CERN Neutrino beams CERN Neutrino platform

Similar documents
The ESS neutrino facility for CP violation discovery

Marcos Dracos IPHC, Université de Strasbourg, CNRS/IN2P3, F Strasbourg, France

Marcos Dracos IPHC-IN2P3/CNRS Strasbourg. 2 December 2008 M. Dracos, BENE 1

PoS(EPS-HEP2017)483. The CERN Neutrino Platform. Stefania Bordoni CERN

Neutrino Platform

The Research Activities within CERN Neutrino Platform

A lepton CP violation discovery experiment using a unique neutrino Super Beam

LBNF Neutrino Beam. James Strait Fermi National Accelerator Laboratory P.O. Box 500, Batavia, IL , USA. on behalf of the LBNF/DUNE Team

The CNGS neutrino beam

Longbase Neutrino Physics. Neil McCauley University of Liverpool Birmingham February 2013

LHC Status and CERN s future plans. Lyn Evans

International Scientific Spring 2010, March 1-6, 1. R. Garoby. slhc

First propositions of a lattice for the future upgrade of SOLEIL. A. Nadji On behalf of the Accelerators and Engineering Division

First neutrino beam and cosmic tracks. GDR neutrino

MINOS. Physics Program and Construction Status. Karol Lang The University of Texas at Austin. YITP: Neutrinos and Implications for Physics Beyond

Physics Potential of existing and future LBL ν beams

The T2K experiment Results and Perspectives. PPC2017 Corpus Christi Mai 2017 Michel Gonin On behalf of the T2K collaboration

Proposal for a lepton CP violation discovery experiment using a neutrino Super Beam from ESS

OVERVIEW OF THE LHEC DESIGN STUDY AT CERN

A Beam Dump Facility (BDF) at CERN - The Concept and a First Radiological Assessment

Technological challenges of future Super Beam projects

Neutrino Oscillations Physics at DUNE

CERN and Astroparticle Physics. Fabiola Gianotti, APPEC, 7 April 2016

Optimization of the SIS100 Lattice and a Dedicated Collimation System for Ionisation Losses

slhc-project-report-0034

Application of GLoBES: GLACIER on conventional neutrino beams

Eric Baussan IPHC, Université de Strasbourg, CNRS/IN2P3, F Strasbourg, France

BNL Very Long Baseline Neutrino Oscillation Expt.

Neutrino-Nucleus Scattering at MINERvA

ScienceDirect. The LAGUNA-LBNO Project

The CERN Neutrino Platform. Paola Sala CERN and INFN Milano For the NP team 09/09/2016 Neutrino Platform NOW2016 1

JHFnu at J-PARC neutrino oscillation experiment

Neutrino beamline prospects, concepts Milorad Popovic

Study of possible opportunities for leptonic CP violation and mass hierarchy at LNGS

Hadron Production Experiments and Neutrino Beams

NEUTRINO FACTORY / MUON STORAGE RING


Lattice Design and Performance for PEP-X Light Source

1.5-GeV FFAG Accelerator as Injector to the BNL-AGS

The TESLA Dogbone Damping Ring

Douglas Michael California Institute of Technology RPIA 2002 KEK, Oct. 29, 2002

PoS(NEUTEL2015)037. The NOvA Experiment. G. Pawloski University of Minnesota Minneapolis, Minnesota 55455, USA

Overview on CERN Test Beam Facilities

Neutrino oscillations from CERN to Pyhäsalmi

PoS(NOW2016)003. T2K oscillation results. Lorenzo Magaletti. INFN Sezione di Bari

REPORT OF THE HIGH INTENSITY PROTONS WORKING GROUP

FAIR AT GSI. P. Spiller, GSI, Darmstadt, Germany

BNL Very Long Baseline Neutrino Oscillation Expt.

