For personal use only

Similar documents
STEP-OUT DRILLING EXTENDS HIGH GRADE COPPER ZONE AT SYNDICATED S 100% BARBARA SOUTH LODE

New Drilling Program Commences at Mutiny s Deflector Deposit

ASX Release and Media Announcement 27 September Central Eyre Iron Project 2011 Stage VI Drilling Programme Completion

HIGH-GRADE GOLD MINERALISATION CONTINUES ALONG STRIKE AT THE BODDINGTON SOUTH GOLD PROJECT

For personal use only

High-grade Gold in First Drilling Undertaken at Productora South

High-grade Copper and Gold Discovered at Productora

CRATER MOUNTAIN MAJOR MULTIPLE MINERALISATION EVENTS POTENTIAL ASSOCIATED WITH PORPHYRY SYSTEM NOW IDENTIFIED

African Energy Resources Limited

For personal use only

The Manager Companies ASX Limited 20 Bridge Street

Hann Prospect New Gold Discovery Confirmed

Norwest successfully lists on ASX, Drilling commenced at Warriedar Gold Project

For personal use only

STRONG GOLD IN SOIL ANOMALY OUTLINED AT MARY HARRISON PROJECT HIGHLIGHTS

TWO HIGH-GRADE GOLD ZONES DISCOVERED AT HERMES GOLD PROJECT

High Grade Gold Results from RAB Drilling at the Central Bore Prospect

Bass Metals records further positive drill results & progress at 3 prospects.

For personal use only

Quarterly Activities Report For the Period Ended March HIGHLIGHTS

For personal use only

FIVE RIGS DRILLING AT KARLAWINDA

For personal use only

KINGSTON RESOURCES LIMITED

Co-O MINE MINERAL RESOURCE UPDATE

CORPORATE UPDATE. Feasibility Study being finalised for completion towards the end of April.

For personal use only

$2.5 Million Resource Drilling Program Commences at Siberia Mining Centre

Savannah Resources Plc / Index: AIM / Epic: SAV / Sector: Mining RNS 14 December 2015

2010 RIU Sydney Resources Round-up

For personal use only

ASX Announcements & Media Release

New High Grade Gold-Copper Extensions At Mutiny s Deflector Deposit Highlight Project s Significant Growth Potential

LOS CALATOS DRILLING RESULTS TD2 TARGET

MARKET UPDATE ON URANIUM AND GOLD PROJECTS

MAJOR EXPLORATION SUCCESS AT JACK HILLS IRON ORE PROJECT EXPLORATION TARGET OF ADDITIONAL MILLION TONNES

60% upgrade of Flying Doctor Resource to 104,600 tonnes of contained zinc and lead.

ASX ANNOUNCEMENT 21 MARCH 2011

Resource Diamond Drilling Commences at Productora. Strong results continue from Productora central area drilling

For personal use only

EXCELLENT FIRST DRILL RESULTS FROM WELD RANGE

LATEST DRILL RESULTS REVEALS MINERALISATION OPEN AT STRIKE AND DEPTH AT KATANNING GOLD DEPOSIT

NEW COBAR-STYLE COPPER DISCOVERY IN NSW

For personal use only

ACQUISITION OF THE MCCLEERY COPPER-COBALT PROJECT, CANADA

ROE HILLS COBALT AND GOLD DRILLING ADVANCES

Resource upgrade at Greater Whitewash Project to 604 ppm Moly Equivalent*

Ovoot Coking Coal Project (100%)

High Grade Gold Drill Results Extend Buccaneer

Option agreement with Randgold set to commercialise Massigui Gold Project

Drilling Program Commences on Iron Oxide Copper Gold Targets

Auger Drilling Progress Report - Meguet Trend Prospect Multiple Highly Anomalous Gold Discoveries within 8km Mineralised Corridor

High Grade Gold Intercepts at Bangaba

For personal use only

MAJOR EXPLORATION PROGRAMME TO COMMENCE AT ROSEBY

MARCH 2010 QUARTERLY REPORT

ASX announcement 16 May 2016

Rock chip sampling confirms high grade quartz vein 500m long and up to 20m wide

GRAPHITE OVER 50% AT JOLLY TAR PROSPECT, CROYDON PROJECT QLD

GEOPACIFIC REPORTS HIGH GOLD VALUES IN AUGER SOIL SAMPLES FROM THE QALAU AND TATAIYA PROSPECTS, RAKI RAKI PROJECT,

For personal use only

Drilling Commences at Telfer West Gold Project

Additional significant gold and copper intercepts obtained in Sweden

Significant Copper-Gold JORC Exploration Target

MAIDEN 26.6Mt JORC COPPER RESOURCE AT VISCARIA PROJECT, SWEDEN

704,000 OUNCE MIYABI GOLD PROJECT UPDATE

MEDIA RELEASE OCEANAGOLD REPORTS ADDITIONAL HIGH-GRADE DRILL RESULTS AT WAIHI IN NEW ZEALAND

Malachite Resources Limited ABN

MANGANESE DISCOVERY AT KONONGO PROJECT

COPPER MOUNTAIN COMPLETES PHASE 2 DRILL PROGRAM AT NEW INGERBELLE WITH CONTINUED POSITIVE RESULTS

LATEST RESULTS FROM RC DRILLING

Ausgold awarded EIS grant for Jinkas deep drilling

CENTAURUS EXPANDS JAMBREIRO STUDY WORK AS A RESULT OF EXCELLENT RESULTS IN SOUTH EAST EXTENSION ZONE

UPDATE ON DRILLING TO BE CONDUCTED AT AURORA TANK GOLD PROJECT

For personal use only

For personal use only

FIRST RESULTS FROM RC DRILLING AT KONONGO

Diamond Drilling confirms depth potential for mineralisation at Mrima Hill.

