Probe Metals Discovers New High Grade Gold Zone on Val-d Or East Project: Intersects 12.6 g/t Gold Over 7.3 Metres

Similar documents
Probe Metals Continues to Intersect Significant Gold Mineralization in Expansion Drilling at Val-d Or East, including 4.1 g/t Gold Over 15.

Probe Metals Continues to Expand Gold Zones At Val-d Or East

Probe Metals Confirms Continuity of Gold Mineralization on its Val-d Or East Project And Increases 2017 Drill Program to 75,000 metres

Probe Metals Intersects 1,122 g/t Gold Over 0.7 Metres in New Zone at Val-d Or East

Probe Metals Intersects 3.2 g/t Gold Over 45.5 Metres At Val-d Or East

QMX GOLD CONTINUES TO INTERSECT STRONG MINERALIZATION AT BONNEFOND, INTERSECTING 39.5 g/t Au OVER 2.4 METRES AND 31.5 g/t Au OVER 1.

At the contact, mineralization is associated with strong tourmalinization of the Bevcon Intrusion.

Detour Gold Reports Drilling Results from Lower Detour

MONETA INTERCEPTS g/t GOLD INCLUDING g/t GOLD AND g/t GOLD INCLUDING g/t GOLD AT SOUTH WEST

TRENCHING AT LAS DOLORES EXTENDS STRIKE LENGTH TO OVER 1,000 METRES, INTERSECTING

OSISKO METALS INTERSECTS 10.49% ZINC+LEAD OVER METRES AND 12.15% ZINC+LEAD OVER METRES AT PINE POINT

Highlights include: Hole TTD050: 6.12 g/t Au over 7.00 metres from metres o Including g/t Au over 1.18 metres

Orford Intersects 41.1 m Grading 1.36 g/t Au at Jones Keystone Project in North Carolina

QMX GOLD INTERSECTS 29.8 G/T AU OVER 3.0 METERS AND 19.3 G/T AU OVER 3.2 METERS AT BONNEFOND

MONETA INTERCEPTS g/t GOLD INCLUDING g/t GOLD AT SOUTH WEST

INV METALS ANNOUNCES DRILL RESULTS AT LOMA LARGA AND INITIAL PROSPECTING RESULTS ON NEW REGIONAL PROPERTIES

ET and and and

NEWS RELEASE ORCA GOLD REPORTS CONTINUED SUCCESS AT GSS

NEWS RELEASE. Foran Mining Intersects High Grade Zinc at McIlvenna Bay. Results expand area of known mineralization

MINERAL MOUNTAIN RESOURCES LTD. MMV.TSX-V

Plateau Extends Falchani East Lithium Deposit Community Agreements Executed and Three Drill Rigs Active at Falchani West

TROILUS GOLD CORP. INITIATES 30,000 METRE DRILL PROGRAM ON TROILUS PROPERTY

NORTHQUEST LTD. ANNOUNCES DRILLING RESULTS FROM THE PISTOL BAY GOLD PROJECT, NUNAVUT, CANADA

ATON RETURNS 22.2 METRES OF 2.77 GRAMS PER TONNE GOLD EQUIVALENT FROM HAMAMA WEST; VISIBLE GOLD DISCOVERED AT BOHLOG

News Release. Infill Drilling Program

GOLDPLAY ANNOUNCES FURTHER SAMPLING RESULTS FROM SAN MARCIAL HISTORICAL CORE; CONFIRMS OPEN PIT TARGET NEAR SURFACE WITH gpt AgEq.

Assay Results Highlights (as of November 16, 2017) representing approximately 4,500 metres ( m ) of drilling:

NEWS RELEASE LATEST EXPLORATION PROGRAM CONTINUES TO DEMONSTRATE NARANJILLO AS A HIGH GRADE SILVER HOST

BALMORAL INTERSECTS g/t GOLD OVER 7.99 METRES, BUG LAKE SOUTH, DETOUR GOLD TREND PROJECT, QUEBEC

West Pender Street Vancouver, BC V6C 2V6 Tel: Fax: TSX-V: GBR NEWS RELEASE

IDAHO CHAMPION INTERSECTS 4.80 GRAMS PER TONNE GOLD OVER 5.9 METRES IN HIGHLY OXIDIZED ZONE AT THE BANER PROJECT

Drilling Highlights: Phase II BCV Infill Drilling

(TSXV: GPLY, OTCQB: GLYXF

Orsu Metals hits 2.62 g/t Au over 22.2 metres and proves higher gold grades at Zone 23, Sergeevskoe Gold Project, Russia

