BLAST MONITORING REPORT. HG12 Hard Stone Quarry at Ta Klement, l/o Qala Gozo 22nd January 2016

Similar documents
BLAST MONITORING REPORT. HG12 Hard Stone Quarry at Ta Klement, l/o Qala Gozo 1st March 2013

BLAST MONITORING REPORT. HM22 Hard Stone Quarry at Wied Filep, l/o Naxxar 8th August 2016

BLAST MONITORING REPORT. Four blasts were carried out between 10:56 and 11:09 at the points as approximately indicated on the attached site diagram.

Rio Tinto- Compagnie minière IOC

LIONS GATE SECONDARY WWTP SEWER CONVEYANCE

APPENDIX Q BLASTING IMPACT ASSESSMENT REPORT

Mathias Jern nitroconsult.se)

Blast Impact Analysis Fleming Quarry Extension Concession Broken Front, Part of Lot 40 Township of Ramara County of Simcoe.

PTA-427 BAROMETRIC PRESSURE TRANSDUCER OPERATOR S MANUAL

Improving Safety Provisions of Structural Design of Containment Against External Explosion

POE Practice Test - Electricity, Power, & Energy

792A AC/DC Transfer Standard

Uncertainties associated with the use of a sound level meter

Loadcell Calibration - Evaluation of Uncertainties

PREDICTION RESULTS AND VALIDATION OF LONG RANGE NOISE PROPAGATION FROM BLAST EVENTS

MEASUREMENTS OF SOUND ABSORPTION TIMBERCRETE

Guidelines on the Calibration of Automatic Instruments for Weighing Road Vehicles in Motion and Measuring Axle Loads AWICal WIM Guide May 2018

SMD Shielded Power Inductor. TIS8D43GS Series. Features. Applications. Dimensions

Update on Acton Extension Application

SPECIFICATIONS. Multi-layer Chip Ferrite Bead GZ Series Customer Part Number. [ New Released, Revised] SPEC No.: GZ110000

Data Capture Sheet. ref no MNK05_001. Location Il-Minżel, Manikata. Site Description (Address) Pillbox at Il-Minżel, Manikata.

GROUND VIBRATIONS IN OPENCAST MINE BLAST ON STRUCTURES VIS-À-VIS A LOCAL ENVIRONMENTAL EFFECT AND ITS MITIGATION THROUGH MINING TECHNOLOGY

Teacher s notes 19b An investigation into the energy changes occurring in a pendulum swing

ROAD WEATHER INFORMATION SYSTEM DEVICE TESTING LEVEL C

BUREAU OF MINERAL RESOURCES, GEOLOGY AND GEOPHYSICS

792A AC/DC Transfer Standard

Importance of blast-design in reduction of blast-induced vibrations

Consultancy Report Ref: 9383-R01

SHOCK AND VIBRATION RESPONSE SPECTRA COURSE Unit 29. Shock Response Spectrum Synthesis via Wavelets

ROCKMA Digital Strata Mapping Based on Drill Monitoring. Presentation by Warwick Smyth GeoConsult BBUGS & BOHUGS 2014

wave speed (metre/second, m/s) = frequency (hertz, Hz) x wavelength (metre, m)

Modern SLMs are very stable and shouldn t drift this much

PHYSICS B SAMPLE EXAM I Time - 90 minutes 70 Questions

Application and verification of ECMWF products 2015

TESTING THE DETONATOR ACCURACY USING VELOCITY OF DETONATION AND AIRBLAST METERS

the firm: Tel.: REMENT

MEI STRUCTURED MATHEMATICS 4763

Lab 01: Harmonic Motion I. Theory: Three experiments. The first we measure the oscillation of a spring, the second of a rubber band (non-linear).

Committee Draft No. 99 To be combined with T-150 as a method B. Determination of Natural Frequency and Flexural Modulus by Experimental Modal Analysis

Honors Physics. Summer Assignments Teacher Information. Summer Assignment Goals

Lesson 4.1 Exercises, pages

Circular Motion. ว Note and Worksheet 2. Recall that the defining equation for instantaneous acceleration is

b) What is its position when its velocity (magnitude) is largest? When it is at x=0 all the energy is kinetic.