LIS section meeting. PS2 design status. Y. Papaphilippou. April 30 th, 2007

The High-Power-Target System of a Muon Collider or Neutrino Factory

The T2K Neutrino Experiment

CNGS - CERN NEUTRINOS TO GRAN SASSO

Current and Future Developments in Accelerator Facilities. Jordan Nash, Imperial College London

New Physics with a High Intensity PS (in Italy)

The ERC ENUBET project high precision neutrino flux measurements in conventional neutrino beams

Tools of Particle Physics I Accelerators

Operational Experience with J-PARC Injection and Extraction Systems

Choosing the Baseline Lattice for the Engineering Design Phase

A beam line for schools

Horn R&D. S. Gilardoni. Speaker A. Fabich CERN AB

The ENUBET neutrino beam

PoS(NuFact2017)088. EMuS in CSNS. Guang Zhao 1. Institute of High Energy Physics Beijing, China

Recent T2K results on CP violation in the lepton sector

A new underground laboratory at Frejus

Status and Neutrino Oscillation Physics Potential of the Hyper-Kamiokande Project in Japan

Physics at Accelerators

New irradiation zones at the CERN-PS

The FLUKA study of the secondary particles fluence in the AD-Antiproton Decelerator target area.

The LENA Neutrino Observatory

SLS at the Paul Scherrer Institute (PSI), Villigen, Switzerland

Simulations of the Long Baseline Neutrino Experiment for the Sieroszowice Underground Laboratory (SUNLAB)

Update on MOMENT s Target Station Studies

Recent Results from Alysia Marino, University of Colorado at Boulder Neutrino Flux Workshop, University of Pittsburgh, Dec 6 8,2012

On-axis injection into small dynamic aperture

THE EUROnu PROJECT: A High Intensity Neutrino Oscillation Facility In Europe. Elena Wildner, CERN Rob Edgecock, STFC/RAL

Physics 736. Experimental Methods in Nuclear-, Particle-, and Astrophysics. - Accelerator Techniques: Introduction and History -

Thanks to all Contributors

Constraining the T2K Neutrino Flux Prediction with 2009 NA61/SHINE Replica-Target Data arxiv: v1 [physics.ins-det] 1 Apr 2018

How J-PARC recovered from the big earthquake

New Hadroproduction results from the HARP/PS214 experiment at CERN PS

The 2015 erhic Ring-Ring Design. Christoph Montag Collider-Accelerator Department Brookhaven National Laboratory

LBL projects and neutrino CP violation in Europe

COMET muon conversion experiment in J-PARC

CLIC Detector studies status + plans

Review of ISOL-type Radioactive Beam Facilities

arxiv: v1 [physics.ins-det] 14 Jan 2016

SSA Measurements with Primary Beam at J-PARC

(a) (b) Fig. 1 - The LEP/LHC tunnel map and (b) the CERN accelerator system.

Short Introduction to CLIC and CTF3, Technologies for Future Linear Colliders

Where is Europe going?

NEW νe Appearance Results from the. T2K Experiment. Matthew Malek Imperial College London. University of Birmingham HEP Seminar 13 June 2012

Design Status of the PEFP RCS

JAPAN PROTON ACCELERATOR RESEARCH COMPLEX

Advanced Neutrino Sources

The First Results of K2K long-baseline Neutrino Oscillation Experiment

Accelerator Design and Construction Progress of TPS Project

Overview of Acceleration

ERL FACILITY AT CERN FOR APPLICATIONS

Hadron cancer therapy complex using nonscaling fixed field alternating gradient accelerator and gantry design

ESS and the UK share. Justin Greenhalgh Senior programme manager, UK-ESS

Transcription:

CERN Neutrino beams CERN Neutrino platform 23 th June, 2014 APPEC, International Meeting for Large Neutrino Infrastructures (IMLNI) M.Nessi 1

CERN and Europe long history of Neutrino Physics : last on the long series of neutrino facilities the CNGS - Short Baseline Neutrino physics and infrastructure - Long Baseline Neutrino physics and infrastructure - Generic R&D on future Neutrino technologies (detectors, beams,..) the agreed 2013 European Strategy : Rapid progress in neutrino oscillation physics, with significant European involvement, has established a strong scientific case for a long-baseline neutrino programme exploring CP violation and the mass hierarchy in the neutrino sector. CERN should develop a neutrino program to pave the way for a substantial European role in future long-baseline experiments. Europe should explore the possibility of major participation in leading 2 long-baseline neutrino projects in the US and Japan.

