ASX Announcement 24 December Drilling results confirm depth potential of Lamboo Project

Similar documents
New High Grade Lode Discovered at Wagtail South

ASX Announcement. Bulletin grows resource base and tenement position

New Drilling Program Commences at Mutiny s Deflector Deposit

EXPLORATION SUCCESS AT COYOTE GOLD MINE

For personal use only

STEP-OUT DRILLING EXTENDS HIGH GRADE COPPER ZONE AT SYNDICATED S 100% BARBARA SOUTH LODE

High Grade Gold Drill Results Extend Buccaneer

ASX Announcements & Media Release

266,900oz of gold. ASX Announcement

Hits of up to 123gpt show Chesterfield emerging as a high grade gold project

High Grade Gold Intercepts at Bangaba

BUNDARRA RESOURCE UPDATE

Malachite Resources Limited ABN

HIGH-GRADE GOLD MINERALISATION CONTINUES ALONG STRIKE AT THE BODDINGTON SOUTH GOLD PROJECT

King of the Hills Gold Project, Leonora, to commence production in Q2 2011

EXCELLENT FIRST DRILL RESULTS FROM WELD RANGE

For personal use only

New Zone of High Grade Gold Mineralisation Discovered at Balogo, Burkina Faso

For personal use only

For personal use only

For personal use only

Trouser Legs Mine Strong Drilling Results - including g/t Au Potential for Further Mine Development

New Zone of High Grade Gold Discovered at Balogo

New High Grade Gold-Copper Extensions At Mutiny s Deflector Deposit Highlight Project s Significant Growth Potential

ASX/Media Announcement 14 July 2010

NEW DISCOVERIES AT THE RED OCTOBER MINE

Developing the +1.2Moz Pilbara Gold Project

ASX ANNOUNCEMENT 21 MARCH 2011

KINGSTON RESOURCES LIMITED

Diamond Drilling Extends the Netiana Lodes at Depth

HIGH GRADE GOLD FROM RC DRILLING AT BARLEE

For personal use only

LATEST DRILL RESULTS REVEALS MINERALISATION OPEN AT STRIKE AND DEPTH AT KATANNING GOLD DEPOSIT

Drill testing of gold zones at Albury Heath intersect impressive quartz lodes

For personal use only

FIVE RIGS DRILLING AT KARLAWINDA

Co-O MINE MINERAL RESOURCE UPDATE

Symposium s Investor Roadshow Sydney 12 August 2014 Melbourne 13 August 2014

Additional significant gold and copper intercepts obtained in Sweden

For personal use only

SITE WORKS COMMENCE AT A1 GOLD MINE, EASTERN VICTORIA

High-grade Gold in First Drilling Undertaken at Productora South

Ausgold awarded EIS grant for Jinkas deep drilling

For personal use only

For personal use only

For personal use only

Hann Prospect New Gold Discovery Confirmed

Further Extensions to the Netiana Lodes at Balogo, Burkina Faso

76,000 Ounce Gold Resource at Akoko North

ASX and Media Release

A1 GOLD MINE 14 LEVEL STOCK WORKS TARGET FURTHER HIGH GRADE DRILL INTERCEPTS

STRONG GOLD IN SOIL ANOMALY OUTLINED AT MARY HARRISON PROJECT HIGHLIGHTS

For personal use only

For personal use only

TWO HIGH-GRADE GOLD ZONES DISCOVERED AT HERMES GOLD PROJECT

For personal use only

Chalice, Higginsville Drilling

High Grade Gold Intersections at Harry Smith Prospect

For personal use only

For personal use only

FOCUS MINERALS REPORTS ENCOURAGING FIRST ROUND RESULTS FROM COOLGARDIE NEAR MILL PROGRAMME

102 metres strike length averaging 32.62g/t Gold extends overall surface vein sampling to date to 726 metres strike length averaging 24.

More High Grade Gold Intercepts from the Netiana Lodes at Balogo, Burkina Faso

ASX/Media Announcement

60% upgrade of Flying Doctor Resource to 104,600 tonnes of contained zinc and lead.