NEWS RELEASE. Foran Intersects Over 28 Metres of Copper Mineralization

NEWS RELEASE. FORAN INTERSECTS 9.4% ZINC OVER 6.1 METRES Feasibility Drilling Continues

NEWS RELEASE ORCA GOLD INDICATED AND INFERRED RESOURCES AT BLOCK 14 INCREASE BY 24% AND 48% RESPECTIVELY

NEWS RELEASE FULLER PROPERTY CONTINUES TO DELIVER GOOD RESULTS 2.53 GRAMS PER TONNE GOLD OVER METRES

Orford Completes Phase 1 Exploration Program and Generates High-Quality Drill Targets on its Carolina Gold Properties

BALMORAL ANNOUNCES SIGNIFICANT GOLD DISCOVERY ON DETOUR GOLD TREND IN QUEBEC

CAUTIONARY STATEMENT

AbraPlata defines gold-rich zone with up to 16.7g/t Au over 10.6m in the basement at its Diablillos property in Argentina

IDM Mining s Underground Drilling Intersects g/t Au and g/t Ag over 6.80 Meters True Width at the Red Mountain Gold Project

ANTLER GOLD EXPLORATION UPDATE, WILDING LAKE GOLD PROJECT, NEWFOUNDLAND

Eloro Outlines Major New Mineralized Trend on La Victoria Project, Peru; Sample Results Return Values To 33 Grams Gold Per Tonne

FALCO PACIFIC COMPLETES INITIAL MODEL FOR THE HORNE 5 GOLD/SILVER/ZINC/COPPER DEPOSIT

BELO SUN INTERSECTS NEW HIGH GRADE ZONE AT GROTA SECA AND EXPANDS GRANDE DEPOSIT

CANARC RESOURCE CORP Howe Street Vancouver, BC V6C 2T6. News Release

V Sample from C.O.D vein 15 metres southwest of V

55 Adelaide Street East, Suite St-Charles west, Suite 411, West Tower

BK Copper Project Strong Copper Results Confirm and Extend BKM

SABINA GOLD &SILVER REPORTS COMPLETION OF DRILLING AT ECHO DEPOSIT, BACK RIVER, NUNAVUT.

Orsu Metals intercepted a voluminous 200-m-wide gold-mineralized stockwork in the north of the Klyuchi West zone, Sergeevskoe Gold Project, Russia

IAMGOLD PROVIDES UPDATE ON ADVANCED EXPLORATION PROJECT DIAMOND DRILLING RESULTS BOTO PROJECT, SENEGAL

Canadian Gold Miner Grab Sample Returns 29.5 Grams per tonne Gold from South Kirkland Project

Orsu Metals completes Phase 2 drilling program and announces significant intercepts in drillhole SDH17-15 at Zone 23, Sergeevskoe Gold Project, Russia

PRESS RELEASE. DUBUISSON NORTH DRILLING CUTS g/t AU OVER 5.0 METRES NEW S50 EAST DISCOVERY, 3.39 g/t AU OVER 25.9 METRES

OSISKO INTERSECTS 36 g/t Au OVER 6.9 METRES AT LYNX

MINERA ALAMOS TO COMMENCE DRILLING AIMED AT EXPANDING AREAS OF DEFINED GOLD MINERALIZATION AT SANTANA/LOS VERDES PROPERTY, SONORA, MEXICO

Drilling Extending Mineralization in La Mina North Zone

Yorbeau identifies two new exciting exploration targets at the Rouyn Property

Mineral Resource Estimate Comparison at 3 g/t Au cut-off

BOREAL EXPANDS DISCOVERY ZONE OF HIGH-GRADE ZINC, SILVER AND LEAD MINERALIZATION AT GUMSBERG PROJECT IN SWEDEN

GOLDPLAY OUTLINES FIVE NEW EXPLORATION TARGETS AT THE SAN MARCIAL PROJECT IN MEXICO

EXPLOR INTERSECTS MULTIPLE COPPER ZONES GRADES UP TO 3.65% CU OVER 5.35 METERS ON THE CHESTER COPPER PROPERTY

Hole (93) From (m) To (m) m Au (g/t) Ag (g/t) Cu (%) Pb (%) Zn (%) CMLP

KIRKLAND LAKE GOLD INTERSECTS NEW MINERALIZATION AT TAYLOR MINE, CONTINUES TO EXTEND PORPHYRY DEPOSITS TO DEPTH

August 20, 2018 SBB NR SBB TSX

Drilling Extending Mineralization in La Mina North Zone

BALMORAL INTERSECTS 1,138 g/t (33 oz/ton) GOLD OVER 4.87 METRES, BUG LAKE FOOTWALL ZONE, DETOUR GOLD TREND PROJECT, QUEBEC

