PUB NLH 185 Island Interconnected System Supply Issues and Power Outages Page 1 of 9

Similar documents
DISTRIBUTION SYSTEM ELECTRIC INFRASTRUCTURE RELIABILITY PERFORMANCE INDICATORS

Peterborough Distribution Inc Ashburnham Drive, PO Box 4125, Station Main Peterborough ON K9J 6Z5

Climate change and power systems

f<~~ ~ Gulf Power April16, 2018

Director, Operations Services, Met-Ed

Alternating Current (AC): Alternating Current is electric current that reverses directions at regular intervals.

Section 5. TADS Data Reporting Instruction Manual DRAFT Section 5 and Associated Appendices With Proposed Event Type Numbers

Traffic Control Weather Policy

BVES Annual Reliability Public Presentation 2016 Performance

Severe Weather Watches, Advisories & Warnings

SPEARFISH FIRE DEPARTMENT POLICIES AND PROCEDURES

2016 HURRICANE SEASON PREPARATION. March 30, 2016

How Power is Restored After a Severe Storm. Presented by Stacy Shaw, Safety Director & Nolan Hartzler, GIS Mapping Technician

Network Quality and Reliability of Supply Code

IS YOUR BUSINESS PREPARED FOR A POWER OUTAGE?

Norm Hann Performance Manager, Performance Management Department Hydro One Networks Inc.

GIS Solution For Electric Utilities With Integration With Distribution Management System

Minnesota Public Utilities Commission Staff Briefing Papers

Network Quality and Reliability of Supply

Lake Lure Community Meeting with Duke Energy

PSEG Long Island LLC 111 Eighth Avenue, 13th Floor New York, NY 10011

Risk Analysis for Assessment of Vegetation Impact on Outages in Electric Power Systems. T. DOKIC, P.-C. CHEN, M. KEZUNOVIC Texas A&M University USA

The Study of Overhead Line Fault Probability Model Based on Fuzzy Theory

Power System Research Group Electrical Engineering Dept., University of Saskatchewan Saskatoon, Canada

Staging for Utility Personnel and Mutual Aid. 1. Hermine- Meeting dates were August 29th_31 st, 2016 and September 1st, 2016.

Reliability Assessment of Radial distribution system incorporating weather effects

Review of Florida s Investor-Owned Electric Utilities Service Reliability Reports. September

COMPANY NEWS JANUARY 2019 BE PREPARED FOR OUTAGES

Electric Distribution Storm Hardening Initiatives. Paul V. Stergiou Distribution Engineering October 14 th, 2015

Major Event Response Reporting Guelph Hydro Electric Systems Inc. (Guelph Hydro) May 4, 2018 Wind Storm

GENERATOR INTERCONNECTION APPLICATION

1 City of Edmonton Quesnell Bridge, Roads and Associated Structures Assessment

Standard Operating Procedure

Model M3484 Industrial Line Noise Filter Module Customer Reference Manual

Transmission & Distribution Electrical Reliability 2007 Annual Report

ATTACHMENT Mitigating Systems

Wind Events. Flooding Events. T-Storm Events. Awareness Alerts / Potential Alerts / Action Alerts / Immediate Action Alerts / Emergency Alerts.

A Novel Approach for Increasing the Reliability of Power Transmission Lines in Galloping Conditions

Review of Florida s Investor-Owned Electric Utilities Service Reliability Reports. November

Circuit Reliability Review

NORDIC AND BALTIC GRID DISTURBANCE STATISTICS 2015

Review of. Florida s Investor-Owned Electric Utilities Service Reliability reports. State of Florida

Cold Weather Preparation

Review of. Florida s Investor-Owned Electric Utilities Service Reliability reports. State of Florida

Customer Track Maintenance Guide

Big Data Paradigm for Risk- Based Predictive Asset and Outage Management

Vegetation Related Transmission Outage Report

Periodic Inspection and Testing of Electrical Installations Sample Test ( ) Version 1.3 July 2018