MARKET UPDATE ON URANIUM AND GOLD PROJECTS

For personal use only

HERON ENTERS OPTION TO PURCHASE A1 GOLD MINE, EASTERN VICTORIA

FINANCIERS MANDATED FOR THE DALGARANGA GOLD PROJECT

For personal use only

New zones of mineralisation found close to flagship deposits at Wa Gold Project

More growth at Wa Gold Project as Julie-Collette resource increases to 410,700 ounces

QUEEN SHEBA - RESOURCE TABLE: AUGUST 2011 RESOURCE CATEGORY. Tonnes Au Ag Cu (000) g/t g/t % GLOBAL RESOURCE TABLE: CONTAINED METAL

ASX Release 29 November 2017

$2.5 Million Resource Drilling Program Commences at Siberia Mining Centre

MINCOR /GOLDEN RIM FIJI JOINT VENTURE SIGNIFICANT NEW EXPLORATION RESULTS

The Manager Companies ASX Limited 20 Bridge Street

For personal use only

Norwest successfully lists on ASX, Drilling commenced at Warriedar Gold Project

GEOPACIFIC REPORTS HIGH GOLD VALUES IN AUGER SOIL SAMPLES FROM THE QALAU AND TATAIYA PROSPECTS, RAKI RAKI PROJECT,

Maiden Kandia Gold Resource of 107,500 Ounces

For personal use only

SECOND ADVANCED GOLD PROJECT IDENTIFIED AT THREE RIVERS PROJECT

FIRST ASSAYS FROM FALUN DRILLING CONFIRM HIGH GRADE GOLD MINERALISATION

For personal use only

High-grade Copper and Gold Discovered at Productora

For personal use only

LATEST RESULTS FROM RC DRILLING

ASX announcement 16 May 2016

DIAMOND AND AIR CORE DRILLING TO COMMENCE ON WHITELAW GOLD BELT

FIRST RESULTS FROM RC DRILLING AT KONONGO

For personal use only

Ovoot Coking Coal Project (100%)

For personal use only

ASX ANNOUNCEMENT FURTHER EXPLORATION SUCCESS AT NULLAGINE

Rock chip sampling confirms high grade quartz vein 500m long and up to 20m wide

For personal use only

Highlights. Wa Project. Kandia Prospect. South Wa. Julie West Jang Trend. Corporate

ASX Release 28th June 2011

Transcription:

Bulletin Resources is the 100% owner of the Lamboo and Golden Crown Gold Projects located near Halls Creek in the East Kimberley region of Western Australia. The projects have a combined open pit and underground Mineral Resource of 1.77 million tonnes at 5.2g/t Au (for a total of 294,000 ounces) and a 120,000 tpa processing facility currently under care and maintenance. ASX Code: BNR Issued capital: 81,504,762 listed ord. shares 8,875,000 unlisted options Share price at 21 December 2012: $0.054 Market capitalisation at 21 December: $4.4 million Cash on hand at 30 October 2012: $1.0 million Directors: Non-Executive Chairman: Phil Retter Managing Director: Martin Phillips Non-Executive Director: Steve Robinson Investor and Media Contact: admin@bulletinresources.com +61 8 9388 6921 ASX Announcement 24 December 2012 Drilling results confirm depth potential of Lamboo Project Quartz lode mineralisation successfully intersected in majority of holes drilled down-plunge of the Nicolson s South and Nicolson s Find resource. Highlights include: NRC12045 : 4m at 22.3g/t Au from 179m including : 1m at 61.2g/t Au from 180m NRC12020 : 1m at 8.5g/t Au from 198m NRC208 : 1m at 13.5g/t Au from 307m NRC12032 : 3m at 4.0g/t Au from 206m NRC12026 : 5m at 2.3 g/t Au from 197m Depth potential of the two Wagtail South lodes confirmed: WRC12010 : 1m at 13.0g/t Au from 94m : 3m at 5.8g/t Au from 165m : 1m at 6.3g/t Au from 180m Bulletin to receive $135,000 in co-funding from the WA Department of Mines and Petroleum under the WA State Government Exploration Incentive Scheme s (EIS) Co-funded Exploration Drilling Program. Bulletin s Managing Director, Martin Phillips commented: The results from this wildcat program are extremely promising, having confirmed our expectations of the depth potential of the Lamboo Project resources following receipt of an independent study by Optiro Pty Ltd, which estimated the total potential of all exploration targets within the Lamboo project at approximately 4 to 7 million tonnes containing 0.7 to 1.1 million ounces at an average grade of 5.2 to 5.4g/t Au*. The program has also provided valuable geological information that will greatly assist in the design of the follow-up drilling campaign to specifically target those high grade lodes at depth. Martin Phillips Managing Director *The potential tonnes and grades of the exploration target expressed in this announcement are conceptual in nature and should not be considered as an estimate of a Mineral Resource. There has been insufficient exploration to estimate a Mineral Resource and it is uncertain if further exploration will result in the estimation of a Mineral Resource.

