First Phase Metallurgical Optimization Program Initiated

Similar documents
Drilling Extending Mineralization in La Mina North Zone

Drilling Extending Mineralization in La Mina North Zone

Hole (93) From (m) To (m) m Au (g/t) Ag (g/t) Cu (%) Pb (%) Zn (%) CMLP

Toachi Mining Inc. Drills Four High Grade Gold-Copper-Zinc-Silver intercepts at the Gold-Rich La Plata VMS Project in Ecuador

Toachi Mining Inc. Identifies High Priority Exploration Targets

SALAZAR ANNOUNCES AN UPDATED RESOURCE REPORT OF 5.53 MT INDICATED AND 1.46 MT INFERRED AT ITS HIGH GRADE VMS EL DOMO DEPOSIT

A B C PAD A HIGHLIGHTS

Probe Metals Continues to Expand Gold Zones At Val-d Or East

Probe Metals Intersects 3.2 g/t Gold Over 45.5 Metres At Val-d Or East

CARACARA SILVER INC. PLANNING DRILL PROGRAM AT PILUNANI ZINC-LEAD PROJECT IN PERU

Salazar intersects metres (13.07m true) averaging 2.65 g/t gold, g/t silver, 1.32% copper, 6.63% zinc at its Curipamba Project.

Probe Metals Continues to Intersect Significant Gold Mineralization in Expansion Drilling at Val-d Or East, including 4.1 g/t Gold Over 15.

BOREAL EXPANDS DISCOVERY ZONE OF HIGH-GRADE ZINC, SILVER AND LEAD MINERALIZATION AT GUMSBERG PROJECT IN SWEDEN

FALCO PACIFIC COMPLETES INITIAL MODEL FOR THE HORNE 5 GOLD/SILVER/ZINC/COPPER DEPOSIT

REGULUS DISCOVERS NEW GOLD-RICH, HIGH-GRADE COPPER-GOLD ZONE AT RIO GRANDE

Spruce Ridge Resources Ltd Leslie Road West, Puslinch, ON N0B 2J0 Telephone: (519) , Fax: (519)

(TSXV: GPLY, OTCQB: GLYXF

EXPLOR INTERSECTS MULTIPLE COPPER ZONES GRADES UP TO 3.65% CU OVER 5.35 METERS ON THE CHESTER COPPER PROPERTY

GRAPHITE ONE DRILLS 165.3M of 4.23% GRAPHITE INCLUDING 46.4M OF 6.6%, 14.3M of 10.1% and 21M of 10.1% GRAPHITE

Assay Results Highlights (as of November 16, 2017) representing approximately 4,500 metres ( m ) of drilling:

West Pender Street Vancouver, BC V6C 2V6 Tel: Fax: TSX-V: GBR NEWS RELEASE

OSISKO METALS INTERSECTS 10.49% ZINC+LEAD OVER METRES AND 12.15% ZINC+LEAD OVER METRES AT PINE POINT

Probe Metals Confirms Continuity of Gold Mineralization on its Val-d Or East Project And Increases 2017 Drill Program to 75,000 metres

Plateau Extends Falchani East Lithium Deposit Community Agreements Executed and Three Drill Rigs Active at Falchani West

Canadian Gold Miner Grab Sample Returns 29.5 Grams per tonne Gold from South Kirkland Project

Detour Gold Reports Drilling Results from Lower Detour

The new sulphide mineralization lies within a 1.4 kilometer long east-west trending

Northern Dynasty Minerals Ltd.

The Inferred Mineral Resource Statement prepared by SRK for the Talbot Deposit is detailed below.

Rock sample A13479 from cleared surface exposure assaying: 0.36ppm Au, 21.3ppm Ag, 0.57%Cu, 0.1% Pb, 0.58% Zn 580 M

ET and and and

MINERAL MOUNTAIN RESOURCES LTD. MMV.TSX-V

Highlights from the four holes announced in this news release include:

GOLDPLAY ANNOUNCES FURTHER SAMPLING RESULTS FROM SAN MARCIAL HISTORICAL CORE; CONFIRMS OPEN PIT TARGET NEAR SURFACE WITH gpt AgEq.

