Rock sample A13479 from cleared surface exposure assaying: 0.36ppm Au, 21.3ppm Ag, 0.57%Cu, 0.1% Pb, 0.58% Zn 580 M

Similar documents
Hole (93) From (m) To (m) m Au (g/t) Ag (g/t) Cu (%) Pb (%) Zn (%) CMLP

Drilling Extending Mineralization in La Mina North Zone

Drilling Extending Mineralization in La Mina North Zone

Toachi Mining Inc. Drills Four High Grade Gold-Copper-Zinc-Silver intercepts at the Gold-Rich La Plata VMS Project in Ecuador

Toachi Mining Inc. Identifies High Priority Exploration Targets

First Phase Metallurgical Optimization Program Initiated

A B C PAD A HIGHLIGHTS

Salazar intersects metres (13.07m true) averaging 2.65 g/t gold, g/t silver, 1.32% copper, 6.63% zinc at its Curipamba Project.

SALAZAR ANNOUNCES AN UPDATED RESOURCE REPORT OF 5.53 MT INDICATED AND 1.46 MT INFERRED AT ITS HIGH GRADE VMS EL DOMO DEPOSIT

ANTLER GOLD EXPLORATION UPDATE, WILDING LAKE GOLD PROJECT, NEWFOUNDLAND

EXPLOR INTERSECTS MULTIPLE COPPER ZONES GRADES UP TO 3.65% CU OVER 5.35 METERS ON THE CHESTER COPPER PROPERTY

(TSXV: GPLY, OTCQB: GLYXF

ET and and and

Surface Trenching Highlights. Santos Target. To (m) Width (m) Au (g/t) Comment. (m) Santos (1)-includes internal dilution

GOLDPLAY ANNOUNCES FURTHER SAMPLING RESULTS FROM SAN MARCIAL HISTORICAL CORE; CONFIRMS OPEN PIT TARGET NEAR SURFACE WITH gpt AgEq.

Orford Intersects 41.1 m Grading 1.36 g/t Au at Jones Keystone Project in North Carolina

Probe Metals Continues to Intersect Significant Gold Mineralization in Expansion Drilling at Val-d Or East, including 4.1 g/t Gold Over 15.

Plateau Extends Falchani East Lithium Deposit Community Agreements Executed and Three Drill Rigs Active at Falchani West

NEWS RELEASE NOVEMBER 15, 2018 HANNAN COMPLETES DRILLING AT BALLYHICKEY, DEFINES SIGNIFICANT ZINC TARGET AT KILMURRY, CO.

GOLDPLAY OUTLINES FIVE NEW EXPLORATION TARGETS AT THE SAN MARCIAL PROJECT IN MEXICO

ANTLER GOLD DRILLS GRAMS PER TONNE GOLD OVER 5.35 METRES AT THE WILDING LAKE GOLD PROJECT, NEWFOUNDLAND

CARACARA SILVER INC. PLANNING DRILL PROGRAM AT PILUNANI ZINC-LEAD PROJECT IN PERU

2. The latter two intersections occur outside the presently defined mineral resource.

Pacific Empire Minerals Provides Copper King RC Drilling Results

NEWS RELEASE CANADIAN ZINC REPORTS REMAINING DRILL RESULTS AT LEMARCHANT DEPOSIT, SOUTH TALLY POND PROJECT, NEWFOUNDLAND

Suite West Georgia Street Vancouver, B.C. V6E 4M3 NEWS RELEASE

Namibia Critical Metals Drilling Confirms Cobalt and Copper Mineralization in First Two Targets at Kunene

Mirasol Outlines 1.4 km long Geophysical Anomaly at the Resolution Trend of the Nico Ag-Au Project, Santa Cruz, Argentina

Sherlock drilling returns best intercept to date of 0.63% Cu and 7.45 g/t Ag over m

Dalradian Reports Regional Gold and Base Metal Targets for the Tyrone Project. Drill Rig 6 Arrives to Start Scout Drilling Program

NEWS RELEASE LATEST EXPLORATION PROGRAM CONTINUES TO DEMONSTRATE NARANJILLO AS A HIGH GRADE SILVER HOST

October 8, 2015 News Release Brucejack Regional Drilling Intersects Over 8,000 Grams Per Tonne Gold

ANTLER GOLD HIGHLIGHTS NEW GOLD-IN-SOIL ANOMALIES, CENTRAL NEWFOUNDLAND

Zinc One Reports Additional High-Grade Zinc Results From Surface Samples at Bongará Zinc Mine Project