AVION GOLD DJAMBAYE II ZONE, TABAKOTO PROJECT, MALI, RETURNS HIGH GRADE INTERCEPTS OF 7.56 G/T Au OVER 7.0 METRES AND G/T Au OVER 3.

Hole ID From (m) To (m) Interval (m) Au (g/t) Ag (g/t) AuEq (g/t)* Zn (%)

23 January, 2018 CSE: RFR For Immediate Release. Renforth extends Parbec Gold Deposit strike 60m with gold in all 7 drillholes

BELO SUN DISCOVERS NEW MINERALIZED ZONE AT ITS VOLTA GRANDE GOLD PROJECT, BRAZIL

Minsud to recommence resource outline diamond drilling at the Chita Valley Cu- Au-Ag-Mo Project, San Juan, Argentina

Toronto, Canada March 4, 2013

Asiamet Drilling Further Extends BKM Mineralisation

KIRKLAND LAKE GOLD EXPANDS NEW HIGH-GRADE ZONE BELOW TAYLOR MINE, REPORTS MINERALIZED EXTENSIONS ALONG STRIKE AND AT DEPTH

OSISKO INTERSECTS 2223 g/t Au OVER 2.0 METRES AT WINDFALL Infill Drilling Hits Bonanza Grade in Zone 27

OSISKO INTERSECTS 115 g/t Au OVER 8.4 METRES AT LYNX. Interval (m)

True Width (m) Carneritos to

Orsu Metals doubles the strike length in Zone 23 to over 600 meters and identifies a high-grade core at the Sergeevskoe Gold Project, Russia

IAMGOLD REPORTS HIGH-GRADE DRILL INTERSECTIONS FROM ITS 2017 DRILLING PROGRAM ON THE DIAKHA DEPOSIT, SIRIBAYA PROJECT IN MALI

BELO SUN RELEASES RESULTS FROM 65 DRILL HOLES FURTHER EXTENDING THE OURO VERDE DEPOSIT ALONG STRIKE NORTHWEST AND DOWN DIP

GRAPHITE ONE DRILLS 165.3M of 4.23% GRAPHITE INCLUDING 46.4M OF 6.6%, 14.3M of 10.1% and 21M of 10.1% GRAPHITE

Drilling at Perseverance in Arizona, USA Suggests Proximity to Porphyry Copper System

Pacific Empire Minerals Provides Copper King RC Drilling Results

Pershing Gold Hits Highest Grade Gold to Date in Relief Canyon with Grams per Tonne (3.618 Ounces per Ton) Intercept

AUGUSTINE VENTURES ANNOUNCES HIGH GRADE GOLD BEARING TENSION VEINS IN THE HANGING WALL OF THE SURLUGA DEPOSIT

OSISKO INFILL 38.9 g/t Au OVER 13.7 METRES AT UNDERDOG Infill Drilling Continues to Intersect High Grade

NEWS RELEASE. FOR IMMEDIATE RELEASE Shares Outstanding: 35,190,286

5.65 m of g/t gold and 25.1 g/t silver (vertical hole) 4.15 m of g/t gold and 12.2 g/t silver (vertical hole)

CROCODILE GOLD INTERSECTS 7.1 G/T AU OVER 4.5 METERS INCLUDING 11.2 G/T AU OVER 2.6 METERS AT THE UNION REEFS PROJECT, PROSPECT DEPOSIT

CHAMPION IRON REPORTS EXPLORATION RESULTS AT POWDERHORN PROJECT, NEWFOUNDLAND

IAMGOLD PROVIDES EXPLORATION UPDATE ON BOTO PROJECT IN SENEGAL

NEWS RELEASE FORAN INTERSECTS 27 METRES OF CONTINUOUS MINERALIZATION

NEWS RELEASE. March 22, 2017

MEDIA RELEASE OCEANAGOLD ANNOUNCES FURTHER DOWN DIP EXTENSIONS OF MINERALISATION AT PANEL 2: FRASERS UNDERGROUND MINE

Pahtavaara Drill Program Intersects 32.8 G/T Gold Over 2.0M And 2.1 G/T Gold Over 18.0M In The Karoliina Zone

