AUSTRALIAN UNITED GOLD LTD ACN

Similar documents
metal two base The view Metals Australia L ustralia.com.auu

High Grade Gold Intercepts at Bangaba

News Release DRILLING STEPPED UP AT FORRESTANIA NICKEL PROJECT AND UPDATE ON DIGGERS SOUTH PRE - FEASIBILITY STUDY

HIGH-GRADE GOLD MINERALISATION CONTINUES ALONG STRIKE AT THE BODDINGTON SOUTH GOLD PROJECT

The Company was admitted to the Official List on 12 November 2010 and its shares commenced trading

Additional significant gold and copper intercepts obtained in Sweden

African Energy Resources Limited

For personal use only

Norwest successfully lists on ASX, Drilling commenced at Warriedar Gold Project

For personal use only

EXPLORATION UPDATE: BODDINGTON SOUTH GOLD PROJECT AND DOOLGUNNA STATION PROJECT

STEP-OUT DRILLING EXTENDS HIGH GRADE COPPER ZONE AT SYNDICATED S 100% BARBARA SOUTH LODE

New Drilling Program Commences at Mutiny s Deflector Deposit

ATLAS GOLD LIMITED ABN QUARTERLY REPORT FOR THE PERIOD ENDED 31 MARCH 2005

QUARTERLY ACTIVITIES REPORT

New High Grade Gold-Copper Extensions At Mutiny s Deflector Deposit Highlight Project s Significant Growth Potential

For personal use only

Quarterly Activities Report For the Period Ended March HIGHLIGHTS

Additional Significant Gold Intercepts Obtained in Sweden

For personal use only

Drilling Commences at Telfer West Gold Project

HIGH GRADE GOLD-BEARING QUARTZ VEIN DISCOVERED AT MIAREE, KARRATHA AREA WESTERN AUSTRALIA

Ausgold awarded EIS grant for Jinkas deep drilling

Highlights. Wa Project. Kandia Prospect. South Wa. Julie West Jang Trend. Corporate

Chalice, Higginsville Drilling

For personal use only

For personal use only

Drilling Program Commences on Iron Oxide Copper Gold Targets

NEW COBAR-STYLE COPPER DISCOVERY IN NSW

A1 GOLD MINE 14 LEVEL STOCK WORKS TARGET FURTHER HIGH GRADE DRILL INTERCEPTS

Hampton Hill Mining NL

For personal use only

For personal use only

CORPORATE UPDATE. Feasibility Study being finalised for completion towards the end of April.

The Manager Companies ASX Limited 20 Bridge Street

Bass Metals records further positive drill results & progress at 3 prospects.

Magnus Copper Project exploration update

Carrapateena Mineral Resources Explanatory Notes April OZ Minerals Limited. Carrapateena Mineral Resources Statement April

ROX DEFINES STRONG IP ANOMALIES AT PHA LUANG

Malachite Resources Limited ABN

ENCOURAGING GOLD-BASE METALS AT MAY DAY, MOLY- GOLD AT ATTUNGA

STRONG GOLD IN SOIL ANOMALY OUTLINED AT MARY HARRISON PROJECT HIGHLIGHTS

For personal use only

ASX Announcement. 28 January Drill results indicate large Porphyry Copper Gold System at Peenam

SEPTEMBER QUARTERLY REPORT

For personal use only

For personal use only

FIRST ASSAYS FROM FALUN DRILLING CONFIRM HIGH GRADE GOLD MINERALISATION

Significant Copper-Gold JORC Exploration Target

KINGSTON RESOURCES LIMITED

Drilling program commences on Cloncurry and Mount Isa projects

Trouser Legs Mine Strong Drilling Results - including g/t Au Potential for Further Mine Development

For personal use only

For personal use only

SIMUKU DRILLING TO OVER 1000 METRES DEMONSTRATES SIGNIFICANTLY INCREASED TONNAGE POTENTIAL OF THE INFERRED RESOURCE

For personal use only

BUNDARRA RESOURCE UPDATE

FIRST 2 DRILL HOLES AT NAKRU-2 PROSPECT BOTH INTERSECT SIGNIFICANT HIGHER GRADE COPPER MINERALISATION

For personal use only

ASX Announcement. FLEM survey underway at Henrietta Cobalt Nickel Prospect, Tasmania ASX: AX8 HIGHLIGHTS. Market Data. Board and Management.

