BLAST MONITORING REPORT. Four blasts were carried out between 10:56 and 11:09 at the points as approximately indicated on the attached site diagram.

Rio Tinto- Compagnie minière IOC

LIONS GATE SECONDARY WWTP SEWER CONVEYANCE

APPENDIX Q BLASTING IMPACT ASSESSMENT REPORT

Mathias Jern nitroconsult.se)

Improving Safety Provisions of Structural Design of Containment Against External Explosion

Blast Impact Analysis Fleming Quarry Extension Concession Broken Front, Part of Lot 40 Township of Ramara County of Simcoe.

MEASUREMENTS OF SOUND ABSORPTION TIMBERCRETE

GROUND VIBRATIONS FROM ROCK BLASTING

792A AC/DC Transfer Standard

Importance of blast-design in reduction of blast-induced vibrations

A new predictor for ground vibration prediction and its comparison with other predictors

Physical Properties of the Spring

792A AC/DC Transfer Standard

PTA-427 BAROMETRIC PRESSURE TRANSDUCER OPERATOR S MANUAL

Update on Acton Extension Application

GROUND VIBRATIONS IN OPENCAST MINE BLAST ON STRUCTURES VIS-À-VIS A LOCAL ENVIRONMENTAL EFFECT AND ITS MITIGATION THROUGH MINING TECHNOLOGY

SHOCK AND VIBRATION RESPONSE SPECTRA COURSE Unit 29. Shock Response Spectrum Synthesis via Wavelets

DeFelsko PosiTector Dew Point Meter with Anemometer (DPMA)

Non-Acoustical Inputs

Loadcell Calibration - Evaluation of Uncertainties

PREDICTION RESULTS AND VALIDATION OF LONG RANGE NOISE PROPAGATION FROM BLAST EVENTS

SMD Shielded Power Inductor. TIS8D43GS Series. Features. Applications. Dimensions

POE Practice Test - Electricity, Power, & Energy

SPECIFICATIONS. Multi-layer Chip Ferrite Bead GZ Series Customer Part Number. [ New Released, Revised] SPEC No.: GZ110000

ROCKMA Digital Strata Mapping Based on Drill Monitoring. Presentation by Warwick Smyth GeoConsult BBUGS & BOHUGS 2014

Data Capture Sheet. ref no MNK05_001. Location Il-Minżel, Manikata. Site Description (Address) Pillbox at Il-Minżel, Manikata.

MEI STRUCTURED MATHEMATICS 4763

Uncertainties associated with the use of a sound level meter

Lab 01: Harmonic Motion I. Theory: Three experiments. The first we measure the oscillation of a spring, the second of a rubber band (non-linear).

InfraRed Thermometer with Laser Pointer

TESTING THE DETONATOR ACCURACY USING VELOCITY OF DETONATION AND AIRBLAST METERS

Modern SLMs are very stable and shouldn t drift this much

Consultancy Report Ref: 9383-R01

wave speed (metre/second, m/s) = frequency (hertz, Hz) x wavelength (metre, m)

Comparison Of Blast-Induced Ground Vibration Predictors In Case Of Tulu-Plain Open Pit Colemanite Mine Of Eti Mine

Guidelines on the Calibration of Automatic Instruments for Weighing Road Vehicles in Motion and Measuring Axle Loads AWICal WIM Guide May 2018

PHYSICS 111 SPRING EXAM 3: April 12, 2016; 8:15pm - 9:45pm

Safety Precautions WARNING If critical situations that could lead to user s death or serious injury is assumed by mishandling of the product.

Protection of Underground Mine Structures Due to Adjoining Open-pit Mine Blasting

9334 DM Bit Addressable Latch

A COMPUTATIONAL SOFTWARE FOR NOISE MEASUREMENT AND TOWARD ITS IDENTIFICATION

APPROVAL SHEET FOR AL. ELECTROLYTIC CAPACITORS

Composition, Structure and Energy. ATS 351 Lecture 2 September 14, 2009

Blasting Design. Explosion A chemical reaction involving an extremely rapid expansion of gasses usually associated with the liberation of heat.