OSISKO INTERSECTS 37.0 g/t Au OVER 5.4 METRES AT OSBORNE-BELL Infill Drilling Continues to Confirm High-Grade

Transcription:

NEWS RELEASE 23/2016 Symbol: TSX-V: PRB Shares Issued: 85,458,906 Probe Metals Discovers New High Grade Gold Zone on Val-d Or East Project: Intersects 12.6 g/t Gold Over 7.3 Metres Toronto, December 6, 2016 PROBE METALS INC. (TSX-V: PRB) ( Probe or the Company, is pleased to announce results from the ongoing drilling program on its 100% owned Val-d Or East project (the "Project") located in Quebec (see table 1). In addition to further definition and delineation of the East-West trending gold-bearing quartz-tourmaline vein system, drilling was also successful in discovering a new high-grade gold zone hosted by diorite dyke, similar to that of the past-producing Beliveau Mine. Highlights from new drilling include: - Discovery of a new high-grade gold zone in diorite dyke returning intervals of up to 12.6 g/t gold ( Au ) over 7.3 metres in Hole PC-90. Mineralization was intersected consistently between 400 and 800 metres depth and could represent a significant new gold zone (within the dyke mineralization, true width is not known) - Holes PC-91 & -94 also intersected the high-grade zone returning intercepts of up to 8.5 g/t Au over 3.5 metres and 9.7 g/t Au over 4.2 metres, respectively (within the dyke mineralization, true width is not known) - Continuity of near surface mineralization continues to be demonstrated with some impressive intervals in the first 150 meters of depth, with the best intercept returning 2.0 g/t Au over 143 metres, including 35.1 g/t Au over 4.2 metres, in Hole PC-90 (true width approximately 70% - 90% of drill interval). The new gold zone was intersected by an infill drill hole, DDH PC-90, which was originally designed to test for higher grade mineralization within the east-west-trending quartz-tourmaline vein system. At approximately 400 metres depth (down-hole) a north-south-trending diorite dyke containing numerous zones of significant disseminated pyrite mineralization and quartz-tourmaline veins, similar to that hosting the former Beliveau Mine, were intersected and traced down to over 800 metres depth down hole. The true width of these zones is not known and will require further drilling to determine. The presence of strong gold mineralization in the diorite dyke at these depths indicates that the east-west feeder system is active at these levels and bodes well for further expansion along strike, away from the dyke, at these depths. In addition to the new zone, the higher-grade quartztourmaline vein mineralization originally targeted was also intersected at shallow depths in Hole PC- 90, returning an impressive 2.0 g/t Au over 143 metres starting at 15 metres depth (down hole). Other highlights of the near-surface vein system include: 2.5 g/t Au over 25.5 metres in Hole PC-86; and 3.0 g/t Au over 16.0 metres in Hole PC-88. Results from this first-phase drilling program are very encouraging, and indicate increased potential for both near-surface bulk tonnage and deeper, higher grade mineralized systems. Results also demonstrate the continuity of the gold mineralization and