May 17, Two holes explored the extension at depth of the historic Sta Rosa vein

Pahtavaara Drill Program Intersects 32.8 G/T Gold Over 2.0M And 2.1 G/T Gold Over 18.0M In The Karoliina Zone

ATON RETURNS 22.2 METRES OF 2.77 GRAMS PER TONNE GOLD EQUIVALENT FROM HAMAMA WEST; VISIBLE GOLD DISCOVERED AT BOHLOG

SAVARY GOLD DRILLING EXTENDS KNOWN ZONES AND INTERSECTS SIGNFICANT GOLD MINERALIZATION AT FOUR NEW TARGETS

Spruce Ridge Resources Ltd Leslie Road West, Puslinch, ON N0B 2J0 Telephone: (519) , Fax: (519)

Probe Metals Continues to Expand Gold Zones At Val-d Or East

BOREAL EXPANDS DISCOVERY ZONE OF HIGH-GRADE ZINC, SILVER AND LEAD MINERALIZATION AT GUMSBERG PROJECT IN SWEDEN

ADDITIONAL SAMPLING IDENTIFIES VEINS WITH UP TO 240 G/T GOLD AND 2,479 G/T SILVER AT INV METALS TIERRAS COLORADAS DISCOVERIES

The new sulphide mineralization lies within a 1.4 kilometer long east-west trending

BALMORAL CONTINUES TO EXPAND GRASSET NI-CU-PGE DISCOVERY

Seafield Announces the Discovery of a New Porphyry-Style Drill Target at its Quinchía Gold Project in Risaralda, Colombia

BROAD ZONES OF MASSIVE AND SEMI-MASSIVE SULPHIDE MINERALIZATION ENCOUNTERED AT SAN DIEGO PROPERTY, MEXICO

IDM Mining s Underground Drilling Intersects g/t Au and g/t Ag over 6.80 Meters True Width at the Red Mountain Gold Project

GOLDPLAY ANNOUNCES SIGNIFICANT SILVER VALUES OF UP T0

LME m averaging 0.65 g/t Au and 0.32% Cu, or 1.19 g/t Au Equiv LME m averaging 0.64 g/t Au and 0.11% Cu, or 0.

NEWS RELEASE July 13, 2018

MINAURUM GOLD INC : : News Releases

Atico Mining Provides Exploration Update

Cabral cuts 36.9 g/t gold in Machichie Drilling and Announces the Discovery of a New High-grade Zone at the Cuiú Cuiú Project, Brazil

Probe Metals Intersects 3.2 g/t Gold Over 45.5 Metres At Val-d Or East

Probe Metals Confirms Continuity of Gold Mineralization on its Val-d Or East Project And Increases 2017 Drill Program to 75,000 metres

MONETA INTERCEPTS g/t GOLD INCLUDING g/t GOLD AT SOUTH WEST

NEWS RELEASE Ocean Park Ventures Identifies Large Multi-Structure Sulfide Mineralized System Trapper Gold Project, British Columbia

NEWS RELEASE July 26, 2018

NEWS RELEASE TSX-V Ticker: SWA 23 April 2013 SWA.WT SARAMA RESOURCES EXTENDS HIGH-GRADE MINERALISATION AT MM PROSPECT IN BURKINA FASO

Bellhaven Adds Gold at the El Limon Target at the La Mina Project, Colombia

Precipitate s Geophysical Surveying Generates More Targets at Melchor and Peak Zones

North American Palladium Announces Positive Exploration Results from Lac des Iles Mine

NEWS RELEASE FOR IMMEDIATE RELEASE: MARCH 5, 2018

Orford Completes Phase 1 Exploration Program and Generates High-Quality Drill Targets on its Carolina Gold Properties

NORTHERN SUPERIOR RESOURCES INC. 1351C Kelly Lake Road, Unit 7 Sudbury, Ontario, Canada P3E 5P5 Tel: (705) Fax: (705)

COMPASS GOLD: FIELDWORK CONTINUES ON OUASSADA & SANKARANI PERMITS TO AID BEDROCK DRILLING TARGETING

True Width (m) Carneritos to

NEWS RELEASE August 10, 2017

SilverCrest Expands Babicanora High Grade Footprint to 600 metres; New High Grade Vein Discoveries Highlight District Scale Potential

