QMX GOLD CONTINUES TO INTERSECT STRONG MINERALIZATION AT BONNEFOND, INTERSECTING 39.5 g/t Au OVER 2.4 METRES AND 31.5 g/t Au OVER 1.

Similar documents
QMX GOLD INTERSECTS 29.8 G/T AU OVER 3.0 METERS AND 19.3 G/T AU OVER 3.2 METERS AT BONNEFOND

At the contact, mineralization is associated with strong tourmalinization of the Bevcon Intrusion.

Probe Metals Continues to Intersect Significant Gold Mineralization in Expansion Drilling at Val-d Or East, including 4.1 g/t Gold Over 15.

Probe Metals Continues to Expand Gold Zones At Val-d Or East

Probe Metals Intersects 3.2 g/t Gold Over 45.5 Metres At Val-d Or East

Probe Metals Confirms Continuity of Gold Mineralization on its Val-d Or East Project And Increases 2017 Drill Program to 75,000 metres

Probe Metals Intersects 1,122 g/t Gold Over 0.7 Metres in New Zone at Val-d Or East

Detour Gold Reports Drilling Results from Lower Detour

Probe Metals Discovers New High Grade Gold Zone on Val-d Or East Project: Intersects 12.6 g/t Gold Over 7.3 Metres

NEWS RELEASE. Tigray Intersects 28.2 metres at 8.50 grams per tonne gold at Mato Bula, Adyabo Project, Northern Ethiopia

BELO SUN INTERSECTS NEW HIGH GRADE ZONE AT GROTA SECA AND EXPANDS GRANDE DEPOSIT

Highlights include: Hole TTD050: 6.12 g/t Au over 7.00 metres from metres o Including g/t Au over 1.18 metres

BELO SUN RELEASES RESULTS FROM 65 DRILL HOLES FURTHER EXTENDING THE OURO VERDE DEPOSIT ALONG STRIKE NORTHWEST AND DOWN DIP

BELO SUN RELEASES RESULTS FOR 74 ADDITIONAL DRILL HOLES AT ITS VOLTA GRANDE PROJECT

55 Adelaide Street East, Suite St-Charles west, Suite 411, West Tower

MEDIA RELEASE OCEANAGOLD ANNOUNCES FURTHER DOWN DIP EXTENSIONS OF MINERALISATION AT PANEL 2: FRASERS UNDERGROUND MINE

Sherlock drilling returns best intercept to date of 0.63% Cu and 7.45 g/t Ag over m

BELO SUN DISCOVERS NEW MINERALIZED ZONE AT ITS VOLTA GRANDE GOLD PROJECT, BRAZIL

(TSXV: GPLY, OTCQB: GLYXF

NEWS RELEASE ORCA GOLD REPORTS CONTINUED SUCCESS AT GSS

Monument Announces NOA 7/8 Drilling Program Results at Burnakura Gold Project

June 4, 2015 News Release Valley of the Kings Underground Infill Drilling Underway

July 15, 2015 News Release Valley of the Kings Underground Infill Drilling Progresses

NEWS RELEASE. March 22, 2017

GOLDPLAY ANNOUNCES FURTHER SAMPLING RESULTS FROM SAN MARCIAL HISTORICAL CORE; CONFIRMS OPEN PIT TARGET NEAR SURFACE WITH gpt AgEq.

PRESS RELEASE. DUBUISSON NORTH DRILLING CUTS g/t AU OVER 5.0 METRES NEW S50 EAST DISCOVERY, 3.39 g/t AU OVER 25.9 METRES

TROILUS GOLD CORP. INITIATES 30,000 METRE DRILL PROGRAM ON TROILUS PROPERTY

True Width (m) Carneritos to

NEWS RELEASE ORCA GOLD INDICATED AND INFERRED RESOURCES AT BLOCK 14 INCREASE BY 24% AND 48% RESPECTIVELY

Assay Results Highlights (as of November 16, 2017) representing approximately 4,500 metres ( m ) of drilling:

AVION GOLD DJAMBAYE II ZONE, TABAKOTO PROJECT, MALI, RETURNS HIGH GRADE INTERCEPTS OF 7.56 G/T Au OVER 7.0 METRES AND G/T Au OVER 3.

