Information Document Calculation of Pool Price and Transmission Constraint Rebalancing Costs During a Constraint Event ID # R

Similar documents
AESO Load Forecast Application for Demand Side Participation. Eligibility Working Group September 26, 2017

Bringing Renewables to the Grid. John Dumas Director Wholesale Market Operations ERCOT

Total Market Demand Wed Jan 02 Thu Jan 03 Fri Jan 04 Sat Jan 05 Sun Jan 06 Mon Jan 07 Tue Jan 08

Capacity Scarcity Condition Monday, September 3, 2018 Two primary factors led to the implementation of OP 4 event Significant generation outages and r

DEMAND FORECASTING PROTOCOL

Chapter 5. Transmission networks and electricity markets

California Independent System Operator (CAISO) Challenges and Solutions

+/- $50 Bid Cap and Node Limitations on Up-To Congestion Transactions APRIL 10 SPECIAL SESSION MIC NOHA SIDHOM- INERTIA POWER

A Model for a Zonal Operating Reserve Demand Curve

Optimization Basics for Electric Power Markets

Monthly Trading Report Trading Date: Dec Monthly Trading Report December 2017

Net Export Rule 1 : Deriving the generation value of storage device G(t)

UPDATE ELECTRICITY STATEMENT OF OPPORTUNITIES FOR THE NATIONAL ELECTRICITY MARKET

SCHEDULING ERROR 3 AND 4 JULY 2011

Course notes for EE394V Restructured Electricity Markets: Locational Marginal Pricing

CAISO Participating Intermittent Resource Program for Wind Generation

Report on System-Level Estimation of Demand Response Program Impact

Monthly Trading Report July 2018

COORDINATING CONGESTION RELIEF ACROSS MULTIPLE REGIONS

RESERVE LEVEL DECLARATION GUIDELINES

4/26/94 Revised 12/26/96 5/9/99 7/30/01 WSCC UNSCHEDULED FLOW MITIGATION PLAN

Colorado PUC E-Filings System

POWER SYSTEM OPERATING PROCEDURE LOAD FORECASTING

POWER SYSTEM OPERATING PROCEDURE LOAD FORECASTING

MISO September 15 Maximum Generation Event Overview. October 11, 2018

Price Correction Examples

Outage Coordination and Business Practices

Draft Wholesale Power Price Forecasts

Operations Report. Tag B. Short, Director South Region Operations. Entergy Regional State Committee (ERSC) February 14, 2018

MIDWEST INDEPENDENT TRANSMISSION SYSTEM OPERATOR, INC. 701 City Center Drive Carmel, IN /23/2007 Invoice Type:

Derogation Criteria for the Requirements for Generators Network Code

International Workshop on Wind Energy Development Cairo, Egypt. ERCOT Wind Experience

DIMACS, Rutgers U January 21, 2013 Michael Caramanis

Integrating Wind Resources Into the Transmission Grid

Chapter 6 Impact of Stochastic Renewable Energy Generation on Market Quantities 6.1 Introduction

Spatially-Explicit Prediction of Wholesale Electricity Prices

P278 Treatment of Transmission Losses for Interconnector Users

Recent US Wind Integration Experience

NATIONAL ELECTRICITY FORECASTING REPORT UPDATE FOR THE NATIONAL ELECTRICITY MARKET

Wind Rules and Forecasting Project Update Market Issues Working Group 12/14/2007

Administration by the CER of the Carbon Revenue Levy

2017/18 Wider Cancellation Charge Statement. Version 1. Effective from 1 st April Based Upon: User Commitment Methodology.

2018/19 Wider Cancellation Charge Statement. Version 2.0. Effective from 1 st April Based Upon: User Commitment Methodology.