Blasting related failures. K F Man Mines Division, CEDD 3 March 2007

STRAIGHT LINE MOTION TEST

DSC HW 4: Assigned 7/9/11, Due 7/18/12 Page 1

Appendix D Rock Blasting Report

2.003 Engineering Dynamics Problem Set 10 with answer to the concept questions

Evaluation of Ground Vibration Induced by Blasting During the Excavation of a Transportation Tunnel in Istanbul Metropolis

Determination of sound absorption coefficient in impedance tubes according to ISO (2 appendices)

Acceptance test of the AGATA Ge detectors

Calibration of a Fragmentation Model for a New Mining Operation

ROAD WEATHER INFORMATION SYSTEM DEVICE TESTING LEVEL C

AP Physics 1 Multiple Choice Questions - Chapter 9

CERTIFICATE OF ACCREDITATION

Ground vibrations level characterization through the geological strength index (GSI)

Blasting, fragmentation and wall quality result at West Wanagon slope stability project on Grasberg Mine

Simple Harmonic Motion Investigating a Mass Oscillating on a Spring

Laboratory handouts, ME 340

Underwater sound pressure and ground vibration measurements taken during blasting in the Ben Schoeman Dock in Cape Town, February 2008

Shaft Sinking with Electronic detonators at the Gautrain Rapid Rail Link Project

Certificate of Calibration Sound Level Calibrator

Bay Linear. 1.0Amp Low Dropout Voltage Regulator B1117

Specification For LTCC Doherty Combiner

Studnice Test Station (EGÚ Brno)

BUREAU OF MINERAL RESOURCES, GEOLOGY AND GEOPHYSICS

Model 791 Calibration Plate for Tiltmeters and Inclinometers

93L34 8-Bit Addressable Latch

AQA Physics P2 Topic 1. Motion

Data in Brief. Peak particle velocity data acquisition for monitoring blast induced earthquakes in quarry sites

1. (P2.2D) Describe the acceleration and speed of an object that is experiencing uniform circular motion.

Solid Tantalum Chip Capacitors TANTAMOUNT, Low Profile, Conformal Coated, Maximum CV

Magnitude of Vibration vis-a-vis Charge per Delay and Total Charge

PHYSICS 1 Simple Harmonic Motion

1 Introduction. Station Type No. Synoptic/GTS 17 Principal 172 Ordinary 546 Precipitation

Standard Practices for Air Speed Calibration Testing

PAPER 2 THEORY QUESTIONS

iweathar EDGE V Installation Guide Copyright 2012 iweathar. All rights reserved.

Electrical Test Report on PS3300 Series Uninterruptible Power Supply for Powerstar Inc. Gaithersburg MD

PHYSICS B SAMPLE EXAM I Time - 90 minutes 70 Questions

DETECTION OF NATURALLY OCCURRING EVENTS FROM SMALL APERTURE INFRASOUND ARRAYS

ROLLEASE ACMEDA ACOUSTICAL PERFORMANCE TEST REPORT

Direct Fatigue Damage Spectrum Calculation for a Shock Response Spectrum

Optimum Blasting Parameters for Single Shot Blasting in Non Fractured Biotite-Gneiss Rocks of Sri Lanka

1. Distinguish the important characteristics of instrument that are totally electrical and totally electronic in nature. [16]

ARG100 Rainfall Intensity Adjustments

European Shotfiring Certificate. Requirements for basic training

CONSTRUCTION MATERIALS

Spruce Ridge Resources Ltd Leslie Road West, Puslinch, ON N0B 2J0 Telephone: (519) , Fax: (519)

On the Calibration of Alpha Sciences Proportional Counters

UNIVERSITY OF SASKATCHEWAN Department of Physics and Engineering Physics

The influence of drilling process automation on improvement of blasting works quality in open pit mining

FIELD INSTRUMENTATION AND ANALYSIS OF PROTOTYPE AND EXISTING LIGHT POLES ON THE BRONX-WHITESTONE BRIDGE. Final Report. Ian C. Hodgson.

