RE: COMMUNITY WATERSHEDS TERRAIN STABILITY MAPPING FRBC PROJECT # T096198a(TOLKO), VERNON FOREST DISTRICT

Similar documents
DETAILED TERRAIN MAPPING WITH INTERPRETATIONS FOR SLOPE STABILITY, EROSION POTENTIAL AND SEDIMENT TRANSFER. DILLARD CREEK FRBC Project # TO-96187

MABEL LAKE RECONNAISSANCE TERRAIN STABILITY REPORT (T.S.I. LEVEL '0') to accompany

EBA Engineering ConsultCfnts Ltd.

SCOTCH, KWIKOIT and CORNING CREEKS DETAILED and RECONNAISSANCE TERRAIN STABILITY MAPPING SALMON ARM FOREST DISTRICT. P. oject No.

EBA Engineering Consultants Ltd.

E8A Engineering Consultants Ltd.

FL A ADAMS LAKE. KAMLOOPS AND CLEARWATER FOREST DISTRl 'TS TSILD RECONNAISSANCE SLOPE T ABILITY FINALREPOR. Submitted

THE DIGITAL TERRAIN MAP LIBRARY: AN EXPLORATIONIST S RESOURCE

Detailed Terrain Stability Mapping In the Ellis Creek Community Watershed and the Steward Creek Watershed, Penticton Forest District, BC

Re: Steep Slope Assessment for 2465 Waverly Drive, Blind Bay, BC; Legal Address: Lot 39, Section 18, Township 22, Range 10, Plan 25579, W6M, KDYD.

TEXAS CREEK AR. Prepared by. Jennifer Shypitka, B.Sc, GJ.T. For. B.C. Ministry of For sts Lillooet Forest Dist ict. January 1996

SALMON RIVER TRI~UT ARIES

1.0 INSPECTION ANNUAL INSPECTION, JUNE 29, 2011 CARMACKS COPPER PROJECT, CARMACKS, YUKON. Dear Mr. West-Sells,

This report was prepared by Klohn Crippen Consultants Ltd. for Alberta Transportation Central Region under Contract No. CE053/2000.

- LONGITUDE : 128'06 'W

EBA Engineering Consultants Ltd. Creating and Delivering Better Solutions

MINERAL MOUNTAIN RESOURCES LTD. MMV.TSX-V

Licensed Science Officer Benchmark

..!I AXE CLAIMS ON THE. for RICHCORE EXPLORATIONS LTO. GREENWOOD MINING DIVISION BRITISH COLUMBIA. Latitude 49O 30"; Longitude 118' 30'W NTS 82E/9W

The subject paper is being submitted for approval for publication in the annual volume entitled Geological Survey Research.

February 18, 2003 File: NORTH CENTRAL REGION LANDSLIDE ASSESSMENT HWY 43:16 WHITECOURT EAST HILL (NC1) 2002 ANNUAL INSPECTION REPORT

P. Beaudry and Associates Ltd. Integrated Watershed Management

1 PROJECT BACKGROUND. August 14, Alberta Transportation Central Region #401, Street Red Deer, Alberta T4N 6K8

NTS 93L/9W GEOCHEMICAL AND GEOPHYSICAL REPORT MONA CLAIM OMINICA MINING DIVISION. Lati tude 54036'N; Longitude 'W

Archaeological Predictive Modeling within the context of Paleo-river Terraces in the City of Prince George

APPLIED FLUVIAL GEOMORPHOLOGY

THE NEW DNR LANDSLIDE HAZARDS PROGRAM

PEACE REGION (PEACE RIVER- HIGH LEVEL AREA) GEOHAZARD ASSESSMENT CALL-OUT PH56: EMBANKMENT FAILURE ON HWY 35:08 SOUTHWEST OF MEIKLE RIVER CROSSING

via via CCTA File /6 Train Avenue West and 70 Yonge Street South, Springwater Natural Hazard Study

September 17, OGC

ASSESSMENT REPORT ON THE PEAVINE PROJECT. DGW & Associates # Alberni Street, Vancouver, British Columbia, V6E 4V2

Snow depths and solar radiation before and after partial logging at the Mt. Tom Adaptive Management Trial

Mark Hawley, Piteau Associates Engineering Ltd. John Cunning, Golder Associates Ltd.