Surface Trenching Highlights. Santos Target. To (m) Width (m) Au (g/t) Comment. (m) Santos (1)-includes internal dilution

NEWS RELEASE. Foran Intersects Over 28 Metres of Copper Mineralization

Queenston Announces 112% Increase in Indicated Resource (to 1.5 M oz. gold) and 16% Increase in Inferred Resource (to 0.7 M oz. gold) at Upper Beaver

EL CONDOR IN-FILL DRILLING INTERSECTS 26.9 METERS 2.19% CU & 0.58% NI

QMX GOLD CONTINUES TO INTERSECT STRONG MINERALIZATION AT BONNEFOND, INTERSECTING 39.5 g/t Au OVER 2.4 METRES AND 31.5 g/t Au OVER 1.

GOLDEN MINERALS DISCOVERS ADDITIONAL HIGH GRADE VEINS AT SANTA MARIA RESULTS UP TO 1.88 g/t Au and 648 g/t Ag

Probe Metals Discovers New High Grade Gold Zone on Val-d Or East Project: Intersects 12.6 g/t Gold Over 7.3 Metres

TROILUS GOLD CORP. INITIATES 30,000 METRE DRILL PROGRAM ON TROILUS PROPERTY

Goldplay President and CEO Marcio Fonseca commented

Pahtavaara Drill Program Intersects 32.8 G/T Gold Over 2.0M And 2.1 G/T Gold Over 18.0M In The Karoliina Zone

ADDITIONAL SAMPLING IDENTIFIES VEINS WITH UP TO 240 G/T GOLD AND 2,479 G/T SILVER AT INV METALS TIERRAS COLORADAS DISCOVERIES

Minsud to recommence resource outline diamond drilling at the Chita Valley Cu- Au-Ag-Mo Project, San Juan, Argentina

Suite West Georgia Street Vancouver, B.C. V6E 4M3 NEWS RELEASE

LME m averaging 0.65 g/t Au and 0.32% Cu, or 1.19 g/t Au Equiv LME m averaging 0.64 g/t Au and 0.11% Cu, or 0.

Vendetta Reports Additional High Grade Drilling Results from Zones 2 and 3 at Pegmont Lead-Zinc Project

MEXICAN GOLD SAMPLES G/T GOLD AND 37.2 G/T SILVER OVER 0.42 METRES AT PUEBLO NUEVO HISTORICAL MINES

Colt Resources intersects 17.4% Cu over 0.42 metres (0.32 m true width) at Miguel Vacas Copper Project in its Borba exploration concession in Portugal

Bellhaven Adds Gold at the El Limon Target at the La Mina Project, Colombia

Probe Metals Intersects 1,122 g/t Gold Over 0.7 Metres in New Zone at Val-d Or East

GOLD REACH (GRV) ANNOUNCES A 141% INCREASE IN INDICATED AND 91% INCREASE IN INFERRED RESOURCES AT SEEL

Bellhaven Expands the Middle Zone Prospect with New Drilling: Advances toward New Resource in First Half of 2012

NEWS RELEASE LATEST EXPLORATION PROGRAM CONTINUES TO DEMONSTRATE NARANJILLO AS A HIGH GRADE SILVER HOST

NEWS RELEASE. FORAN INTERSECTS 9.4% ZINC OVER 6.1 METRES Feasibility Drilling Continues

IDM Mining s Underground Drilling Intersects g/t Au and g/t Ag over 6.80 Meters True Width at the Red Mountain Gold Project

MEXICAN GOLD INTERSECTS 7.18 G/T GOLD EQUIVALENT (2.00 G/T AU, G/T AG, 3.05 % CU) OVER 14.0 METERS AT LAS MINAS DIKE CONTACT ZONES

Toronto, Canada March 4, 2013

SilverCrest Expands Babicanora High Grade Footprint to 600 metres; New High Grade Vein Discoveries Highlight District Scale Potential

