For personal use only

Similar documents
For personal use only

QUARTERLY ACTIVITIES REPORT. For the period ended 30 June 2014

QUARTERLY ACTIVITIES REPORT For the period ended 31 March 2014

For personal use only

Quarterly Activities Report for the Period Ended 31 March 2013

For personal use only

For personal use only

QUARTERLY ACTIVITIES REPORT FOR THE PERIOD ENDED 30 JUNE 2016

TRAKA RESOURCES LTD (A.B.N )

QUARTERLY REPORT FOR THE PERIOD ENDING 31 MARCH 2012

Quarterly. Activities Report. For Quarter ended 31 March Exploration Activities. Corporate Activities

Early drill results include wide and high-grade intersections of cobalt mineralisation at Offset and Railway Prospects.

QUARTERLY REPORT OF OPERATIONS FOR THE PERIOD ENDED 31 MARCH Highlights of the Quarter s Activities

29 April 2013 COMPANY OVERVIEW CAPITAL DETAILS. ASX Code: RGU, RGUO. As 26 April 2013 Share Price: 1.3 cents. Option price: 0.

ACTIVITIES REPORT FOR THE QUARTER ENDED 30 SEPTEMBER 2018

High Grade Gold Intercepts at Bangaba

JV PROJECT UPDATE JORC COAL RESOURCE

September 2014 Quarterly Activities Report

For personal use only

For personal use only

STEP-OUT DRILLING EXTENDS HIGH GRADE COPPER ZONE AT SYNDICATED S 100% BARBARA SOUTH LODE

YELLOW ROCK RESOURCES LIMITED ABN

QUARTERLY REPORT Ending 30 June 2014

MAIDEN JORC RESOURCE CONFIRMS SIGNIFICANT COAL DEPOSIT AT MARIOLA COAL PROJECT, POLAND

STRONG GOLD IN SOIL ANOMALY OUTLINED AT MARY HARRISON PROJECT HIGHLIGHTS

For personal use only

For personal use only

KINGSTON RESOURCES LIMITED

HIGH GRADE GOLD-BEARING QUARTZ VEIN DISCOVERED AT MIAREE, KARRATHA AREA WESTERN AUSTRALIA

TANDARRA GOLD PROJECT DRILLING COMMENCES AND FOUR EAGLES GOLD PROJECT DRILLING UPDATE

TWO HIGH-GRADE GOLD ZONES DISCOVERED AT HERMES GOLD PROJECT

BUNDARRA RESOURCE UPDATE

ASX Announcement. 28 January Drill results indicate large Porphyry Copper Gold System at Peenam

For personal use only

FIVE RIGS DRILLING AT KARLAWINDA

For personal use only

TRAKA RESOURCES LIMITED ABN

The Manager Companies ASX Limited 20 Bridge Street

ASX announcement. Mylo-Frontier Pilbara Gold Project acquisition. 27 November Summary

Planning advanced for diamond drill testing on the Kingsley target.

Hits of up to 123gpt show Chesterfield emerging as a high grade gold project

For personal use only

RC drilling begins at Akoko Project marking commencement of 2010/11 exploration field season

ASX ANNOUNCEMENT Date: 03 October 2018 Number: 604/031018

Highlights. Wa Project. Kandia Prospect. South Wa. Julie West Jang Trend. Corporate

FINANCIERS MANDATED FOR THE DALGARANGA GOLD PROJECT

For personal use only

Option agreement with Randgold set to commercialise Massigui Gold Project

For personal use only

AGM Presentation 6 November 2012

$2.5 Million Resource Drilling Program Commences at Siberia Mining Centre

KATINGAN RIA COAL RESOURCE UPGRADE

June 2017 Quarterly Report

AGM Presentation 12 November 2013

ASX Release ASX Code: RLC

Commencement of Targeted RC Drilling Nabarlek Project

Quarterly Report Quarter ended 30 June 2010

GEOPACIFIC REPORTS HIGH GOLD VALUES IN AUGER SOIL SAMPLES FROM THE QALAU AND TATAIYA PROSPECTS, RAKI RAKI PROJECT,

For personal use only

SPL 1452 NAMOLI & WAINIVAU GOLD AND COPPER PROSPECTS

Diamond drilling program of over 2,500 metres to test portfolio of high quality targets