Watershed Overview. 2.1 Purpose

Lat. 52' 43' N Long ' W

patersongroup Mineral Aggregate Assessment 3119 Carp Road Ottawa, Ontario Prepared For Mr. Greg LeBlanc March 7, 2014 Report: PH2223-REP.

APPENDIX 1. Geotechnical Information and Analysis. Pacific Aggregates Inc. and Pacific Clay Products July 13, 2011 RP112 Reclamation Plan

August 14, James Bolton 312 Perry Lane Lovingston, VA

1. PROJECT BACKGROUND. July 18, Alberta Infrastructure & Transportation Central Region #401, Street Red Deer, Alberta T4N 6K8

NOTICE OF PUBLIC TENDER

Suitability Analysis on Second Home Areas Selection in Smithers British Columbia

2010 Fish Passage Culvert Inspection (FPCI) Fish Presence/Absence Mapping Progress Report (Phases 1 through 3)

MINISTRY OF FORESTS, LANDS AND NATURAL RESOURCE OPERATIONS, POST-WILDFIRE RISK ANALYSIS PRELIMINARY REPORT

Prospecting Report on the Dynasty Jade Placer Dorthy Creek Claims

The Role of Mapping, GPS, and GIS in Trail Design and Construction

PROSPECTING REPORT THE WALLACE CLAIM OMENICA MINING DIVISION. 54" x6" 3.d d. for. Reako Exlorat ions Ltd. Wallace Rev. C.G.

Prospecting Report on the Dynasty Jade Claims

PHASE 1 STUDIES UPDATE EROSION WORKING GROUP

September 3, 2009 File: NORTH CENTRAL REGION GEOHAZARD ASSESSMENT HWY 40:28 NORTH OF CADOMIN (NC50) 2009 ANNUAL INSPECTION REPORT

Groundwater Investigation SOUTHGATE GRAVEL PIT Part of Lot 15, Concession 15 (formerly Township of Proton), Township of Southgate.

MISSION CREEK WATERSHED (2002 Report Year 4)

MRD-160 METADATA DETAIL PAGE

3 SHORELINE CLASSIFICATION METHODOLOGY

January 16, Re: Soo Line Dump Site 2018 Annual Soil Cover Inspection. Dear Mr. Nichols:

Manitoba s Elevation (LiDAR) & Imagery Datasets. Acquisition Plans & Opportunities for Collaboration

MEMORANDUM. wa.tsr..-z.n~.e.s-t.i~at.i.o.ns... Branch... Mr. Webster contends that prior to excavation of the gravel

Table 1 - Infiltration Rates

Canadian Technical Landslide Guidelines and Best Practices for Landslide Professionals

Appendix C. Questionnaire Summary of Responses Geographic Information Systems

TRENCHING AT LAS DOLORES EXTENDS STRIKE LENGTH TO OVER 1,000 METRES, INTERSECTING

August 10, 2007 File:

Ronin Placer Ground-penetrating Radar Survey Report

Analysis of Road Sediment Accumulation to Monumental Creek using the GRAIP Method

GEOLOGICAL MAPPING REPORT ON THE ASH MINERAL CLAIM OSOYOOS MINING DIVISION ASHNOLA RIVER MAP SHEET NTS M092,H019 MCBRIDE CREEK AREA, ASHNOLA RIVER,

Quality Assurance Project Plan (QAPP) - Vegetation Survey of Huron Creek Houghton, MI

DROUGHT RISK EVALUATION USING REMOTE SENSING AND GIS : A CASE STUDY IN LOP BURI PROVINCE

Vergo Placer Claims Ground-penetrating Radar Survey Report

Assignment 1. Measuring River Characteristics- Vernon Creek. Applied Fluvial Geomorphology Field Techniques EESc 435

Karst Inventory Standards and Vulnerability Assessment Procedures for British Columbia

HYDROLOGY AND HYDRAULICS MUSKEG RIVER BRIDGE

POST WILDFIRE HAZARD ASSESSMENTS

BIODIVERSITY CONSERVATION HABITAT ANALYSIS

PHYSICAL WORK REPORT. the BAY CLAIMS. Omineca Mining Division Smithers, British Columbia N.T.S. 93E 13E/W

December 11, 2006 File:

Licensed Science Officer Benchmark

Large Scale Mapping Policy for the Province of Nova Scotia

Our File: 92 F/1, 92 F/8. Numerous licenced springs occur north of the B.C. Hydro right-of-way on. Water Management Branch