Report on Reliability of ComEd Electrical Service within Downers Grove. Prepared September 1, 2013

Comprehensive Emergency Management Plan

URD Cable Fault Prediction Model

Vegetation Related Transmission Outage Report

Joseph E. Boxhorn, Ph.D., Senior Planner Southeastern Wisconsin Regional Planning Commission #

CITY OF NEW LONDON WINTER ROAD & SIDEWALK MAINTENANCE POLICY

YORK REGION DISTRICT SCHOOL BOARD. Procedure #NP464.0, Snow/Ice Clearance and Removal

Film Capacitors. EMI suppression capacitors. Date: June 2018

PROCEDURE NO.: SO5-2-6 PAGES: 1 OF 10 CHIEF SYSTEM OPERATOR

ICE STORM! a mini tabletop exercise for home care agencies

General. High Winds. High winds are a common hazard in the UAE.

STORM IMPLEMENTATION PLAN & ANNUAL RELIABILITY PERFORMANCE REPORTS

Deicing Chemicals - State of Practice

Thermal Cube. Custom-built Heat Flux Sensor

An Introduction to Insulation Resistance Testing

Joseph E. Boxhorn, Ph.D., Senior Planner Southeastern Wisconsin Regional Planning Commission #

SNOW CONTROL OPERATIONS

Installation Manual. Installation manual for PerfectEnergy Solar Modules. Content

Hurricane Preparation and Recovery. October 11, 2011 Jon Nance, Chief Engineer, NCDOT

Reven ue Req u i remen t Ap pl icat ion 2004/05 and 2005/06. BC hydro m W. Volume 2. Appendix L. System Performance Indicators

1. Explain the various methods of methods of grounding. In power system, grounding or earthing means connecting frame of electrical equipment (non-cur

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA PACIFICORP. Direct Testimony of Heidemarie C. Caswell

SSC-JE EE POWER SYSTEMS: GENERATION, TRANSMISSION & DISTRIBUTION SSC-JE STAFF SELECTION COMMISSION ELECTRICAL ENGINEERING STUDY MATERIAL

Table-Top Exercise for Emergency Preparedness Evaluation: Little Anse, Isle Madame

Lamp and Control Panel (Lamp Panel)

Request Ensure that this Instruction Manual is delivered to the end users and the maintenance manager.

THUNDERSTORM/STORM PROCEDURE

Severe Ice Storm Risks in Ontario

Applications. Remote Weather Station with Telephone Communications. Tripod Tower Weather Station with 4-20 ma Outputs

Trainee Manual C02 CITY OF SASKATOON. Water and Sewer Section. Severe Storm Response Trainee Manual. Version # 1-0-3

Superconducting Fault Current Limiters

While all thunderstorms are dangerous, the National Weather Service (NWS) defines a severe thunderstorm as one that:

Instruction. Vacuum Circuit Breaker Operator Module. Type 3AH 4.16kV to 38kV. Power Transmission & Distribution

Northwest Hydro Tech Session_2017

Field Pro Operation and Installation Manual

Winter Preparation for Severe Weather Events

Conductor Replacement Strategy. Eric Desjardins, EIT Hamdy Khalil, P. Eng., PMP Asset Management - BCTC

FOR PROJECTS INITIATED AFTER NOVEMBER 1, 2008 ITEM 716 EMBANKMENT EARTH OUTLET SEDIMENT TRAP

MUNICIPALITY OF ANCHORAGE PUBLIC TRANSPORTATION DEPARTMENT AnchorRIDES TRANSPORTATION SYSTEM

Qualification Test Report. Modular Plugs, Unshielded and Shielded

Village Weather, Snow, Ice, Breakup, Flooding, Fire sites

Jinzhou Power Supply Company, Liaoning Electric Power Company Limited, State Grid, China

BEFORE THE CORPORATION COMMISSION OF OKLAHOMA

Town of Oconomowoc Snow & Ice Control Policy

Applications of GIS in Electrical Power System

MTO s Road Weather Information System (RWIS)