Short Baseline Triggered by: - Sterile neutrino searches (ICARUS and NESSiE proposal) - Test facility for new technologies (2 phases LAr TPC LAGUNA proposal, MIND detector,.) proposed 80-90s 2006-2012

CERN Neutrino Facility (CENF) Design 2012-2014 Primary beam extraction from SPS TT20 Target area Near detector facility ~460 m from target Far detector facility ~1600 m from target Primary beam line Target facility Near detectors facility Far detectors facility 460 m 450 m 440 m EHN1 Slope 1.5804 % TT20 12 November 2013 Neutrino beam M. Calviani (CERN) -- International Workshop of Next Generation Nucleon Decay and Neutrino Detectors (NNN13) 0 500 m 1000 m 1500 m 2000 m MORAINE MOLASSE 4

CENF : Primary p-beam characteristics Beam time structure similar to CNGS Primary beam momentum 100 GeV/c Fast extraction: beam excitation via injection kicker in LSS1 and extraction in LSS2 Novel solution tested for low intensities during recent beam tests ~720 kj/pulse ~200 kw on target 4.5x10 19 POT/y 5

CENF: Neutrino beam optimisation FLUKA multi-parameter optimisation 5 GeV pion focusing central n m energy ~1.8 GeV Target inside horn, followed by reflector Perfect focus within 1 rad Best configuration Initial configuration Far detector: ~1M n m /y 6

Rates for 1-year (4.5 10 19 pot), 1kt, E<5 GeV neutrino mode antineutrino mode Far detector (1600m) Near det (500m) Far detector (1600m) Near det (500m) n m CC 2.0 x 10 6 2.3x 10 7 1.9 x 10 5 2.1x 10 6 n m CC 5.5 x 10 4 5.9x 10 5 5.6 x 10 5 6.1 x 10 6 n e CC 1.2 x 10 4 1.4x 10 5 3.0 x 10 3 3.4 x 10 4 n e CC 8.9 x 10 2 1.0x 10 4 3.4 x 10 3 3.8 x 10 4 Large event statistics at both positions will allow a systematic study of n m and n e topologies, both in neutrino and antineutrino mode!! 7

CENF : Neutrino Beam Secondary beam (target, decay pipe, ) engineering design very advance and will be finalised by the end of 2014, ready for a future eventual implementation if requested! 1) An LOI for a CENF short baseline was presented in March 2013 to the CERN directorate 2) Cost of the Facility estimated to ~70 MEuro 3) This generated a lot of discussion inside the community and inside CERN 4) Decision taken not to implement it now as a Short Baseline Neutrino facility at CERN 5) But decision to bring all implementation studies to maturity, ready for an eventual implementation 6) Interest for short baseline moved to the US- FNAL neutrino facilities 7) Implement the near detector facility as an R&D platform with charged beams possibilities 8

Triggered by: LBNO Long Baseline - the LBNO EU FP7 design study for a n beam pointing to Finland Pyhäsalmi CERN

CERN Neutrinos 2 PYhasalmi beam Phase 1 : proton beam extracted beam from SPS -400 GeV, max 7.0 10 13 protons every 6 sec, ~750 kw nominal beam power, 10 μs pulse SPS Extraction Phase 2 : use the proton beam from a new HP-PS -50(75) GeV, 1 Hz, 2.5 10 14 ppp, 2 MW nominal beam power, 4 μs pulse -alternative option: upgraded SPS The CN2PY ν-beam ν-beam HP-PS

LBNO - CN2PY Layout Options (two) Two layouts considered in the CERN Area HP-PS New BeamXfer line for 50 GeV (or through SPS) LINAC4 SPL LSS6-TT69 CN2PY (Option A) LSS2-TT20 CN2PY (Option B)

LBNO - CN2PY Layout Option A HP-PS Hadron Stop Near Detector Target cavern New TT69 beam line continued from existing TT66 beamline (HiRadMat) will eventually require a switch between TT66 and TT69, with a lateral displacement of TT66 for HiRadMat FODO arc with 35 m half-cell length, 6 dipoles per half-cell Superconducting dipoles assumed for the TT69 arc 4.0 m long magnetic, 4.6 T field 13.85 mrad bend angle per dipole, 6.9 mm sagitta H/V aperture of ~40 mm (good field region) CN2PY Depth TT69 Target Cavern Hadron Stop Near Detector -117 m -189 m -262 m Target cavern Hadron Stop 400 m Near Detector 800 m 12

