NEWS RELEASE. Evrim announces additional drilling results at Cuale Gold Project in Mexico

Similar documents
NEWS RELEASE. Evrim announces initial drilling results at Cuale Gold Project in Mexico

NEWS RELEASE. Evrim samples metres grading g/t gold at 100%-owned Cuale High Sulphidation project

NEWS RELEASE. Evrim and Harvest Gold Complete Drilling at Cerro Cascaron

NEWS RELEASE. Evrim drills 1.0 metre grading 20.1 grams per tonne gold at Cerro Cascaron with partner Harvest Gold

NEWS RELEASE. Evrim commences drilling at Cerro Cascaron gold and silver project with partner Harvest Gold

NEWS RELEASE. District scale high-grade gold and silver targets confirmed at Cerro Cascaron

BOREAL EXPANDS DISCOVERY ZONE OF HIGH-GRADE ZINC, SILVER AND LEAD MINERALIZATION AT GUMSBERG PROJECT IN SWEDEN

NEWS RELEASE DRILLING BEGINS AT THE CERRO CASCARON GOLD AND SILVER PROJECT IN MEXICO

True Width (m) Carneritos to

V Sample from C.O.D vein 15 metres southwest of V

AZUCAR MINERALS COMMENCES DRILLING AT THE EL COBRE PROJECT, MEXICO

BALMORAL INTERSECTS g/t GOLD OVER 7.99 METRES, BUG LAKE SOUTH, DETOUR GOLD TREND PROJECT, QUEBEC

Highlights include: Hole TTD050: 6.12 g/t Au over 7.00 metres from metres o Including g/t Au over 1.18 metres

July Exploring for Canadian Gold in the Rainy River District of Ontario

MINERAL MOUNTAIN RESOURCES LTD. MMV.TSX-V

NEWS RELEASE LATEST EXPLORATION PROGRAM CONTINUES TO DEMONSTRATE NARANJILLO AS A HIGH GRADE SILVER HOST

Canadian Gold Miner Grab Sample Returns 29.5 Grams per tonne Gold from South Kirkland Project

West Pender Street Vancouver, BC V6C 2V6 Tel: Fax: TSX-V: GBR NEWS RELEASE

FALCO PACIFIC COMPLETES INITIAL MODEL FOR THE HORNE 5 GOLD/SILVER/ZINC/COPPER DEPOSIT

Suite 1800 Two Bentall Centre 555 Burrard Street Vancouver, BC V7X 1M9 Tel: (604) Tel: (888) April 8, 2018 SBB NR SBB TSX

NEWS RELEASE NOVEMBER 28th, 2017 Trading Symbols: TSX-V: AMZ; OTCQX: AXDDF

GRAPHITE ONE DRILLS 165.3M of 4.23% GRAPHITE INCLUDING 46.4M OF 6.6%, 14.3M of 10.1% and 21M of 10.1% GRAPHITE

Cuale High Sulphidation Project

2. The latter two intersections occur outside the presently defined mineral resource.

August 20, 2018 SBB NR SBB TSX

Probe Metals Continues to Intersect Significant Gold Mineralization in Expansion Drilling at Val-d Or East, including 4.1 g/t Gold Over 15.

Eloro Outlines Major New Mineralized Trend on La Victoria Project, Peru; Sample Results Return Values To 33 Grams Gold Per Tonne

Skeena Intersects g/t AuEq over metres at Eskay Creek

BALMORAL ANNOUNCES SIGNIFICANT GOLD DISCOVERY ON DETOUR GOLD TREND IN QUEBEC

Hole (93) From (m) To (m) m Au (g/t) Ag (g/t) Cu (%) Pb (%) Zn (%) CMLP

Vendetta Reports Additional High Grade Drilling Results from Zones 2 and 3 at Pegmont Lead-Zinc Project

Suite West Georgia Street Vancouver, B.C. V6E 4M3 NEWS RELEASE

Toronto, Canada March 4, 2013

Pacific Empire Minerals Provides Copper King RC Drilling Results

ERDENE RESOURCE DEVELOPMENT CORP.

