BRANDON LAKES AVENUE PRE AND POST CONDITIONS DRAINAGE REPORT

Similar documents
LOCATED IN INDIAN RIVER COUNTY PREPARED FOR S.J.R.W.M.D. AND F.W.C.D. DECEMBER, 2003 Updated 2007 Updated May 2014 PREPARED BY

CITY OF CAPE CORAL STORMWATER MASTER PLAN PHASE II - PART 1 BASINS 4, 10, & 14 SUB-BASIN DRAINAGE IMPROVEMENTS HYDRAULIC ANALYSIS SUMMARY

REPORT FOR: ISLAND LAKE ESTATES 4275 Placida Road Englewood, FL 34224

Wal-mart Store # Ft. Walton Beach, FL NE Corner of Eglin Parkway/S.R. 85 and South Street STORMWATER REPORT. February 2017

WATER MANAGEMENT REPORT FOR PAGE ESTATES

Chapter 5 CALIBRATION AND VERIFICATION

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND 2 (AP-2) GEORGIA POWER COMPANY

Interconnected Channel and Pond Routing Model (ICPR) 2002 Streamline Technologies, Inc. Page 1 of 5

HISTORY OF CONSTRUCTION FOR EXISTING CCR SURFACE IMPOUNDMENT PLANT GASTON ASH POND 40 CFR (c)(1)(i) (xii)

STORMWATER REPORT FRITO LAY SUBDIVISION NO. 3

STREUVER FIDELCO CAPPELLI, LLC YONKERS DOWNTOWN DEVELOPMENT PHASE 1. DRAFT ENVIRONMENTAL IMPACT STATEMENT For: PALISADES POINT

APPENDIX B DRAINAGE REPORT

Submitted to: St. Johns River Power Park New Berlin Road Jacksonville, FL 32226

City of Thornton Attn: Tim Semones Development Engineeering 9500 Civic Center Dr. Thornton, CO 80229

Section 4: Model Development and Application

Stormwater Guidelines and Case Studies. CAHILL ASSOCIATES Environmental Consultants West Chester, PA (610)

Project Description. Project Options. End Analysis On... Apr 26, :00:00. Rainfall Details

ARTICLE 5 (PART 2) DETENTION VOLUME EXAMPLE PROBLEMS

September 6, City of Thornton 9500 Civic Center Drive Thornton, CO (303) RE: Maverik Thornton, CO - Drainage Report

Continuing Education Course #101 Drainage Design with WinTR-55

******************* Project Description ******************* File Name... NAAF Stormwater Improvement Project 11_21_2014.SPF

DRAINAGE REPORT FOR THORNTON SELF STORAGE THORNTON, COLORADO

December 16, Mr. Lee Hughes Southwest Florida Water Management District Tampa Service Office 7601 Highway 301 North Tampa, FL 33637

DRAINAGE REPORT FOR ROCKY S CONVENIENCE STORE

Westshore Marina District Bridge Street Phase 2 (f.k.a. New Port Tampa Bay Phase 2) Stormwater Management Plan & Report

Stormwater Management Engineering Report

INTRODUCTION TO HYDROLOGIC MODELING USING HEC-HMS

Chapter 10 - Sacramento Method Examples

Section 3.0 Existing Systems Hydrology and Hydraulics

Stormwater Drainage Design Report. Reeve & Associates, Inc. Maverik, Inc. 88th Avenue and Pecos Street. Thornton, CO

Stormwater Capacity Analysis for Westover Branch Watershed

Drainage Analysis. Appendix F

Monitoring Considerations and Costs

Preliminary Hydraulic Report

ATTACHMENT A. STORMWATER MANAGEMENT REPORT Tamiami Trail East Ochopee, FL 34141

SAN JACINTO RIVER / BAUTISTA CREEK LEVEE SYSTEM RIVERSIDE COUNTY, CALIFORNIA NLD ID #

Assessment of Catch Basin Inserts

3301 East 120 th Avenue Assited Living & Memory Care

Hillcrest Residential Development Hollywood, Florida

DUCK POND WATERSHED MANAGEMENT PLAN UPDATE APPENDICES. Prepared for:

FLOOD REPORT FOR MANITOBA. June 28, A Gale wind warning is in effect for Lake Manitoba and Lake Winnipeg

Sediment Control Practices. John Mathews Ohio Dept. of Natural Resources, Division of Soil and Water Resources

Hydrology Study Report

Climate Adaptation Challenges for Boston s Water and Sewer Systems

Basic Hydraulics June 2007

FOR PROJECTS INITIATED AFTER NOVEMBER 1, 2008 ITEM 716 EMBANKMENT EARTH OUTLET SEDIMENT TRAP

CASE STUDIES. Introduction

Hydrologic Forecast Centre. Manitoba Infrastructure. Winnipeg, Manitoba FEBRUARY FLOOD OUTLOOK REPORT FOR MANITOBA.