therefore the potential for significant new mineralization laterally to the west and east of the known mineralization. Table 1: Val-d Or East Project Drilling Results Hole Number From (m) To (m) Lenght (m) Au (g/t) Host Rock PC-16-84 45.5 62.2 16.7 1.5 Int. Volcanics including 52.9 54.9 2.0 9.5 Int. Volcanics 134.0 140.0 6.0 2.9 Diorite Dyke PC-16-85 101.0 158.9 57.9 1.1 Diorite Dyke including 148.8 150.5 1.7 9.0 Diorite Dyke PC-16-86 41.5 67.0 25.5 2.5 Int. Volcanics including 45.5 48.1 2.6 14.6 Int. Volcanics 85.0 90.0 5.0 3.9 Int. Volcanics 102.7 144.0 41.3 1.0 Int. Volcanics 153.4 156.0 2.6 6.9 Int. Volcanics PC-16-87 131.5 149.5 18.0 2.4 Int. Volcanics including 139.5 142.0 2.5 11.2 Int. Volcanics PC-16-88 166.0 182.0 16.0 3.0 Int. Volcanics including 168.0 171.0 3.0 15.0 Int. Volcanics PC-16-89 13.0 36.6 23.6 0.8 Int. Volcanics PC-16-90 14.8 157.8 143.0 2.0 Int. Volcanics including 14.8 27.3 12.5 7.0 Int. Volcanics including 94.4 98.5 4.2 35.1 Int. Volcanics 437.5 450.0 12.5 2.6 Diorite Dyke 524.4 535.8 11.4 3.2 Diorite Dyke 586.4 593.7 7.3 12.6 Diorite Dyke 637.8 648.5 10.8 3.1 Int. Volcanics 657.8 663.6 5.8 5.3 Int. Volcanics 669.5 678.0 8.5 3.5 Int. Volcanics 710.4 717.5 7.1 4.7 Diorite Dyke PC-16-91 150.7 152.8 2.1 14.6 Int. Volcanics 476.1 483.6 7.5 3.8 Int. Volcanics 518.3 521.3 3.0 6.3 Int. Volcanics 680.5 684.0 3.5 8.0 Diorite Dyke PC-16-92 392.0 394.3 2.3 19.5 Int. Volcanics PC-16-93 100.3 105.3 5.0 3.2 Int. Volcanics PC-16-94 15.7 155.0 139.3 0.7 Int. Volcanics including 17.7 25.7 8.0 6.2 Int. Volcanics 529.6 540.6 11.0 4.8 Diorite Dyke 649.7 651.7 2.0 8.2 Diorite Dyke 641.0 664.1 23.1 3.1 Diorite Dyke including 661.6 664.1 2.5 12.9 Diorite Dyke 690.5 693.3 2.8 5.1 Diorite Dyke 728.0 731.0 3.0 5.1 Diorite Dyke 808.9 813.1 4.2 9.7 Diorite Dyke PC-16-95 14.8 19.3 4.5 2.6 Int. Volcanics 136.9 141.8 4.9 2.8 Int. Volcanics

163.8 168.0 4.3 3.4 Int. Volcanics 254.0 263.0 9.0 3.9 Int. Volcanics PC-16-96 164.9 167.0 2.1 10.9 Diorite Dyke (1) For intervals within diorite, true thickness is not known. Additional drilling is planned for the immediate area which will enable the true width determination (2) For all other rock types, true thickness is currently estimated to be between 70% to 90% of drill length. Figure 1: Drill Holes Location Surface Map https://probemetals.com/site/assets/files/1249/figure_1_surfacemap_2016drillingresults-v2.jpg Figure 2: New Discovery at Depth North-South Drill Section Hole 90 https://probemetals.com/site/assets/files/1249/figure_2-lb_sectionns_level1890_pc_16_90.jpg For complete drilling results, click link below: https://probemetals.com/site/assets/files/1249/table_assay_results_pr-december_2016.pdf David Palmer, President and CEO of Probe, states: Initial results from the drilling program have definitely validated our confidence in the Val-d Or East project and highlighted its significant exploration upside and potential for expansion. To come up with a new discovery so soon after the combination of Probe and Adventure Gold is not only a testament to the project but also the dedication of the new exploration and management team. We look forward to continuing the success on Vald Or East, as well as our other projects, as we ramp up our exploration activities. With the bulk of our land consolidation strategy achieved, we will now be able to focus more effort on our exploration programs and generating results. Following the discovery of the new zone, surface drilling has been expanded to better delineate this mineralization and test for its extensions. Two drill rigs are currently in operation on site testing the new zones. The results announced today are from 5,600 metres of drilling, representing 13 drill holes. Drill results from the ongoing drill program will be disclosed as they become available. In addition to drilling, the first phase of a property-scale IP survey has been completed and is currently being interpreted. The Company intends to commence drill-testing of the new IP anomalies in Q1-2017 with the addition of a third drill. The New Beliveau Gold Deposit The New Beliveau deposit consists predominantly of a series of parallel, east-west trending, moderately dipping to the south mineralized zones hosting gold-bearing quartz-pyrite-tourmaline veins. Gold mineralization occurs in the veins but also in their immediate wall rocks. The sulphide content is generally 1 to 5%, but may reach up to 10% in the higher-grade sections. The extent of the alteration zone, which consist of a mixture of quartz, tourmaline, dolomite, albite, and euhedral pyrite is commonly twice the thickness of the vein itself. The north-south-trending diorite dykes also contain significant gold with gold grades typically increasing in areas where the dykes are intersected by the east-west quartz-tourmaline veins. Wall rocks for both systems consist of intermediate volcanics rock. Together with the Highway and North Zones, the New Beliveau Deposit host a NI 43-101 inferred resources of 770,000 ounces at 2.6 g/t gold calculated at a 1.0 g/t cut-off above 350 metres depth and