NEWS RELEASE. Tigray Intersects 28.2 metres at 8.50 grams per tonne gold at Mato Bula, Adyabo Project, Northern Ethiopia

WESDOME ANNOUNCES HIGH GRADE GOLD DISCOVERY AT KIENA COMPLEX IN VAL D OR QUEBEC

SALAZAR ANNOUNCES AN UPDATED RESOURCE REPORT OF 5.53 MT INDICATED AND 1.46 MT INFERRED AT ITS HIGH GRADE VMS EL DOMO DEPOSIT

Vendetta Reports Initial Results from 2017 Pegmont Program with High Grade Zone 3 Step Out Drilling

DRILLING AT ASCOT S PREMIER PROPERTY EXTENDS GOLD MINERALIZATION 150 METRES WEST TOWARDS UNDERGROUND PORTAL

LH Property Update: Magnum Goldcorp Hits High Grade Gold 16.9 m of g/t, including 10.9 m of g/t, and as well, 11 m of 20.

NEWS RELEASE NOVEMBER 15, 2018 HANNAN COMPLETES DRILLING AT BALLYHICKEY, DEFINES SIGNIFICANT ZINC TARGET AT KILMURRY, CO.

555 Burrard Street, Suite 375, Vancouver, B.C. V7X 1M June 13, 2017 SBB NR SBB TSX

Corvus Gold Drills g/t Gold, Extends Mother Lode Sediment Hosted Gold System to at Least 450 Metres Along Strike

Sabina Gold & Silver Reports 2018 Drilling has Commenced at Back River Gold Project

Cuale Gold Project. July 2018

A New Direction. Copper-Gold Deposit at Thor TSX.V:COL. August 11, May 2013

PRESS RELEASE. DUBUISSON NORTH DRILLING CUTS g/t AU OVER 5.0 METRES NEW S50 EAST DISCOVERY, 3.39 g/t AU OVER 25.9 METRES

Drilling Extending Mineralization in La Mina North Zone

Probe Metals Continues to Expand Gold Zones At Val-d Or East

NEWS RELEASE ORCA GOLD INDICATED AND INFERRED RESOURCES AT BLOCK 14 INCREASE BY 24% AND 48% RESPECTIVELY

Drilling Extending Mineralization in La Mina North Zone

Great Atlantic Rock Samples Return up to 5.8 oz. / ton Gold Golden Promise Property in Central Newfoundland

(TSXV: GPLY, OTCQB: GLYXF

930 West 1 st Street, Suite 202, North Vancouver, BC V7P 3N4. Tel: (604) Tel:

Figure 1. Location of Boreal s Key Projects

MINAURUM GOLD INC : : News Releases

The new sulphide mineralization lies within a 1.4 kilometer long east-west trending

Probe Metals Intersects 3.2 g/t Gold Over 45.5 Metres At Val-d Or East

Northern Dynasty Minerals Ltd.

Probe Metals Confirms Continuity of Gold Mineralization on its Val-d Or East Project And Increases 2017 Drill Program to 75,000 metres

Highlights from the four holes announced in this news release include:

ERDENE RESOURCE DEVELOPMENT CORP.

Underground Exploration Drilling Complete; Brucejack Mineralization Extends to the East

Rich Saddle North Au-Cu-Ag Porphyry Expands by 275m Along Strike and 250m Down-Dip

The ALTPF: OTCQB 9AJ1: FWB Altiplano Provides 2017 Exploration Update For Its Maria Luisa and Farellon Projects, Chile