Stormwater Management Master Plan

CITY OF PUYALLUP TOSCANOS SINKHOLE EVALUATION

Black Gore Creek 2013 Sediment Source Monitoring and TMDL Sediment Budget

Eastlake Assited Living & Memory Care

Final Drainage Report

Appendix C Fluvial Flood Hazards

CIVIL CONSULTING ENGINEERS

D. B. G R A Y E N G I N E E R I N G I N C.

PRELIMINARY CULVERT ANALYSIS REPORT FOR CULVERT NO. 008-C OREGON AVENUE OVER PINEHURST CREEK

Rucker Pond. Background

FINAL DRAINAGE REPORT Villages at Riverdale Carriage Homes Thornton, CO

Chapter 7 Mudflow Analysis

FHWA - HIGHWAY HYDROLOGY

Between 6 am to 4 pm the next day approximately 7.5 inches fell. Chesapeake Bay Bridge Tunnel NOAA Tide Gage

Coal Combustion Residuals Unit Inflow Design Flood Control System Plan

Chapter 7 Mudflow Analysis

HYDROLOGY REPORT Tentative Tract No. 5978

Mr. Michael Malone CPS Energy 145 Navarro Street San Antonio, Texas Project No

Advanced /Surface Hydrology Dr. Jagadish Torlapati Fall 2017 MODULE 2 - ROUTING METHODS

PECKMAN RIVER BASIN, NEW JERSEY FLOOD RISK MANAGEMENT FEASIBILITY STUDY. Hydrology Appendix. New York District

Sediment Trap. At multiple locations within the project site where sediment control is needed.

Materials. Use materials meeting the following.

CITY OF PERRIS FLOOD CONTROL MAINTENANCE DISTRICT NO. 1. ANNUAL ENGINEER S REPORT FISCAL YEAR 2011/2012 April 26, 2011

Local Flood Hazards. Click here for Real-time River Information

HISTORY OF CONSTRUCTION FOR EXISTING CCR SURFACE IMPOUNDMENT PLANT GADSDEN ASH POND 40 CFR (c)(1)(i)-(xii)

Rock & Aggregate Drop Inlet Protection

Attachment B to Technical Memorandum No.2. Operations Plan of Ross Valley Detention Basins

REDWOOD VALLEY SUBAREA

WELCOME Lake Wabukayne OPEN HOUSE

APPENDIX E GREATER SPRINGFIELD RELIABILTIY PROJECT DRAINAGE ANALYSIS FOR THE NEWGATE/PHELPS ROAD AND THE HATCHETT HILL ROAD AREAS

Background on the March 13-14, 2007 Flooding in Browns Valley (Traverse County), Minnesota

Sediment Trap. A temporary runoff containment area, which promotes sedimentation prior to discharge of the runoff through a stabilized spillway.

CITY OF PERRIS FLOOD CONTROL MAINTENANCE DISTRICT NO. 1. ANNUAL ENGINEER S REPORT FISCAL YEAR 2015/2016 May 12, 2015

HOTEL KANATA 160 HEARST WAY KANATA, ONTARIO SERVICING REPORT. Prepared for: David Johnston Architect. Prepared By:

Pressure Head: Pressure head is the height of a column of water that would exert a unit pressure equal to the pressure of the water.

MIDDLESEX COUNTY Department of Planning and Community Development P.O. Box 427, Saluda, VA Phone: Fax:

Crows Landing Naval Base Easement

YELLOWSTONE RIVER FLOOD STUDY REPORT TEXT

TABLE OF CONTENTS - (On Attached DVDs)

Pennypack Creek Watershed Act 167 Study

PRELIMINARY ENGINEERING REPORT FOR SANITARY SEWER COLLECTION SYSTEM OSKALOOSA, IOWA 2017

Instream Sediment Control Systems

D. MATHEMATICAL MODEL AND SIMULATION

Stormwater Report Addendum #1 (City & SWFWMD Submittal)

APPENDIX B DESIGN CRITERIA FOR TEMPORARY WATER QUALITY BMPS USED DURING CONSTRUCTION

Stone Outlet Sediment Trap

Lecture 14: Floods. Key Questions

MEMORANDUM. Lebanon Area Regional Stormwater Consortium Participants. From: Dan Cannistraci. Streambank Restoration Projects.

CCR Rule Annual Inspection Report (cont.) 2

Suitable Applications Sediment traps should be considered for use:

The following maps must be provided as a part of the ADA. The appropriate scale for each map should be determined at the pre application conference.