Developing the +1.2Moz Pilbara Gold Project

For personal use only

MINCOR /GOLDEN RIM FIJI JOINT VENTURE SIGNIFICANT NEW EXPLORATION RESULTS

GEOPACIFIC REPORTS HIGH GOLD VALUES IN AUGER SOIL SAMPLES FROM THE QALAU AND TATAIYA PROSPECTS, RAKI RAKI PROJECT,

ASX announcement. Mylo-Frontier Pilbara Gold Project acquisition. 27 November Summary

New Zone of High Grade Gold Mineralisation Discovered at Balogo, Burkina Faso

ASX ANNOUNCEMENT 19 NOVEMBER 2015 SIGNIFICANT GOLD PROSPECT CONFIRMED AT APOLLO S SA GOLD PROJECT NEAR CHALLENGER

High Grade Gold Results from RAB Drilling at the Central Bore Prospect

ONGAVA POLY-METALLIC PROJECT

For personal use only

ASX RELEASE / MEDIA RELEASE 2,810 ppb gold in shallow auger samples Four new parallel zones defined up to 1500m in strike

ASX RELEASE REVIEW OF GLANDORE DATA TO DEFINE DRILL PROGRAM

DECEMBER QUARTERLY REPORT

ASX/MEDIA RELEASE 25 November EMERGENT CONFIRMS MAJOR JORC RESOURCE UPGRADE TO 561Mt FROM PREVIOUS 127Mt AT BEYONDIE IRON PROJECT

Successful Exploration Program - Metallum Identifies Multiple Bedrock Conductors at Teutonic

For personal use only

SUMBA EPITHERMAL GOLD SYSTEM

FINANCIERS MANDATED FOR THE DALGARANGA GOLD PROJECT

MARCH 2012 QUARTERLY REPORT. Highlights. Exploration Activities. Wyloo Iron Ore & Gold Project. Fast Facts

For personal use only

DIAMOND AND AIR CORE DRILLING TO COMMENCE ON WHITELAW GOLD BELT

Axiom Nightflower Drilling Progress and IP Survey Results, North Queensland

MAIDEN 26.6Mt JORC COPPER RESOURCE AT VISCARIA PROJECT, SWEDEN

Option agreement with Randgold set to commercialise Massigui Gold Project

MOUNT DOROTHY AND ELAINE DOROTHY PROSPECTS UPDATE

TWO HIGH-GRADE GOLD ZONES DISCOVERED AT HERMES GOLD PROJECT

For personal use only

ACQUISITION OF THE MCCLEERY COPPER-COBALT PROJECT, CANADA

Aurora Tank Gold Drilling Update

ASX Announcement. New economic gold results confirm Dave East as an exciting new discovery. Highlights. 4 July 2011

******************* *******************

For personal use only

For personal use only

TANDARRA GOLD PROJECT DRILLING COMMENCES AND FOUR EAGLES GOLD PROJECT DRILLING UPDATE

New Zone of High Grade Gold Discovered at Balogo

Exploration Update: RC Drilling Commenced at Lucky Strike

Drilling commenced at Thomson targets

ASX / MEDIA RELEASE 6 MAY MILE SILVER-LEAD-ZINC DISCOVERY; HIGH GRADE SILVER-GOLD IN ROCK CHIPS AT RUBY SILVER

INAUGURAL FARM IN DRILL RESULTS AT CALARIE PROJECT

Ni-Cu-Au-U TYPE AIRBORNE ANOMALIES OUTLINED

Transcription:

AUSTRALIAN UNITED GOLD LTD ACN 008 982 474 1st Floor, 8 Parliament Place West Perth WA 6005 PO Box 1618 West Perth WA 6872 Tel: (08) 9481-7833 Fax: (08) 9481-7835 Email: aul@austunitedgold.com Website: www.austunitedgold.com 28 July 2006 The Manager - Companies Australian Stock Exchange Limited Exchange Centre 20 Bond Street SYDNEY NSW 2000 Quarterly Report for the Period Ended 30 June 2006 1. EXPLORATION A. Manindi Zinc Project, Murchison, WA. (M57/227,240, 533, P57/934-936, 938, 939, 942) The Manindi Zinc Project is located in the East Murchison District of Western Australia, 20 kms south east of Youanmi. The project comprises a series of volcanogenic massive sulphide zinc deposits. The geological environment shows similarities to those of other base metal sulphide deposits in the Yilgarn Craton of Western Australia such as the Golden Grove deposits located to the southwest of Manindi, at Yalgoo, and the Teutonic Bore / Jaguar deposits in the Eastern Goldfields. The project was previously known as Freddie Well and was initially discovered and explored by CRA Exploration Pty Ltd in the late 1970's and early 1980's. As previously announced, the global resource based on drilling at the Kultarr (tested to 200 metres below surface), as well as the Kowari, Mulgara and Warabi prospects (all tested to only 100 metres below surface) was estimated at 1.05 Mt @ 7.64% Zn (At >1% Zn Cut-Off) 0.79 Mt @ 9.48% Zn (At >3% Zn Cut-Off) In comparison to drilling at Golden Grove & Jaguar, the drill testing of the Manindi deposits are very shallow and at an early stage of resource definition. A soil sampling programme at 100 x 25 metres spacing, with infill sampling at 50 x 25 metres spacing has extended the geochemical signatures of the Mulgara and Warabi resource areas, and defined new target areas to the south at Bandicoot and east at Quoll. In September 2005 the Company commissioned BioHeap Limited to undertake work on the zinc ore to ascertain the viability of heap leaching the ore using bacterial technology. The test results received indicated that the test work has been extremely effective in leaching zinc AUL Quarter June 2006.doc