WEATHER DERIVATIVES AS A VEHICLE TO REALISE THE SKILL OF SEASONAL FORECASTS

Analysis and the methods of forecasting of the intra-hour system imbalance

2018 Project Prioritization and Budgeting Process

REVISED UPDATED PREPARED DIRECT SAFETY ENHANCEMENT COST ALLOCATION TESTIMONY OF GARY LENART SAN DIEGO GAS & ELECTRIC COMPANY AND

Battery Energy Storage

Integrated Electricity Demand and Price Forecasting

SHORT-TERM hydropower planning under uncertainty is

A Unified Framework for Defining and Measuring Flexibility in Power System

Short-Term Demand Forecasting Methodology for Scheduling and Dispatch

Economic Evaluation of Short- Term Wind Power Forecasts in ERCOT: Preliminary Results

DS3 System Services Scalar Design RECOMMENDATIONS PAPER. DS3 System Services Implementation Project

ECG 740 GENERATION SCHEDULING (UNIT COMMITMENT)

Whitepaper. All Currency, One Wallet!

Contents Economic dispatch of thermal units

PUBLIC UTILITY COMIVIISSION OF OREGON STAFF REPORT PUBLIC MEETING DATE: March 8, 2016

Tutorial 2: Modelling Transmission

Incorporating Dynamic Line Ratings to Alleviate Transmission Congestion, Increase Wind Resource Utilization, and Improve Power Market Efficiency

SECTION DESCRIPTION PAGE I. BUDGET INTRODUCTION... 1 II. FISCAL YEAR 2017 BUDGET ANALYSIS... 2 III. PROPOSED OPERATING BUDGET... 3

MEDIUM TERM PASA PROCESS DESCRIPTION

Chapter 2. Planning Criteria. Turaj Amraee. Fall 2012 K.N.Toosi University of Technology

CALCULATING ACE DISTRIBUTION FACTORS. Example I Distribution Factors for Flow-gate A

The North American Electric Reliability Corporation hereby submits Informational Filing of the North American Electric Reliability Corporation.

Multi-Area Interchange Scheduling under Uncertainty

Calibration for Settlement Areas. February 2016 Version 1.0

Energy Forecasting Customers: Analysing end users requirements Dec 3rd, 2013 Carlos Alberto Castaño, PhD Head of R&D

RESOLUTION NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF SUPERVISORS OF THE CORKSCREW FARMS COMMUNITY DEVELOPMENT DISTRICT:

Forecast Postalised Tariff 2015/ /20. Utility Regulator Explanatory Note. August Introduction

Software Tools: Congestion Management

Systems Operations. PRAMOD JAIN, Ph.D. Consultant, USAID Power the Future. Astana, September, /6/2018

Economic Operation of Power Systems

Bilevel Programming-Based Unit Commitment for Locational Marginal Price Computation

EUROPEAN EXPERIENCE: Large-scale cross-country forecasting with the help of Ensemble Forecasts

Perfect and Imperfect Competition in Electricity Markets

Energy System Modelling Summer Semester 2018, Lecture 7

Activation of unscheduled reserves for Victoria and South Australia 19 January 2018 May 2018

Power System Seminar Presentation Wind Forecasting and Dispatch 7 th July, Wind Power Forecasting tools and methodologies

Deregulated Electricity Market for Smart Grid: A Network Economic Approach

Baltic regional gas market study Final Report. 8 th April 2016

2018 Annual Review of Availability Assessment Hours

A possible notion of short-term value-based reliability

AN OVERVIEW OF THE PROCESSES AND METHODOLOGY USED BY THE SYSTEM OPERATOR TO PREPARE THE FORECAST OF DEMAND.

Numerical illustration

The DC Optimal Power Flow

Benchmark of forecasting models

Charges for Deviation (Paise/kWh) applicable for: 19 December 2018

WIND INTEGRATION IN ELECTRICITY GRIDS WORK PACKAGE 3: SIMULATION USING HISTORICAL WIND DATA

2016 NERC Probabilistic Assessment MISO

04-Economic Dispatch 2. EE570 Energy Utilization & Conservation Professor Henry Louie

Joint procurement of natural gas for grid operation

SECTION DESCRIPTION PAGE I. BUDGET INTRODUCTION... 1 II. FISCAL YEAR 2017 BUDGET ANALYSIS... 2 III. PROPOSED OPERATING BUDGET... 4

APPENDIX H WIND INTEGRATION STUDY

PARTICIPATING ORGANISATIONS CIRCULAR

Report on Phase 2: System Performance Evaluation. Prepared for:

Weather Derivatives-Pricing and Design Issue in India

SECTION DESCRIPTION PAGE I. BUDGET INTRODUCTION... 1 II. FISCAL YEAR 2016 BUDGET ANALYSIS... 2 III. FINAL OPERATING BUDGET FUND

SOUTH AUSTRALIAN WIND STUDY REPORT SOUTH AUSTRALIAN ADVISORY FUNCTIONS

System Impact Assessment Addendum #2 Greenfield & St. Clair Energy Centres

Transcription:

Information Documents are not authoritative. Information Documents are for information purposes only and are intended to provide guidance. In the event of any discrepancy between an Information Document and any Authoritative Document(s) in effect, the Authoritative Document(s) governs. 1 Purpose This Information Document relates to the following Authoritative Documents 1 : Section 302.1 of the ISO rules, Real Time Transmission Constraint Management ( Section 302.1 ); and Section 103.4 of the ISO Rules, Power Pool Financial Settlement ( Section 103.4 ). The purpose of this Information Document is to provide information regarding the determination of pool price, the calculation of transmission constraint rebalancing payments and the display of information relating to the location and estimated cost of constraint events. 2 Inflow and Outflow Constraints Transmission constraints are generally described as either inflow or outflow constraints. An inflow constraint occurs when there is insufficient in-merit generation in an area to reliably serve load, resulting in excess load in the area, and insufficient transmission capability to flow energy into the area to serve such load. In the case of an inflow constraint, the area containing excess load is considered to be located at the downstream constraint side, and the area outside the area containing excess load is considered to be located at the upstream constraint side. An outflow constraint occurs when there is insufficient transmission capability to permit all in-merit generators to deliver the full amount of their offered energy to the Alberta interconnected electric system. In the case of an outflow constraint, generators and, in some circumstances, importers are considered to be located at the upstream constraint side, while loads are considered to be located at the downstream constraint side. This Information Document applies only to the mitigation of an outflow constraint, as the mitigation of an inflow constraint does not involve curtailing in-merit generation. Therefore, the mitigation of an inflow constraint does not result in transmission constraint rebalancing payments, which are described below, because dispatches or directives for transmission must-run energy from generating units located at the downstream constraint side are generally effective in mitigating an inflow constraint. Any potential impact associated with the dispatch of out-of-merit energy by way of a dispatch or directive for transmission must-run energy is offset through the use of dispatch down service. 3 Determination of Pool Price The pool price is the single clearing price of energy in the Alberta electricity market, which reflects the intersection of the unconstrained supply and demand curves. When there are no constraints, the AESO dispatches up the energy market merit order to ensure supply-demand balance. The highest asset marginal price at the point of balance during a given minute determines the system marginal price upon which the AESO sets the pool price in accordance with subsection 4 of Section 201.6 of the ISO rules, Pricing ( Section 201.6 ). As there is no curtailed generation and no transmission constraint rebalancing, the AESO sets the pool price based on the unconstrained system marginal price. 1 Authoritative Documents is the general name given by the AESO to categories of documents made by the AESO under the authority of the Electric Utilities Act and regulations, and that contain binding legal requirements for either market participants or the AESO, or both. AESO Authoritative Documents include: the ISO rules, the Alberta reliability standards, and the ISO tariff. Posting Date: 2016-09-28 Page 1 of 5 Public