Standards for Soil Erosion and Sediment Control in New Jersey May 2012

Transcription:

BRANDON LAKES AVENUE PRE AND POST CONDITIONS DRAINAGE REPORT Hillsborough County Public Works County Center, 22nd Floor 601 E. Kennedy Blvd. Tampa, FL 33602 BRANDON LAKES AVENUE DRAINAGE IMPROVEMENTS Capital Improvements Project (CIP) No. 46139.042 Submitted by: 3868 Sun City Center Blvd. Sun City Center, FL 33573 Phone: 813.641.1200 Fax: 813.633.2110 CA# 25990 November 22, 2016 Mark Flint, P.E. License #38627 This item has been electronically signed and sealed by Mark Flint, P.E., on November 22, 2016 using an SHA-1 authentication code. Printed copies of this document are not considered signed and sealed, and the SHA-1 authentication code must be verified on any electronic copies.

I. PURPOSE The intent of this drainage report is to evaluate the drainage and debris-capture improvement design for the Brandon Lakes Avenue Drainage Improvement project (Hillsborough County CIP No. 46139.042). There is a reported problem with trash and debris being discharged into Valrico Lake at the existing point of discharge of the stormwater management system servicing the Brandon Lakes Avenue subdivision. The purpose of this project is to partially divert flow from the existing 30-inch outfall pipe (that flows eastward towards the Brandon Lakes Avenue dead end and into Valrico Lake) to the proposed bubbler system (that flows northward along Meadowcrest Drive and discharges into Valrico Lake). The proposed flow-diversion junction box will also serve as a trash/sediment sump. Fiber-reinforced plastic (FRP) screens will also be installed to the top of the existing downstream 42 pipe within the proposed junction box to physically capture any floating debris collected by runoff. It is important to note that stormwater management system at the location of the proposed work is expected to be surcharged at all times due to the tailwater conditions of Valrico Lake. This drainage report provides an assessment of the proposed drainage improvements that satisfy the requirements established by the Southwest Florida Water Management District (SWFWMD) Statewide ERP and Hillsborough County. II. DESCRIPTION The existing stormwater system is located along Brandon Lakes Avenue in Valrico, FL, and consists of a network of pipes, curb inlets, and valley curbs. The project area is located in Section 13, Township 29S, and Range 20E. The community of Valrico lies within the Pemberton Creek-Baker Canal Area (PBA) watershed. The PBA watershed covers approximately 65 square miles in central Hillsborough County and is roughly bound by Knights Griffin Road to the north, Plant City limits & State Highway 39 to the east, Durant Road & Downing Street to the south, and State Road 579 & Parsons Avenue to the south. The watershed is also divided by several large roads, including Interstate 4, Martin Luther King Drive, Forbes Road, and McIntosh Road. The location of the Brandon Lakes Avenue Drainage Improvement project is illustrated in Figure 2 on the following page. Figure 1. Pemberton Creek/Baker Canal Area (PBA) that contains Brandon Lakes Avenue 2

Figure 2. General Vicinity Map III. EXISTING CONDITIONS The Brandon Lakes Avenue stormwater system features a network of pipes, curb inlets, and valley curbs. Currently, no form of water quality treatment exists for this system, which was constructed in the 1970s. This has resulted in debris being conveyed by runoff and discharging untreated directly into Valrico Lake. The drainage area served by this project s stormwater system is comprised of residential properties within Valrico, Hillsborough County, FL. These properties total approximately 22.89 acres. Based on historical data and record drawings provided by Hillsborough County, Brandon Lakes Avenue is subdivided into 9 subbasins 5 south of Brandon Lakes Avenue and 4 north of Brandon Lakes Avenue (see Figure 4 on the following page). Figure 3. Floating Trash and Debris within Curb Inlet at SW Corner of Brandon Lakes Ave. & Meadowcrest Dr. 3

Subbasin ID A B C D E F G H I Area (AC) 5.20 2.49 3.70 3.28 3.06 1.87 1.71 0.69 0.95 Figure 4. Existing Drainage Map from Historical Data and Record Drawings (Relabeled to Match ICPR Model Basins) and Subbasin Areas (in Acres) Rainfall from each subbasin is conveyed into curb inlets located within each subbasin and also flows overland (when pipe capacity is full) towards the east until it discharges into Valrico Lake. 4

Figure 5. Existing Conditions Drainage Map (Flow discharges to the east into Valrico Lake)

IV. PROPOSED CONDITIONS A concrete junction box (known as ST-1 in the attached construction plans) is being proposed at the SE corner of Brandon Lakes Avenue & Meadowcrest Drive that will both partially divert flow to the north via 30-inch reinforced concrete pipe (RCP) (see Figure 6) to the new point of discharge (known as ST-3 in the attached construction plans; located within an existing 65-ft. drainage easement as reported by the Winchester Woods Subdivision asbuilts, dated 1984) and capture floating debris and sediment. The historic flow path of runoff will be maintained as is, except for a proposed fiber-reinforced plastic screen to be attached at the top of the pipe opening of the existing downstream (east) 42 pipe within the proposed junction box (see Figures 7 and 8). FRP screens are also proposed for the new 30 RCP along Meadowcrest Drive at the proposed junction box (ST-1) and at the proposed manhole (ST-2). By capturing large floating debris and sediments within the proposed box, this will allow for easier maintenance and disposal of collected pollutants. This proposed work provides a method of water quality treatment that can be retrofitted into the aging system. The new drainage feature (the proposed 30-inch RCP along Meadowcrest Dr.) will act as a bubbler system (see Figure 8). Figure 6. Typical Section of Proposed Work along Meadowcrest Drive