LOOP frequency estimates due to external events

SMD Switch SI-C3436A General specification. Soldering conditions Reflow Soldering condition. Standard Reel Dimensions (mm) Packing specification

Visibility and present weather sensors. you can trust... visibly better

TABLE OF CONTENTS LIST OF TABLES. Page

Structure Monitoring Technology. Features. Ordering Information. Trigger Tape. A2 Pulse Counter (Optional) Solar Radiation Sensor

Climate Change Engineering Vulnerability Assessment. Coquihalla Highway (B.C. Highway 5) Between Nicolum River and Dry Gulch

Transcription:

PUB NLH 1 Page 1 of 1 Q. Provide Hydro s list of outage cause codes and indicate how troublemen are managed and trained to properly use the codes. Explain the method used to report outage causes. A. Hydro maintains outages codes for use on the transmission system (> kv) and the distribution system. The following explains each system. 1 1 1 1 1 1 1 1 0 1 Transmission System Hydro follows the Canadian Electricity Association (CEA) approved outage cause codes for reporting outages on the transmission system for both Bulk Electric System delivery points and transmission equipment outages. These codes are used by the Energy Control Centre (ECC) Operators to enter the information into Hydro s Reliability Reporting System database after a disturbance event occurs. The Senior System Operations Engineer Reliability (SSOE R) reviews the record entry, completes an initial investigation into the cause of the outage, trains the ECC operators on the use of the cause codes and updates the cause code as required. For unknown outage causes, the ECC Operator will use undetermined as the cause code. This code is updated by the SSOE R following the investigation into the disturbance event, which will include discussions with field staff as necessary. The SSOE R participates in CEA workshops where the proper use of codes is discussed among participating utilities. In addition, the CEA has published manuals which are referenced for reporting purposes. The outage cause codes are as follows: Transmission Cause Code Definitions The following describes the cause codes used in the Reliability Reporting System. The reporting code to be used is the root cause (primary cause) of the outage.

Code 0 Defective Equipment PUB NLH 1 Page of There are five sub codes used to break down the defective equipment cause code. These codes are as follows: 1 1 1 1 1 1 Deterioration due to age Equipment failure caused by the age of equipment. Incorrect Manufacturing Design Equipment that has a manufacturing design flaw. Incorrect Manufacturing Materials Equipment manufactured with incorrect materials Incorrect Manufacturing Assembly Equipment was assembled incorrectly by the manufacturer. Lack of Maintenance Equipment failure caused by incorrect maintenance procedures or no maintenance done on the equipment. Other Defective Equipment Equipment failure which does not fall in any of the sub codes listed above. 1 1 1 0 1 Code 00 Adverse Weather There are sub codes used to describe Adverse Weather. The best code to describe the condition that existed at the time of the outage to the equipment is used. Environment Canada or any other weather service provider is used to confirm the weather condition at the time of the outage. 01 Lightning Outage was caused by a confirmed lightning storm. 0 Rain Outage was caused by heavy rains. 0 Freezing Rain Outage was caused by freezing rain. 0 Ice Outage was caused by an ice accumulation. 0 Snow Outage was caused by a snow storm.

PUB NLH 1 0 Wind Outage was caused by a wind storm. Page of 0 High Ambient Temperatures Abnormal temperatures above the operating range of equipment. 0 Low Ambient Temperatures Abnormal temperatures below the operating range of equipment. 0 Freezing Fog or Frost Outage was caused by a freezing fog or frost. Tornadoes Outage was caused by a confirmed tornado. Hail Outage was caused by a hail storm. 1 Galloping Outage caused by galloping conductors. 1 1 1 1 Code 00 Adverse Environment There are eight sub codes used to describe Adverse Environment. The best code to describe the condition that existed at the time of the outage to the equipment is used. These sub codes, where possible, are determined by field personnel at the location of the equipment which resulted in the outage. 1 1 1 1 0 1 01 Salt Spray Outage due to salt contamination. 0 Industrial Pollution Outage due to any type of industrial pollution. Not caused by birds. 0 Humidity Outage due to a humidity problem. 0 Corrosion Outage due to corrosion on the equipment that caused the outage. 0 Vibration Outage due to vibration on the equipment that caused the outage. 0 Fire Outage due to a fire on or near the equipment that caused the outage. This could be a forest, building or any type of fire. Also includes smoke from the fire.

