12 g/t Au over 7.00 metres from metres o Including g/t Au over 1.18 metres

True Width (m) Carneritos to

FILO MINING DRILLS 50 METRES OF G/T SILVER, 0.56% COPPER, 0.50 G/T GOLD AND 36 METRES OF 1.45% COPPER AT FILO DEL SOL

Pershing Gold Hits Highest Grade Gold to Date in Relief Canyon with Grams per Tonne (3.618 Ounces per Ton) Intercept

INV METALS ANNOUNCES DRILL RESULTS AT LOMA LARGA AND INITIAL PROSPECTING RESULTS ON NEW REGIONAL PROPERTIES

This area in SE Sullivan Gulch was never mined by previous operators

June 4, 2015 News Release Valley of the Kings Underground Infill Drilling Underway

June 4, 2014 News Release Valley of the Kings Exploration Program Underway; Project Update

Skeena Intersects g/t AuEq over metres at Eskay Creek

Press Release Thunder Bay: August 2, 2018

PRESS RELEASE. DUBUISSON NORTH DRILLING CUTS g/t AU OVER 5.0 METRES NEW S50 EAST DISCOVERY, 3.39 g/t AU OVER 25.9 METRES

CROCODILE GOLD INTERSECTS GRAMS PER TONNE GOLD OVER 2.05 METERS BELOW THE PROSPECT DEPOSIT AT UNION REEFS

NEWS RELEASE. Evrim and Harvest Gold Complete Drilling at Cerro Cascaron

Northern Dynasty Minerals Ltd.

Monument Announces NOA 7/8 Drilling Program Results at Burnakura Gold Project

QMX GOLD CONTINUES TO INTERSECT STRONG MINERALIZATION AT BONNEFOND, INTERSECTING 39.5 g/t Au OVER 2.4 METRES AND 31.5 g/t Au OVER 1.

- 2 - TABLE 1. INDICATED AND INFERRED GOLD AND SILVER RESOURCES. All Indicated

NEWS RELEASE. Mountain Province Diamonds Completes the Kennady North Winter Exploration Program

Goldplay President and CEO Marcio Fonseca commented

CENTRAL ZONE CONTINUES TO EXPAND AT EL GALLO 1 MINE REGIONAL DRILLING DELIVERS HIGH SILVER GRADES OVER GOOD WIDTHS NEW RESOURCE UPDATE PENDING

NEWS RELEASE. Mountain Province Diamonds Reports Additional Kimberlite Identified in Gahcho Kué Exploration Program

Dalradian Intersects 2.48 metres Grading g/t Gold and 4.87 metres Grading 8.35 g/t Gold With Infill Drilling at Curraghinalt

NGEX ANNOUNCES COPPER GOLD DISCOVERY AT NACIMIENTOS PROJECT

MINERA ALAMOS TO COMMENCE DRILLING AIMED AT EXPANDING AREAS OF DEFINED GOLD MINERALIZATION AT SANTANA/LOS VERDES PROPERTY, SONORA, MEXICO

Vendetta Reports Additional High Grade Drilling Results from Zones 2 and 3 at Pegmont Lead-Zinc Project

Canadian Gold Miner Grab Sample Returns 29.5 Grams per tonne Gold from South Kirkland Project

Precipitate s Geophysical Surveying Generates More Targets at Melchor and Peak Zones

IAMGOLD REPORTS HIGH-GRADE DRILL INTERSECTIONS FROM ITS 2017 DRILLING PROGRAM ON THE DIAKHA DEPOSIT, SIRIBAYA PROJECT IN MALI

NEWS RELEASE. FOR IMMEDIATE RELEASE Shares Outstanding: 35,190,286

NEWS RELEASE. Evrim drills 1.0 metre grading 20.1 grams per tonne gold at Cerro Cascaron with partner Harvest Gold

Rich Saddle North Au-Cu-Ag Porphyry Expands by 275m Along Strike and 250m Down-Dip

GOLDPLAY ANNOUNCES SIGNIFICANT SILVER VALUES OF UP T0

FALCO PACIFIC COMPLETES INITIAL MODEL FOR THE HORNE 5 GOLD/SILVER/ZINC/COPPER DEPOSIT

GRAPHITE ONE DRILLS 165.3M of 4.23% GRAPHITE INCLUDING 46.4M OF 6.6%, 14.3M of 10.1% and 21M of 10.1% GRAPHITE

MINAURUM GOLD INC : : News Releases

IAMGOLD PROVIDES EXPLORATION UPDATE ON BOTO PROJECT IN SENEGAL

BELO SUN ANNOUNCES INFERRED RESOURCE ESTIMATE OF 356,600 OUNCES GRADING 2

TROILUS GOLD CORP. INITIATES 30,000 METRE DRILL PROGRAM ON TROILUS PROPERTY

Underground Exploration Drilling Complete; Brucejack Mineralization Extends to the East