Figure 7. Cross Section of Proposed Junction Box/Trash Sump (ST-1) 7

Figure 8. Plan and Profile of Proposed Work

Figure 9. Proposed Conditions Drainage Map (Flow is partially diverted to the north and discharges into Valrico Lake.) 9

V. ICPR MODEL RESULTS The following tables show the ICPR model results for existing and proposed conditions for the subbasins immediately upstream and downstream of the proposed work. For all storm events, predicted flood staging is reduced. Therefore, no adverse impacts to the existing upstream and downstream basins are anticipated with this project. Table 1. 100-yr, 24-hour Storm Event Location Max Stage (NAVD88 ft) Description Node ID Existing Proposed Difference Subbasin at upstream (western) end of Node D C 49.39 49.34-0.05 Subbasin at upstream (northern) end of Node D H 48.99 48.86-0.13 Subbasin at upstream end of proposed flow-diversion junction box/trash sump D 48.97 48.74-0.23 Subbasin at (eastern) downstream end of proposed flow-diversion junction box/trash sump E 47.69 47.52-0.17 Table 2. 25-yr, 24-hour Storm Event Location Max Stage (NAVD88 ft) Description Node ID Existing Proposed Difference Subbasin at upstream (western) end of Node D C 49.08 48.98-0.10 Subbasin at upstream (northern) end of Node D H 48.67 48.59-0.08 Subbasin at upstream end of proposed flow-diversion junction box/trash sump D 48.59 48.17-0.42 Subbasin at (eastern) downstream end of proposed flow-diversion junction box/trash sump E 47.33 46.91-0.42

Table 3. 10-yr, 24-hour Storm Event Location Max Stage (NAVD88 ft) Description Node ID Existing Proposed Difference Subbasin at upstream (western) end of Node D C 48.95 48.82-0.13 Subbasin at upstream (northern) end of Node D H 48.57 48.42-0.15 Subbasin at upstream end of proposed flow-diversion junction box/trash sump D 48.40 47.79-0.61 Subbasin at (eastern) downstream end of proposed flow-diversion junction box/trash sump E 47.22 46.71-0.51 Table 4. 5-yr, 24-hour Storm Event Location Max Stage (NAVD88 ft) Description Node ID Existing Proposed Difference Subbasin at upstream (western) end of Node D C 48.69 48.10-0.59 Subbasin at upstream (northern) end of Node D H 48.35 46.59-1.76 Subbasin at upstream end of proposed flow-diversion junction box/trash sump D 48.00 46.55-1.45 Subbasin at (eastern) downstream end of proposed flow-diversion junction box/trash sump E 46.96 45.86-1.10 11

Table 5. 2.33-yr, 24-hour Storm Event Location Max Stage (NAVD88 ft) Description Node ID Existing Proposed Difference Subbasin at upstream (western) end of Node D C 48.34 46.77-1.57 Subbasin at upstream (northern) end of Node D H 47.47 45.80-1.67 Subbasin at upstream end of proposed flow-diversion junction box/trash sump D 47.43 45.78-1.65 Subbasin at (eastern) downstream end of proposed flow-diversion junction box/trash sump E 46.73 45.36-1.37 VI. OPERATION AND MAINTENANCE INSTRUCTION A. OPERATION The project s drainage system is a gravity system and requires no operational protocols. B. MAINTENANCE i. Inlet Grates: Inlet grates will be checked monthly for damage or blockage. Any damaged grates will be replaced or repaired. Any debris blocking full flow through the gate will removed. ii. iii. Pipes and Inlets: Pipes and inlets will be inspected annually for damage or blockage. Any damaged pipes or inlets will be repaired or replaced. Any damaged pipes or inlets will be repaired or replaced. Any trash or debris will be removed. Trash Sump: The trash sump will be inspected semiannually for damage or blockage and/or as needed after major storm events. Any trash, debris, and sediment collected within the trash sump will be disposed off-site. 12