NEWS RELEASE FULLER PROPERTY CONTINUES TO DELIVER GOOD RESULTS 2.53 GRAMS PER TONNE GOLD OVER METRES

NEWS RELEASE August 10, 2017

October 8, 2015 News Release Brucejack Regional Drilling Intersects Over 8,000 Grams Per Tonne Gold

Melkior retains Geologica to complete a NI report on its Launay property, Québec

A New Silver-Zinc Developer in Peru. July, 2013

True Width (m) Carneritos to

Vendetta Reports Initial Results from 2017 Pegmont Program with High Grade Zone 3 Step Out Drilling

ATON RETURNS 22.2 METRES OF 2.77 GRAMS PER TONNE GOLD EQUIVALENT FROM HAMAMA WEST; VISIBLE GOLD DISCOVERED AT BOHLOG

QMX GOLD INTERSECTS 29.8 G/T AU OVER 3.0 METERS AND 19.3 G/T AU OVER 3.2 METERS AT BONNEFOND

PUMA EXPLORATION AND TREVALI MINING CORPORATION DRILLED 13.1% Zn, 4.8% Pb OVER 27.0 METERS AT MURRAY BROOK DEPOSIT

INFILL DRILLING EXPANDS MINERALIZATION IN HIGH-GRADE GOLD-COPPER CORE AT SOUTHWEST DISCOVERY ZONE TURQUOISE HILL PROJECT, MONGOLIA

Details of the NI compliant mineral resource estimate are as follows. Total Inferred 7,603,

55 Adelaide Street East, Suite St-Charles west, Suite 411, West Tower

NEWS RELEASE. Foran Mining Intersects High Grade Zinc at McIlvenna Bay. Results expand area of known mineralization

Hole ID From (m) To (m) Interval (m) Au (g/t) Ag (g/t) AuEq (g/t)* Zn (%)

SAVARY GOLD DRILLING EXTENDS KNOWN ZONES AND INTERSECTS SIGNFICANT GOLD MINERALIZATION AT FOUR NEW TARGETS

North American Palladium Announces Positive Exploration Results from Lac des Iles Mine

MONETA INTERCEPTS g/t GOLD INCLUDING g/t GOLD AND g/t GOLD INCLUDING g/t GOLD AT SOUTH WEST

NEWS RELEASE. March 22, 2017

MEXICAN GOLD SAMPLES 5.11 G/T GOLD & 7.15 % ZINC OVER 2.0 METRES AND G/T GOLD OVER 1.4 METRES AT CHANGARRO ZONE, LAS MINAS PROJECT

GOLDPLAY OUTLINES FIVE NEW EXPLORATION TARGETS AT THE SAN MARCIAL PROJECT IN MEXICO

NEWS RELEASE. Tigray Intersects 28.2 metres at 8.50 grams per tonne gold at Mato Bula, Adyabo Project, Northern Ethiopia

IAMGOLD ANNOUNCES RESULTS FROM THE WESTWOOD-MOOSHLA EXPLORATION PROJECT

NEWS RELEASE ORCA GOLD INDICATED AND INFERRED RESOURCES AT BLOCK 14 INCREASE BY 24% AND 48% RESPECTIVELY

NEWS RELEASE August 8, 2018

V Sample from C.O.D vein 15 metres southwest of V

Copper Lake Samples g/t Gold and g/t Gold from the Queen Alexandra Gold Mine Property

NEWS RELEASE NOVEMBER 15, 2018 HANNAN COMPLETES DRILLING AT BALLYHICKEY, DEFINES SIGNIFICANT ZINC TARGET AT KILMURRY, CO.