LBNO - CN2PY Layout Option B Hadron Stop Target cavern Near Detector SPS North Area SPS Operation @ 400 GeV New extraction switch upstream the NA targets continued from existing TT20 beamline NC dipoles similar to CNGS HP-PS Operation @ 50 MeV HP-PS remains close to Meyrin site Remain closer to LP-SPL with the possibility to inject into SPS New transfer line or passage through SPS to bring the beam to NA ν-beam layout same in both cases CN2PY Depth TT20 Target Cavern Hadron Stop Near Detector -117 m -189 m -262 m Target cavern Hadron Stop 400 m Near Detector 800 m 13

LBNO - CN2PY ν-beam design Conventional neutrino beam Constraints/challenges: - have the same layout for 400 & 50 GeV beams - control or radiation environment (2 MW beam power!) - ν-flux optimisation for both oscillation prob. maxima - steep slope of 18% Additional considerations - The length of the hadron stop and near detector location determined by the μ flux limit requirement for the 400 GeV case (< 9 μ/m 2 /spill) - Additional μ flux monitoring stations must be foreseen for the 50 GeV operation 14

LBNO - CN2PY ν-beam optimisation Optimisation regions: [1-2], [3-8] GeV regions corresponding to 1 st and 2 nd maximum of oscillaiton probability 15

LBNO - CN2PY ν-beam design Key challenge : manage the slope, whilst maintaining reasonable tunnel sizes for optimized cost and operation at high-power. Access shaft Service tunnel Access cavern (0% slope) Beam cavern (18% slope) Decay pipe Proton beam (18% slope)

LBNO - CN2PY ν-beam design ν-beam elements in He container to minimize the production of radioactive elements and limit corrosion effects Water cooled shielding blocks, remote handling of all equipment He-container morgue & hot cell Area (0% slope) Horn with lateral s hielding

CN2PY Phase 2: HP-PS Design Possible accelerator landscape including the new HP-PS 18

Based on PS2 design LAGUNA-LBNO: HP-PS main characteristics Parameter PS2 (ref.) HP-PS Circumference [m] 1346.4 1174 Symmetry 2-fold 3-fold Beam Power [MW] 0.37 2 Repetion Rate [Hz] 0.42 1 Kinetic Energy @ ext. [GeV] 50 50/75 Protons/pulse [10 14 ] 1.1 2.5/1.7 3-fold symmetric ring with transfer, collimation and RF in separate long straight sections Negative Momentum Compaction (NMC) arc cell to avoid transition Doublet Long Straight Section (LSS) giving space for BT equipment, collimation and RF See R.Garoby @ICFA neutrino https://indico.in2p3.fr/conferenceotherviews.py?view=standard&confid=8974

HP-PS Parameters HP-PS Parameter 50 GeV 75 GeV Units Inj. / Extr. Kinetic Energy 4 / 50 4 / 75 [GeV] Beam power 2 [MW] Repetition rate 1 [Hz] f rev / f RF @ inj. 0.234 / 39.31 [MHz] RF harmonic 168 - f rev / f RF @ extr. 0.238 / 40.08 0.238 / 40.08 [MHz] Bunch spacing @ extr. 25 [ns] Total beam intensity 2.5 E14 1.7 E14 - Number of bunches 157 - Intensity per bunch 1.6 E12 1.1 E12 - Main dipole field inj. / extr. 0.19 / 2.1 0.19 / 3.13 [T] Ramp time 500 500 [ms] Dipole field rate db/dt (acc. ramp) 3.5 5.5 [T/s] 20

CN2PY : Neutrino Beam 1) All studies presented here are part of the LAGUNA-LBNO FP7 design study EU project with CERN participation in the beam work package (final report due in summer 2014) 2) Cost of the beam Facility not yet estimated, as well as the infrastructure cost of the near detector facility (@ -262 m) 3) This beam and its infrastructure is for the moment not part of the medium term plan of CERN 21

Triggered by: ESS Long Baseline - recent idea (design study group just forming) for a superbeam at the ESS new facility in Lund Doubling pulse frequency 10 MW of which 5 MW for neutrino beam 22