Quarterly Activities Report For the Period Ended March HIGHLIGHTS

For personal use only

For personal use only

For personal use only

For personal use only

Acquisition agreement to move to 100% ownership of the Ashford Coking Coal Project

For personal use only

HERON ENTERS OPTION TO PURCHASE A1 GOLD MINE, EASTERN VICTORIA

September 2008 Quarterly Report

For personal use only

ASX Announcement & Media Release 26 October 2010

For personal use only

For personal use only

COMPLETION OF PHASE 1 DRILLING AT TITIRIBI PROJECT IDENTIFIES ADDITIONAL SIGNIFICANT COAL INTERCEPTS

ASX announcement 16 May 2016

Drilling Commences at Telfer West Gold Project

For personal use only

December 2017 Quarter Activities Report

DRILLING CONFIRMS CLEAVERVILLE FORMATION MAGNETITE POTENTIAL ON THE MIAREE MAGNETITE TREND HIGHLIGHTS

ASX Release 29 November 2017

SECOND ADVANCED GOLD PROJECT IDENTIFIED AT THREE RIVERS PROJECT

For personal use only

Exploration targets identified to increase Browns Range Project s mine life

HIGH-GRADE GOLD MINERALISATION CONTINUES ALONG STRIKE AT THE BODDINGTON SOUTH GOLD PROJECT

Victory plans gravity survey for Bonaparte after encouraging rock-chip results

For personal use only

Ovoot Coking Coal Project (100%)

Lake Resources N L, Quarterly Report, January - March 2013 LAKE RESOURCES NL QUARTERLY REPORT JANUARY MARCH 2013

QUARTERLY REPORT for the Quarter Ended 31 March 2017

Developing the +1.2Moz Pilbara Gold Project

For personal use only

DIAMOND AND AIR CORE DRILLING TO COMMENCE ON WHITELAW GOLD BELT

Queensland Mining Corporation Limited

For personal use only

CORPORATE UPDATE. Feasibility Study being finalised for completion towards the end of April.

BROKEN HILL PROSPECTING LTD (ASX: BPL) QUARTERLY REPORT FOR THE PERIOD TO 30th September 2014

Ausgold awarded EIS grant for Jinkas deep drilling

FOUR EAGLES MINERALISATION REPORT ACCEPTED AND DRILLING TO RECOMMENCE

Quarterly Report for the period ended 31 December 2010

Transcription:

WAVENET INTERNATIONAL LIMITED ABN 50 087 139 428 Wavenet International is an exploration company with coal tenements in Queensland as well as gold concessions in West Kalimantan, Indonesia. Update In Queensland a maiden Inferred Coal Resource was completed last quarter on EPC2044 at Gayndah. Approximately 79 million tonnes exceeding 6000 kcal/kg has been identified. The coal has high ash content but initial recovery tests indicate that about 24 by volume can be recovered as a market product. Selaup Gold Project, West Kalimantan showed gold within epithermal vein systems in sediments and andesite intrusives. A review of all exploration data has concluded that the hard rock mineralization at Selaup is very localized and sporadic and does not provide sufficient tonnage to justify an open pit mining project. The concession has now been surrendered. Sintang Gold Project, West Kalimantan is within sediments and andesite/ diorite intrusions. Soil sampling revealed many gold anomalies, with some assays returning up to 1.68 g/t Gold. An area of the Bangun River drainage over 4 kilometres length has been identified as potential goldbearing alluvium. A Bangka drilling program is planned for the next quarter. Registered Office: 45 Quarry Street Fremantle WA 6160 Telephone: (08 9435 3800) Directors & Management Chairman Mick Stroud Directors Laurie Holyoak Gregg Freemantle Company Secretary Laurie Holyoak Geological Consultants Geologica Pty Ltd 29 April 2014 ASX Limited Company Announcements Office SYDNEY NSW 2000 QUARTERLY ACTIVITIES REPORT FOR PERIOD ENDING MARCH 31 st 2014 HIGHLIGHTS Queensland Coal Exploration is continuing in the Gayndah area and Exploration Permit application EPC2265 (located immediately west of EPC2044 coal resource area) has now been granted. An estimation of the Maiden coal resource on EPC 2044 at Gayndah was completed last quarter. An Inferred Coal Resource of approximately 79 million tonnes exceeding 6000 kcal/kg has been identified. CATEGORY Volume (m 3 ) Tonnes (wet t) Density Moisture (ar) GCV (adb) Ash (adb) VM FC HGI kcal/kg INFERRED 38,254,232 79,569,000 2.08 8.38 62422 42.39 14.27 39.10 46 This resource estimation was announced by WAL on 7th November 2013 and relates to JORC 2004 guidelines Due to the high ash content in core, samples were sent for recovery tests to Recycoal Ltd in UK. Current results indicate that about 24 is recoverable and a standard coal product can be obtained by minimal upgrading processes. Selaup Gold Project A review of all exploration data has concluded that the hard rock mineralization at Selaup is very localized and sporadic and does not provide sufficient tonnage to justify an open pit mining project. Also the grade and tonnage of the alluvia area at Selaup does not justify an economic alluvial mining project. The Exploration Permit at Selaup was surrendered and no further exploration is planned for this area Sintang Gold Project An area of approximately 4 kilometres in length on the Bangun River drainage has been identified as potential for alluvial gold mining. A reconnaissance sampling program on this areaa proved gold occurrences in many of the panned concentrates In order to assess resource potential a sampling program using a Bangkaa drill is planned for the next quarter. DETAILS