San Gold Drills New Mine Horizon Adjacent to Rice Lake Mine, Returns 10.4 Metres Grading 25.7 g/t Au

MONETA INTERCEPTS g/t GOLD INCLUDING g/t GOLD AND g/t GOLD INCLUDING g/t GOLD AT SOUTH WEST

October 8, 2015 News Release Brucejack Regional Drilling Intersects Over 8,000 Grams Per Tonne Gold

Orsu Metals hits 2.62 g/t Au over 22.2 metres and proves higher gold grades at Zone 23, Sergeevskoe Gold Project, Russia

JUNE 25, 2015 TSX: WDO

ET and and and

Orsu Metals completes Phase 2 drilling program and announces significant intercepts in drillhole SDH17-15 at Zone 23, Sergeevskoe Gold Project, Russia

NEWS RELEASE TSX-V Ticker: SWA 23 April 2013 SWA.WT SARAMA RESOURCES EXTENDS HIGH-GRADE MINERALISATION AT MM PROSPECT IN BURKINA FASO

MONETA INTERCEPTS g/t GOLD INCLUDING g/t GOLD AT SOUTH WEST

Goldcrest Resources Ltd.

June 4, 2014 News Release Valley of the Kings Exploration Program Underway; Project Update

CALIFORNIA GOLD COMMENCES RESOURCE EXPANSION DRILLING AT NEW ZONE ON ITS FREMONT PROPERTY

PRESS RELEASE WESDOME PLANS AGGRESSIVE DRILLING AND DEVELOPMENT PROGRAM IN 2011

Canadian Gold Miner Grab Sample Returns 29.5 Grams per tonne Gold from South Kirkland Project

BALMORAL ANNOUNCES SIGNIFICANT GOLD DISCOVERY ON DETOUR GOLD TREND IN QUEBEC

NORTHQUEST LTD. ANNOUNCES DRILLING RESULTS FROM THE PISTOL BAY GOLD PROJECT, NUNAVUT, CANADA

IAMGOLD ANNOUNCES RESULTS FROM THE WESTWOOD-MOOSHLA EXPLORATION PROJECT

West Pender Street Vancouver, BC V6C 2V6 Tel: Fax: TSX-V: GBR NEWS RELEASE

BALMORAL INTERSECTS g/t GOLD OVER 7.99 METRES, BUG LAKE SOUTH, DETOUR GOLD TREND PROJECT, QUEBEC

COPPER MOUNTAIN COMPLETES PHASE 2 DRILL PROGRAM AT NEW INGERBELLE WITH CONTINUED POSITIVE RESULTS

Pahtavaara Drill Program Intersects 32.8 G/T Gold Over 2.0M And 2.1 G/T Gold Over 18.0M In The Karoliina Zone

RED EAGLE MINING INTERCEPTS 35.5 METRES AT 2.28 GRAMS GOLD PER TONNE AT SANTA ROSA

Atacama Pacific Drills 208 Metres Grading 0.60 g/t Gold at Cerro Maricunga. Reports Further Positive Metallurgical Test Results

A B C PAD A HIGHLIGHTS

OSISKO INFILL 38.9 g/t Au OVER 13.7 METRES AT UNDERDOG Infill Drilling Continues to Intersect High Grade

NEWS RELEASE FULLER PROPERTY CONTINUES TO DELIVER GOOD RESULTS 2.53 GRAMS PER TONNE GOLD OVER METRES

Plateau Extends Falchani East Lithium Deposit Community Agreements Executed and Three Drill Rigs Active at Falchani West

WESDOME ANNOUNCES HIGH GRADE GOLD DISCOVERY AT KIENA COMPLEX IN VAL D OR QUEBEC

Eloro Outlines Major New Mineralized Trend on La Victoria Project, Peru; Sample Results Return Values To 33 Grams Gold Per Tonne