Transcription:

Goldgroup Drilling Continues to Extend the La Paila Zone at Caballo Blanco DDH 11 CBN 153: 197.10 m @ 0.60 g/t Au DDH 11 CBN 157: 66.55 m @ 0.84 g/t Au DDH 11 CBN 159: 67.32 m @ 0.88 g/t Au Vancouver, British Columbia (January 31, 2012) Goldgroup Mining Inc. ( Goldgroup or the Company ) (TSX:GGA) is pleased to announce that additional diamond drill holes at the Company s 100% wholly owned Caballo Blanco gold project in Veracruz, Mexico have yielded significant gold intercepts. All diamond drill holes are contained in completely oxidized, vuggy and siliceous rock occurring within and peripheral to the La Paila Zone, which lies within the Northern Zone. All 11 drill holes reported below (see Tables 1 and 2 and the drill hole location map) are above the established cut-off grade and are part of the ongoing drilling program intended to increase mineralized resources at Caballo Blanco. Of the 11 drill holes reported below, six of these drill holes further define the La Paila mineral resource, and the remaining five drill holes expanded the southwestern flank of the La Paila Zone. The zone currently remains open to the south and southwest. Keith Piggott, President and CEO of Goldgroup, stated, We are pleased with these new diamond drill results, which continue to confirm, define and expand the La Paila Zone. As we continue to receive positive results from our 2011 drill program and conduct our additional 30,000 metre drill program in 2012, we expect to increase resources at the La Paila Zone, as the zone currently remains open to the south and southwest. Furthermore, Management expects to identify new zones of mineralization in both the Northern Zone and Highway Zone through its 2012 drill program. The Company focused its 2011 drilling program primarily on the La Paila Zone, specifically with the objectives of designing the first open pit and updating the current NI 43-101 mineral resource estimate for Caballo Blanco, which is expected to be released in the coming weeks. Moreover, in-house and consultant engineering have significantly advanced Goldgroup s column leach testing in its large on-site facility and progressed leach pad and carbon recovery plant design. The drilling and infrastructure work, combined with the anticipated upcoming updated NI 43-101 mineral resource estimate, are intended to form the basis of a preliminary economic assessment (PEA) expected to be completed on the Caballo Blanco project in the first quarter of 2012. The current drilling program, together with the on-going column-leach metallurgical testing, environmental and sociological studies as well as the run of mine heap-leach pad design and other engineering, form the basis for targeting commencement of production at Caballo Blanco by 2012 year-end. As part of Goldgroup s ongoing 30,000 metre drill program in 2012, the Company expects to continue diamond drilling in the La Paila Zone, in addition to diamond drilling a number of identified geochemical and geophysical targets occurring to the south, southwest and northeast of the La Paila Zone, all within the large Northern Zone ring structure. Furthermore, the Company also intends to drill targets in the Highway Zone, which is located approximately seven kilometres to the southeast of the Northern Zone. 1

Table 1. Drill-Hole Results for the Caballo Blanco Project, Mexico DIAMOND DRILLING - LA PAILA ZONE 2 Mineralization Diamond Drill Hole From (m) To (m) Interval (m) Au grade (g/t) 11 CBN 150 135.33 145.73 10.40 0.39 and 199.34 211.53 12.19 0.23 and 226.27 232.27 6.00 0.29 11 CBN 151 73.05 143.30 70.25 0.64 11 CBN 151A 73.58 189.58 116.00 0.49 and 203.58 209.58 6.00 0.25 and 227.58 231.58 4.00 0.30 and 237.58 251.58 14.00 0.37 11 CBN 152 122.00 128.60 6.60 0.26 and 161.60 256.60 95.00 0.27 and 264.60 268.60 4.00 0.27 11 CBN 153 35.00 41.00 6.00 0.40 and 51.00 248.10 197.10 0.60 11 CBN 154 153.00 177.00 24.00 0.33 and 183.00 189.00 6.00 0.20 and 273.00 310.79 37.79 0.30 11 CBN 155 198.45 201.50 3.05 0.41 11 CBN 156 7.01 22.25 15.24 1.04 and 62.05 80.05 18.00 0.27 and 114.55 204.55 90.00 0.39 and 240.55 268.55 28.00 0.79 and 292.28 300.42 8.14 0.35 11 CBN 157 109.05 114.40 5.35 0.36 and 209.95 276.50 66.55 0.84 11 CBN 158 196.40 254.40 58.00 0.37 11 CBN 159 106.38 173.70 67.32 0.88 and 258.30 268.30 10.00 0.25 and 288.70 296.70 8.00 0.21 For a drill hole location map, click here. All of the holes presented above intersected gold mineralization in excess of the 0.2 g/t Au cut-off grade used in the current Caballo Blanco NI 43-101 technical report dated February 28, 2011 which is available on SEDAR. However, it is expected that as a result of favourable leach kinetics, recovery and ease of mining, a lower cut-off grade may be applicable. The results presented today are part of the 2011 drill program and are intended to be used in the preparation of the upcoming updated NI 43-101 mineral resource estimate. Drill holes 11 CBN 150, 151, 151A, 153, 156 and 159 were all drilled within the main La Paila Zone to further define the mineral resource. Five of these