1.5 g/t cut-off below 350 metres depth (see NI 43-101 technical report: Mineral Resource Val-d Or East Property - January 4, 2013). Qualified Persons The scientific and technical content of this press release has been prepared, reviewed and approved by Mr. Marco Gagnon, P.Geo, Executive Vice President of Probe, and Mr. Denis Chenard, P.Eng, Senior Geologist of Probe at the Val-d Or East Project, who are "Qualified Persons" as defined by National Instrument 43-101 - Standards of Disclosure for Mineral Projects ("NI 43-101"). Quality Control During the last drilling program, assay samples were taken from the NQ core and sawed in half, with one-half sent to a certified commercial laboratory and the other half retained for future reference. A strict QA/QC program was applied to all samples; which includes insertion of mineralized standards and blank samples for each batch of 20 samples. The gold analyses were completed by fire-assayed with an atomic absorption finish on 50 grams of materials. Repeats were carried out by fire-assay followed by gravimetric testing on each sample containing 5.0 g/t gold or more. Total gold analyses (Metalic Sieve) were carried out on the samples which presented a great variation of their gold contents or the presence of visible gold. ABOUT PROBE METALS Probe Metals Inc. is a leading Canadian gold exploration company focused on the acquisition, exploration and development of highly prospective gold properties. The Company is well-funded and controls a strategic land package of over 1,000-square-kilometres of exploration ground within some of the most prolific gold belts in Ontario and Quebec: Val d Or, West Timmins, Casa-Berardi and Detour Quebec. The Company is committed to discovering and developing high-quality gold projects, including its key asset the Val-d Or East Gold Project. The Company was formed as a result of the sale of Probe Mines Limited to Goldcorp on March 13, 2015. Goldcorp currently owns a 15% stake in the Company. On behalf of Probe Metals Inc., Dr. David Palmer, President & Chief Executive Officer For further information: Please visit our website at www.probemetals.com or contact: Patrick Langlois, Vice President, Corporate Development Tel: (416) 777-9470 Email: patrick@probemetals.com Karen Willoughby, Director of Corporate Communications

Tel: (866) 936-6766 Email: kwilloughby@probemetals.com Forward-Looking Statements Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release. This News Release includes certain "forward-looking statements" which are not comprised of historical facts. Forward-looking statements include estimates and statements that describe the Company s future plans, objectives or goals, including words to the effect that the Company or management expects a stated condition or result to occur. Forward-looking statements may be identified by such terms as believes, anticipates, expects, estimates, may, could, would, will, or plan. Since forward-looking statements are based on assumptions and address future events and conditions, by their very nature they involve inherent risks and uncertainties. Although these statements are based on information currently available to the Company, the Company provides no assurance that actual results will meet management s expectations. Risks, uncertainties and other factors involved with forward-looking information could cause actual events, results, performance, prospects and opportunities to differ materially from those expressed or implied by such forward-looking information. Forward looking information in this news release includes, but is not limited to, the Company s objectives, goals or future plans, statements, exploration results, potential mineralization, the estimation of mineral resources, exploration and mine development plans, timing of the commencement of operations and estimates of market conditions. Factors that could cause actual results to differ materially from such forward-looking information include, but are not limited to failure to identify mineral resources, failure to convert estimated mineral resources to reserves, the inability to complete a feasibility study which recommends a production decision, the preliminary nature of metallurgical test results, delays in obtaining or failures to obtain required governmental, environmental or other project approvals, political risks, inability to fulfill the duty to accommodate First Nations and other indigenous peoples, uncertainties relating to the availability and costs of financing needed in the future, changes in equity markets, inflation, changes in exchange rates, fluctuations in commodity prices, delays in the development of projects, capital and operating costs varying significantly from estimates and the other risks involved in the mineral exploration and development industry, and those risks set out in the Company s public documents filed on SEDAR. Although the Company believes that the assumptions and factors used in preparing the forward-looking information in this news release are reasonable, undue reliance should not be placed on such information, which only applies as of the date of this news release, and no assurance can be given that such events will occur in the disclosed time frames or at all. The Company disclaims any intention or obligation to update or revise any forward-looking information, whether as a result of new information, future events or otherwise, other than as required by law.