Bulletin Resources Limited (ASX: BNR) ( Bulletin ) is pleased to provide the following update on drilling activities at its 100% owned Lamboo Project located near Halls Creek in the East Kimberley Region of WA. The main objective of the current wildcat drilling program was to test the potential for down-plunge extensions to the main resource areas at Nicolson s Find, Nicolson s South and Wagtail South. Owing to the limited available time due to the onset of the wet season, only 13 RC drill holes were completed including a further two holes at Nicolson s North. Significant deviation was experienced in several of the deeper holes at Nicolson s Find and Nicolson s South (>260m depth). Numerous methods were trialled to straighten the holes without success and resulted in suboptimal testing of the lode structures, particularly the projected down-plunge extensions of the higher grade zones. Notwithstanding this, most of the deeper holes intersected well developed quartz lode mineralisation at the target depths, which will greatly assist in the planning of future campaigns using a more suitable drill rig. Nicolson s Despite several suboptimal intersection positions, the results of the deep drilling at Nicolson s Find and Nicolson s South successfully confirmed the depth continuance of both resources with quartz and sulphide lode mineralisation intersected where expected. Significant intersections included: NRC12045 : 4m at 22.3g/t Au from 179m including : 1m at 61.2g/t Au from 180m 1m at 1.1g/t Au from 186m NRC12020 : 1m at 8.5g/t Au from 198m NRC208 : 1m at 2.1g/t Au from 281m 1m at 13.5g/t Au from 307m NRC12032 : 3m at 4.0g/t Au from 206m 1m at 3.6g/t Au from 261m 2m at 2.1g/t Au from 302m NRC12026 : 5m at 2.3g/t Au from 197m 1m at 1.3g/t Au from 207m 1m at 3.8g/t Au from 247m 1m at 1.3g/t Au from 304m A longitudinal section showing the drill hole results is presented in Figure 1 with representative cross sections presented in Figures 2 to 4. All drill hole results above a 1g/t Au cut-off are summarised in Table 1. Page 2

Figure 1: Long section of Nicolson s showing recent significant drill hole intersections Figure 2: Cross section 19300mN through Nicolson s South Page 3

Figure 3: Cross section 19440mN through Nicolson s Find Figure 4: Cross section 19500mN through Nicolson s Find Page 4

Nicolson s North Two deep RC drill holes were completed at Nicolson s North, located 400 metres north of the former Nicolson s Find open pit, targeting the down-plunge extent of the previously announced high grade drill hole intersections (Figure 5). Hole NRC12046 intersected quartz with strong sulphide mineralisation at the interpreted lode position while NRC12047 intersected unmineralised quartz. Significant results were: NRC12046: 1m at 1.2g/t Au from 160m While the drill holes successfully confirmed the down-plunge extent of the mineralised structure at the extrapolated position, further drilling is required to determine the structural controls to the previously reported high grade intersections. Figure 5: Long section of Nicolson s showing Nicolson s North drill hole results Wagtail South Three RC holes were drilled at Wagtail South to assist in determining the plunge of the Wagtail South mineralisation at depth. Hole WRC12010 intersected multiple quartz and sulphide mineralised lodes associated with high grade gold mineralisation at the anticipated depths (Figures 6 and 7). WRC12010 : 1m at 13.0g/t Au from 94m 3m at 5.8g/t Au from 165m 1m at 6.3g/t Au from 180m The two shallower RC holes failed to intersect any significant quartz veining indicating that the down-plunge orientation of the high-grade Wagtail South lode mineralisation is steeper than previously interpreted. Page 5