RED EAGLE MINING INTERCEPTS 35.5 METRES AT 2.28 GRAMS GOLD PER TONNE AT SANTA ROSA

NEWS RELEASE FULLER PROPERTY CONTINUES TO DELIVER GOOD RESULTS 2.53 GRAMS PER TONNE GOLD OVER METRES

TRENCHING AT LAS DOLORES EXTENDS STRIKE LENGTH TO OVER 1,000 METRES, INTERSECTING

Detour Gold Reports Drilling Results from Lower Detour

JUNE 25, 2015 TSX: WDO

NEWS RELEASE. March 22, 2017

MONETA INTERCEPTS g/t GOLD INCLUDING g/t GOLD AND g/t GOLD INCLUDING g/t GOLD AT SOUTH WEST

For Immediate Release ASCOT DRLLING AT UNICORN INTERSECTS MORE HIGH-GRADE GOLD

Cordoba Minerals Provides an Update on Exploration Activities at the San Matias Copper-Gold Project in Colombia

Precious Metals Summit - September 2018

MONETA INTERCEPTS g/t GOLD INCLUDING g/t GOLD AT SOUTH WEST

SilverCrest Expands Babicanora High Grade Footprint to 600 metres; New High Grade Vein Discoveries Highlight District Scale Potential

NGEX ANNOUNCES COPPER GOLD DISCOVERY AT NACIMIENTOS PROJECT

July 15, 2015 News Release Valley of the Kings Underground Infill Drilling Progresses

VR SAMPLES 58.3 g/t GOLD AND 809 g/t SILVER AND STAKES NEW PROPERTY TO EXPAND ITS DANBO PROPERTY EPITHERMAL GOLD TREND IN NEVADA

GOLDEN MINERALS IDENTIFIES HIGH GRADE GOLD AND SILVER VEINS AT YOQUIVO

ERDENE RESOURCE DEVELOPMENT CORP.

GOLDPLAY OUTLINES FIVE NEW EXPLORATION TARGETS AT THE SAN MARCIAL PROJECT IN MEXICO

GOLDEN RIDGE RESOURCES DRILLS 60.27m of 2.60 G/T AUEQ AT THE HANK PROJECT IN BC S GOLDEN TRIANGLE

NEWS RELEASE August 10, 2017

Salazar intersects metres (13.07m true) averaging 2.65 g/t gold, g/t silver, 1.32% copper, 6.63% zinc at its Curipamba Project.

SABINA GOLD &SILVER REPORTS COMPLETION OF DRILLING AT ECHO DEPOSIT, BACK RIVER, NUNAVUT.

GOLDPLAY ANNOUNCES FURTHER SAMPLING RESULTS FROM SAN MARCIAL HISTORICAL CORE; CONFIRMS OPEN PIT TARGET NEAR SURFACE WITH gpt AgEq.

West Georgia Street, Vancouver, BC, V6E 3V7 Phone: / Fax: NEWS RELEASE October 11, 2017

Goldplay President and CEO Marcio Fonseca commented

Ongoing Drilling of Kiena Deep a Zone Confirms Multiple High Grade Lenses and Extends Zone Down Dip

Toachi Mining Inc. Drills Four High Grade Gold-Copper-Zinc-Silver intercepts at the Gold-Rich La Plata VMS Project in Ecuador

AVION GOLD DJAMBAYE II ZONE, TABAKOTO PROJECT, MALI, RETURNS HIGH GRADE INTERCEPTS OF 7.56 G/T Au OVER 7.0 METRES AND G/T Au OVER 3.

Widest Intercepts to Date Extend High-Grade Valdecañas Vein to Depth

Sherlock drilling returns best intercept to date of 0.63% Cu and 7.45 g/t Ag over m

April Exploring for Canadian Gold in the Rainy River District of Ontario

Probe Metals Intersects 1,122 g/t Gold Over 0.7 Metres in New Zone at Val-d Or East

Toronto, Canada May 7, 2015

NGEX PROVIDES UPDATE ON EXPLORATION PROGRAM AT NACIMIENTOS PROJECT, ARGENTINA

Transcription:

910-850 WEST HASTINGS ST. VANCOUVER, BC, CANADA V6C 1E1 TEL: 604.248.8648 FAX: 604.248.8663 WWW.EVRIMRESOURCES.COM TSX-V: EVM CONTACT: PADDY NICOL OR CHARLES FUNK NEWS RELEASE Evrim announces additional drilling results at Cuale Gold Project in Mexico Vancouver B.C. February 11, 2018: Evrim Resources Corp. (TSX.V:EVM) ( Evrim or the Company ) announces additional drill results from the Cuale gold project in Jalisco, Mexico. The Company has received assay results from ten diamond drill holes completed in 2018 for a total of 2,179 metres. The drill program at Cuale was designed to test an exposed high sulphidation gold target defined by quartzpyrophyllite-hematite alteration with high grade gold over significant lengths in trenches, pit sampling, rock chips and soils. The drilling confirmed the alteration, but gold results are restricted to a maximum depth of 50 metres from surface. The gold values are notably lower than in the trenches. A mid-january review of the drilling indicates that the host sequence is dominated by submarine volcanic rocks with a lower stratabound copper rich-horizon and an upper gold rich horizon with high-sulphidation alteration. The overall setting identified by drilling is interpreted as a laterally extensive Volcanic Massive Sulphide ( VMS ) style system. The upper gold rich horizon is interpreted to have undergone lateritic weathering and mechanical concentration to produce the high gold grades that do not extend to depth. The maiden drilling program at Cuale has afforded the Company a better understanding of the geological setting that hosts the gold mineralization. With this information, the Company plans to test extensions of the gold and copper horizons and will commence a reconnaissance program across the property seeking new targets. Upon completion of this program, the Company will re-assess the appropriate path forward, commented Charles Funk, Vice President of New Opportunities and Exploration. Significant Drill Intersections Drill Hole GLR18-04 32.0 metres grading 0.83 grams per tonne ("g/t") gold from surface including 22.0 metres grading 1.06 g/t gold 12.0 metres grading 0.34% copper from 78 metres downhole Drill Hole GLR18-09 11.0 metres grading 0.31 g/t gold from 36 metres downhole Drill Hole GLD18-10 4.0 metres grading 0.42% copper from 136 metres downhole About the Cuale Drill Program The drill program tested the trench area, a zone of quartz-pyrophyllite-hematite alteration to the north of the trenches, the North Dome target, and the eastern downthrown block (see Figure 1). The host sequence is dominated by submarine volcanic rocks including hyaloclastite breccias, reworked tuffs and volcanoclastic sedimentary units, capped by debris-flow breccias (quartz-hematite breccia and Wifi breccia). The latter breccias host the high sulphidation alteration and gold mineralization.

The chalcopyrite-dominant copper mineralization intersected on holes GRL18-01, -02, -04 and -10 is stratigraphically controlled and when combined with submarine nature of the volcanic rocks and associated chlorite-rich alteration, suggests that the copper occurs in a thin but laterally extensive zone of VMS-style mineralization. Both horizons have identifiable feeder veins with quartz-pyrite veins occurring beneath and terminating at the level of the copper horizon while pyrite-pyrophyllite veins continue upward to the gold horizon. Drilling beneath the North Dome hill passes through the submarine host sequence into a tightly folded and metamorphized phyllite sequence. No sub-vertical feeder zone has been noted in this area and alteration generally decreases to the northwest away from the trenched area and hole GLR18-10. Two additional drill holes are being completed west of hole GLR18-04 and east of hole GLR18-10. With this information the Company has planned a reconnaissance mapping and stream-sediment sampling program across project to identify additional gold and copper targets. Significant Intersection Table Hole From To Width Gold (g/t) Copper (%) Comment GLR18-01 0 14 14 1.92 - Previously Released Including 1 11 10 2.51 - And 238.8 249 10.2-1.58 GLR18-02 0 17 17 0.52 - Previously Released And 213 216 3-0.76 GLR18-03 6 35 29 0.87 - Previously Released Including 33 34 1 11.3 - GLR18-04 0 32 32 0.83 - Including 0 22 22 1.06 - And 78.0 90.0 12-0.34 GLR18-05 26 28 2 0.85 - Previously Released GLR18-06 No Significant Result GLR18-07 1 7 6 0.14 - GLR18-08 No Significant Result GLR18-09 36 47 11 0.31 - GLR18-10 6 7 1 0.43 - And 136 140 4-0.42% For previously released drill hole results, see press release dated December 6, 2018 on the Company s website at www.evrimresources.com or on Sedar at www.sedar.com.