PUB NLH 1 Page of 0 Flooding Outage due to flooding or damage from flooding to the equipment that caused the outage. 0 Flying Debris Outage due to any type of flying debris that hit on the equipment that caused the outage. Code 00 System Conditions There are seven sub codes used to describe System Conditions. These sub codes are determined by SSOE R, who investigates the power system conditions at the time of the outage. 1 1 1 1 1 1 01 Over Voltage. 0 Under Voltage. 0 Switching Transient. 0 Overload. 0 Over Frequency. 0 Under Frequency. 0 Operation Related System Configuration. 1 1 0 1 Code 00 Human Element There are ten sub codes used to describe Human Element related outages. These sub codes are determined by SSOE R who reviews the outage. 01 Incorrect System Records or Diagrams Equipment information or drawing was incorrect which resulted in a human tripping the equipment. 0 Incorrect Use of Equipment Equipment tripped due to a human(s) using that equipment incorrectly. 0 Incorrect Construction, Installation or Maintenance Equipment was constructed, installed or maintained incorrectly.

PUB NLH 1 Page of 0 Incorrect Protection setting Protection had the wrong setting applied or the protection was calculated in error. 0 Switching Error Personnel performing the switching caused the trip. 0 Testing Equipment tripped during testing due to human interaction. 0 Incorrect Circuit Labeling Equipment was labeled incorrect. 0 Contact (resulting in no damage) by Employees or Utility Contractors 0 Deliberate Damage by Employees or Utility Contractors Accidental Damage by Employees or Utility Contractors 1 Code 00 Foreign Inference There are 1 sub codes used to describe Foreign Inference. These sub codes are determined by SSOE R who reviews the outage. 1 1 1 1 1 1 1 0 1 01 Contact (resulting in no damage) by Persons other than Employees or Utility Contractors. 0 Deliberate Damage by Persons Other Than Employees or Utility Contractors Vandalism, Terrorism, or other Malicious Acts (Hunters). 0 Accidental Damage by Persons Other Than Employees or Utility Contractors. 0 Contact by Vehicles Equipment tripped after it was hit by a vehicle (on road or off road type). 0 Contact by Animals Equipment tripped after it was contacted by an animal (not human). 0 Contact by Trees Equipment tripped after it was hit by a tree, broken tree branch, tree growing up in the line, falling tree, or tree damage due to storm. 0 Solar Magnetic Induction Equipment tripped after a confirmed Solar Magnetic Storm. 0 Birds Equipment tripped after a bird hit the equipment. 0 Crane Equipment tripped after it was hit by a crane (not a vehicle).

PUB NLH 1 Kite Equipment tripped after it was hit by a kite. Plane Equipment tripped after it was hit by an aircraft. Page of 1 Vegetation Equipment tripped after it was contacted by vegetation (not considered a tree). Code 00 Loss of Generation Used for delivery point interruptions only, caused by the loss of generation in the system that was supplying the delivery point at the time of the trip. 1 Code U Unknown The cause of the outage could not be determined. To be used only after the investigation could not determine the root cause. 1 1 1 1 1 1 1 0 1 Distribution System The Distribution System includes all equipment rated at kv and below. Reporting occurs for only equipment problems which result in customer interruptions. The distribution system reporting is based on the CEA approved outage codes. Hydro uses a further breakdown to some of the cause codes. These additional codes are used by Hydro to identify certain areas of concern. Line crews are trained to complete the attached form (PUB NLH 1 Attachment 1) for each trouble call affecting one customer or the entire distribution feeder. The Asset Specialist Distribution will complete the form for total distribution system outages. New personnel are trained by senior members of the line crews or by Line Supervisors. The completed forms are forwarded to office clerks for input into the Distribution Outage Reporting System database. The Asset Specialist Distribution reviews and verifies all reports. The Asset Specialist is a senior person who is familiar with the reporting system. These reports are monitored for each distribution feeder to identify any trends that may be developing in substandard