Figure 6: Long section of Wagtail showing recent significant drill hole intersections Figure 7: Cross section 17810mN through Wagtail South Page 6

Drill funding award Bulletin was successful in its application to the WA Department of Mines and Petroleum for $135,000 in co-funding under the WA State Government Exploration Incentive Scheme s (EIS) Co-funded Exploration Drilling Program. The majority of the drilling is earmarked for the area extending from Nicolson s North to Hyena where several outcropping high grade quartz veins were recently discovered in proximity to the granite contact in a setting comparable to the Nicolson s Find deposit. Further details on the timing of this drilling will be made in due course. Page 7

Table 1: 1 Summary of Assay Results from Lamboo Gold Project above a 1g/t Au cut-off Hole ID Local North Local East Local mrl End of Hole (m) From (m) To (m) 2 Downhole Interval (m) 3 Grade (g/t Au) 4 Lode Nicolson's Find & Nicolson's South NRC139 5 19441 10159 295 222 199 200 - NSR NSth NRC208 5 19501 10215 297 318 281 282 1.0 2.1 NSth 307 308 1.0 13.5 NSth NRC12020 6 19277 10185 293 300 198 199 1.0 8.5 NSth 265 266 - NSR NSth NRC12021 6 19360 10168 297 288 97 98 1.0 2.0 NHW 100 102 2.0 1.3 NHW 147 148 1.0 1.3 NFW 241 242 1.0 2.1 NSth NRC12025 6 19360 10217 293 348 186 187 1.0 2.1 Main 220 221 1.0 2.5 NFW NRC12026 6 19440 10226 296 318 197 202 5.0 2.3 NFW 207 208 1.0 1.3 NFW 247 248 1.0 3.8 NSth 304 305 1.0 1.3 NSth NRC12032 6 19505 10272 295 355 206 209 3.0 4.0 Main 261 262 1.0 3.6 NFW 302 304 2.0 2.1 NSth NRC12045 19759 10188 302 252 179 183 4.0 22.3 NFW including 180 181 1.0 61.2 186 187 1.0 1.1 NFW Nicolson's North NRC12046 19960 10165 302 179 160 161 1.0 1.2 NRC12047 19999 10193 302 237 222 223 - NSR Wagtail South WRC12008 17883 9926 288 119 80 81 - NSR WRC12009 17869 9946 289 119 100 101 - NSR WRC12010 17810 9964 293 186 94 95 1.0 13.0 165 168 3.0 5.8 180 181 1.0 6.3 Notes for Table 1: 1 Drilling and assay results in Table 1 are down-hole intervals compiled using a 1.0 g/t Au lower cut with a maximum of 1m < 1.0 g/t Au internal dilution. No upper cut value has been applied to the assay results. NSR denotes No Significant Results. 2 True intersection widths are estimated to be 60 to 80 % of down-hole intersection widths. All holes are collared with an azimuth of 270 o to grid unless otherwise indicated. 3 Drill samples were analysed using a 40 gram fire assay with AAS finish. 4 Lode description: Main = Nicolson's Main lode, NHW = Nicolson s Hanging wall lode, NFW = Nicolson's Footwall lode, NSth = Nicolson's South Lode 5 NRC139 and NRC208 are extensions of existing holes 6 Significant down-hole dip deviation (up to -11 o ) occurred at Nicolson s Find and Nicolson s South on holes greater than 260m depth resulting in holes missing intended target area Page 8