Optimized PSD Envelope for Nonstationary Vibration Revision A

Interpretation of Microseismic Effects from Response to Large Coal Mine Blasts

Ring Blasting Design Modeling and Optimization

Transcription:

ems Pimlico Flats, no. 5, Triq Viani, Sliema, MALTA Mob: +356 9944 5767 Email: tcini@yahoo.com environmental monitoring services BLAST MONITORING REPORT HG12 Hard Stone Quarry at Ta Klement, l/o Qala Gozo 1st March 2013 Details Date 01-03-2013 Quarry number HG12 Ta Klement, l/o Qala Gozo Quarry operator Ballut Blocks Ltd. ANFO Supplier Road Constructions Co. Ltd. Police escort PC1127 F Bonello Location and Time of Blasting Three blasts were carried out between 12:27 and 12:37 at the points as approximately indicated on the attached site diagram. Summary of Blasting Conditions Maximum charge per delay: 70-90m: 13Kg; 90-110m: 21Kg; 110-130m: 32Kg, 139-150m: 45Kg; 150m+: 60Kg. These distances are to be measured from the slipway and the girna. Vibration limit: 4 mm/s (20 to 40) at the nearest girna or the natural arch near the slipway. Air overpressure limit: 120 db(l). Site Specific Permit All holes were within quarry boundaries and within the maximum depth allowed. Maximum charge per delay was not exceeded. Blasting is carried out according to site specifications. Weather Conditions Humidity [1] Wind [1] Temperature [1] Cloud Cover [2] 69% 24 Knots SE by E 16 C c. 100% low cloud cover [1] As reported by weather.maltairport.com on 1 March 2013 at 12:15 at Luqa Airport [2] Our observation Comments All holes are at the top shelf of the quarry in their respective location. This blast was a trial of the new method of reducing the ANFO. In this trial the burden was reduced to 2.4m and the amount of ANFO per hole is reduced to 35Kg. The reason is that the quarry was called to follow the new vibration and air overpressure limits and this necessitates the reduction of maximum charge per delay. 2013-03-01_HG12 Report Page 1 of 2 Anthony Cini Digitally signed by

e m s environmental monitoring services Notes about Monitoring The seismograph was placed at the entrance to the girna. The seismograph was set to trigger at 0.51 mm/s. Instrument used is MiniMate Plus, serial number BE9488. Readings Blast Number 1 2 3 Time 12:27 12:32 12:37 No. of Holes 11 11 11 No. of Delays 11 11 11 Depth of Holes (m) 13.5 13.5 13.5 Max. Charge per Delay (kg) 35 33 33 Total Charge (kg) 375 363 363 Dist. from Seismograph (m) 170 170 170 PPV (mm/s) 1.13 2.17 1.81 Frequency () 57 46 29.3 Air Overpressure (db L) 118.8 146.2 133.1 Scaled Distance (m kg -½ ) 28.7 29.6 29.6 Burden is an average of 2.4 metres, and distance between holes is an average of 2.5 metres. Weights in kilograms are rounded-up to the nearest unit, and depth in metres is rounded to the nearest ½ unit. Displacement between holes and the seismograph is measured using the online version of MEPA s Map Server and is accurate to the nearest 10 metres. Number of holes, their depth, burden, and the amount of ANFO used are as given by the quarry operator. Scaled distance and maximum charge per delay are calculated from the primary data. Weights are rounded-up to the nearest kilogram and the depth is rounded to the nearest ½ meter. Observations There was no flyrock outside the quarry boundaries. No damage to the surroundings was observed after the blast. The air overpressure measured exceeds the 120dB limit by 26dB in one case and by 13dB in another case. The ground vibration is within the limits of 4mm/s. The reason for the excessive air overpressure is the reduced burden due to the gas-release pulse: that is the gases produced by the explosion escape through fissures in the material being cut with great force. The rock was cleanly cut and the quarry operators plan to further reduce the ANFO per delay and increase slightly the burden in the next blasting to address the air overpressure exceedances. Anthony Cini B.Sc. 2013-03-01_HG12 Report Page 2 of 2