May 12, 2016 News Release Valley of the Kings Infill Drilling Intersects 37,000 Grams Per Tonne Gold

CANARC RESOURCE CORP Howe Street Vancouver, BC V6C 2T6. News Release

KIRKLAND LAKE GOLD ANNOUNCES 120 METRE DOWN-PLUNGE EXTENSION OF SWAN ZONE

Strategic Phase 2 Exploration Program Launched at Island Gold High-Grade Resource Potential Identified Laterally and at Depth

Ongoing Drilling of Kiena Deep a Zone Confirms Multiple High Grade Lenses and Extends Zone Down Dip

Colt Resources intersects 17.4% Cu over 0.42 metres (0.32 m true width) at Miguel Vacas Copper Project in its Borba exploration concession in Portugal

LH Property Update: Magnum Goldcorp Hits High Grade Gold 16.9 m of g/t, including 10.9 m of g/t, and as well, 11 m of 20.

Melkior retains Geologica to complete a NI report on its Launay property, Québec

OSISKO METALS INTERSECTS 10.49% ZINC+LEAD OVER METRES AND 12.15% ZINC+LEAD OVER METRES AT PINE POINT

NEWS RELEASE July 26, 2018

Monument Announces Significant Intercepts Assay Results at NOA7_8 in Burnakura

BALMORAL INTERSECTS 1,138 g/t (33 oz/ton) GOLD OVER 4.87 METRES, BUG LAKE FOOTWALL ZONE, DETOUR GOLD TREND PROJECT, QUEBEC

NEWS RELEASE August 8, 2018

Orsu Metals doubles the strike length in Zone 23 to over 600 meters and identifies a high-grade core at the Sergeevskoe Gold Project, Russia

Mineral Resource Estimate Comparison at 3 g/t Au cut-off

NEWS RELEASE August 10, 2017

FILO MINING DRILLS 50 METRES OF G/T SILVER, 0.56% COPPER, 0.50 G/T GOLD AND 36 METRES OF 1.45% COPPER AT FILO DEL SOL

OSISKO INTERSECTS 115 g/t Au OVER 8.4 METRES AT LYNX. Interval (m)

News Release. Infill Drilling Program

SDH18-59, SDH18-62, SDH18-63

Salazar intersects metres (13.07m true) averaging 2.65 g/t gold, g/t silver, 1.32% copper, 6.63% zinc at its Curipamba Project.

OSISKO INTERSECTS 36 g/t Au OVER 6.9 METRES AT LYNX

OSISKO INTERSECTS 37.0 g/t Au OVER 5.4 METRES AT OSBORNE-BELL Infill Drilling Continues to Confirm High-Grade

FALCO PACIFIC COMPLETES INITIAL MODEL FOR THE HORNE 5 GOLD/SILVER/ZINC/COPPER DEPOSIT

Drilling Extending Mineralization in La Mina North Zone

OSISKO INTERSECTS 2223 g/t Au OVER 2.0 METRES AT WINDFALL Infill Drilling Hits Bonanza Grade in Zone 27

Gungnir Resources Inc.

Hole ID From (m) To (m) Interval (m) Au (g/t) Ag (g/t) AuEq (g/t)* Zn (%)

PROJECT 81 Lucas Gold Deposit 2018 Winter Drilling Program Assay Results

Surface Trenching Highlights. Santos Target. To (m) Width (m) Au (g/t) Comment. (m) Santos (1)-includes internal dilution

Sabina Gold & Silver Reports 2018 Drilling has Commenced at Back River Gold Project

NEWS RELEASE. September 30 th, Trading Symbols: GTP (TSX-V) P01 (FRANKFURT) COLTF (OTC Pink)

Drilling Extending Mineralization in La Mina North Zone

August 20, 2018 SBB NR SBB TSX

NEWS RELEASE TSX: ELD NYSE: EGO September 6, Eldorado Announces Drilling Results from KMC Project, Serbia

BOREAL EXPANDS DISCOVERY ZONE OF HIGH-GRADE ZINC, SILVER AND LEAD MINERALIZATION AT GUMSBERG PROJECT IN SWEDEN

IAMGOLD PROVIDES UPDATE ON ADVANCED EXPLORATION PROJECT DIAMOND DRILLING RESULTS BOTO PROJECT, SENEGAL

Drilling Highlights: Phase II BCV Infill Drilling

News Release. Canarc Continues to Intersect High-Grade Gold at Fondaway Canyon, Nevada, Including 3.24 Grams per Tonne Gold over 12.