Bulletin Resources Ore Reserve Statement September 2012 Proved Probable Total Open Pit Tonnes Gold grade (g/t) Contained Gold (oz) Tonnes Gold grade (g/t) Contained Gold (oz) Tonnes Gold grade (g/t) Contained Gold (oz) Nicolson's South - - - 268,000 4.4 38,000 268,000 4.4 38,000 Nicolson's Find - - - 92,000 5.9 17,000 92,000 5.9 17,000 Wagtail North - - - 105,000 3.0 10,000 105,000 3.0 10,000 Rowdies - - - 19,000 2.0 1,000 19,000 2.0 1,000 Wagtail South - - - 77,000 3.6 9,000 77,000 3.6 9,000 Total Open Pit 560,000 4.2 75,000 560,000 4.2 75,000 Underground - - - 177,000 6.0 34,000 177,000 6.0 34,000 Total - - 737,000 4.6 110,000 737,000 4.6 110,000 Note: Figures may not add due to rounding Bulletin Resources Mineral Resource Statement September 2012 Category Tonnes Gold grade (g/t) Contained Gold (oz) Lamboo Project Nicolson s Open pit Indicated 333,000 5.5 59,000 Open pit Inferred 16,000 2.7 1,000 Total open pit 349,000 5.4 60,000 Underground Indicated 406,000 6.5 85,000 Underground Inferred 372,000 5.7 69,000 Total underground 778,000 6.2 154,000 Nicolson s total 1,127,000 5.9 214,000 Rowdies Open pit Indicated 17,000 2.4 1,000 Open pit Inferred 6,000 2.7 1,000 Total open pit 22,000 2.5 2,000 Underground Indicated 35,000 5.4 6,000 Underground Inferred 7,000 6.4 1,000 Total underground 43,000 5.6 8,000 Rowdies total 65,000 4.5 9,000 Page 9

Category Tonnes Gold grade (g/t) Contained Gold (oz) Wagtail North Open pit Indicated 87,000 3.8 11,000 Open pit Inferred 1,000 0.8 0 Total open pit 88,000 3.8 11,000 Underground Indicated 82,000 4.9 13,000 Underground Inferred 4,000 4.7 1,000 Total underground 86,000 4.8 13,000 Wagtail North total 174,000 4.3 24,000 Wagtail South Open pit Indicated 51,000 5.6 9,000 Open pit Inferred 7,000 1.9 0 Total open pit 58,000 5.2 10,000 Underground Indicated 16,000 4.5 2,000 Underground Inferred 5,000 5.1 1,000 Total underground 21,000 4.6 3,000 Wagtail South total 79,000 5.0 13,000 Total Total open pit 517,000 5.0 82,000 Total underground 928,000 6.0 178,000 Project Total Project total 1,445,000 5.6 261,000 Golden Crown Project Golden Crown Open pit Inferred 136,000 3.80 17,000 Faugh-a-Ballagh Open pit Inferred 187,000 2.83 17,000 Project Total 323,000 3.24 34,000 Combined Total 1,768,000 5.2 294,000 Note: Lamboo Project Resource Estimate reported at 0.6g/t Au cut-off grade for potential open pit material and 3.0g/t Au cut-off grade for potential underground material. Golden Crown Project Resource Estimate reported at 1.0g/t Au cut-off grade. Figures may not add due to rounding. Competent Persons statement The information in this announcement that relates to Lamboo Project and Mineral Resources and Exploration Targets is based on information compiled by Mr Ian Glacken, who is a Fellow of the Australasian Institute of Mining and Metallurgy. Mr Glacken is a full time employee of Optiro Pty Ltd where he holds the title of Principal Consultant. Mr Glacken has sufficient experience relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Glacken consents to the inclusion in this table of the matters based on his information in the form and context in which it appears. Page 10

The information in this table that relates to Golden Crown and Faugh-a-Ballagh Mineral Resources is based on information compiled by Mr Aaron Green, who is a Member of the Australian Institute of Geoscientists (AIG). Mr Green is a full time employee of Runge Limited where he holds the title of Operations Manager WA. Mr Green has sufficient experience relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Green consents to the inclusion in this table of the matters based on his information in the form and context in which it appears. The information in this table that relates to Ore Reserves is based on information compiled by Mr Glen Carthew who is a Member of the Australasian Institute of Mining and Metallurgy. Mr Carthew is a full time employee of AMC Consultants Pty Ltd. Mr Carthew has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Carthew consents to the inclusion in this table of the matters based on his information in the form and context in which it appears. The information in this announcement that relates to Exploration Results is based on information compiled by Mark Csar, who is a Fellow of the Australasian Institute of Mining and Metallurgy. Mark Csar is a full-time employee of the Company and has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mark Csar consents to the inclusion in the report of the matters based on his information in the form and context in which it appears. Page 11