six drill holes encountered mineralized intervals at widths and gold grades comparable to those used in the initial resource calculation. Drill hole 11 CBN 150 encountered sporadic mineralization above the 0.2g/t cut off grade, below the main zone. Drill holes 11 CBN 152, 154, 155, 157 and 158 were all collared on the southwestern flank of the La Paila Zone and extend the mineralization in this direction. Relative to the current NI 43-101 resource estimate, the La Paila Zone has been extended by the current drill campaign an average of 50 metres down dip to the west and on average 150 metres down plunge to the southwest. The zone remains open to the south and southwest. The middle portion of the eastern flank between coordinates 2,184,200N and 2,184,500N has been extended 50 metres further east. A complete summary of the assay results from diamond drill holes DDH 11 CBN 150 to DDH 11 CBN 159, as well as a drill-hole location map of the La Paila Zone detailing the relative locations of all historical drill holes will be posted on the Goldgroup website under at http://www.goldgroupmining.com/s/projects.asp. DD Hole Number Table 2. Drill Hole Location Data, Caballo Blanco Project, Mexico East North UTM UTM Elevation Azimuth Coord Coord (m.a.s.l) (degrees) 3 Plunge (degrees) Total Length 11 CBN 150 768308 2184687 481 90-60 318.2 11 CBN 151 768274 2184449 503 90-65 143.3 11 CBN 151A 768274 2184449 503 90-60 347.5 11 CBN 152 768118 2184192 527 0-90 277.5 11 CBN 153 768341 2184550 544 90-57 257.0 11 CBN 154 768178 2184138 536 0-90 321.0 11 CBN 155 768117 2184195 528 270-80 201.5 11 CBN 156 768343 2184742 499 135-45 300.4 11 CBN 157 768159 2184240 509 270-70 308.4 11 CBN 158 768118 2184150 536 0-90 274.0 11 CBN 159 768247 2184448 503 90-80 311.0 m.a.s.l = metres above sea level; Coord = Coordinate; na = not applicable About Caballo Blanco Goldgroup owns 100% of the Caballo Blanco gold project which consists of a series of fully oxidized gold zones located in the State of Veracruz in eastern Mexico. The principal known gold zone at Caballo Blanco is the La Paila Zone located within a cluster of high-sulphidation epithermal alteration zones referred to as the Northern Zone. The current NI 43-101 mineral resource estimate for the La Paila Zone was compiled from 32 diamond drill holes totalling approximately 7,000 metres completed by NGEx Resources Inc., prior to Goldgroup s acquisition of its interest in the project in November 2009. This mineral resource estimate consists of 139,000 ounces of gold (6.7 million tonnes grading 0.65 g/t Au) contained in the category of indicated resources and 517,000 ounces of gold (27.6 million tonnes grading 0.58 g/t Au) contained in the category of inferred resources. NGEx Resources Inc. drilled an additional 8 drill holes at the Caballo Blanco project outside the La Paila Zone. Subsequently, Goldgroup has drilled an additional 149 holes in 2010 and 2011, for a total of 189 holes drilled to date at the Caballo Blanco project. During 2011, Goldgroup completed a 30,000 metre, 120 hole drill program, of mostly HQ core, centered largely on the La Paila mineralized zone. The Company has received assays for all 2010 holes and 90 holes drilled in its 2011 program, which are expected to be used to update the NI 43-101 mineral resource estimate in the coming weeks. Assaying and Qualified Person After project geologists logged and marked the core, technicians cut the individual lengths with a diamond saw, then tagged the bags and secured them with security clips. The samples were then collected by ALS