NEWS RELEASE For immediate distribution

COMPASS GOLD: DRILLING SUCCESS AT FIRST OUASSADA BEDROCK GOLD TARGETS

PUMA EXPLORATION AND TREVALI MINING CORPORATION DRILLED 13.1% Zn, 4.8% Pb OVER 27.0 METERS AT MURRAY BROOK DEPOSIT

REGULUS DISCOVERS NEW GOLD-RICH, HIGH-GRADE COPPER-GOLD ZONE AT RIO GRANDE

Copper Lake Samples g/t Gold and g/t Gold from the Queen Alexandra Gold Mine Property

ENCOURAGING GOLD-BASE METALS AT MAY DAY, MOLY- GOLD AT ATTUNGA

NEWS RELEASE. September 22, Symbol: TSX V: ANG

Precipitate s Geophysical Surveying Generates More Targets at Melchor and Peak Zones

EL CONDOR IN-FILL DRILLING INTERSECTS 26.9 METERS 2.19% CU & 0.58% NI

BALMORAL INTERSECTS g/t GOLD OVER 7.99 METRES, BUG LAKE SOUTH, DETOUR GOLD TREND PROJECT, QUEBEC

AUGUSTINE VENTURES ANNOUNCES HIGH GRADE GOLD BEARING TENSION VEINS IN THE HANGING WALL OF THE SURLUGA DEPOSIT

Cabral identifies stockwork-style mineralization under post-mineral cover at the Vila Rica Discovery, Cuiú Cuiú Project, Brazil

Highlights from the four holes announced in this news release include:

MONETA INTERCEPTS g/t GOLD INCLUDING g/t GOLD AND g/t GOLD INCLUDING g/t GOLD AT SOUTH WEST

Altan Nar. Gold & Base Metal Discovery (Tsenkher Nomin Property) October 12 th, 2011

INV METALS ANNOUNCES DRILL RESULTS AT LOMA LARGA AND INITIAL PROSPECTING RESULTS ON NEW REGIONAL PROPERTIES

Timberline Completes Technical Reports on the Elder Creek and Paiute Porphyry Copper-Gold Projects, Nevada

AUC.V PRESS RELEASE NO. 01/06

PROJECT 81 Lucas Gold Deposit 2018 Winter Drilling Program Assay Results

NEW COBAR-STYLE COPPER DISCOVERY IN NSW

West Pender Street Vancouver, BC V6C 2V6 Tel: Fax: TSX-V: GBR NEWS RELEASE

Drill hole DC12B575 cut 4.0 m true width of Veta del Contacto averaging 709 g/t silver and 2.12% lead.

Novo Resources Corp. Suite West Georgia Street Vancouver, BC V6E 3C9

The Inferred Mineral Resource Statement prepared by SRK for the Talbot Deposit is detailed below.

Bellhaven Expands the Middle Zone Prospect with New Drilling: Advances toward New Resource in First Half of 2012

NEWS RELEASE August 8, 2018

Salazar reports results from new anomaly Roble 1, Ecuador: 3.6 meters at g/t gold, 258 g/t silver, 0.56% copper, 3.25 % lead and 5.

Cordoba Minerals Provides an Update on Exploration Activities at the San Matias Copper-Gold Project in Colombia

3,000 metre Diamond Drilling Program Underway at Big Ranch Copper Prospect

Figure 1. Location of Boreal s Key Projects

MEXICAN GOLD SAMPLES G/T GOLD AND 37.2 G/T SILVER OVER 0.42 METRES AT PUEBLO NUEVO HISTORICAL MINES

Transcription:

TOACHI MINING DISCOVERS OUTCROPPING VMS HORIZON AND TRENCH CUTS 2.5M @ 5.36 G/T AU, 71.18 G/T AG, 2.14% CU 3.22% PB & 10.86% ZN NORTH OF ITS LA MINA DEPOSIT IN ECUADOR Toronto, Ontario January 16, 2019: Toachi Mining Inc., ( Toachi or the Company ) (TSX-V: TIM) (OTCQB: TIMGF) has completed a series of new high grade trenching results and encouraging stream sediment sampling results extending to 1.1 km the known VMS corridor footprint towards the north including trenching of 2.5m of 5.36 g/t Au, 71.18 Ag, 2.14% Cu, 3.22% Pb & 10.86% Zn. Exploration Program Highlights Distance* Prospect Highlights 225 M Guatuza 30.3 meters @ 0.75 g/t Au 10.08 g/t Ag, 0.75% Cu, 0.13% Pb and 2.92% Zn from 20.7m depth, including 5 meters @ 1.57 g/t Au, 22.94 g/t Ag, 1.66% Cu, 0.44% Pb and 6.64% Zn from 26m depth. Previously reported drill hole intercepts (Toachi Press Release dated March 1 st, 2017) from exploration drill hole CMLP-16-21 not included in the latest NI 43-101 resource estimate. 275 M Guatuza 2.5 meters of 5.36 g/t Au, 71.18 Ag, 2.14% Cu, 3.22% Pb & 10.86% Zn & 2.7 meters of 2.36 g/t Au, 45.41 Ag, 0.65% Cu, 1.99% Pb & 8.87% Zn. Channel sample assay results from surface trenching program at Guatuza prospect south wall in sheared VMS. 300 M Guatuza Discovery in Guatuza north wall of sheared VMS horizon composed of alternating layers of massive sphalerite, galena, and pyrite. (Trench channel sample assays pending) 440 M Guatuza Rock sample A13479 from cleared surface exposure assaying: 0.36ppm Au, 21.3ppm Ag, 0.57%Cu, 0.1% Pb, 0.58% Zn 580 M Guatuza VMS xenolith rock sample A13532 assaying: North 4.5ppm Au, 51.3ppm Ag, 16.55% Cu, 0.02% Pb, 5.83% Zn *This distance is calculated from the northern edge of the La Mina resource polygon (Figure 2) 204 stream sediments samples collected and assayed 1107 mapping observations taken and plotted 254 rock chip samples collected and assayed Discovery of a covered surface VMS horizon

Five surface trenches channel sampled across the VMS horizon Trench samples show similar polymetallic high-grade mineralization to VMS mineralization in the La Mina south and north block Alain Bureau, President and CEO stated, "Results from the surface trenching program to date shows significant continuity of high grades, widths, and consistent mineralization right at surface identical to the surface signature at La Mina deposit. Guatuza Trenching Significant Intercepts Channel From (m) AuEq (g/t) Intercept* Au (g/t) Ag (g/t) Cu % Pb % Zn % LPTR-18-03 4.0 1.5m @ 5.19 g/t AuEq 2.76 54.10 0.93 0.35 0.26 LPTR-18-04 2.0 3.5m @ 5.36 g/t AuEq 1.24 15.89 1.50 0.42 2.09 including 4.0 0.5m @ 11.15 g/t AuEq 2.02 27.40 4.39 0.34 2.74 LPTR-18-05 0.0 1.6m @ 9.75 g/t AuEq 3.51 46.14 1.66 2.26 2.99 including 0.9 0.7m @ 12.59 g/t AuEq 5.62 57.90 2.12 2.05 2.97 LPTR-18-06 0.0 2.7m @ 10.81 g/t AuEq 2.36 45.41 0.65 1.99 8.87 including 0.0 0.7m @ 29.25 g/t AuEq 7.14 156.00 1.16 7.50 22.11 LPTR-18-07** 0.0 2.5m @ 18.37 g/t AuEq 5.36 71.18 2.14 3.22 10.86 *Based on a 4ppm AuEq cut-off grade, 1m minimum composite length and 1m maximum internal dilution. Gold equivalent grades are calculated using the following metal prices in US$: 1235 Au/Oz, 14.5 Ag/Oz, 2.8 Cu/lb, 0.9 Pb/lb & 1.2 Zn/lb. Sampled widths in LPTR- 18-03, 04, 05 & 06 are considered the true widths cutting perpendicular to the mineralization. **The width in LPTR-18-07 is not considered the true width of the mineralization. Complete trenching results summary is available in a Table 1 below along with a plan map and channel profiles (Figure 1a & Figure 1b)