Triggered by: ESS Long Baseline - recent idea (design study group just forming) for a superbeam at the ESS new facility in Lund The ESS will be a copious source of spallation neutrons 5 MW average beam power in the linac 125 MW peak power 14 Hz repetition rate (2.86 ms pulse duration, 10 15 protons) 28 Hz 4% duty cycle 2.0 GeV protons (up to 3.5 GeV with linac upgrades) n ~ 300 MeV >2.7x10 23 p.o.t/year (http://lanl.arxiv.org/abs/1212.5048) 23

ESS n production target Shield Blocks Horn Support Module Split Proton Beam Collimators Horns and Targets Decay Volume (He, 25 m) Beam Dump Neutrino Beam Direction

Given the still vague/evolving road map on long baseline n activities in Europe, Japan and US CERN adopted (pragmatical) position is to support, on the short term, generic R&D on n detectors & beams and to support physics related to a n short baseline (steriles, crosssections, calibration, event reconstruction,.). The goal is to assist and foster collaboration in Europe among the various n institutions, independently where a Long and/or Short n baseline(s) will be implemented CERN Neutrino Platform 25

CERN Neutrino Platform It will happen CERN Neutrino Platform Neutrino detectors R&D Logistics + Test Beams Infrastructure (EHN1 ext) Investigate new programs (mu storage ring, betabeams?, ) EU participation in a High Intensity Facility (detectors, beam, infrastr.) Design and eventually implement a Neutrino Beam PHYSICS 26

CERN council last week has decided to implement the proposed Medium Term Plan (MTP) which for the first time (since years) contains an important allocation of resources in the next 5 years dedicated to the Neutrino CERN Platform This will cover: Generic n detector R&D including large prototypes Design and generic R&D on n beams The construction of a new experimental hall dedicated to neutrinos (Nord Area extension : EHN1) with charged test beams capabilities The reinforcement of various Technical/Scientific groups at CERN (cryogenics, physics,.) which will support the activities of the platform The support with detectors and components of the Short Baseline at FNAL Support to various design/feasibility studies on this field (nustorm, ESS beam,..) 27

Nord Area EHN1 extension

n + charged beams for all experiments MIND LAGUNA-PROTO NESSiE New detectors? ICARUS T150

charged beams layout ( ~0.5 20. GeV ) 30

CERN Neutrino Platform Neutrino detectors R&D 2014-2018 Preparation of 5 MOUs addenda in progress WA104: rebuild ICARUS T600 in bldg 185 and make it ready for a FNAL beam WA104: R&D on an AIR core muon detector (NESSiE) or eventually integrate a solenoid in the main TPC WA105: R&D on 2 phases large LAr TPC prototypes MIND : R&D on muon tracking detectors LBNF : Test of a LBNE module inside the WA105 cryostat In the pipeline : Argoncube-TPC, Hyper-Kamiokande EU prototypes, new 200t TPC,.. 31

CERN Neutrino Platform Neutrino detectors R&D 2014-2018 MOUs preparation in progress CERN direct contribution under evaluation: - all logistics aspects (incl. various assembly buildings at CERN!85,182,..) - cryostats (membrane and new ICARUS type) - cryogenics - cleanrooms, civil engineering - services and utilities (CV, EL, Power Suppl., Cooling unit, gas, ) - controls & DAQ - magnets and B-fields - integration and assembly - host for visiting collaborators (PJAS, fellows, students, scientific associates,..) - special studies (feasibilities, particular techniques, ) 32

MOU frame How to get in? - Present to the CERN SPSC a LOI or an expression of interest - When approved we prepare together an MOU (addendum) which defines all responsibilities and resources needed - Then a CERN experiment is created (WA104, WA105, ), with all priviledges and requirements https://edms.cern.ch/document/1353815 33

5 MOUs are being prepared for signature 34

CERN Neutrino Platform Summary: CERN offers a platform for Neutrino detectors R&D. This platform is now part of the CERN MTP. We will support this platform in an active way and will help WA104, WA105 and others proposals in this initial phase CERN will construct a large neutrino test area (EHN1 extension) with charged beams capabilities, available in 2016 CERN will assist the EU neutrino community in their long term common plans. For the moment CERN is not committing to any neutrino beam at CERN, in view of an agreed road map between all partners 35