PRODUCT DATA. Sound Intensity Calibrator Type 3541-A. Uses and Features

Simple Harmonic Motion Investigating a Mass Oscillating on a Spring

Physical Properties of the Spring

OpenWeatherMap Module

DeFelsko PosiTector Dew Point Meter with Anemometer (DPMA)

National Quali cations

Application and verification of ECMWF products 2012

Model 791 Calibration Plate for Tiltmeters and Inclinometers

Studnice Test Station (EGÚ Brno)

PAPER 2 THEORY QUESTIONS

X: The Hall Effect in Metals

ea980r Digital Anemometer User Manual

Physics Assessment Unit AS 1

Two boats, the Rosemary and the Sage, are having a race between two points A and B. t, where 0 t (i) Find the distance AB.

Product Data. Brüel & Kjær B. Sound Intensity Calibrator Type 3541

ROLLEASE ACMEDA ACOUSTICAL PERFORMANCE TEST REPORT

2. Find the value of y for which the line through A and B has the given slope m: A(-2, 3), B(4, y), 2 3

Standard Practices for Air Speed Calibration Testing

APPROVAL SHEET FOR AL. ELECTROLYTIC CAPACITORS

Chapter 5 Review. 1. [No Calculator] Evaluate using the FTOC (the evaluation part) 2. [No Calculator] Evaluate using geometry

3.The wrecking crane shown is moving toward a brick wall that is to be torn down.

The Hungarian Meteorological Service has made

Inclement Weather Preparedness. Tornadoes and Severe Thunderstorms

WEATHER STATION FIELD GUIDE

SMD Switch SI-C3436A General specification. Soldering conditions Reflow Soldering condition. Standard Reel Dimensions (mm) Packing specification

TEST REPORT. Test Method : See the attached sheets.

Composition, Structure and Energy. ATS 351 Lecture 2 September 14, 2009

Blasting related failures. K F Man Mines Division, CEDD 3 March 2007

ARUBA CLIMATOLOGICAL SUMMARY 2014 PRECIPITATION

CONSTRUCTION MATERIALS

Determination of sound absorption coefficient in impedance tubes according to ISO (2 appendices)

Blower Motor 3P Connector

National Public Weather and Warning Services in the Swaziland Meteorological Service Dennis S.Mkhonta /

DETECTION OF NATURALLY OCCURRING EVENTS FROM SMALL APERTURE INFRASOUND ARRAYS

Weather observations from Tórshavn, The Faroe Islands

HEIGHT ALTITUDE FLIGHT LEVEL

PREPARATION FOR CALCULUS

DMI Report Weather observations from Tórshavn, The Faroe Islands Observation data with description

LABORATORY MEASUREMENTS OF THE SOUND ABSORPTION COEFFICIENTS OF OSCAR EVO-PANELS

Physics 2080 Extra Credit Due March 15, 2011

a) Draw the angle in standard position. b) determine an angle that is co-terminal to c) Determine the reference angle of

TEST REPORT. Page 1 of 11

Smart Phone MEMS Labs Dr. Lynn Fuller

Protection of Underground Mine Structures Due to Adjoining Open-pit Mine Blasting

Application and verification of ECMWF products 2016

Unit 1: Introduction Measurement and Scientific Notation. Measurements in physics are carried out in SI units, aka the.

Merging of the observation sources. Sami Saarinen, Niko Sokka. ECMWF, Reading/UK. Conventional data sources Merging process into the PREODB

C310T-SC 3.6 mm x 10 mm Time-delay, axial lead ceramic tube fuses

LABORATORY MEASUREMENTS OF THE REDUCTION OF TRANSMITTED IMPACT NOISE PANETTI OVERLAID BY CONCRETE FLOORING

VIBRATION METER. Instruction Manual.