ATTACHMENTS (ICPR Model Results) 13

Brandon Lakes Ave Drainage Improvements Nodes A Stage/Area V Stage/Volume T Time/Stage M Manhole Basins O Overland Flow U SCS Unit CN S SBUH CN Y SCS Unit GA Z SBUH GA Links P Pipe W Weir C Channel D Drop Structure B Bridge R Rating Curve H Breach E Percolation F Filter X Exfil Trench M: A U: BASIN A M: F U: BASIN F M: B U: BASIN B W: F-G W: F-B P: F-B EX 15" CMP M: G U: BASIN G P: G-C EX 15" CMP W: G-C M: C U: BASIN C W: G-H M: H U: BASIN H P: H-D EX 18" RCP W: H-D M: D U: BASIN D W: H-I M: I U: BASIN I P: I-E EX 18" PVC W: I-E M: E U: BASIN E W: I-OUTFALL T: VALRICO LAKE W: A-B P: A-B EX 18" CMP P: B-C EX 30" CMP W: B-C P: C-D EX 36" RCP W: C-D P: D-E EX 42" RCP W: D-E P: E-VL EX 30" RCP W: E-OUTFALL Existing Conditions - 2016-11-02 Existing 30" RCP Outfall (East) Tailwater Derived from SWMM Interconnected Channel and Pond Routing Model (ICPR) 2002 Streamline Technologies, Inc.

Brandon Lakes Ave Drainage Improvements Max Time Max Warning Max Delta Max Surf Max Time Max Max Time Max Name Group Simulation Stage Stage Stage Stage Area Inflow Inflow Outflow Outflow hrs ft ft ft ft2 hrs cfs hrs cfs A BASE 10-YR PRE 12.08 64.11 64.22 0.0077 125 12.08 16.52 12.08 16.51 B BASE 10-YR PRE 12.09 54.26 54.32 0.0076 150 12.08 27.10 12.09 27.07 C BASE 10-YR PRE 12.09 48.95 48.59 0.0068 176 11.94 32.08 12.09 32.44 D BASE 10-YR PRE 12.09 48.40 48.59-0.0056 195 12.09 49.92 12.09 49.38 E BASE 10-YR PRE 12.09 47.22 46.84-0.0109 167 12.38 54.09 12.09 53.92 F BASE 10-YR PRE 12.09 54.28 54.32 0.0055 114 12.08 5.94 12.09 5.93 G BASE 10-YR PRE 12.09 48.93 48.48 0.0089 114 12.08 8.33 11.94 8.68 H BASE 10-YR PRE 12.09 48.57 48.47-0.0045 115 12.09 16.47 12.09 16.57 I BASE 10-YR PRE 12.09 47.18 46.84 0.0154 114 12.09 10.93 12.38 13.98 VALRICO LAKE BASE 10-YR PRE 24.00 45.98 47.00 0.0002 10 12.09 67.92 0.00 0.00 A BASE 100-YR PRE 12.08 64.24 64.22 0.0085 125 12.08 27.62 12.08 27.62 B BASE 100-YR PRE 12.08 54.62 54.32 0.0085 150 12.08 46.52 12.08 37.21 C BASE 100-YR PRE 12.09 49.39 48.59-0.0367 176 12.11 74.17 12.09 48.58 D BASE 100-YR PRE 12.09 48.97 48.59 0.0097 195 12.09 77.86 12.09 71.61 E BASE 100-YR PRE 12.09 47.69 46.84-0.0179 167 12.09 112.45 12.09 76.97 F BASE 100-YR PRE 12.08 54.63 54.32-0.0080 114 12.08 9.93 12.09 19.30 G BASE 100-YR PRE 12.11 49.36 48.48 0.0563 114 12.08 22.11 12.11 50.81 H BASE 100-YR PRE 12.09 48.99 48.47-0.0168 115 12.11 35.51 12.09 42.53 I BASE 100-YR PRE 12.09 47.72 46.84 0.0256 114 12.09 30.94 12.09 65.58 VALRICO LAKE BASE 100-YR PRE 24.00 47.58 47.00 0.0005 10 12.09 114.30 0.00 0.00 A BASE 2.33-YR PRE 12.10 61.73 64.22 0.0027 172 12.08 9.51 12.10 9.44 B BASE 2.33-YR PRE 12.15 50.79 54.32 0.0020 351 12.09 17.13 12.08 16.69 C BASE 2.33-YR PRE 12.14 48.34 48.59-0.0047 197 12.08 25.70 12.13 25.11 D BASE 2.33-YR PRE 12.15 47.43 48.59-0.0041 195 12.14 32.33 12.14 32.29 E BASE 2.33-YR PRE 12.17 46.73 46.84 0.0050 167 12.09 37.66 12.17 36.87 F BASE 2.33-YR PRE 12.16 51.29 54.32 0.0012 116 12.08 3.42 12.09 3.37 G BASE 2.33-YR PRE 12.13 48.43 48.48 0.0050 114 12.08 3.13 12.09 3.08 H BASE 2.33-YR PRE 12.14 47.47 48.47-0.0050 115 12.13 2.08 12.13 2.07 I BASE 2.33-YR PRE 12.17 46.73 46.84-0.0050 114 12.08 1.70 12.09 3.17 VALRICO LAKE BASE 2.33-YR PRE 24.00 45.22 47.00 0.0001 10 12.17 38.46 0.00 0.00 A BASE 25-YR PRE 12.08 64.14 64.22 0.0082 125 12.08 19.31 12.08 19.31 B BASE 25-YR PRE 12.09 54.38 54.32 0.0081 150 12.08 32.91 12.08 29.75 C BASE 25-YR PRE 12.09 49.08 48.59-0.0217 176 12.09 50.83 12.09 36.43 D BASE 25-YR PRE 12.09 48.59 48.59-0.0056 195 12.09 56.79 12.09 56.15 E BASE 25-YR PRE 12.09 47.33 46.84-0.0121 167 12.09 76.51 12.09 59.25 F BASE 25-YR PRE 12.08 54.38 54.32-0.0079 114 12.08 6.94 12.08 10.28 G BASE 25-YR PRE 12.09 49.06 48.48 0.0331 114 12.08 11.85 12.09 27.48 H BASE 25-YR PRE 12.09 48.67 48.47-0.0049 115 12.09 21.79 12.09 21.43 I BASE 25-YR PRE 12.09 47.34 46.84 0.0171 114 12.09 14.92 12.09 31.97 VALRICO LAKE BASE 25-YR PRE 24.00 46.38 47.00 0.0003 10 12.09 79.66 0.00 0.00 A BASE 5-YR PRE 12.09 64.03 64.22 0.0045 125 12.08 12.31 12.08 12.30 B BASE 5-YR PRE 12.12 52.95 54.32 0.0058 150 12.10 21.84 12.12 21.76 C BASE 5-YR PRE 12.12 48.69 48.59 0.0063 176 12.08 31.40 12.07 27.43 D BASE 5-YR PRE 12.12 48.00 48.59 0.0042 195 12.12 40.36 12.12 40.49 E BASE 5-YR PRE 12.13 46.96 46.84-0.0083 167 12.12 49.39 12.12 43.63 F BASE 5-YR PRE 12.13 53.85 54.32 0.0038 114 12.08 4.43 12.16 4.32 G BASE 5-YR PRE 12.12 48.69 48.48 0.0078 114 12.08 4.05 12.08 8.09 H BASE 5-YR PRE 12.12 48.35 48.47-0.0045 115 12.12 8.11 12.12 8.04 I BASE 5-YR PRE 12.13 46.95 46.84 0.0120 114 12.12 3.88 12.12 9.91 VALRICO LAKE BASE 5-YR PRE 24.00 45.49 47.00 0.0001 10 12.13 50.02 0.00 0.00 Existing Conditions - 2016-11-02 Existing 30" RCP Outfall (East) Tailwater Derived from SWMM Interconnected Channel and Pond Routing Model (ICPR) 2002 Streamline Technologies, Inc. Page 1 of 2