Event Report Date/Time at 12:27:36 March 1, 2013 Trigger Source Geo: 0.510 mm/s, Mic: 119 db(l) Range Geo: 31.7 mm/s Record Time 2.0 sec at 4096 sps Notes Location: Quarry Blasting Client: User Name: ems General: Serial Number Battery Level Unit Calibration File Name 254 200 BE9488 V 8.01-8.0 MiniMate Plus 6.1 Volts September 3, 2012 by Datum Monitoring K488EP53.Y00 BS 6472:1992 CURVE 32 Microphone PSPL Channel Test PPV Time (Rel. to Trig) Peak Acceleration Peak Displacement Frequency Overswing Ratio Linear Weighting 118.8 db(l) at 0.654 sec 8.5 (Freq = 20.1 Amp = 542 mv) 0.905 16.9 0.139 464 0693 7.1 0.762 59 0.149 0765 7.5 3.7 1.13 57 05 663 0386 7.6 mm/s sec g mm Velocity (mm/s) 100 50 20 10 xy Peak Vector Sum 1.23 mm/s at 05 sec 5 z 2 1 1 2 5 10 20 50 100 > Frequency () : + : x : AirOP 1.0 2.0 Time Scale: 0.20 sec/div Amplitude Scale: Geo: 0.500 mm/s/div Mic: 10 pa.(l)/div Trigger = Printed: April 18, 2013 (V 10.40-10.40) Format 1995-2012 Xmark Corporation

Event Report Date/Time at 12:32:40 March 1, 2013 Trigger Source Geo: 0.510 mm/s, Mic: 119 db(l) Range Geo: 31.7 mm/s Record Time 2.0 sec at 4096 sps Notes Location: Quarry Blasting Client: User Name: ems General: Serial Number Battery Level Unit Calibration File Name 254 200 BE9488 V 8.01-8.0 MiniMate Plus 6.1 Volts September 3, 2012 by Datum Monitoring K488EP54.6G0 BS 6472:1992 CURVE 32 Microphone PSPL Channel Test PPV Time (Rel. to Trig) Peak Acceleration Peak Displacement Frequency Overswing Ratio Linear Weighting 146.2 db(l) at 0.669 sec 19.0 (Freq = 20.1 Amp = 542 mv) 0.905 55 60 0566 7.1 1.06 41 80 0620 7.5 3.7 2.17 46 10 729 0771 7.6 mm/s sec g mm Velocity (mm/s) 100 50 20 10 xy Peak Vector Sum 2.21 mm/s at 09 sec 5 z 2 1 x 1 2 5 10 20 50 100 Frequency () : + : x : > AirOP 1.0 2.0 Time Scale: 0.20 sec/div Amplitude Scale: Geo: 0.500 mm/s/div Mic: 10 pa.(l)/div Trigger = Printed: April 18, 2013 (V 10.40-10.40) Format 1995-2012 Xmark Corporation

Event Report Date/Time at 12:37:03 March 1, 2013 Trigger Source Geo: 0.510 mm/s, Mic: 119 db(l) Range Geo: 31.7 mm/s Record Time 2.0 sec at 4096 sps Notes Location: Quarry Blasting Client: User Name: ems General: Serial Number Battery Level Unit Calibration File Name 254 200 BE9488 V 8.01-8.0 MiniMate Plus 6.1 Volts September 3, 2012 by Datum Monitoring K488EP54.DR0 BS 6472:1992 CURVE 32 Microphone PSPL Channel Test PPV Time (Rel. to Trig) Peak Acceleration Peak Displacement Frequency Overswing Ratio Linear Weighting 133.1 db(l) at 0.696 sec 17.7 (Freq = 20.1 Amp = 542 mv) 0.857 24.4 81 331 0630 7.1 1.40 29.3 0.125 0738 7.5 3.7 1.81 29.3 0.111 530 0894 7.6 mm/s sec g mm Velocity (mm/s) 100 50 20 10 xy Peak Vector Sum 1.88 mm/s at 0.111 sec 5 z 2 x 1 x 1 2 5 10 20 50 100 > Frequency () : + : x : AirOP 1.0 2.0 Time Scale: 0.20 sec/div Amplitude Scale: Geo: 0.500 mm/s/div Mic: 2 pa.(l)/div Trigger = Printed: April 18, 2013 (V 10.40-10.40) Format 1995-2012 Xmark Corporation