Quarterly Activities Report For the Period Ended March HIGHLIGHTS

Similar documents
For personal use only

Canadian Major to Earn Back into Las Opeñas Gold Project following highly promising results

Highlights. Wa Project. Kandia Prospect. South Wa. Julie West Jang Trend. Corporate

RC drilling begins at Akoko Project marking commencement of 2010/11 exploration field season

New Zone of High Grade Gold Mineralisation Discovered at Balogo, Burkina Faso

New Drilling Program Commences at Mutiny s Deflector Deposit

ACQUISITION OF THE MCCLEERY COPPER-COBALT PROJECT, CANADA

For personal use only

Drilling program commences on Cloncurry and Mount Isa projects

STRONG GOLD IN SOIL ANOMALY OUTLINED AT MARY HARRISON PROJECT HIGHLIGHTS

For personal use only

HIGH-GRADE GOLD MINERALISATION CONTINUES ALONG STRIKE AT THE BODDINGTON SOUTH GOLD PROJECT

For personal use only

TANDARRA GOLD PROJECT DRILLING COMMENCES AND FOUR EAGLES GOLD PROJECT DRILLING UPDATE

For personal use only

For personal use only

High Grade Gold Intercepts at Bangaba

October 2017 Investor Presentation. Moving to the next level: cash-flow, exploration and growth in WA s premier gold districts

Drilling Program Commences on Iron Oxide Copper Gold Targets

The Manager Companies ASX Limited 20 Bridge Street

Highlights. ASX Announcement Quarterly Activities Report For the Quarter Ended 31 March Viking Gold Project, Western Australia

For personal use only

ASX Announcement. FLEM survey underway at Henrietta Cobalt Nickel Prospect, Tasmania ASX: AX8 HIGHLIGHTS. Market Data. Board and Management.

Bass Metals records further positive drill results & progress at 3 prospects.

For personal use only

MARCH 2012 QUARTERLY REPORT. Highlights. Exploration Activities. Wyloo Iron Ore & Gold Project. Fast Facts

HERON ENTERS OPTION TO PURCHASE A1 GOLD MINE, EASTERN VICTORIA

EXPLORING FOR COPPER AND GOLD IN CHILE

Two New WA Projects Introduced into Newcrest Generation Alliance

2010 RIU Sydney Resources Round-up

SILVER CITY MINERALS LIMITED ABN Silver City Minerals

For personal use only

Norwest successfully lists on ASX, Drilling commenced at Warriedar Gold Project

ASX Announcement. 28 January Drill results indicate large Porphyry Copper Gold System at Peenam

SECOND ADVANCED GOLD PROJECT IDENTIFIED AT THREE RIVERS PROJECT

SUMMARY. QUARTERLY REPORT for the Quarter Ended 31 March km uranium zone with grades up to 0.03% U 3 O 8 at Lake Seabrook.

QUARTERLY REPORT FOR THE PERIOD ENDING 30 JUNE 2008

EXPLORATION UPDATE: BODDINGTON SOUTH GOLD PROJECT AND DOOLGUNNA STATION PROJECT

Annual General Meeting

UPDATE ON DRILLING TO BE CONDUCTED AT AURORA TANK GOLD PROJECT

Mountain Maid Gold System Displays Major Size Potential

Additional significant gold and copper intercepts obtained in Sweden

SUMMARY HIGHL. The project is located close to road and gas pipeline infrastructure and a large service centre.

New area of extensive artisanal gold workings discovered on Wa Project

Hampton Hill Mining NL

ASX announcement 16 May 2016

For personal use only

Drilling Commences at Telfer West Gold Project

EXPLORATION UPDATE CHILEAN COPPER-GOLD PROJECTS

Exploration Update: RC Drilling Commenced at Lucky Strike

CORPORATE UPDATE. Feasibility Study being finalised for completion towards the end of April.