Drilling program commences on Cloncurry and Mount Isa projects

Auger Drilling Progress Report - Moktedu Trend Prospect 5km Gold Trend Confirmed Along Strike from 3.5Moz Deposit

Exploration targets identified to increase Browns Range Project s mine life

Developing the +1.2Moz Pilbara Gold Project

Boseto Near Mine Exploration Update. North East Plutus, South West Petra and Nexus Propsects

For personal use only

For personal use only

Significant New Mineralised Zone Paroo Range (RGU:100%)

RC DRILLING TO RESUME THIS WEEK AT CARLISLE REEFS

For personal use only

Aurora Tank Gold Drilling Update

For personal use only

For personal use only

For personal use only

FOUR EAGLES MINERALISATION REPORT ACCEPTED AND DRILLING TO RECOMMENCE

For personal use only

MAIDEN JORC RESOURCE CONFIRMS SIGNIFICANT COAL DEPOSIT AT MARIOLA COAL PROJECT, POLAND

A1 GOLD MINE 14 LEVEL STOCK WORKS TARGET FURTHER HIGH GRADE DRILL INTERCEPTS

FURTHER DRILLING SUCCESS AT BARLEE GOLD PROSPECT

Highlights. Wa Project. Kandia Prospect. South Wa. Julie West Jang Trend. Corporate

Savannah Resources Plc

March 26 th Expansive Exploration Target Defined at Leonora Gold Project

Transcription:

Company Announcements Office, ASX Securities Limited, 20, Bridge Street, Sydney, N.S.W. 2000 COMMENCEMENT OF DRILLING, PILOT MOUNTAIN - NEVADA The Board of Thor Mining Plc ( Thor or the Company ) (AIM, ASX: THR), is pleased to advise the commencement of drilling in a campaign designed to expand the tungsten resource at the Company s wholly owned Pilot Mountain tungsten project in Nevada, USA (Figure 1). The program of eight reverse circulation ( RC ) drill holes is designed to confirm and expand upon existing high grade drill intersections, which the directors hope will facilitate a significant increase in the existing Pilot Mountain mineral resources, and also test for extensions of high grade mineralisation, intersected in the Desert Scheelite resource in 2012. Highlights: Two holes target extension of the 2012 high grade Desert Scheelite intersection from DSDD015 (17.5m @ 5.7% Cu equivalent) which comprised; 13.9 metres (m) @ 0.89% tungsten trioxide (WO 3 ) from 198m, and 17.5m @1.80% copper and 2.2% zinc from 196m (Figure 2); Six holes to validate selected 1970 s Union Carbide Corporation drill intersections from the Garnet deposit (Figure 3 & 4); Estimation of initial Garnet deposit mineral resource. Potential extension of the existing Pilot Mountain JORC compliant resource of 6.79 million tonnes (Mt) @ 0.31% WO 3 (Table 1) Mr Mick Billing, Executive Chairman of Thor: We have dual objectives for the drilling programme at Pilot Mountain. The first of these is to add to the overall project resource inventory by twinning some historical holes at the Garnet deposit which, if successful, should allow the preparation of a mineral resource estimate for this deposit. The second & potentially very exciting objective is to test for potential extension of high grade mineralisation at the eastern end of the Desert Scheelite resource, which, if successful, could result in the re-classification of that deposit as a significant tungsten and copper deposit. The proposed significant infrastructure works signalled by the new US administration is likely to have a positive impact on demand for tungsten products, and with no current tungsten mining operations in the country, Pilot Mountain may be well placed to fill part of that demand. THOR MINING PLC Registered Numbers: United Kingdom 05 276 414 Australia 121 117 673 Registered Office: 58 Galway Avenue MARLESTON, SA, 5035 Australia Ph: +61 8 7324 1935 Fx: +61 8 8351 5169 Email: corporate@thormining.com Website: www.thormining.com Twitter @ThorMining Enquiries: Mick Billing Executive Chairman Thor Mining PLC +61 8 7324 1935 Nominated Advisor Colin Aaronson Grant Thornton +44 (0) 20 7383 5100 ASX Listings: Shares: THR AIM Listings: Shares: THR Directors: Michael Billing David Thomas Gervaise Heddle Paul Johnson Key Projects: Tungsten Molyhil NT Pilot Mountain USA Figure 1: Pilot Mountain location map Page 1