GAYNDAH COAL PROJECT, QUEENSLAND Exploration Permit EPC2265 located adjacent and to the west of EPC2044 Gayndah and centred on the township of Munduberra has now been granted. Initial research work and geological reconnaissance has begun so that areas for detailed mapping and potential drilling sites can be identified. The western side of the tenement is occupied by Surat Basin sediments including the Evergreen Formation and these are known to host coal measure sequences. See Figure 1 below. Figure 1 Simplified Geology of EPC 2265 An Inferred Coal Resource for EPC 2044 was estimated and reported in the previous quarter. This complied with standard resource estimation procedures as detailed by the 2004 edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (JORC Code). The limited drill coverage means that the deposit has been placed in the Inferred Coal Resource category. RC Holes MD1 to MD30 and Diamond Drill holes DDH1 to DDH5 were completed on EPC2044 and form the basis of the estimation. The coal is classified as a high ash, dry subbituminous type. An explanation of the method and procedures used for resource estimation is found in the Summary Table of Resource Criteria in the appendix to the announcement of this maiden resource to ASX on 7 th November 2013. Figure 2 Location of Resource Area in relation to EPC2044 permit area Resource volumes and tonnages using an as received (laboratory measured) coal seam density of 2.08 are tabulated below:

RESOURCE CATEGORY Volume (m 3 ) Tonnes (wet) Density Moisture (ar) GCV (adb) kcal/kg Ash (adb) INFERRED 38,254,232 79,569,000 2.08 8.38 6242 42.39 14.27 39.10 46 VM FC HGI Due to the high ash content of the coal various recovery tests have been completed and recoveries of approximately 24 are applicable to the material so far investigated. Further test drilling and confirmation of suitable recovery techniques is planned. SELAUP PROJECT KALIMANTAN Drilling to date has proven that the geology is more complex than initially understood. Detailed mapping and exploration drilling of the artisanal mining area has confirmed that mineralization occurs in flatlying clay horizons through sandstones as well as in steeper structures. Several drill holes were completed to test fault zones thought to be conduits responsible for mineralising the artisanal gold mining area. The recovered core intersected several cataclastic breccia zones showing strong sericite and quartz hydrothermal alteration with minor pyrite. Assays indicate that these zones of structural disruption are not mineralised. A review of all the drilling and rock chip data has been completed. It was concluded that the hard rock mineralisation is localised, inconsistent and poorly developed. There appears to be insufficient tonnage of mineralised material to justify the expense of open pit operations. In addition an alluvial mapping program was completed over the drainage system in the western half of the concession. The main area of interest was in the northwestern part of the concession where assay results from Intertek Laboratory, Jakarta confirmed grades of between 0.10 g/m 3 and 1.98 g/m 3 with an average of 0.44 g/m 3. An assessment of the economic potential for alluvial mining was completed for this area and it was concluded that the grades and potential tonnage do not justify an alluvial mining project. The Selaup exploration concession was surrendered to the Mines Department, the tracks and pads rehabilitated and all equipment and personnel removed from the area. No further work was completed during the quarter. SINTANG PROJECT KALIMANTAN An area of approximately 4 kilometres in length on the Bangun River drainage has been identified as potential for alluvial gold mining. Reconnaissance sampling using panning concentrates indicated that most of the Bangun river system is mineralized with gold (see example photograph of pan concentrate 1034 in Figure 3).Some locations along this drainage are currently being mined by artisans using primitive sluicing and jig equipment as shown in Figure 4. There are several alluvial deposits occurring in the Bangun river valley ranging from recent fine sand and silt to older alluvial terraces of coarse sand and gravel as well as some areas of pebble conglomerates all known to be goldbearing. Figure 5 is a typical photograph of the Bangun valley showing some of the interpreted terraces. The general distribution of these areas is shown on the map on Figure 6. A sampling program using a Bangka drill on lines at 100m spacing through the Bangun alluvial areas is planned for next quarter. This will assist WAL to assess resource potential.