For personal use only

For personal use only

MAJOR EXPLORATION PROGRAMME TO COMMENCE AT ROSEBY

For personal use only

June 2017 Quarterly Report

Significant Copper-Gold JORC Exploration Target

For personal use only

Disclaimer. Forward-Looking Statements. Competent Person s Statement

High-grade Copper and Gold Discovered at Productora

EXPLORATION ACTIVITY TO RECOMMENCE AT KOURI GOLD PROJECT IN BURKINA FASO

STEP-OUT DRILLING EXTENDS HIGH GRADE COPPER ZONE AT SYNDICATED S 100% BARBARA SOUTH LODE

Exploration targets identified to increase Browns Range Project s mine life

LATEST DRILL RESULTS REVEALS MINERALISATION OPEN AT STRIKE AND DEPTH AT KATANNING GOLD DEPOSIT

SPL 1452 NAMOLI & WAINIVAU GOLD AND COPPER PROSPECTS

SITE WORKS COMMENCE AT A1 GOLD MINE, EASTERN VICTORIA

March 26 th Expansive Exploration Target Defined at Leonora Gold Project

Cash-flow, exploration and growth in WA s premier gold districts. Resources Rising Stars, May 2017 / Michael Fowler, Managing Director

High Grade Gold Results from RAB Drilling at the Central Bore Prospect

ASX ANNOUNCEMENT 19 NOVEMBER 2015 SIGNIFICANT GOLD PROSPECT CONFIRMED AT APOLLO S SA GOLD PROJECT NEAR CHALLENGER

For personal use only

FOUR EAGLES MINERALISATION REPORT ACCEPTED AND DRILLING TO RECOMMENCE

NT RESOURCES LIMITED QUARTERLY ACTIVITIES REPORT FOR THE PERIOD ENDED 30 JUNE 2010 ASX CODE: NTR

For personal use only

New Zone of High Grade Gold Discovered at Balogo

HIGHLIGHTS. Strong drilling results and positive Scoping Study pave way for Underground Feasibility Study at Ulysses

QUARTERLY REPORT for the Quarter Ended 31 December Jubuk resource drilling imminent.

HIGHLIGHTS. Drilling intersects wt% recovered DTR concentrate grading 69.8% Fe, including 27 metres in excess of 21% DTR.

Developing the +1.2Moz Pilbara Gold Project

ASX announcement. Mylo-Frontier Pilbara Gold Project acquisition. 27 November Summary

High Grade Gold Drill Results Extend Buccaneer

DIAMOND AND AIR CORE DRILLING TO COMMENCE ON WHITELAW GOLD BELT

For personal use only


For personal use only

ATLAS GOLD LIMITED ABN QUARTERLY REPORT FOR THE PERIOD ENDED 31 MARCH 2005

For personal use only

For personal use only

Rock chip sampling confirms high grade quartz vein 500m long and up to 20m wide

BUNDARRA RESOURCE UPDATE

Magnus Copper Project exploration update

For personal use only

Option agreement with Randgold set to commercialise Massigui Gold Project

Significant New Gold Discovery along Kandia Trend

For personal use only

King of the Hills Gold Project, Leonora, to commence production in Q2 2011

For personal use only

ASX/MEDIA RELEASE 25 November EMERGENT CONFIRMS MAJOR JORC RESOURCE UPGRADE TO 561Mt FROM PREVIOUS 127Mt AT BEYONDIE IRON PROJECT

Axiom Nightflower Drilling Progress and IP Survey Results, North Queensland

FIRST ASSAYS FROM FALUN DRILLING CONFIRM HIGH GRADE GOLD MINERALISATION

Transcription:

Quarterly Activities Report For the Period Ended March 31 2008 HIGHLIGHTS Merceditas Project, Chile Genesis Minerals Limited secured an Option to acquire a 100% interest in the significant Merceditas copper - gold project located in northern Chile, comprising the Paula and Lucy Prospects. Potential for 30 to 40 million tonnes of high grade oxide copper ore (0.7% to 1% copper + gold credit). Preparation well advanced to commence initial drilling program in May 2008. JORC compliant resource anticipated to be completed in 2 nd half of 2008. Bankable feasibility study to be completed by January 2011. Low capital, near term open pit production opportunity. Significant copper oxide mineralisation defined at surface over 5km by 3km area. Significant trench results from the Paula Prospect include: 102m @ 1.32% copper 81m @ 1.35% copper 21m @ 2.52% copper 111m @ 0.82% copper 39m @ 0.84% copper and 0.82g/t gold 38m @ 1.13% copper 15m @ 1.34% copper and 0.87 g/t gold 45m @ 0.7% copper 18m @ 1.22% copper Only limited drill testing of oxide mineralisation at the Paula Prospect with considerable exploration upside. Lucy Prospect offers large tonnage "porphyry copper" style mineralisation/opportunity open at depth and along strike. Trainor Project, WA Large geochemical sampling program commenced to test strike extensive copper-nickel-zinc-pge anomaly. GENESIS MINERALSLIMITED ABN: 72 124 772 041 Level 3, 10 Outram St West Perth, WA, Australia, 6005 PO BOX 437, West Perth WA, Australia, 6872 T: +618 9322 6178 F: +618 9481 2335 info@genesisminerals.com.au www.genesisminerals.com.au Registered Office 46 Ord St West Perth WA 6005 Issued Capital 23.0 million shares 9.25 million options ASX Code: GMD Board Members Michael Haynes Chairman Michael Fowler Managing Director/CEO Graeme Smith Non Executive Director Company Secretary Chile Office Alcantara 200, 6th Floor Las Condes Santiago, Chile GMD March 2008 Quarterly Activities Report 1