into solution. The test work achieved excellent results with zinc recoveries of 97.1% being achieved in amenability tests. The detailed test results and the leach solutions were passed to Australian Metallurgical and Mineral Testing Consultants, ( AMMTEC ), who were commissioned to study downstream processing routes for the production of zinc metal. Test work completed by AMMTEC resulted in a conceptual flow sheet for the process beginning with heap leach of zinc ore through to the production of zinc metal. The process proceeds from heap leach through ion exchange to electrowinning. The results of work carried out by AMMTEC, including ion exchange test work, on the bioheap zinc solutions was sent to both Outokumpu and Ecotec in Canada in late March 2006 for conceptual design and Opex and Capex costs for ion exchange systems. Data received from these companies was evaluated by AMMTEC, who also forwarded data to manufacturers of commercial electrowinning plants for conceptual design and Capex and Opex calculations for an on-site electrowinning plant. The study by AMMTEC is ongoing with the intention of establishing a cost effective, on-site plant to produce zinc metal. The Company previously commissioned Newexco Services Pty Ltd ( Newexco ) to compile and review all geological data relating to the Manindi project. The purpose was to identify exploration targets to drill to increase the zinc ore resource at Manindi. The review identified further targets and recommended that a ground and downhole electromagnetic survey be carried out. The EM survey began during the March Quarter. All ground EM was completed, and was followed by an RC drilling programme conducted in June. A programme of downhole EM will be completed in conjunction with the upcoming diamond drilling programme, scheduled to begin in August. In June 2006, Newexco undertook a programme of 17 RC drill holes at Manindi. These drill holes were designed to: Test the previously defined geochemical & geophysical anomalies at Warabi (Zone A), Mulgara (Zone B), Quoll, Bandicoot & Ningaui. Twin historical drill holes FWD 005 and FRC 033 at Warabi (Zone A) and Mulgara (Zone B), respectively, to validate and extend the known resources. Drill two pre-collars at Kultarr (Zone D North) to facilitate later diamond drilling and downhole EM. This drilling was successful in all its objectives, delineating both massive sulphide mineralisation in a number of new prospect areas, as well as extending the known areas of economic mineralisation. Warabi (Zone A) This resource was drilled to test an EM anomaly and to validate previously delineated mineralisation. Three RC holes were drilled at Warabi. Drill hole MNRC 008 was designed to test an undrilled EM anomaly and encountered massive sphalerite and pyrite sulphide mineralisation from 44 to 54 metres. This interval assayed at 6.85% Zn and 0.4% Cu, however, it has a higher grade core, with results as follows: MNRC 008 664246E 6818038N 44-49 m 5m @ 11.8 % Zn/0.74% Cu This drill hole extends the known mineralisation at Warabi by at least 20 metres to the north of the established resource. Extensional and infill drilling will be required to allow an upgraded resource to be calculated for Warabi. 2