KIRKLAND LAKE GOLD ANNOUNCES 120 METRE DOWN-PLUNGE EXTENSION OF SWAN ZONE

Sept 20, 2012 TSX Venture Exchange Tier 1 Trading Symbol: OK

Vendetta Mining Intersects Meters of 11.91% Pb+Zn from Zone 5 at the Pegmont Lead-Zinc Deposit

Skeena Intersects g/t AuEq over metres at Eskay Creek

AbraPlata defines gold-rich zone with up to 16.7g/t Au over 10.6m in the basement at its Diablillos property in Argentina

NEWS RELEASE TSX-V Ticker: SWA 23 April 2013 SWA.WT SARAMA RESOURCES EXTENDS HIGH-GRADE MINERALISATION AT MM PROSPECT IN BURKINA FASO

TRENCHING AT LAS DOLORES EXTENDS STRIKE LENGTH TO OVER 1,000 METRES, INTERSECTING

MINERA ALAMOS TO COMMENCE DRILLING AIMED AT EXPANDING AREAS OF DEFINED GOLD MINERALIZATION AT SANTANA/LOS VERDES PROPERTY, SONORA, MEXICO

WESDOME ANNOUNCES HIGH GRADE GOLD DISCOVERY AT KIENA COMPLEX IN VAL D OR QUEBEC

NEWS RELEASE. September 30 th, Trading Symbols: GTP (TSX-V) P01 (FRANKFURT) COLTF (OTC Pink)

ANTLER GOLD EXPLORATION UPDATE, WILDING LAKE GOLD PROJECT, NEWFOUNDLAND

Transcription:

Toachi Mining Inc. Intersects 15.89 m grading 7.63 g/t Au, 49.74 g/t Ag, 2.4% Cu, 11.82% Zn and 0.97% Pb at the Gold-Rich La Plata VMS Project in Ecuador First Phase Metallurgical Optimization Program Initiated Toronto, Ontario January 9, 2017 Toachi Mining Inc., ( Toachi or the Company ) (TSX-V: TIM) is pleased to announce results from on-going drilling at its La Plata gold-rich volcanogenic massive sulphide ( VMS ) project in Ecuador. Program Highlights Hole CMLP-16-14 intersected 15.89 metres (m) of massive and disseminated sulphide mineralization grading 7.63 grams per tonne (g/t) gold, 49.74 g/t silver, 2.40% copper, 11.82% zinc and 0.97% lead from 135.57 m. Included within this zone is a higher grading interval of 2.96 m grading 10.17 g/t gold, 48.09 g/t silver, 4.13% copper, 26.78% zinc and 0.70% lead from 140.21 m. Hole CMLP-16-20 intersected 2.31 m of massive and disseminated sulphide mineralization grading 2.55 g/t gold, 60.99 g/t silver, 7.61% copper, 6.92% zinc and 0.74% lead from 30 m. This intersection is within a wider 9.38 m zone grading 1.15 g/t gold, 20.89 g/t silver, 3.28% copper, 1.9% zinc and 0.2% lead from 23.95 m to 33.33 m. Hole CMLP-16-17, collared to the east of CMLP-16-20 intersected 7.10 m of massive sulphide and brecciated mineralization, grading 1.25 g/t gold, 43.14 g/t silver, 2.42% copper, 8.28% zinc and 1.08% lead from 23.55 m. Holes CMLP-16-14, CMLP-16-17 and CMLP-16-20 were collared to test for extensions of near surface mineralization intersected in hole CMLP-16-04 which returned 5.3 m grading 5.19 g/t gold, 40.24 g/t silver, 3.15% copper, 8.98% zinc and 0.59% lead from a shallow depth of 45.7 m in the vicinity of the former open pit.