Figure 1 Plan map of completed drill holes with rock chip samples, trench locations and cross-section line plotted.

About the Cuale Property Figure 2 Longitudinal section looking to the west showing geology and significant intersections The Cuale project is 100%-owned by Evrim and comprised of a 232 square kilometre early stage exploration property prospective for gold and copper mineralization. The project is located 185 kilometres west of Guadalajara and 35 kilometres southeast of Puerto Vallarta in the Cordillera Madre del Sur. Regionally, the project is located within the Talpa de Allende area of Jalisco near Agnico Eagle Mines' Barqueño project (645,000 ounces gold and 38 million ounces silver) and Endeavour Silver's Terronera project (436,000 ounces gold and 42 million ounces silver). The area is close to infrastructure with roads and powerlines crossing the property. Cuale is subject to a 1.5% net smelter royalty ("NSR") for precious metals and a 1.0% NSR for base metals payable to Altius Minerals. Qualified Person Statement Evrim's disclosure of technical or scientific information in this press release has been reviewed and approved by Stewart Harris, P.Geo. Vice President, Technical Services for the Company. Mr. Harris serves as a Qualified Person under the definition of National Instrument 43-101. Core samples were delivered to ALS Global in Guadalajara, Jalisco for sample preparation and to the ALS laboratory in North Vancouver for analysis. The Guadalajara and North Vancouver facilities have ISO/IEC 17025:2017

certification. Field duplicate samples, blank rock samples and certified reference materials were inserted into the sample sequence each at a frequency of one per 20 samples. Samples were assayed for gold by 30 gram fire assay and multi-element analysis by four-acid and ICP analysis. About Evrim Resources Evrim Resources is a mineral exploration company whose goal is to participate in significant exploration discoveries supported by a sustainable business model. The Company is well financed, has a diverse range of quality projects and a database covering substantial areas of Mexico and portions of southwestern United States. The Company s projects are advanced through option and joint venture agreements with industry partners to create shareholder value. Evrim s business plan also includes royalty creation utilizing the Company s exploration expertise and existing projects. On Behalf of the Board EVRIM RESOURCES CORP. Paddy Nicol President & CEO To find out more about Evrim Resources Corp., please contact Paddy Nicol, President, or Charles Funk, VP New Opportunities and Exploration at 604-248-8648, or Liliana Wong, Manager of Investor Relations. Visit our website at www.evrimresources.com. Forward Looking Information This news release includes certain statements that may be deemed "forward looking statements". All statements in this news release, other than statements of historical facts, that address events or developments that Evrim Resources Corp. (the "Company ) expects to occur, are forward looking statements. Forward looking statements are statements that are not historical facts and are generally, but not always, identified by the words "expects", "plans", "anticipates", "believes", "intends", "estimates", "projects", "potential" and similar expressions, or that events or conditions "will", "would", "may", "could" or "should" occur. Although the Company believes the expectations expressed in such forward looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results may differ materially from those in the forward looking statements. Factors that could cause the actual results to differ materially from those in forward looking statements include market prices, exploitation and exploration successes, and continued availability of capital and financing, and general economic, market or business conditions. Investors are cautioned that any such statements are not guarantees of future performance and actual results or developments may differ materially from those projected in the forward looking statements. Forward looking statements are based on the beliefs, estimates and opinions of the Company s management on the date the statements are made. Except as required by securities laws, the Company undertakes no obligation to update these forward looking statements in the event that management's beliefs, estimates or opinions, or other factors, should change.