Drill hole MNRC 014 was drilled to validate drill hole FWD 005, which was undertaken by previous operators. Disseminated to massive sulphides were encountered over an interval of 18 metres. MNRC 014 664314E 6817997N 43-61 m 18m @ 14.96% Zn The intersection contains a high grade core of: 48-61 m 13m @ 19.94% Zn Within this high grade zone one sample assayed 36.3% Zn from 48-51 metres. From To Zn% Cu% Comments Dolerite with pyrite veins and disseminated 43 46 3.31 0.055 sulphides 46 48 0.09 0.007 Dolerite 48 51 36.3 0.06 Massive sphalerite and pyrite 51 54 23.5 0.51 Massive pyrite, sphalerite and chalcopyrite traces 54 57 14.15 1.34 Massive pyrite, sphalerite and chalcopyrite traces 57 58 5.98 0.50 Fine grained disseminated pyrite 58 59 0.22 0.02 Traces of pyrite 59 60 7.37 0.583 Veins and disseminations of pyrite 60 61 23.7 0.683 Massive fine grained pyrite This drill hole confirms the tenor and width of the mineralisation at Warabi (Zone A). Mulgara (Zone B) This resource was drilled to test an EM anomaly and to validate previously delineated mineralisation. Five drill holes were undertaken in a number of locations throughout the Mulgara resource area. All of these drill holes encountered anomalous mineralisation, however of particular note was: MNRC 012 664174E 6818174N 23-39 m 16m @ 7.4% Zn The intersection includes a high grade core of: 29-39 m 10m @ 10.2% Zn Drill hole MNRC 013 was drilled to validate drill hole FRC 033, which was undertaken by previous operators. Anomalous zinc mineralisation was observed over an interval of approximately 70 metres. Better results included: MNRC 013 664211E 6818144N 32-39 m 7m @ 5.10% Zn 89-92 m 3m @ 16.9% Zn The success of this drilling has extended the known extents of the Mulgara resource and highlights the requirement for both infill and extensional drilling to allow an upgraded resource to be calculated for Mulgara. Bandicoot This prospect is located approximately 250 metres to the south of Warabi (Zone A) and was defined through both surface geochemistry and surface EM. Three drill holes tested 200 metres strike of the anomaly and encountered massive sulphides in two of the three drill holes, the best result being: MNRC 002 664298E 6817436N 82-86 m 4m @ 1.58% Zn 3

Quoll The Quoll prospect is located adjacent and to the east of Warabi (Zone A), and possibly represents the footwall lode to this resource; this prospect was initially defined through both surface geochemistry and surface EM. Three drill holes tested 100 metres strike of this anomaly and encountered disseminated sulphides in all three of the drill holes, with the best result being: MNRC 005 664398E 6817869N 15-18 m 3m @ 0.62% Zn Ningaui The Ningaui prospect is located to the west of Mulgara (Zone B), and represents the southern strike extensions of the Kultarr & Kowari (Zone D) mineralisation; this prospect was defined through both surface geochemistry and surface EM. One drill hole tested this anomaly and encountered anomalous zinc results from 8 to 98 metres (a total of 90 metres), with the best result being: MNRC 015 663746E 6818084N 71-74 m 3m @ 1.00% Zn The recent RC drilling at Manindi has been successful in testing the designed objectives of the exploration programme, and is especially encouraging as it served to validate: The current first pass exploration techniques being employed, including both surface geochemistry & surface EM. The presence of mineralisation at the recently defined prospect areas, which lie outside the known resource areas. The tenor and widths of the known resources and their mineralisation characteristics. The next phase of exploration will be the deeper diamond drilling programme to be undertaken at Kultarr (Zone D North), and the carrying out of down hole EM, which is scheduled for August 2006. Further extensional and RC drilling is planned for the existing reserve areas at Warabi (Zone A) and Mulgara (Zone B). The Company is encouraged by the progress of its Manindi project. The Company believes that future drilling programmes could substantially increase the tonnage of zinc ore, and with current zinc prices in excess of US$3400 per tonne, the Company is looking to fast track development of the project. B. Namibian Uranium Prospect In November 2005 the Company announced that it had entered into an agreement with a local Namibian title holder to acquire two Prospecting Licences in Namibia prospective for Uranium. The company has also applied for a further tenement in the Engo Valley area of Namibia. To date, no on-ground work has been carried out on these tenements pending settlement of the acquisition and the granting of the Tenement Application. The Company has, however, carried out a comprehensive due diligence on the tenements and their mineralisation. When all due diligence issues relating to the tenements have been satisfied and effective title is able to be obtained, the Company will commence on-ground exploration. 4

C. Sherlock Bay Extended Nickel- Copper Project, Pilbara, WA The Company may earn up to 70% of the Sherlock Bay Extended Project which is located in the Eastern Pilbara Region, 1250 km north of Perth, and 75 km to the east of Karratha. The project is composed of three exploration licences (ELA 47/ 1226, 1227 & 1251), which cover over 470 km2 and is in close proximity to logistical infrastructure including sealed roads and port facilities; the tenement areas surround Sherlock Bay Nickel's 'Sherlock Bay' resource area. 2. Financials As at 20 June 2006 the Company had cash of $6,254,000. A further sum of $703,061 was received after the end of the quarter from the exercise of underwritten options. The Company also holds 2,250,000 tradable shares in Tiger Resources Limited and shares in other listed public companies which at June 30 2006 had a combined market value of $1,215,000. B R McCULLAGH Company Secretary Competent Person Declaration The information in this report that relates to Exploration Results, Mineral Resources or Ore Reserves is based on information compiled by Timothy Putt of Exploration and Mining Information Systems. Timothy Putt has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resource and Ore Reserves. Timothy Putt consents to the inclusion in the report of the matters based on his information in the form and context in which it appears. 5