Brandon Lakes Ave Drainage Improvements Max Time Max Warning Max Delta Max Surf Max Time Max Max Time Max Name Group Simulation Stage Stage Stage Stage Area Inflow Inflow Outflow Outflow hrs ft ft ft ft2 hrs cfs hrs cfs Existing Conditions - 2016-11-02 Existing 30" RCP Outfall (East) Tailwater Derived from SWMM Interconnected Channel and Pond Routing Model (ICPR) 2002 Streamline Technologies, Inc. Page 2 of 2

Brandon Lakes Ave Drainage Improvements Nodes A Stage/Area V Stage/Volume T Time/Stage M Manhole P: ST-2-ST-3 M: ST-2 A: ST-3 W: ST-3 Basins O Overland Flow U SCS Unit CN S SBUH CN Y SCS Unit GA Z SBUH GA Links P Pipe W Weir C Channel D Drop Structure B Bridge R Rating Curve H Breach E Percolation F Filter X Exfil Trench M: A U: BASIN A M: F U: BASIN F W: F-B P: F-B EX 15" CMP M: B U: BASIN B W: F-G M: G U: BASIN G P: G-C EX 15" CMP W: G-C M: C U: BASIN C W: G-H M: H U: BASIN H M: D U: BASIN D W: H-I P: H-D EX 18" RCP W: H-D P: ST-1-ST-2 W: D-E M: I U: BASIN I P: I-E EX 18" PVC W: I-E M: E U: BASIN E W: I-OUTFALL T: VALRICO LAKE A: ST-1 W: A-B P: A-B EX 18" CMP P: B-C EX 30" CMP W: B-C P: C-D EX 36" RCP W: C-D P: D-ST-1 42" RCP P: ST-1-E 42" RCP P: E-VL EX 30" RCP W: E-LAKE Proposed Conditions w/ 21" Top Clip on Exist. 42" Pipe, 9" Top Clips on Prop. 30" Pipes - 2016-11-02 Existing 30" RCP Outfall + Proposed 30" RCP Bubbler Tailwater Derived from SWMM Interconnected Channel and Pond Routing Model (ICPR) 2002 Streamline Technologies, Inc.