Edward R. Sajecki Commissioner of Planning and Building. Conservation Authority Regulations and Mapping

Little Blackfoot TPA 2009 Sediment and Habitat Assessment QAQC Review March 9, 2010

Roy Pyle March 24, 2017 Chief Facilities Planner Contra Costa Community College District 500 North Court Street Martinez, CA 94533

Chapter Five. Synopsis

GEOPHYSICAL DATA SET (GDS) 1084B METADATA

GEOCSZNICAL - SURVEY. ICAMLOOPS Kl.D. 2'' 6;kr. HY "'f. Alfred R. Allen,P.Eng. 1 NO.%=...,... 6"- 'I.

Earth Sciences Report Alberta Kimberlite-Indicator Mineral Geochemical Compilation

May 22, Mr. Tim Tyler TRWME Properties, LLC 240 Hwy. 65 N Conway, AR RE: Royal Oaks Vista Subdivision Site. Dear Mr.

MEMORANDUM. REVISED Options for Landslide Regulations: Setbacks and Slope Height

Serengeti Resources Inc GEOCHEMICAL REPORT ON THE SHADOW PROPERTY a.

Date of Report: EPA agreement number: Center Name and Institution of Ctr. Director: Identifier used by Center for Project: Title of Project:

IDM Mining s Underground Drilling Intersects g/t Au and g/t Ag over 6.80 Meters True Width at the Red Mountain Gold Project

51 46'N Latitude, 119'44'1;!

CanAlaska Uranium Details Extensive Rare Earth Mineralization at NE Wollaston

Valley-Fill Sandstones in the Kootenai Formation on the Crow Indian Reservation, South-Central Montana

Required Documents. Title: Number: AEP Administration 2017 No. 1. Provincial Wetlands and Water Boundaries Section. Effective Date: September 1, 2017

January 17, 2008 File:

Canadian Gold Miner Grab Sample Returns 29.5 Grams per tonne Gold from South Kirkland Project

Ronin and Dayton Placer Ground-penetrating Radar Survey Report

USING HYPERSPECTRAL IMAGERY

Exxon Valdez Oil Spill Restoration Project Annual Report

Clyde River Landslide

Placer Potential Map. Dawson L and U se P lan. Jeffrey Bond. Yukon Geological Survey

Transcription:

Golder Associates Ltd. 100. 388 First Avenue Komloops, British Columbia, Canada V2C 6W3 Telephone 1250) 828 6116 Fax 1250) 828 1215 April 17, 1998 Our ref: 962-3150 Tolko Industries Ltd. c/o Kamloops Region Ministry of Forests 515 Columbia S tree! Kamloops, B.C. V2C2T7 ATTENTION: Mr. Tim Giles. P.Geo. RE: COMMUNITY WATERSHEDS TERRAIN STABILITY MAPPING FRBC PROJECT # T096198a(TOLKO), VERNON FOREST DISTRICT Dear Sirs: Please find enclosed a document package relating to I the above-noted project. Could you please forward the documents to the appropriate agencies, including Mr. Kim Young, R.P.F., of Tolko Industries, Lavington Division. Thd attachments include: One set of typed airphotos for the study area. T e terrain mapping is marked directly onto the photos and includes material type, slope range, drainage class, and interpretations for slope stability, erosion potenti:ll and sediment transfer potential. Five copies of the report (four bound copies and 6ne unbound copy). 1:20,000 scale terrain and derivative maps of the broject area (4 sets). One copy of the field cards and notes taken dj ring our field reconnaissance. The information from these forms is summarized in the attached report and on the maps. The originals will be retained by Golder in our project files. one copy of the polygon database (Excel spreadsheet). Should you have any questions or comments regardl g the above information, please do not hesitate to contact us. Yours truly, GOLDER ASSOCIATES LTD. I OFFICES IN AUSTRALIA. CANADA. GERMANY. HUNGARY, ITALY. SWEDEN, UNITED KINGDOM, UNITED STATES