Figure 3 Pan Concentrate of sample 1034 showing flakes of gold Figure 4 Simple sluice device on the bank of the Bangun River

Figure 5 Photograph of the Bangun River showing interpreted terraces. Figure 6 Location of Alluvial areas on the Sintang Concession

Comment It is common practice for a company to comment on and discuss its exploration in terms of target size and type. In addition surface sampling assays and drill sample results may also be discussed in the context of information describing the presence of anomalous mineral content. The above information relating to an Exploration Target should not be misunderstood or misconstrued as an estimate of Mineral Resources or Mineral Reserves. Hence the terms Resource (s) or Reserve(s) have not been used in this context. The potential quantity and grade is conceptual in nature, since there has been insufficient exploration to define a Mineral Resource. It is uncertain if further exploration will result in the determination of a Mineral Resource. Declaration The information in this statement that relates to Exploration Results, Mineral Resources or Ore Reserves is based on information compiled by independent consulting geologist Brian Davis who is a Member of The Australian Institute of Mining and Metallurgy and the Australian Institute of Geoscientists. Mr Davis is employed by Geologica Pty Ltd and has sufficient experience which is relevant to the style of mineralization and type of deposit under consideration and to the activity which is undertaken to qualify as a Competent Person as defined in the 2004 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Davis consents to the inclusion in the report of the matters based on the information made available to him, in the form and context in which it appears.

Appendix 5B Rule 5.5 Mining exploration entity and oil and gas exploration entity quarterly report Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10, 01/05/2013 Name of entity Wavenet International Limited ABN Quarter ended ( current quarter ) 50 087 139 428 31 March 2014 Consolidated statement of cash flows Cash flows related to operating activities Current quarter Year to date (..9... months) 1.1 Receipts from product sales and related debtors 1.2 Payments for (a) exploration & evaluation (b) development (c) production (d) administration (61) (200) (294) (617) 1.3 Dividends received 1.4 Interest and other items of a similar nature received 1.5 Interest and other costs of finance paid (21) (69) 1.6 Income taxes paid (115) (453) 1.7 Other (provide details if material) Net Operating Cash Flows Cash flows related to investing activities 1.8 Payment for purchases of: (a) prospects (b) equity investments (c) other fixed assets 1.9 Proceeds from sale of: (a) prospects (b) equity investments (397) (1,433) 643 1,492 (c) other fixed assets 1.10 Loans to other entities (229) (928) 1.11 Loans repaid by other entities 1,075 1,608 1.12 Other (provide details if material) Net investing cash flows 1.13 Total operating and investing cash flows (carried forward) 1,489 2,172 1,092 739