Brandon Lakes Ave Drainage Improvements Max Time Max Warning Max Delta Max Surf Max Time Max Max Time Max Name Group Simulation Stage Stage Stage Stage Area Inflow Inflow Outflow Outflow hrs ft ft ft ft2 hrs cfs hrs cfs A BASE 10-YR POST 12.08 64.11 64.22-14.9000 125 12.08 16.52 12.08 16.51 B BASE 10-YR POST 12.09 54.25 54.32-3.6800 150 12.08 27.20 12.09 27.19 C BASE 10-YR POST 12.09 48.82 48.59 0.0058 176 12.08 43.29 12.00 36.23 D BASE 10-YR POST 12.09 47.79 48.59 0.0045 155 12.09 54.40 12.09 54.61 E BASE 10-YR POST 12.10 46.71 46.84 0.0044 164 12.09 36.28 12.09 36.27 F BASE 10-YR POST 12.09 54.27 54.32-5.2800 114 12.08 5.94 12.09 5.93 G BASE 10-YR POST 12.09 48.82 48.48-0.0076 114 12.08 8.23 12.09 15.41 H BASE 10-YR POST 12.09 48.42 48.47-0.0050 115 12.09 12.61 12.09 12.33 I BASE 10-YR POST 12.09 46.74 46.84 0.0020 114 12.09 5.82 12.09 5.81 ST-1 BASE 10-YR POST 12.09 47.00 48.73-0.0108 166 12.09 54.61 12.09 54.55 ST-2 BASE 10-YR POST 24.00 45.97 47.50-0.0083 128 12.09 29.76 12.10 29.76 ST-3 BASE 10-YR POST 24.00 46.00 47.50 0.0091 117 12.10 29.76 12.10 29.75 VALRICO LAKE BASE 10-YR POST 24.00 45.98 48.00 0.0001 10 12.09 67.88 0.00 0.00 A BASE 100-YR POST 12.08 64.24 64.22-14.9000 125 12.08 27.62 12.08 27.61 B BASE 100-YR POST 12.08 54.64 54.32-3.6800 150 11.89 33.14 12.08 37.78 C BASE 100-YR POST 12.09 49.34 48.59-0.0198 176 12.38 55.37 12.08 49.82 D BASE 100-YR POST 12.09 48.74 48.59 0.0050 155 12.09 81.53 12.09 80.24 E BASE 100-YR POST 24.00 47.52 46.84 0.0126 164 12.09 79.53 12.09 58.92 F BASE 100-YR POST 12.08 54.61 54.32-5.2800 114 12.08 9.93 11.89 10.27 G BASE 100-YR POST 12.09 49.27 48.48 0.0300 114 12.08 21.36 12.38 29.16 H BASE 100-YR POST 12.09 48.86 48.47 0.0071 115 12.09 31.59 12.09 32.80 I BASE 100-YR POST 24.00 47.65 46.84-0.0166 114 12.09 20.96 24.00 64.64 ST-1 BASE 100-YR POST 12.09 47.77 48.73-0.0106 166 12.08 63.15 12.09 63.76 ST-2 BASE 100-YR POST 24.00 47.56 47.50-0.0083 128 12.08 33.63 12.13 33.65 ST-3 BASE 100-YR POST 24.00 47.60 47.50-0.0113 117 12.13 33.65 12.08 33.59 VALRICO LAKE BASE 100-YR POST 24.00 47.58 48.00 0.0003 10 12.09 113.98 0.00 0.00 A BASE 2.33-YR POST 12.10 61.73 64.22-14.9000 172 12.08 9.51 12.10 9.44 B BASE 2.33-YR POST 12.11 50.59 54.32-3.6800 605 12.09 17.15 12.11 17.09 C BASE 2.33-YR POST 12.15 46.77 48.59 0.0026 579 12.11 26.39 12.14 26.17 D BASE 2.33-YR POST 12.16 45.78 48.59 0.0036 155 12.14 32.55 12.15 32.54 E BASE 2.33-YR POST 12.17 45.36 46.84 0.0046 164 12.16 20.86 12.16 20.85 F BASE 2.33-YR POST 12.10 51.22 54.32-5.2800 119 12.08 3.42 12.10 3.39 G BASE 2.33-YR POST 12.15 47.22 48.48 0.0031 114 12.08 3.13 12.15 3.01 H BASE 2.33-YR POST 12.16 45.80 48.47-0.0047 115 12.08 1.26 11.76 1.75 I BASE 2.33-YR POST 12.16 45.38 46.84 0.0019 114 12.08 1.70 12.09 1.64 ST-1 BASE 2.33-YR POST 12.16 45.47 48.73 0.0048 166 12.15 32.54 12.15 32.53 ST-2 BASE 2.33-YR POST 24.00 45.21 47.50-0.0083 128 12.16 17.82 12.16 17.81 ST-3 BASE 2.33-YR POST 24.00 45.24 47.50 0.0091 117 12.16 17.81 12.14 19.04 VALRICO LAKE BASE 2.33-YR POST 24.00 45.22 48.00 0.0000 10 12.14 39.85 0.00 0.00 A BASE 25-YR POST 12.08 64.14 64.22-14.9000 125 12.08 19.31 12.08 19.31 B BASE 25-YR POST 12.08 54.37 54.32-3.6800 150 12.08 32.69 12.08 29.87 C BASE 25-YR POST 12.09 48.98 48.59 0.0056 176 12.08 52.29 12.08 38.37 D BASE 25-YR POST 12.09 48.17 48.59 0.0049 155 12.08 60.11 12.09 60.43 E BASE 25-YR POST 12.09 46.91 46.84 0.0044 164 12.09 42.21 12.09 42.18 F BASE 25-YR POST 12.08 54.38 54.32-5.2800 114 12.08 6.94 12.08 9.95 G BASE 25-YR POST 12.09 48.99 48.48-0.0072 114 12.08 11.73 12.08 25.65 H BASE 25-YR POST 12.09 48.59 48.47 0.0066 115 12.09 18.74 12.09 18.22 I BASE 25-YR POST 12.09 46.92 46.84 0.0037 114 12.09 10.32 12.09 10.34 ST-1 BASE 25-YR POST 12.09 47.29 48.73-0.0108 166 12.09 59.42 12.09 59.35 ST-2 BASE 25-YR POST 24.00 46.37 47.50-0.0083 128 12.09 31.38 12.09 31.37 Proposed Conditions w/ 21" Top Clip on Exist. 42" Pipe, 9" Top Clips on Prop. 30" Pipes - 2016-11-02 Existing 30" RCP Outfall + Proposed 30" RCP Bubbler Tailwater Derived from SWMM Interconnected Channel and Pond Routing Model (ICPR) 2002 Streamline Technologies, Inc. Page 1 of 2