I I I Tolko Industries Ltd. Vernon District Terrain Mapping -1- March, 1998 962-3150 1.0 INTRODUCTION This report accompanies a set of Terrain Maps IDl:d Derivative Maps produced as a result of detailed terrain stability mapping at terrain :survey intensity level (TSIL) C for 9 community watersheds in the Vernon Forest District. The maps pertain to the following study areas: Irish Creek watershed, (1030 ha) located 17 km northwest of Vernon, BX Group, including BX Creek, Attridge, Klim,i and Dixon watersheds, a 7580 ha cluster of watersheds extending from the municipal boundary to Silverstar Mountain 16 kin northeast of Vernon, Kalamalka Group, including Vernon Creek, Oyama, King Edward Lake, and Kalamalka watersheds (total of 40,020 ha). The locations of the study areas are shown on FigUres 1 and 2, attached. The work was conducted by Golder Associates Ltd. in association with KDW Geographic Solutions Ltd. on behalf of Tolko Industries Ltd. Utvington Division, and funded by FRBC. Terrain mapping and interpretations for slqpe stability, eros ion potential and sediment transfer potential were carried out accor~ing to provincial standards (see Section 2 - Methods). Terrain mapping was carried :out on 1994 series 1:15 000 scale colour air photos by a combination of air photo interpretation and field checking. I Original mapped photos and field notes have been retained by the Kamloops Region Ministry of Forests for archiving. This report outlines the mapping methodology followed and criteria developed for slope stability and other interpretations in the project area (Section 2). Comments regarding map reliability and project constraints are also included in Section 2. Section 3 contains a general overview of the study area. Sectiohs 4 and 5 summarize information about surficial materials and processes identified duting the course of mapping. The [mal section contains a brief discussion of the nature and extent of apparent terrain hazards present in the study area. 2.0 METHODS 2.1 Terrain Mapping Terrain mapping followed the standard British Oolumbia procedures for terrain classification (Howes and Kenk, 1997), mapping methods (RIC, 1995) and 5-class stability mapping (Forest Practices Code, 1995). I I Terrain mapping was conducted by Mr. Glen Rutherford, E.I.T. (south half of Kalamalka Group), Ms. Carrie-Lynn Brown, G.I.T. i(north half of Kalamalka Group Golder Associates

Tolko Industries Ltd. Vernon District Terrain Mapping -2- March, 1998 962-3150 and final mapping of BX Group) and Ms. Christinl Ouellet, P. Eng. (Irish Creek and pretyping of BX Group), with senior review and. roject management carried out by Mr. Greg Reid, P. Eng. Field checks were perfo med to verify preliminary mapping and, where necessary, revisions to the preliminary I ork. Initial fieldwork was carried out in October 1996 by the three mappers who spent a total of 30 crew days in the various map areas. Supplementary fieldwork was ~equested by the FRBC reviewers as part of the mandatory QA/QC process, which rer,ulted completion of an additional 9 crew days in the summer of 1997 in the BX and IKalamalka project areas. The work involved traversing representative polygons of the "Fious surficial materials and slopes within operable and potentially operable forest areas. In general, road access was adequate in many par~ of all of the project areas, with some exceptions, most notably parts of the Kal1; study area. The map areas were covered in the field by a combination of road quad, and foot traverses, with supplementary visual observations made during a b ief helicopter overflight of parts of the map areas. In general, the traverses were planned to provide representative coverage across all of the map areas while focusing ~n potentially operable regions with steeper slopes and areas of potential instability. Soil pits were dug on occasion where natural exposures, slide scars or tree-throw hollows kere not available for observation t Table 1: Airphotos Project Flight Line Photo numbers Photo Numbers Irish - Nl BCC94051 # 145-149 Irish - N2 BCC94054 # 009-011 BX- Nl BCC94048 # 038-047 I BX-N2 BCC94043 # 046-054 I BX- N3 BCC94043 # 088-095 I BX-N4 BCC94048 # 133-140 I BX- N5 BCC94043 # 181-185 Kalamalka - N 1 not used I Kalamalka - N2 BCC94052 # 123-128 Kalamalka - N3 BCC94049 # 047-056 Kalamalka - N4 BCC94054 # 057-067 Kalamalka - N5 BCC94089 # 098-110 I Kalamalka - N6 BCC94099 # 062-076 I Kalamalka - N7 BCC94052 # 033-035 I BCC 94089 # 167-182 Kalamalka - N8 BCC94049 # 097-112 I Kalamalka - N9 BCC94053 # 061-076 I Kalamalka - N 10 BCC94053 # 181-196 I Kalamalka - NIl BCC94152 # 097-107 I Kalamalka - N 12 BCC94058 # 033-041 I Kalamalka - N 13 BCC94085 # 145-149 Golder Associates