1.13 Total operating and investing cash flows (brought forward) 1,092 739 Cash flows related to financing activities 1.14 Proceeds from issues of shares, options, etc. 1.15 Proceeds from sale of forfeited shares 1.16 Proceeds from borrowings 1.17 Repayment of borrowings 1.18 Dividends paid 1.19 Other (provide details if material) Net financing cash flows Net increase (decrease) in cash held 1.20 Cash at beginning of quarter/year to date 63 416 1.21 Exchange rate adjustments to item 1.20 1.22 Cash at end of quarter 1,155 1,155 Payments to directors of the entity, associates of the directors, related entities of the entity and associates of the related entities Current quarter $A'000 1.23 Aggregate amount of payments to the parties included in item 1.2 55 1.24 Aggregate amount of loans to the parties included in item 1.10 1.25 Explanation necessary for an understanding of the transactions The amount shown at 1.23 represents payments to directors for remuneration Noncash financing and investing activities 2.1 Details of financing and investing transactions which have had a material effect on consolidated assets and liabilities but did not involve cash flows

2.2 Details of outlays made by other entities to establish or increase their share in projects in which the reporting entity has an interest Financing facilities available Add notes as necessary for an understanding of the position. Amount available Amount used 3.1 Loan facilities 1,360 1,360 3.2 Credit standby arrangements Estimated cash outflows for next quarter 4.1 Exploration and evaluation 50 4.2 Development 4.3 Production 4.4 Administration 200 Total 250 Reconciliation of cash Reconciliation of cash at the end of the quarter (as shown in the consolidated statement of cash flows) to the related items in the accounts is as follows. Current quarter Previous quarter 5.1 Cash on hand and at bank 1,155 63 5.2 Deposits at call 5.3 Bank overdraft 5.4 Other (provide details) Total: cash at end of quarter (item 1.22) 1,155 63

Changes in interests in mining tenements and petroleum tenements 6.1 Interests in mining tenements and petroleum tenements relinquished, reduced or lapsed Tenement reference and location Nature of interest (note (2)) Interest at beginning of quarter Interest at end of quarter 6.2 Interests in mining tenements and petroleum tenements acquired or increased Issued and quoted securities at end of current quarter Description includes rate of interest and any redemption or conversion rights together with prices and dates. Total number Number quoted Issue price per security (see note 3) (cents) Amount paid up per security (see note 3) (cents) 7.1 Preference + securities (description) 7.2 Changes during quarter (a) Increases through issues (b) Decreases through returns of capital, buybacks, redemptions 7.3 + Ordinary securities 55,512,710 55,512,710 Fully Paid Fully Paid 7.4 Changes during quarter (a) Increases through issues (b) Decreases through returns of capital, buybacks 7.5 + Convertible debt securities (description)

7.6 Changes during quarter (a) Increases through issues (b) Decreases through securities matured, converted 7.7 Options (description and conversion factor) 7.8 Issued during quarter 7.9 Exercised during quarter 7.10 Expired during quarter 7.11 Debentures (totals only) 7.12 Unsecured notes (totals only) 9,300,000 Exercise price 40 cents Expiry date 31/08/2016

Compliance statement 1 This statement has been prepared under accounting policies which comply with accounting standards as defined in the Corporations Act or other standards acceptable to ASX (see note 5). 2 This statement does give a true and fair view of the matters disclosed. Sign here:...... Date: 29 April 2014 (Director/Company secretary) Print name: Laurence Holyoak Notes 1 The quarterly report provides a basis for informing the market how the entity s activities have been financed for the past quarter and the effect on its cash position. An entity wanting to disclose additional information is encouraged to do so, in a note or notes attached to this report. 2 The Nature of interest (items 6.1 and 6.2) includes options in respect of interests in mining tenements and petroleum tenements acquired, exercised or lapsed during the reporting period. If the entity is involved in a joint venture agreement and there are conditions precedent which will change its percentage interest in a mining tenement or petroleum tenement, it should disclose the change of percentage interest and conditions precedent in the list required for items 6.1 and 6.2. 3 Issued and quoted securities The issue price and amount paid up is not required in items 7.1 and 7.3 for fully paid securities. 4 The definitions in, and provisions of, AASB 6: Exploration for and Evaluation of Mineral Resources and AASB 107: Statement of Cash Flows apply to this report. 5 Accounting Standards ASX will accept, for example, the use of International Financial Reporting Standards for foreign entities. If the standards used do not address a topic, the Australian standard on that topic (if any) must be complied with. == == == == ==