Guatuza Drilling Significant Intercepts Hole From (m) AuEq (g/t) Intercept* Au (g/t) Ag (g/t) Cu % Pb % Zn % CMLP-16-21 12.2 5.9m @ 7.19 g/t AuEq 0.80 6.55 3.06 0.02 2.31 CMLP-16-21 20.7 30.3m @ 4.05 g/t AuEq 0.75 10.08 0.75 0.13 2.92 including 26.0 5.0m @ 9.06 g/t AuEq 1.57 22.94 1.66 0.44 6.64 CMLP-16-21 126.4 5.6m @ 2.08 g/t AuEq 0.58 11.50 0.11 0.20 1.64 CMLP-16-22 15.0 15.6m @ 3.67 g/t AuEq 1.19 16.50 0.24 0.60 2.43 CMLP-16-24 25.0 2.0m @ 2.71 g/t AuEq 0.45 4.00 0.65 0.01 1.79 CMLP-16-24 30.0 4.3m @ 3.10 g/t AuEq 0.33 2.23 1.11 0.01 1.52 CMLP-16-24 79.4 7.0m @ 3.23 g/t AuEq 2.24 44.72 0.07 0.17 0.41 * Based on 2 ppm AuEq cut-off grade, 2m minimum composite length and 2m maximum internal dilution. Gold equivalent grades are calculated using the following metal prices in US$: 1235 Au/Oz, 14.5 Ag/Oz, 2.8 Cu/lb, 0.9 Pb/lb & 1.2 Zn/lb. Core widths in CMLP-16-21 and CMLP- 16-22 are not considered to be true widths. Core width in CMLP-16-24 is considered to be close to the true width. Exploration Program & Vectoring Summary Exploration work and resource drilling results completed to date suggest that the La Mina VMS Deposit belongs to a subset of VMS deposits where sulfides have replaced favorable horizon(s) of unconsolidated volcanic and volcano-sedimentary material through a specific mechanism of hydrothermal activity at the paleo sub-seafloor level (after Piercey, S. J., 2015). High-grade massive sulfide mineralization at La Mina is overlain by a thick sequence of mafic volcanic and volcaniclastic rocks with incipient chlorite-epidote-hematite alteration. However, the immediate hanging wall contact to the VMS ore zone has been subsequently affected by the final waning phases of hydrothermal activity, and consequently exhibits a distinct geochemical signature. This thin contact horizon shows silica ± hematite metasomatic replacement with anomalous geochemistry in combinations of many or all of these elements (Au, Ag, As, Ba, Sb, Hg, Cu, Pb, Zn). The above observations were used as a vectoring tool along with our understanding of the La Mina deposit lithostratigraphy and unique alteration styles in defining the immediate hangingwall and the footwall to the known VMS ore horizon. Regional exploration at La Plata has always faced a challenge because of the scarcity of bedrock exposures related to dense subtropical foliage and moderately thick cover sequences of airfall tuffs and pyroclastic debris flows. This has guided exploration efforts to use a multi-faceted

systematic approach. Toachi s interpretation of geophysical survey data (IP, magnetic, gravity) in conjunction with field reconnaissance, rock chip sampling and stream sediment sampling programs led the exploration team to new under-explored areas with partially covered bedrock that was cleared, sampled and mapped. These exploration efforts also pertain to our current focus on the assessment, understanding and discovery of new targets close to the existing La Mina deposit. Prior to and during the field reconnaissance and stream prospecting programs north of the La Mina deposit, the Toachi team considered the evidence that the extensive shear zones mapped across this area may have been re-activated several times throughout their geological history. These shear zone structures might have acted as conduits allowing hydrothermal fluids to recurrently circulate leading to alteration of the adjacent mafic volcano-sedimentary hanging wall sequence and possibly remobilizing the primary sulphide mineralization giving the appearance of a phyllic altered footwall or a VMS stringer zone. These weakened zones of intense faulting and shearing exhibit numerous deformation styles and varying geometries and are inferred to be formed along the susceptible mafic-felsic contact zones due to their different rheologic properties. The Toachi team has identified these deformed contact zones as an additional robust vectoring tool, that when properly interpreted, will help in the understanding of the relationship between present-day geomorphology and mineralization within the area, and ultimately may lead to the discovery of new VMS horizons. These latest results, together with the interpreted geological, geochemical and geophysical survey results, have defined several priority drill target areas along the new north extension of the VMS corridor. Stream Sediments & Trenching The inferred continuation of the previously covered high-grade VMS horizon at the Guatuza and San Ramon prospects is strongly supported by the results of recent stream sediment prospecting and trenching (Figure 2). The stream sediment samples taken in a NE trending stream and its western confluences draining the Guatuza and San Ramon prospects have yielded moderate to highly anomalous values for gold, silver, copper, lead, zinc, barium, arsenic, mercury and antimony. This inferred 550m long N-S mineralized corridor, starting at the southern end of the Guatuza prospect, is also supported by coincident geophysical (IP chargeability) and geochemical (soil and rock) anomalies. Additionally, stream sediment samples collected along the San Ramon drainage to the west stretching some 650m further to the north from the Guatuza North prospect have shown continuous and persistent geochemical anomalies along the western side of the prominent NNE