Suite 1800 Two Bentall Centre 555 Burrard Street Vancouver, BC V7X 1M9 Tel: (604) Tel: (888) April 8, 2018 SBB NR SBB TSX

Transcription:

65 Queen Street West Suite 815 Toronto, Ontario Canada M5H 2M5 QMX GOLD CONTINUES TO INTERSECT STRONG MINERALIZATION AT BONNEFOND, INTERSECTING 39.5 g/t Au OVER 2.4 METRES AND 31.5 g/t Au OVER 1.6 METRES Toronto, Ontario January 29, 2019 - QMX Gold Corporation ( QMX or the Company ) (TSX:V:QMX) is pleased to report the results from its on-going Bonnefond drilling program (Figure 1), on the Val d Or East Zone of QMX s extensive land package in Val d Or, Quebec (Figure 2). These thirteen (13) holes cover results from the first half of the on-going definition drilling program on the Bonnefond project. This program's goal is to support an initial resource estimate schedule for late Spring 2019. Highlights include: In the Tonalitic Plug (lengths are measured along the holes): Drill hole 17315-18-063 returned 1.97 g/t Au over 87.5m, including 3.31 g/t Au over 26.8m and 31.55 g/t Au over 1.6m. Drill hole 17315-18-067 returned 1.94 g/t Au over 143.7m, including 12.34 g/t Au over 8.1m. Drill hole 17315-18-072 returned 1.92 g/t Au over 147.6, including 5.11 g/t Au over 4.0m. Shear Zone in Volcanics (lengths are measured along the holes): Drill hole 17315-18-063 returned 9.01 g/t Au over 3.4m Drill hole 17315-18-065 returned 11.95 g/t Au over 8.0m including 39.49 g/t over 2.4m, and 5.54 g/t Au over 1.4m. Drill hole 17315-18-069 returned 12.23 g/t Au over 3.2m and 4.35 g/t over 3.9m. Drill hole 17315-18-070 returned 7.20 g/t Au over 2.5m. Drill hole 17315-18-072 returned 1.69 g/t Au over 40.9m including 3.90g/t Au over 6.2m and 3.14 g/t au over 7.9m. Drill hole 17315-18-073 returned 6.06 g/t au over 5.0m. These results are part of a 50m x 50m infill drilling program on the western side of the Tonalite intrusion between the surface and 400m depth. This program successfully confirm and support the grades and the continuity of the mineralisation in the Bonnefond intrusive with intercepts returning 1.97 g/t Au over 87.5m, including 3.31 g/t Au over 26.8m and 31.55 g/t Au over 1.6m in drill hole 17315-18-063; 1.94 g/t Au over 143.7m, including 12.34 g/t Au over 8.1m in drill hole 17315-18-067 and 1.92 g/t Au over 147.6m in drill hole 17315-18-072. The average true width of the mineralized envelope is 60m and extends 300m east-west. This program also confirmed the continuity and grade in the shear zones south of the Bonnefond intrusive close to surface. Results from this environment include 9.01 g/t Au over 3.4m in drill hole 17315-18-063 and 11.95 g/t Au over 8.0m including 39.49 g/t over 2.4m and 5.54 g/t Au over 1.4m in drill hole 17315-18-065. 1