Brandon Lakes Ave Drainage Improvements Max Time Max Warning Max Delta Max Surf Max Time Max Max Time Max Name Group Simulation Stage Stage Stage Stage Area Inflow Inflow Outflow Outflow hrs ft ft ft ft2 hrs cfs hrs cfs ST-3 BASE 25-YR POST 24.00 46.40 47.50 0.0091 117 12.09 31.37 12.09 31.37 VALRICO LAKE BASE 25-YR POST 24.00 46.38 48.00 0.0001 10 12.09 79.48 0.00 0.00 A BASE 5-YR POST 12.09 64.02 64.22-14.9000 125 12.08 12.31 12.08 12.30 B BASE 5-YR POST 12.15 52.27 54.32-3.6800 150 12.08 21.64 12.14 21.49 C BASE 5-YR POST 12.15 48.10 48.59 0.0042 176 12.12 32.88 12.14 32.82 D BASE 5-YR POST 12.16 46.55 48.59 0.0035 155 12.14 41.75 12.15 41.73 E BASE 5-YR POST 12.17 45.86 46.84-0.0047 164 12.16 26.89 12.17 26.89 F BASE 5-YR POST 12.16 53.14 54.32-5.2800 114 12.08 4.43 12.20 4.29 G BASE 5-YR POST 12.14 48.42 48.48-0.0039 114 12.08 4.05 12.09 4.01 H BASE 5-YR POST 12.16 46.59 48.47-0.0060 115 12.13 2.25 11.65 2.47 I BASE 5-YR POST 12.17 45.89 46.84 0.0023 114 12.08 2.20 12.12 2.11 ST-1 BASE 5-YR POST 12.17 46.03 48.73 0.0050 166 12.15 41.73 12.15 41.72 ST-2 BASE 5-YR POST 24.00 45.48 47.50-0.0084 128 12.16 22.78 12.16 22.78 ST-3 BASE 5-YR POST 24.00 45.51 47.50 0.0092 117 12.16 22.78 12.15 23.53 VALRICO LAKE BASE 5-YR POST 24.00 45.49 48.00 0.0001 10 12.15 50.38 0.00 0.00 Proposed Conditions w/ 21" Top Clip on Exist. 42" Pipe, 9" Top Clips on Prop. 30" Pipes - 2016-11-02 Existing 30" RCP Outfall + Proposed 30" RCP Bubbler Tailwater Derived from SWMM Interconnected Channel and Pond Routing Model (ICPR) 2002 Streamline Technologies, Inc. Page 2 of 2