trending ridge separating the Guatuza s and the La Flaca Prospects (previously inferred by a subtle elongated gravity high and soil geochemical anomalies). Drilling The Guatuza prospect was the subject of sporadic exploration activity by several previous operators working at La Plata. The prospect has undergone partial, wide-spaced exploratory drilling that resulted in several significant mineralized drill hole intercepts. Toachi drilled six (6) shallow scout holes totaling 802m in 2016 and 2017 to test the continuity and grade of the previously identified mineralized zones. The intersected VMS mineralization tested by scout drilling appeared to be discontinuous, faulted, and exhibiting intense ductile and brittle deformations. These drill hole intercepts were previously reported in a corporate press release dated March 1 st, 2017. Toachi determined at that time that more work was needed to understand the nature and geometry of the intersected high-grade mineralization. The reinterpretation by Toachi of the historic and current drill holes at Guatuza, along with additional field reconnaissance, has inferred a continuous NNE trending mineralized shear corridor cutting through the prospect. The continuation of this corridor has been confirmed to extend to the north-northeast for at least 215m from the mineralized intercept in drill hole CMLP- 16-21. QA/QC Sampling Protocols Stream sediment samples were collected and sieved at the sampling site using a 1mm screen. The control duplicate samples were taken at a rate of 1 in 20 of the samples taken. The material was tagged, packed into a plastic and calico bags, then air dried at the Toachi s field camp in Palo Quemado. The semi-dry samples were dispatched to LAC y Asociados laboratory in Cuenca, Ecuador and further sieved using the 0.18mm screen. The sieved <0.18mm samples were then shipped to MS Analytical in Canada for analysis. Trenching undertaken by Toachi Mining in 2018 has been supervised by onsite personnel at the project who rigorously collect and track samples, which are then sealed and shipped to MS Analytical in Canada for analysis. Samples with base metal assay results above 1% have been reassayed using the multi-element ICP-ES, 4 acid digestion analytical method for ore grade assays. The preparation was performed by Ecuadorian partner, LAC y Asociados.

LAC y Asociados and MSA are ISO 9001:2008 registered companies. MS Analytical also meets the requirements as outlined in ISO/IEC 17025. Analytical accuracy and precision are independently controlled using blanks, control reference material and duplicate samples. For all reported drill holes, analysis was completed by ALS Peru S.A. with sample preparation completed in Quito. The lab is accredited with International Standards ISO/IEC 17025:2005 and ISO 9001:2015. All major ALS Geochemistry analytical laboratories are accredited to ISO/IEC 17025:2005 for specific analytical procedures. The Qualified Person under the NI 43-101 Standards of Disclosure for Mineral Projects for this news release is Dr. Michael D. Druecker, Ph.D., CPG who has reviewed and approved its contents. About Toachi Mining Inc. Toachi brings a disciplined and veteran team of project managers together with one of the industry s highest grade polymetallic projects at La Plata in Ecuador. Toachi is focused on and committed to the development of advanced stage mineral projects throughout the Americas using industry best practices combined with a strong social license from local communities. Toachi Mining has 81,166,435 shares issued and outstanding. Forward Looking Statements Certain statements contained in this news release may constitute forward-looking information as such term is used in applicable Canadian securities laws. Forward-looking information is based on plans, expectations and estimates of management at the date the information is provided and is subject to certain factors and assumptions, including, that the Company s financial condition and development plans do not change as a result of unforeseen events and that the Company obtains regulatory approval. Forward-looking information is subject to a variety of risks and uncertainties and other factors that could cause plans, estimates and actual results to vary materially from those projected in such forward-looking information. Factors that could cause the forward-looking information in this news release to change or to be inaccurate include, but are not limited to, the risk that any of the assumptions referred to prove not to be valid or reliable, that occurrences such as those referred to above are realized and result in delays, or cessation in planned work, that the Company s financial condition and development plans change, and delays in regulatory approval, as well as the other risks and uncertainties applicable to the Company as set forth in the Company s continuous disclosure filings filed under the Company s profile at www.sedar.com. The Company undertakes no obligation to update these forward-looking statements, other than as required by applicable law.

FOR ADDITIONAL INFORMATION PLEASE CONTACT: Alain Bureau President and CEO Candace Di Vito Manager, Investor Relations Telephone: 416 365 7043 Email: cdivito@toachimining.com Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Figure 2