Drill hole 17315-18-072 intercepted 1.69 g/t Au over 40.9m including 3.90g/t Au over 6.2m and 3.14 g/t au over 7.9m in one of the shear zones to the north of the Bonnefond intrusion, increasing the potential in this area for the discovery of additional mineralized zones close to surface. Dr. Andreas Rompel, Vice President Exploration, commented We are excited and impressed by these results as they confirm the high-grade nature of the mineralization in and around the Bonnefond target. These results will feature well when we initiate the resource estimation process in this highly prolific area. Table 1: Highlights from the Bonnefond Target Hole Number Hole Length From To Length* Au** (g/t) Remarks 17315-18-063 59.5 147.0 87.5 1.97 Bonnefond intrusive Incl. 93.2 120.0 26.8 3.31 Incl. 93.2 96.0 2.8 8.00 Incl. 113.1 114.7 1.6 31.55 189.6 193.0 3.4 9.01 South Shear zone 17315-18-065 66.0 67.4 1.4 5.54 South Shear zone 179.7 187.7 8.0 11.95 South Shear zone Incl. 182.6 185.0 2.4 39.49 17315-18-067 125.7 269.4 143.7 1.94 Bonnefond intrusive Incl. 147.4 155.5 8.1 12.34 17315-18-069 168.2 171.4 3.2 12.23 South Shear zone 190.3 194.2 3.9 4.35 South Shear zone 17315-18-070 170.0 172.5 2.5 7.20 South Shear zone 17315-18-072 62.0 102.9 40.9 1.69 North Shear zone Incl. 68.8 75.0 6.2 3.90 Incl. 95.0 102.9 7.9 3.14 231.9 379.5 147.6 1.92 Bonnefond intrusive Incl. 287.5 291.5 4.0 5.11 17315-18-073 290.1 295.1 5.0 6.06 South Shear zone * Reported length measured along the hole. ** Au uncut

Figure 1: Bonnefond Target Results from the Fall Definition Drilling program

2019 Winter Drilling Program QMX is currently drilling the last 2,500m of the definition drilling campaign to support an initial resource estimate scheduled for late Spring 2019. Figure 2: QMX s extensive and target rich land package Quality Control During the drilling program, assay samples were taken from the NQ core and sawed in half. One half is sent to Swaslab Ltd. or Agat Laboratories. Both are certified commercial laboratories. The other half of the core is retained for future reference. A strict quality assurance and quality control program was applied to all samples; which included insertion of mineralized standards, blank samples and duplicates inside each batch of 20 samples. The gold analysess were completed by fire-assay with an atomic absorption finish on 50 grams of material. Repeats were carried out by fire-assay with a gravimetric finish on each sample containing 5.0 g/t Au or more. The gold analyses were undertaken by fire-assay on 50 grams of pulp with an atomic absorption finish. Repeats were carried out by fire-assay with a gravimetric finish on each sample containing 5.0 g/t Au or more. Qualified Persons The scientific and technical content of this press release has been reviewed, prepared and approved by Mélanie Pichon, P.Geo, M.Sc, Exploration Manager, who is a "Qualified Person" as defined by National Instrument 43-101 - Standards of Disclosure for Mineral Projects ("NI 43-101").