MERCEDITAS PROJECT, CHILE Genesis Minerals Limited Genesis Minerals Limited (Genesis) reached agreement on the 28 th January 2008 with Andes Pacific Development S.A. (Andes Pacific), a private Chilean company, to acquire a 100% interest in the 18 km 2 Merceditas copper-gold project in northern Chile. Genesis executed an Option agreement with Andes Pacific giving Genesis the exclusive right to earn 100% of the Merceditas Project by completing a feasibility study on all or part of the Project and by making staged payments totalling US$6,000,000 over a 36 month period. Andes Pacific will be paid a further US$10 per tonne of contained copper metal within Measured and Indicated JORC (2004) defined Mineral Resources as defined in the feasibility study. To date Genesis has paid Andes a total of US$500,000. The Merceditas Project is located in northern Chile s Iron-Oxide- Copper-Gold ("IOCG") belt which is one of the most prospective IOCG provinces in the world and hosts numerous deposits including Candelaria (470Mt @ 0.95% copper) and Manto Verde (350Mt @ 0.75% copper). The Project is located north of the city of Copiapó, approximately 1,000km north of Santiago, the capital of Chile. The Project is located in the Atacama Desert and is easily accessible by road. It is located in an area that is serviced by very good infrastructure. Project Location Map Initial Exploration Target The Merceditas Project comprises two main prospects, Paula and Lucy. Significant copper oxide mineralisation has been defined at surface over a 5km by 3km area and is exposed in a number of trenches. Only limited drilling has been completed at the Paula and Lucy Prospects to test the oxide mineralisation, which is known to extend to 80 to 110m below surface in both areas. Previous exploration at the Project was terminated in 1999 in a period of low-metal prices and no further work has been completed since that time Previous resource estimates have been completed but are not considered JORC compliant. Based on historic information the Company has determined an initial exploration target estimate for the Paula and Lucy prospects of 200 million tonnes of ore at grades of approximately 0.5% copper and 0.25g/t gold. Importantly potential exists to delineate 30 to 40 million tonnes of medium to high grade copper oxide ore (0.7% to 1% copper + gold credits) within the prospects. This copper oxide ore potentially provides the Company with a low capital, near term production opportunity during a period of historically high copper prices. GMD March 2008 Quarterly Activities Report 2

Genesis Minerals Limited The estimates presented here are conceptual targets that may result from the completion of a JORCcompliant resource calculation. It should not be understood as indicating the existence of resources in the sense implied by the JORC Code as a JORC-compliant resource is yet to be calculated. There has been insufficient or unverified exploration data to define a Mineral Resource and it is uncertain if further exploration will result in the determination of a Mineral Resource. The initial drilling program is anticipated to commence in May 2008 and this work will facilitate the calculation of a JORC compliant resource during the second half of 2008. Genesis is committed to establishing a significant mining operation at the project. There is considerable potential to delineate a copper oxide resource that could be amenable to extraction by conventional SX-EW processing and exploited as a standalone operation. As part of its Option Agreement the Company is obliged to complete a bankable feasibility study by January 2011. View looking north to the Paula Prospect from Lucy. GMD March 2008 Quarterly Activities Report 3