Minerals and transported to their Guadalajara preparation facility where they were dried and crushed to - 2mm. A 250 gram split of the coarse material was then pulverized to -200 mesh. The rejects remained at the prep facility and the pulps were air couriered to ALS Minerals North Vancouver facility and analyzed for gold by 30g fire assay with an AA finish. In addition, a 35 element ICP analysis was conducted on all samples. A QA/QC program was implemented as part of the sampling procedure for the drill program. One standard, one blank or one duplicate was inserted per group of ten samples sent to the laboratory. The information in this news release has been approved by Marc Simpson, P. Geo., the Company s Qualified Person under National Instrument 43-101 standards. About Goldgroup Goldgroup is a well-funded Canadian-based gold production and exploration Company with significant upside in a portfolio of projects in Mexico, including its flagship 100%-owned advanced stage gold development project, Caballo Blanco, in Veracruz, and the 50%-owned high grade gold exploration project, San José de Gracia, in Sinaloa. The Company operates the 100%-owned Cerro Colorado gold mine in Sonora, Mexico. Goldgroup remains in a flexible financial position with a strong cash balance, no debt and no gold hedging. The Company is led by a team of highly successful and seasoned individuals with extensive expertise in mine development, corporate finance, and exploration in Mexico. Goldgroup's mission is to grow gold production, mineral resources, profitability and cash flow, building a leading gold producer in Mexico. For further information on Goldgroup, please visit www.goldgroupmining.com On behalf of the Board of Directors Keith Piggott, President & CEO T: 604-682-1943 Stephanie Batory, Investor Relations Toll Free: 1-877-655-ozAu (6928) CAUTIONARY NOTE REGARDING FORWARD-LOOKING INFORMATION Certain information contained in this news release, including any information relating to future financial or operating performance may be deemed forward-looking. All statements in this news release, other than statements of historical fact, that address events or developments that Goldgroup expects to occur, are forward-looking information. These statements relate to future events or future performance and reflect Goldgroup s expectations regarding the future growth, results of operations, business prospects and opportunities of Goldgroup. These forwardlooking statements reflect Goldgroup s current internal projections, expectations or beliefs and are based on information currently available to Goldgroup. In some cases forward-looking information can be identified by terminology such as may, will, should, expect, intend, plan, anticipate, believe, estimate, projects, potential, scheduled, forecast, budget or the negative of those terms or other comparable terminology. Certain assumptions have been made regarding the Company s plans at the Caballo Blanco project. Many of these assumptions are based on factors and events that are not within the control of Goldgroup and there is no assurance they will prove to be correct. Forward-looking statements are subject to a variety of known and unknown risks, uncertainties and other factors that could cause actual events or results to materially differ from those reflected in the forward-looking statements, and are developed based on assumptions about such risks, uncertainties and other factors including, without limitation: fluctuations in precious and base metal prices; inherent hazards and risks associated with mining operations; inherent uncertainties associated with mineral exploration and development activities; uncertainties inherent in the estimation of mineral reserves and/or resources and precious metal recoveries; uncertainties related to actual capital costs, operating costs and expenditures, production schedules and economic returns from Goldgroup s projects; uncertainties related to current global financial conditions; uncertainties related to the availability of future financing necessary to undertake exploration, development, mining and processing activities on Goldgroup s properties; Goldgroup s substantial reliance on its Cerro Colorado mine for revenues; risks related to the planned expansion of the Cerro Colorado mine; risks related to the continued operation and planned expansion of the Cerro Colorado mine without a current economic analysis; risks related to the integration of businesses and assets acquired by Goldgroup; uncertainties related to the competitiveness of the mining industry; risks associated with Goldgroup being subject to government regulation, including changes in law and regulation and risks associated with Goldgroup s need for governmental licenses and permits; risks associated with Goldgroup being subject to extensive environmental laws and regulations, including a change in regulation; risks that Goldgroup s title to its property could be challenged; political and country risk; risk of water shortages and risks associated with competition for water; Goldgroup s need to attract and retain qualified personnel; increases in off-site transportation and concentrate processing costs; risks related to the need for reclamation activities on Goldgroup s properties, including the nature of reclamation required and uncertainty of costs estimates related thereto; risks associated with potential conflicts of interest; risks associated with potential labour disputes; and risks associated with potential blockades of mining operations as well as Risks and Uncertainties included in the Annual Information Form and MD&A for Goldgroup available at www.sedar.com. Forward-looking information is not a guarantee of future performance and actual results and future events could differ materially from those discussed in the forward-looking information. All of the forward-looking information contained in this news release is qualified by these cautionary statements. Although Goldgroup believes that the forward-looking information contained in this 4

news release are based on reasonable assumptions, readers cannot be assured that actual results will be consistent with such statements. Accordingly, readers are cautioned against placing undue reliance on forward-looking information. Goldgroup expressly disclaims any intention or obligation to update or revise any forward-looking information, whether as a result of new information, events or otherwise, except in accordance with applicable securities laws. The potential quantities and grades disclosed herein are conceptual in nature and there has been insufficient drilling and exploration to define a mineral resource. It is uncertain if further drilling and exploration will result in the target being delineated as a mineral resource. The true widths of the intercepts disclosed in this news release are unknown at this time. 5