Thor s Pilot Mountain Project, acquired in 2014, is located approximately 200 kilometres south of the city of Reno and 20 kilometres east of the town of Mina located on US Highway 95. The Pilot Mountain Project comprises four tungsten deposits: Desert Scheelite, Gunmetal, Garnet and Good Hope. All are in close proximity (~three kilometres) to each other and have been subjected to small-scale mining activities at various times during the 20th century. Union Carbide acquired the project in 1978, for US$7.0 million (estimated at US$26million - US$40million in 2017 dollars), and conducted detailed exploration and feasibility activities until, following a global downturn in the tungsten industry in the 1980s, they suspended further work. The proposed significant infrastructure works signalled by the new US administration is likely to have a positive impact on demand for tungsten products, and with no current tungsten mining operations in the country, Pilot Mountain may be well placed to fill part of that demand. A drill program in 2012 at Desert Scheelite facilitated the estimate & publication of a resource estimate for that deposit, shown in Table1. Importantly the final hole of the program intersected 17.5 metres @ 1.80% Copper (Cu) plus 2.2% Zinc (Zn) and 32 g/t Silver (Ag), along with 13.5metres of 0.89% tungsten trioxide (WO₃). At recent commodity prices (US$2.66/lb Cu, US$1.26/lb Zn, US$16.80/oz Ag, and US$200/mtu WO₃) this delivers an equivalent copper grade of 5.7% The Desert Scheelite deposit currently comprises 100% of the Pilot Mountain Resource estimate of 6.7Mt. The objective of the two holes programmed at this deposit is to test for extensions to the high grade mineralisation intersected in the last hole drilled into this deposit in 2012. Table 1: Pilot Mountain Resource Summary 2014 (JORC 2012), announced 10 June 2014. 100% owned by Thor Mining Plc Desert Scheelite Resource WO 3 Ag Cu Contained Grade Contained Grade Contained Tonnes Grade % metal (t) g/t metal (t) % metal (t) Indicated 6,090,000 0.31 18,900 24.2 150 0.16 10,000 Inferred 700,000 0.30 2,100 9.1 10 0.24 2,000 Total 6,790,000 0.31 21,000 22.8 160 0.17 12,000 Figure 2: Desert Scheelite drill intersections viewed in long section looking northwards. Proposed drill targets and hole paths shown at the eastern (right hand) end. Page 2

Table 2: Summary of Pilot Mountain exploration targets Tonnage (Mt) % WO 3 Comment Tier 1 Exploration Targets* 7.5 13.5 0.3 0.5 Based on historic drill intersections Tier 2 Exploration Targets* 3.5-9.1 0.3 0.5 Based on favourable geology and proximity to known mineralisation. Total Exploration Target* 11.0-23.0 0.3 0.5 Combined Tier 1 & 2 Tier 1 Exploration Targets* at Pilot Mountain are based on 1970 s drilling undertaken by Union Carbide Corporation and total 7.5 to 13.5 Mt at 0.2 to 0.4% WO 3 (Table 2). The proposed drilling at Garnet will target conversion to mineral resource of between 1.0 to 2.0Mt of the total Tier 1 Exploration Target. *Exploration Targets are conceptual in nature and there has been insufficient exploration to define a Mineral Resource under the JORC Code and it is uncertain if further exploration will result in the determination of a Mineral Resource. Figure 3: Six proposed RC drill holes at the Garnet prospect shown as red dots amongst historic drilling shown as black dots. The drill program is expected to facilitate the estimation of an initial mineral resource estimate for the Garnet prospect. Page 3

Figure 4: East west cross section through one of the seven mineralised zone from the 1970 s Union Carbide Corp drilling. Historic drilling indicates a further two mineralised horizons exist below that shown in the figure above. (Cross section trace shown in Figure 3) To meet the objective of the program at the Garnet deposit Thor have scheduled 6 RC drill holes designed as twins to historical drilling from which the following results were reported Historical Drill hole ref Interval (m) Assay (%WO₃) From hole depth (m) GR66 3.8 0.50% 3.2 7.9 0.14% 40.5 4.9 0.49% 83.6 GR98 0.7 0.30% 7.8 4.1 0.28% 13.6 1.2 0.51% 18.3 GR100 2.2 0.20% 7.1 3.4 0.06% 11.5 4.6 0.36% 15.1 9.4 0.42% 25.9 GR-119 2.2 0.32% 29.9 2.9 0.16% 32.1 3.0 0.90% 34.9 GR-123 4.5 0.58% 14.0 GR-128 7.7 0.04% 18.9 1.4 0.40% 29.9 1.2 0.12% 44.2 1.5 0.12% 48.2 For further information, please contact: Page 4

THOR MINING PLC Mick Billing Executive Chairman +61 8 7324 1935 Competent Person s Report The information in this report that relates to exploration results and exploration targets is based on information compiled by Richard Bradey, who holds a BSc in applied geology and an MSc in natural resource management and who is a Member of The Australasian Institute of Mining and Metallurgy. Mr Bradey is an employee of Thor Mining PLC. He has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Richard Bradey consents to the inclusion in the report of the matters based on his information in the form and context in which it appears. Figure 5: Rig setup at Desert Scheelite Page 5