Laboratory handouts, ME 340

National 5 Physics. Electricity and Energy. Notes

Magnitude of Vibration vis-a-vis Charge per Delay and Total Charge

PTS Volt DC surface mount resettable PTC devices. Technical Data Applications. Agency information.

AP Physics C 1984 Multiple Choice Questions Mechanics

Group/In-Class Exercises 8/18/09 g0401larson8etrig.tst 4.1 Radian and Degree Measure

R & D AKUSTIKA * SIA. Test Report of laboratory Sound Insulation measurements Nr. 569 / 2011 AL 8.4. CUSTOMER: AEROC AS (Estonia)

Transcription:

ems blast monitoring services Pimlico Flats, no., Triq Viani, Sliema, MALTA Mob: 36 9944 767 Email: tcini@yahoo.com BLAST MONITORING REPORT HG Hard Stone Quarry at Ta Klement, l/o Qala Gozo nd January 06 Details Date -0-06 Quarry number HG Ta Klement, l/o Qala Gozo Quarry operator Road Constructions Co. Ltd. ANFO Supplier Framegrip Ltd. Police escort PC 306 T Grech Location and Time of Blasting Five blasts were carried out between 3:39 and 3:49 at the points as approimately indicated on the attached site diagram. Summary of Blasting Conditions Maimum charge per delay: 70-90m: 3Kg; 90-0m: Kg; 0-30m: 3Kg, 39-0m: 4Kg; 0m: 60Kg. These distances are to be measured from the slipway and the girna. Vibration limit: 4 mm/s (0 to 40) at the nearest girna or the natural arch near the slipway. Air overpressure limit: 0 db(l). Site Specific Permit All holes were within quarry boundaries and within the maimum depth allowed. Maimum charge per delay was not eceeded. Blasting is carried out according to site specifications. Weather Conditions Humidity [] Wind [] Atmospheric Pressure Temperature [] Cloud Cover [] 66% 6 Knots ENE 06 hpa C clear [] As reported by weather.maltairport.com on Jan 06 at :0 at Luqa Airport [] Our observation Comments All holes are at the top shelf of the quarry. Blasts number and 3 and 4 and were grouped as two pairs and each pair was detonated by two short circuit eploders in quick sequence and captured as one event by the seismograph. 06-0-_HG Report.doc Page of

ems blast monitoring services Notes about Monitoring The seismograph was placed at the entrance to the girna. The seismograph was set to trigger at 0. mm/s. Instrument used is MiniMate Plus, serial number BE9488. Readings Blast Number 3:39 Time 3 4 3:39 3:49 No. of Holes 6 6 No. of Delays 6 6 Depth of Holes (m) Ma. Charge per Delay (kg) 0 47 47 0 0 Total Charge (kg) 70 70 70 70 70 Dist. from Seismograph (m) 60 70 70 70 70 (mm/s) 4.9 4.9.73.7 9 4.7 Air Overpressure (db L) 9.4 7. 3.7 Scaled Distance (m kg-½).6 4.8 4.8 4.0 4.0 Burden is an average of metres, and distance between holes is an average of.3 metres. Weights in kilograms are rounded-up to the nearest unit, and depth in metres is rounded to the nearest ½ unit. Displacement between holes and the seismograph is measured using the online version of MEPA s Map Server and is accurate to the nearest 0 metres. Number of holes, their depth, burden, and the amount of ANFO used are as given by the quarry operator. Scaled distance and maimum charge per delay are calculated from the primary data. Weights are rounded-up to the nearest kilogram and the depth is rounded to the nearest ½ meter. Observations There was no flyrock outside the quarry boundaries. No damage to the surroundings was observed after the blast. The generated by blasts,, and 3 eceeded the 4mm/s limit. Air overpressure limit of 0dB was eceeded by blasts, 3, 4, and. It is suggested that the charge per delay should be reduced by drilling holes that are closer together and have less burden, since reducing depth is not practical in this area of the quarry Anthony Cini Anthony Cini B.Sc. 06-0-_HG Report.doc Page of