Initial modelling of this near surface mineralization suggests it represents mineralization not included in the historic polygonal resource estimates and lies above those mineralized blocks. Hole CMLP-16-08 collared in the La Mina southern block intersected 1.79 m massive sulphide mineralization grading 10.00 g/t gold, 88.36 g/t silver, 0.36% copper, 6.50% zinc and 3.15% lead from 293.31 m. Hole CMLP-16-09 collared within the hinge zone in the La Mina southern block intersected a narrow 0.78-m high grade zone assaying 20.67 g/t gold, 50.0 g/t silver, 5.78% copper, 5.85% zinc and 0.43% lead from 374.1 m. Drilling Highlights Hole (08)(09) (14)(17)(20) From (m) To (m) m Au (g/t) Ag (g/t) Cu (%) Pb (%) Zn (%) Au Eq (g/t) CMLP-16-08 293.31 295.1 1.79 10.00 88 0.36 3.15 6.50 16.52 CMLP-16-09 374.1 374.88 0.78 20.67 50 5.78 0.43 5.85 31.16 CMLP-16-14 135.57 151.46 15.89 7.63 50 2.40 0.97 11.82 17.67 including 140.21 143.17 2.96 10.17 48 4.13 0.70 26.78 29.84 CMLP-16-17 11.89 13.41 1.52 6.64 203 1.04 1.46 6.43 14.75 23.55 32.38 8.83 1.10 36 2.14 0.87 6.67 7.92 including 23.55 30.65 7.10 1.25 43 2.42 1.08 8.28 9.41 CMLP-16-20 23.95 33.33 9.38 1.15 21 3.28 0.20 1.90 6.22 including 30.09 32.4 2.31 2.55 61 7.61 0.74 6.92 15.94 1) Core widths in CMLP-16-08, CMLP-16-09, CMLP-16-17 and CMLP-16-20 are considered close to true widths. Core widths in CMLP-16-14 are considered orthogonal to the mineralized zone. Gold assay composites were calculated using uncut assays. Gold equivalent values were calculated using a cut-off grade of 2 g Au/tonne and based on the following metal prices in US$: Au $1,310, Ag $18.75, Cu $2.15, Pb $0.875 and Zn $1.00 2) A complete list of all intersections are available in Table 1 below along with a plan map and cross section of CMLP-016-13, CMLP-16-15 and CMLP-16-20 Program Results The drill program, which began in August 2016, is designed to validate the historic drilling database at the La Plata project. The drilling program is intended to infill and expand known resources in the main La Mina VMS lenses leading to the completion of a National Instrument 43-101 compliant resource estimate in 2017. 2

Our drilling is continuing to outline high grade mineralization at La Plata. Testing the potential for outlining high grade near surface mineralization amenable to open pit mining, will be one of our objectives for the coming year, Nick Tintor, President and CEO said. Hole CMLP-16-20 was collared to test for near surface mineralization in the area of the former open pit mine at La Mina which saw small scale mining from 1975-1981. This hole is part of a group of eight drill holes designed to follow up results from hole CMLP-16-04, which was reported earlier. (See Toachi Mining Press Release dated October 26, 2016). Management believes the La Plata project, which is characterized by geology typical of major gold-rich VMS camps around the world, hosts excellent potential for the discovery of additional discrete VMS zones amongst the 14 exploration targets identified to date. Metallurgical Optimization Program Toachi has also initiated a first phase metallurgical optimization program under the supervision of Dr. Simon Meik. Samples representative of different mineralized lithologies from the La Mina deposit have been shipped to SGS Lakefield Research Limited in Lakefield, Ontario, Canada. Dr. Meik has spent the past 13 years as Corporate Director Processing with Dundee Precious Metals ( DPM ) where he was responsible for managing all aspects of DPM s processing operations and annual production of 400,000 tonnes of copper, zinc and gold concentrates. During his career, Dr. Meik was also Chief Process Engineer at BHP s Antofagasta copper mine in Chile and Assistant Superintendent at Southern Peru Copper s Cuajone concentrator in Peru. We are extremely pleased to have a person of Simon s caliber and expertise in metallurgy and processing of suphide concentrates, managing the La Plata project s metallurgical optimization program, Jonathan Goodman, Chairman said. I have worked with Simon for many years in the past and look forward to working with him again at La Plata, he added. La Plata Deposit Geology Gold-bearing sulphide mineralization at La Plata occurs as compositional banding composed of chalcopyrite, sphalerite and pyrite laminae with barite occurring as clasts and also as thin layers. Base and precious metal mineralization at La Plata is interpreted to have formed as part of multiple volcanic episodes that created a stacked volcanic-exhalite hydrothermal sequence which is considered favorable for hosting multiple VMS lenses. 3