PUB NLH 1 Page of materials or in work practices that need to be improved upon. In addition, any work identified by the line crew or by the Asset Specialist that requires immediate attention is addressed by the line crew at the time and if it can wait to be scheduled, it is provided to the distribution planner to schedule a work crew to address. Distribution Cause Codes Definitions A customer interruption cause is defined in terms of the primary cause of the interruption. These causes are assigned the following codes: 1 1 0. Unknown/Other Customer interruptions with no apparent cause or reason which could have contributed to the outage. 1 1 1 1 1. Scheduled Outage Planned Customer interruptions due to the disconnection at a selected time for the purpose of construction or preventive maintenance. 1 1 0 1. Loss of Supply Customer interruptions due to a trip or problems in the bulk electricity supply system such as underfrequency load shedding, transmission system transients, or system frequency excursions. Also includes the trip of the diesel plant on isolated systems.. Tree Contacts Customer interruptions caused by faults due to trees or tree limbs contacting energized circuits.

. Lightning PUB NLH 1 Page of Customer interruptions caused by faults due to lightning striking the Distribution System, resulting in an insulation breakdown and/or flashover.. Defective Equipment a. Defective Equipment Flashover (Further breakdown for Hydro use). b. Defective Equipment Overload (Further breakdown for Hydro use). Customer interruptions resulting from equipment failures due to deterioration from age, incorrect maintenance, or imminent failures detected by maintenance. 1 1 1. Adverse Weather a. Adverse Weather Gallop Conductor (Further breakdown for Hydro use). Customer interruptions resulting from rain, ice storms, snow winds, extreme ambient temperatures, freezing fog, or frost and other extreme conditions. 1 1 1 1 1 0 1. Adverse Environment a. Environment Corrosion (Further breakdown for Hydro use). b. Environment Salt Spray (Further breakdown for Hydro use). Customer interruptions due to equipment being subjected to abnormal environment such as salt spray, industrial contamination, humidity, corrosion, vibration, fire or flooding.. Human Element (Human Error) Customer interruptions due to the interface of the utility staff with the system such as incorrect records, incorrect use of equipment, incorrect construction or installation, incorrect protection settings, switching errors, commissioning errors, deliberate damage, or sabotage.

. Foreign Interference PUB NLH 1 a. Foreign Interference Blasting (Further breakdown for Hydro use). b. Foreign Interference Object (Further breakdown for Hydro use). c. Foreign Interference Vehicle (Further breakdown for Hydro use). Page of Customer interruptions beyond the control of the utility such as birds, animals, vehicles, dig ins, vandalism, sabotage and foreign objects.. Customer Request Customer requested a disconnection at a selected time for the purpose of changes on customer owned equipment.

~ iiijdi-0 a nalcor energy company TRO DISTRIBUTION TROUBLE REPORT CUSTOMER I NAME: JOE WORK ORDER NO. INFORMATION I LOCATION: SYSTEM NO. NATURE OF FEEDER(S) AFFECTED : TROUBLE: REPORTED BY: RECEIVED BY: WORK DONE BY: DATE: TIME: HRS. mansformer T il: KVA: POTENTIAL THIRD PARTY CONTACT (IF APPLICABLE): LOAD (AMPS}: YES DAMAGE CLAIM? D NO D SEC VOLT: DATE INTERRUPTION.. w DURATION NO. CUSTOMERS INTERRUPTED DEVICE MONlli DAY YEAR TIME(HR) z ::J HRS: MINS INTERRUPTION RESTORATION RESTORATION RESTORATION PUB-NLH-1, Attachment 1 Page 1 of 1, Isl Int System Power Outages : : : :