Event Report Date/Time Trigger Source Range Record Time at 3:39:43 January, 06 Geo: mm/s Geo: 3.7 mm/s.0 sec at 4096 sps Serial Number Battery Level Unit Calibration File Name BE9488 V 0.7-8.7 MiniMate Plus 6. Volts August 0, 0 by Datum Monitoring K488G7IL.Y70 Notes Location: Quarry Blasting Client: User Name: ems General: Microphone PSPL Channel Test Linear Weighting 9.4 db(l) 8.7 pa.(l) at 0.466 sec 30.6 (Freq = 0. Amp = 7 mv ) 4 00 00 0 BS 647:99 CURVE 3 Time (Rel. to Trig) Peak Acceleration Peak Displacement Frequency Overswing Ratio 4. 63.8 0.47 0. 3 7.6 3.8.6 9.47 3.0 0.7 0.66 3 7. 4. 4.88 64.3 7 0.4 0.9 4 7. 4.3 Peak Vector Sum.430 mm/s at 0.47 sec mm/s db sec g mm Velocity (mm/s) 0 y 0 z 0 0 0 00 > : : : AirOP.0.0 Time Scale: sec/div Amplitude Scale: Geo:.000 mm/s/div Mic: 00 pa.(l)/div Trigger = Printed: March 4, 06 (V 0.74) Format 99-0 Xmark Corporation

Event Report Date/Time Trigger Source Range Record Time at 3:39:7 January, 06 Geo: mm/s Geo: 3.7 mm/s.0 sec at 4096 sps Serial Number Battery Level Unit Calibration File Name BE9488 V 0.7-8.7 MiniMate Plus 6. Volts August 0, 0 by Datum Monitoring K488G7IL.YL0 Notes Location: Quarry Blasting Client: User Name: ems General: Microphone PSPL Channel Test Linear Weighting 7. db(l) 4. pa.(l) at 0.7 sec 33.6 (Freq = 0. Amp = 7 mv ) 4 00 00 0 BS 647:99 CURVE 3 Time (Rel. to Trig) Peak Acceleration Peak Displacement Frequency Overswing Ratio 4.86 63.64 9 0.346 0.9 7.6 3.8.667 9. 33.6 0.8 0.9 7. 4. 4.7 63.4 36.6 49 0.98 8 7. 4.3 Peak Vector Sum. mm/s at 49 sec mm/s db sec g mm Velocity (mm/s) 0 y 0 z 0 0 0 00 > : : : AirOP.0.0 Time Scale: sec/div Amplitude Scale: Geo:.000 mm/s/div Mic: 00 pa.(l)/div Trigger = Printed: March 4, 06 (V 0.74) Format 99-0 Xmark Corporation

Event Report Date/Time Trigger Source Range Record Time at 3:49:8 January, 06 Geo: mm/s Geo: 3.7 mm/s.0 sec at 4096 sps Serial Number Battery Level Unit Calibration File Name BE9488 V 0.7-8.7 MiniMate Plus 6. Volts August 0, 0 by Datum Monitoring K488G7IM.FA0 Notes Location: Quarry Blasting Client: User Name: ems General: Microphone PSPL Channel Test Linear Weighting 3.7 db(l) 30.7 pa.(l) at 0.903 sec 7.3 (Freq = 0. Amp = 7 mv ) 4 00 00 0 BS 647:99 CURVE 3 Time (Rel. to Trig) Peak Acceleration Peak Displacement Frequency Overswing Ratio.40 4.7 3.0 76 46 07 7.6 3.8 0.9 0.8 3.9 73 33 3 7. 4..730.76 4.7 3 0 7. 4.3 Peak Vector Sum.8 mm/s at sec mm/s db sec g mm Velocity (mm/s) 0 0 y z 0 0 0 00 > : : : AirOP.0.0 Time Scale: sec/div Amplitude Scale: Geo: 0 mm/s/div Mic: 00 pa.(l)/div Trigger = Printed: March 4, 06 (V 0.74) Format 99-0 Xmark Corporation