Examples of this exclusive group of gold-rich VMS camps include Noranda, Doyon-Bousquet- LaRonde and the Flin Flon camps in Canada. Toachi s exploration staff has identified more than 14 discrete exploration targets across the property concessions which extend for more than 9 kilometres, attesting to the potential of this emerging district. The La Plata Project Toachi entered into an option agreement with a private Ecuadorean company to earn between a 60% to 75% interest in the La Plata gold-copper-silver-zinc VMS project, located 85 km south of Quito, Ecuador. For complete terms of the transaction, please see our press release dated February 11, 2016 which is available on our website at www.toachimining.com or on www.sedar.com. La Plata is a gold-rich volcanogenic massive sulphide deposit which was the subject of small scale mining from both an open pit and underground workings from 1975-1981. From 1996 to 2000, Cambior Inc., a Canadian mining company, completed 8,628 metres of drilling and a preliminary resource estimate totaling 840,000 tonnes grading 4.8 grams gold per tonne, 4.1% copper, 54.4 grams silver per tonne and 0.7% lead and 4.2% zinc per tonne in 1999, according to a report completed by AMEC Foster Wheeler, a mining consulting firm, in March 2015. Following a drill program by Cornerstone Capital Resources Inc., which included 5,933 metres of drilling from 2006-2007, a revised mineral resource estimate totaling 913,977 tonnes grading 8.01 grams gold per tonne, 88.3 grams silver per tonne, 5.01% copper, 6.71% zinc and 0.78% lead per tonne in the inferred category was completed. The resource estimates described above are historical estimates as defined by National Instrument 43-101 Standards of Disclosure for Mineral Projects S.2.4 ( NI 43-101 ). Toachi has not completed the work required to independently analyze and verify the results of the previous operators nor has a qualified person completed sufficient work to classify the estimates as current mineral resources or mineral reserves. With respect to the Cambior estimate, the Company is also not aware of what categories were used in the estimate. As a result, Toachi is not treating these estimates as current mineral resources or mineral reserves. The Company believes these historic results provide an indication of the potential of the property and are relevant from an on-going exploration perspective. 4

QA/QC Sampling and Core Sampling Protocols Before sampling, a centreline, representing bottom of hole (or a reference line when this is not known) is marked on the drill core. The core is cut and sampled, always sampling the right-hand side of the drill core. Samples are selected based on logged geological features, such as rock type, mineralization, alteration, veining etc. Sample length does not exceed 1.2 m nor is smaller than 20 cm. In areas of similar geological characteristics, sample length is, in general, 1 m. A total of 10% of the samples submitted are certified blanks and standards and field duplicates with, as a minimum, one blank submitted at the beginning of each sample batch. Certified standards are submitted at an average of 6% of the samples submitted. Field duplicates are taken at a rate of 1 in 20 of the samples taken. For all drill holes, with the exception of CMLP-16-04, analysis was completed by ALS Peru S.A. with sample preparation completed in Quito. The lab is accredited with International Standards ISO/IEC 17025:2005 and ISO 9001:2015. All major ALS Geochemistry analytical laboratories are accredited to ISO/IEC 17025:2005 for specific analytical procedures. For drill hole CMLP-16-04, analysis was completed by MS Analytical in Canada, with preparation performed by Ecuadorian partner, LAC y Asociados. Both LAC y Asociados and MSA are ISO 9001:2008 registered companies. MS Analytical also meets the requirements as outlined in ISO/IEC 17025. Qualified Person Phil Fox, MAIG, a Qualified Person as defined by NI 43-101, has reviewed and approved the contents of this press release About Toachi Mining Inc. Toachi brings a disciplined and veteran team of project managers together with a high grade gold-copper-silver-zinc project at La Plata in Ecuador. Toachi is focused on and committed to the development of advanced stage mineral projects throughout the Americas using industry best practices combined with a strong social license from local communities. Toachi Mining has 50,974,935 shares issued and outstanding. 5