Paula Prospect Genesis Minerals Limited Mineralisation at the Paula Prospect is interpreted to occur in six mineralised bodies that are hosted by amphibole rich andesites with variably altered zones of biotite-chlorite, specularite hematite, magnetite, albite and epidote. Mineralisation occurs in the form of veins, veinlets, stockworks, breccias and disseminations. It displays widths of 20m to more than 200m and lengths between 400m and 2,000m. Copper oxide mineralisation occurs in the form of chrysocolla and malachite, with the oxidised zone occurring to depths of 90m to 100m below surface. Primary copper mineralisation is associated with chalcopyrite. The area has undergone geological, geophysical, and geochemical studies, with 22 trenches excavated for 6,180 m and 14 holes drilled for a total of 2,430 m. Previous exploration by Minera Outokumpu Chile returned significant trench results from the Paula Prospect including: o 102m @ 1.32% copper o 81m @ 1.35%copper o 21m @ 2.52% copper o 39m @ 0.84% copper and 0.82g/t gold o 38m @ 1.13% copper o 15m @ 1.34% copper and 0.87 g/t gold o 45m @ 0.7% copper o 111m @ 0.82% copper o 18m @ 1.22% copper. Oxide copper mineralisation. Paula Prospect local miners pit with strong oxide copper mineralisation. Significant results from the very limited drilling completed to date include: RC-19 60m @ 0.59% copper from 10 metres - oxide RC-25 30m @ 0.60% copper from 50 metres - oxide RC-3 10m @ 0.76% copper from 36 metres - oxide RC-2 12m @ 1.00% copper from 0 metres - oxide RC-15 6m @ 1.59% copper from 12 metres oxide RC-4 76m @ 0.44% copper from 130 metres - primary GMD March 2008 Quarterly Activities Report 4

Genesis Minerals Limited Lucy Prospect Paula Trench Sampling and Drill Hole Locations The Lucy Prospect is a large copper - gold porphyry type system. Mineralisation is oriented ENE and forms an oval shaped hydrothermal alteration zone with a leached cap that covers a surface area of 2 x 1 km. The hydrothermal system is associated with two porphyritic stocks surrounded by andesitic volcanic rocks Minera Mantos Blancos (1992-1993) carried out geological surveys, trenching and drilled twenty four holes for approximately 3,850m. Minera Outokumpu Chile carried out detailed geological mapping and excavated twenty trenches for a total of 4,420m with approximately 1,500 samples collected. Nine RC holes were drilled for a total of 2,612m. Better results from drilling at the Lucy Prospect include: SRP-16 RC 16 RC 7 SRP-12 A SRP 17 104m @ 0.36% Cu and 0.43g/t Au from 6 metres 44m @ 0.38% Cu and 0.25g/t Au from 52 metres 92m @ 0.37% Cu and 0.22 g/t Au from 26 metres 86m @ 0.54% Cu from 92 metres 96m @ 0.4% Cu from 20 metres GMD March 2008 Quarterly Activities Report 5

WESTERN AUSTRALIAN PROJECTS TRAINOR PROJECT (GMD FARMIN) An extensive program of infill geochemical soil sampling covering the anomalous base-metal trends defined in late 2007 commenced in the last week of April after being delayed for 4 weeks. This program will target the west north west striking base metal nickel PGE anomalous corridor which has currently been defined by 1km by 0.1km spaced sampling covering the northern half of E69/1930. This anomalous corridor contains a gossan which was discovered by Dominion Mining Limited in 2004. Genesis Minerals Limited MUNDONG WELL (100%) Native title negotiations for the Mundong Well Project continued during the quarter. CORPORATE Exploration expenditure (including option payments) during the quarter of $659,000 (YTD $910,000). As at the 31 March 2008, Genesis had approximately A$1.8 million on hand. Magnetic image showing tenement outline, and gravity and geochemical anomalies. Michael Fowler Managing Director Further Information Contact - Michael Fowler +618 9322 6178 or mfowler@genesisminerals.com.au Information in this announcement was compiled by Michael Fowler, Genesis Minerals Limited Managing Director, who is a Member of The Australasian Institute of Mining and Metallurgy. Michael Fowler has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 JORC Code. Michael Fowler consents to the inclusion in the announcement of the matters based on their information in the form and context in which it appears. GMD March 2008 Quarterly Activities Report 6