In order to ensure supply-demand balance is maintained during an outflow constraint event in which inmerit energy is curtailed to mitigate a constraint, the AESO dispatches up the constrained energy market merit order, with constrained units removed, in accordance with subsection 2 of Section 203.2 of the ISO rules, Issuing Dispatches for Energy. The AESO IT system identifies the constrained system marginal price, which is the highest asset marginal price at the point where there is supply-demand balance in a one minute period. The AESO IT system then determines the following information in order to calculate a transmission constraint rebalancing volume for each minute during the constraint event: The volume of in-merit energy which has been constrained down; For the first hour in which there is a constraint event, the volume of the import interchange transactions that have been reduced due to an intra-alberta constraint. During subsequent hours, a new schedule is implemented to reflect reduced available transfer capability and the constrained down import volume is considered to be zero; and The amount of transmission must-run energy dispatched when the system marginal price is less than or equal to the reference price. 2 The transmission constraint rebalancing volume is then applied to an energy market merit order containing all supply resources, regardless of constraint conditions. The AESO IT system starts at the point in the unconstrained merit order where there is supply-demand balance, and moves down the unconstrained merit order by a volume equal to the transmission constraint rebalancing volume calculated above. By doing so, the AESO IT system determines what the system marginal price would have been if the constraint event(s) had not occurred. These are the unconstrained system marginal price values upon which pool price is set in accordance with subsection 4 of Section 201.6. Note that transmission must-run energy dispatched in accordance with subsection 2(2)(b) of Section 302.1 may offset some or all of the volume of in-merit energy which has been constrained down, decreasing the transmission constraint rebalancing volume. The AESO dispatches other generating units off by an amount equal to the transmission must-run dispatch volume in order to balance supply and demand. 3 Therefore, where transmission must-run is dispatched instead of transmission constraint rebalancing, pool price is determined based on the unconstrained system marginal price values. 4 Calculation of Transmission Constraint Rebalancing Payments When the AESO dispatches up the energy market merit order in order to replace in-merit generation that has been curtailed due to a constraint, those generators with offers located above the unconstrained price are eligible to receive a transmission constraint rebalancing payment determined in accordance with Section 103.4. The AESO IT system determines the energy production volume of each block of energy priced between the constrained system marginal price and the unconstrained system marginal price and multiplies that volume by the difference between the unconstrained pool price and the offer price associated with the MW level of energy provided by that eligible offer block in order to determine the amount of the transmission constraint rebalancing payment. 5 Display of Real Time Information Relating to the Location and Estimated Cost of Constraint Events Information regarding the location and estimated cost of constraint events is displayed on the AESO website once hourly pool price has been posted. Regions are as indicated by color in the map included in Appendix 1. The following information will be displayed on the AESO website: (a) the estimated cost of constraints; 2 The reference price is calculated in accordance with subsection 5 of Section 201.6. 3 Note that dispatch down service is not dispatched when the volume of in-merit energy that has been constrained down is equal to or greater than the volume of dispatched transmission must-run energy. Posting Date: 2016-09-28 Page 2 of 5 Public

(b) the estimated TCR charge; and (c) the location of constraints (collectively referred to as the real time information ). The real time information will be displayed on the AESO website Trading Page in the form of an Estimated Cost of Constraint Report. See the example in Appendix 2. Historical information will be available via a historical report query. 6 Appendices Appendix 1 Map Indicating Geographic Areas Appendix 2 Example Estimated Cost of Constraint Report Revision History Posting Date Description of Changes 2016-09-28 Administrative amendment 2015-11-26 Addition of information in sections 2, 3 and 4 and Appendices. 2015-11-04 Initial Release. Posting Date: 2016-09-28 Page 3 of 5 Public

Appendix 1 Map Indicating Geographic Regions Posting Date: 2016-09-28 Page 4 of 5 Public

Appendix 2 Example Estimated Cost of Constraint Report Date (HE) Estimated Cost ($) Estimated TCR Charge ($/MWh) Location of Constraints 01/01/9999 15 - - - 01/01/9999 14 0.00 0.00-01/01/9999 13 353.48 0.05 Region Name 01/01/9999 12 0.00 0.00-01/01/9999 11 3.87 0.00 Region Name 01/01/9999 10 1.15 0.00 Region Name 01/01/9999 09 1.51 0.00 Region Name 01/01/9999 08 0.00 0.00-01/01/9999 07 0.00 0.00-01/01/9999 06 0.00 0.00-01/01/9999 05 0.00 0.00-01/01/9999 04 0.00 0.00-01/01/9999 03 20.00 0.00 Region Name 01/01/9999 02 0.00 0.00-01/01/9999 01 0.00 0.00-01/02/9999 24 0.00 0.00-01/02/9999 23 0.00 0.00-01/02/9999 22 0.00 0.00-01/02/9999 21 0.00 0.00-01/02/9999 20 0.00 0.00-01/02/9999 19 0.00 0.00-01/02/9999 18 0.00 0.00-01/02/9999 17 0.00 0.00-01/02/9999 16 579.42 0.08 Region Name Posting Date: 2016-09-28 Page 5 of 5 Public