About QMX Gold Corporation QMX Gold Corporation is a Canadian based resource company traded on the TSX Venture Exchange under the symbol QMX. The Company is systematically exploring its extensive property position in the Val d Or mining camp in the Abitibi District of Quebec. QMX is currently drilling in the Val d Or East portion of its land package focused on the Bonnefond plug and in and around the Bevcon Intrusive. In addition to its extensive land package QMX owns the strategically located Aurbel gold mill and tailings facility, which is expected to commence custom milling in 2019. Contact Information: Brad Humphrey Louis Baribeau President and CEO Public Relations Tel: (416) 861-5887 Tel: (514) 667-2304 Toll free: +1 877-717-3027 Email: info@qmxgold.ca Website: www.qmxgold.ca Cautionary Note Regarding Forward-Looking Information: This press release contains or may be deemed to contain forward-looking information within the meaning of applicable Canadian securities legislation. Forward-looking information includes, but is not limited to, statements regarding future plans, operations and activities, projected mineralization, timing of assay results, and the ability of the Company to continue as a going concern. Generally, forward-looking information can be identified by the use of forwardlooking terminology such as plans, expects or does not expect, is expected, budget, scheduled, estimates, forecasts, intends, anticipates or does not anticipate, or believes, or variations of such words and phrases or state that certain actions, events or results may, could, would, might or will be taken, occur or be achieved. Forward looking information is subject to known and unknown risks, uncertainties and other factors that may cause the actual results, level of activity, performance or achievements of the Company, its properties and/or its projects to be materially different from those expressed or implied by such forward-looking information, including but not limited to those risks described in the disclosure documents of the Company filed under the Company s profile on SEDAR. Although the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking information, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that such information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking information. The Company does not undertake to update any forward-looking information, except in accordance with applicable securities laws. Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Table 2: Results from holes 61 to 73 - Bonnefond South Target Hole Number Azimuth Dip Hole From To Length* Au** Remarks ( ) ( ) Length (g/t) 17315-18-061 180-85 228 58.0 120.5 62.5 0.56 Bonnefond intrusive Incl. 103.6 110.2 6.6 1.99 17315-18-062 180-85 378 No Significant Results 17315-18-063 180-80 232 59.5 147.0 87.5 1.97 Bonnefond intrusive Incl. 93.2 96.0 2.8 8.00 Incl. 113.1 114.7 1.6 31.55 189.6 193.0 3.4 9.01 South Shear zone 17315-18-064 180-85 342 116.9 120.3 3.4 1.99 South Shear zone Incl. 118.3 119.3 1.0 6.16 228.0 232.9 4.9 1.48 South Shear zone Incl. 230.8 232.9 2.1 3.12 329.3 333.7 4.4 1.00 South Shear zone Incl. 330.8 332.3 1.5 2.69 17315-18-065 180-85 210 66.0 67.4 1.4 5.54 South Shear zone 117.8 120.3 2.5 1.84 South Shear zone 129.9 132.6 2.7 1.57 South Shear zone 179.7 187.7 8.0 11.95 South Shear zone Incl. 182.6 185.0 2.4 39.49 17315-18-066 180-85 201 No Significant Results 17315-18-067 180-85 300 108.0 115.5 7.5 1.14 North Shear zone 125.7 269.4 143.7 1.94 Bonnefond intrusive Incl. 125.7 132.3 6.6 1.52 Incl. 147.4 155.5 8.1 12.34 Incl. 261.8 267.0 5.2 4.51 17315-18-068 180-85 192 No Significant Results * Reported length are measured along the hole. ** Au uncut

Table 2 continued: Results from holes 61 to 73 - Bonnefond South Target Hole Number Azimuth Dip Hole From To Length* Au** Remarks ( ) ( ) Length (g/t) 17315-18-069 180-85 207 168.2 171.4 3.2 12.23 South Shear zone 190.3 194.2 3.9 4.35 South Shear zone 17315-18-070 180-85 201 140.5 144.2 3.7 1.17 South Shear zone 170.0 172.5 2.5 7.20 South Shear zone 17315-18-071 180-85 414 67.5 88.6 21.1 0.99 Bonnefond intrusive Incl. 78.3 83.4 5.1 3.37 171.6 175.2 3.6 1.76 South Shear zone 193.7 195.7 2.0 3.93 South Shear zone 340.9 344.0 3.1 1.53 South Shear zone 399.1 404.9 5.8 1.53 South Shear zone 17315-18-072 180-85 462 62.0 102.9 40.9 1.69 North Shear zone Incl. 68.8 75.0 6.2 3.90 Incl. 95.0 102.9 7.9 3.14 231.9 379.5 147.6 1.92 Bonnefond intrusive Incl. 266.4 269.0 2.6 7.77 Incl. 287.5 291.5 4.0 5.11 443.1 448.2 5.1 1.20 South Shear zone 17315-18-073 180-60 318 290.1 295.1 5.0 6.06 South Shear zone * Reported length are measured along the hole. ** Au uncut