Forward Looking Statements Certain statements contained in this news release may constitute forward-looking information as such term is used in applicable Canadian securities laws. Forward-looking information is based on plans, expectations and estimates of management at the date the information is provided and is subject to certain factors and assumptions, including, that the Company s financial condition and development plans do not change as a result of unforeseen events and that the Company obtains regulatory approval. Forward-looking information is subject to a variety of risks and uncertainties and other factors that could cause plans, estimates and actual results to vary materially from those projected in such forward-looking information. Factors that could cause the forward-looking information in this news release to change or to be inaccurate include, but are not limited to, the risk that any of the assumptions referred to prove not to be valid or reliable, that occurrences such as those referred to above are realized and result in delays, or cessation in planned work, that the Company s financial condition and development plans change, and delays in regulatory approval, as well as the other risks and uncertainties applicable to the Company as set forth in the Company s continuous disclosure filings filed under the Company s profile at www.sedar.com. The Company undertakes no obligation to update these forward-looking statements, other than as required by applicable law. FOR ADDITIONAL INFORMATION PLEASE CONTACT Nick Tintor, President and CEO Telephone: 416 987 0855 Mobile: 416 953 4244 Email: ntintor@rgmi.ca Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release. 6

Table 1 Hole From (m) To (m) m Au (g/t) Ag (g/t) Cu (%) Pb (%) Zn (%) Au Eq (g/t) CMLP-16-08 293.31 295.1 1.79 10.00 88 0.36 3.15 6.50 16.52 314.58 315.81 1.23 0.27 1 1.15 0.00 0.01 1.58 CMLP-16-09 374.1 374.88 0.78 20.67 50 5.78 0.43 5.85 31.16 398.39 398.8 0.41 1.77 8 0.02 0.15 0.26 2.09 CMLP-16-10* - - - - - - - - - CMLP-16-11 493.15 494.08 0.93 0.79 47 0.48 0.18 0.72 2.45 CMLP-16-13 119.17 126.2 7.03 1.92 27 1.87 0.34 2.03 5.63 131.63 134.53 2.9 0.30 7 3.08 0.02 0.15 3.96 CMLP-16-14 133.18 133.48 0.3 2.61 6 0.17 0.11 0.59 3.24 135.57 151.46 15.89 7.63 50 2.40 0.97 11.82 17.67 including 140.21 143.17 2.96 10.17 48 4.13 0.70 26.78 29.84 160 161 1 0.36 15 0.75 0.30 1.79 2.50 CMLP-16-15 32.01 34.07 2.06 0.94 6 1.06 0.40 2.30 3.61 CMLP-16-16 15.68 16.32 0.64 0.77 19 0.94 0.46 6.29 5.61 23.38 23.62 0.24 0.52 4 5.78 0.01 0.18 7.18 CMLP-16-17 11.89 13.41 1.52 6.64 203 1.04 1.46 6.43 14.75 23.55 32.38 8.83 1.10 36 2.14 0.87 6.67 7.92 including 23.55 30.65 7.10 1.25 43 2.42 1.08 8.28 9.41 35.6 35.87 0.27 0.36 7 2.03 0.02 0.09 2.79 49 49.57 0.57 0.34 5 1.59 0.01 0.14 2.26 CMLP-16-20 17.2 18.17 0.97 5.33 99 0.22 0.12 0.65 7.38 23.95 33.33 9.38 1.15 21 3.28 0.20 1.90 6.22 including 30.09 32.4 2.31 2.55 61 7.61 0.74 6.92 15.94 62.91 64 1.09 0.58 5 0.90 0.02 0.68 2.02 78.7 83 4.3 0.17 5 1.23 0.03 0.45 1.88 91 95.45 4.45 0.92 11 0.62 0.12 1.53 2.63 * CMLP-16-10 not completed or assayed 7

Figure 1 8

Figure 2 9