Report of 1F Status about Great East Japan Earthquake

Similar documents
Natural Disaster :.JP s Experience and Preparation

JP experience of earthquake, tsunami, and nuclear plant accident

4-3-1 Earthquake and Tsunami Countermeasures of Tokyo s

Revival from Earthquake Disaster and Asbestos Problems

Wildfire Preparedness

Flood Management in Japan

Earthquakes. Copyright 2006 InstructorWeb

Interviewing insights regarding the high fatality rate inflicted by the

Visual Notices to mariners & Navigational Warnings

Damage of Sewage Plant by Tsunami

Natural Processes. Were you prepared for the fast approaching storm? Were you able to take shelter? What about pets, livestock or plants?

Tornado. damage. thunderstorms and can cause a lot of. Tornadoes usually happen during. reaches from the sky to the ground.

KNOWLEDGE NOTE 5-1. Risk Assessment and Hazard Mapping. CLUSTER 5: Hazard and Risk Information and Decision Making. Public Disclosure Authorized

- Information before strong ground motion -

ready get QUEENSLAND PREPARE YOUR EMERGENCY PLAN OUR LOCAL EMERGENCY CONTACTS

HISTORY OF HEAVY RAINFALL DISASTER INFORMATION IN JAPAN

Making the Original Earthquake Early Warning System including epicentral earthquake

Policy and Procedure for Emergency Planning

Bangladesh in Risk of Earthquake: What Can Be Done. Presented By : Md.Jahangir Alam Coordinator, Disaster Management Unit Dhaka Ahsania Mission

National Report on Weather Forecasting Service

GIS present situation in Japan

2013 Tornado and Severe Weather Awareness Drill

DISASTER PROCEDURES th AVE NE, Suite 100 Bellevue WA, Tel: (425)

Comments on the slides. Disaster resilience and anticipation:data, methods, and models, and emerging adaptation strategies

The Challenge of Geospatial Big Data Analysis

Available online at ScienceDirect. Nuclear power plant explosions at Fukushima-Daiichi. Takashi Tsuruda*

Institute for Science and International Security

JMA Tsunami Warning Services. Tomoaki OZAKI Senior Coordinator for Tsunami Forecast Modeling Japan Meteorological Agency

Earthquake,Tsunami,Volcano Monitoring & Warning System in Korea. Jimin Lee Earthquake & Volcano Monitoring Division KMA

Inclement Weather Preparedness. Tornadoes and Severe Thunderstorms

2 nd IRF Asia Regional Congress & Exhibition October 16-20, 2016 Kuala Lumpur, Malaysia

Experiments of Earthquake Early Warning to Expressway Drivers using Plural Driving Simulators

The Integration of Land and Marine Spatial Data Set As Part of Indonesian Spatial Data Infrastructure Development

Development and Application of Earthquake Early Warning System in NCREE. P.Y. Lin, T.Y. Hsu & H.W. Jiang

Lessons Learned from Past Tsunamis Warning and Emergency Response

WHAT S CIVIL DEFENCE?

JMA/WMO WORKSHOP ON EFFECTIVE TROPICAL CYCLONE WARNING IN SOUTHEAST ASIA

Hurricane Preparedness and Awareness!

Earthquakes Science & Safety. Dr. Richard Robertson Geologist & Head Seismic Research Unit

Earthquakes Science & Safety. Ms Joan L. Latchman Seismologist Seismic Research Unit

EARTHQUAKES AND EARTHQUAKE-RESISTANT DESIGN OF STRUCTURES. Er. K. S. BHARGAV LECTURER Department of Civil Engineering, GGSGP CHEEKA

Government GIS and its Application for Decision Support

New Tsunami Disaster Mitigation System considering Local Conditions of Indian Ocean Rim Regions

Risk Assessment and Mitigation. Hurricane Checklist

Whether you are driving or walking, if you come to a flooded road, Turn Around Don't Drown

MACMILLAN READERS ELEMENTARY LEVEL BRAM STOKER. Tales of Horror. Retold by John Davey MACMILLAN

State Of Wisconsin. Department of Military Affairs. Division of Emergency Management

How J-PARC recovered from the big earthquake

NGIAs' roles in successful disaster response

WINTER STORM Annex II

NWS HURRICANES June 3, 2015

Tsunami! Beyond the Book. FOCUS Book

Tsunami Waveform Inversion based on Oceanographic Radar Data

Proposing Effective Method to Develop Common Operational Picture in Disaster Response Utilizing Cloud-based Geospatial Infrastructure

Final Presentation on Disaster Risk Management in Japan. Through ADRC V. R Programme. Main Findings and Action Plan:

Status and Challenges on Geo-DRM Information Systems in Tonga

Case Studies on Mega Cities

Protecting Your Business This Winter Weather Season

Predicting and Preparing for Volcanoes

Xiang Wen, & Takahashi Toru Chiba University, Chiba City, Japan. Katada Masaki Kyoto University, Kyoto, Japan

Annex B Natural No-Notice Event

Annual Report for Research Work in the fiscal year 2005

W. Douglas Wewer 1,2 *, Michael J. Jenkins 1

EMERGENCY PREPAREDNESS AND RESPONSE PROTOCOL: EARTHQUAKES

EMERGENCY PROCEDURES FLIPCHART READ AND UNDERSTAND ALL INSTRUCTIONS THOROUGHLY. THE LIFE YOU SAVE MAY BE YOUR OWN!

Changes in the Level of Convenience of the Iwate Prefecture Temporary Housing Complexes Constructed after the 2011 Tohoku Earthquake

Welcome to our Emergency Preparedness Activity Book!

TEPCO s Activities on the Investigation into Unsolved Issues in the Fukushima Daiichi NPS Accident

held on 4 June 2013 Prof. Yoshimori Honkura, Program Officer of Japan Science and Technology Agency (JST) Jakarta, Indonesia Pan Pacific Hotel)

Enterprise Linear Referencing at the NYS Department of Transportation

EARTHQUAKES. During An Earthquake

Hollie Fulsom, Event Planner

GIS Application for Effective and Efficient Reporting and Information Media in Freeport Underground Mine

Outline of Guideline for Development and Utilization of Tsunami Disaster Management Map

Study on Quantification Methodology of accident sequences for Tsunami Induced by Seismic Events.

GEOFOTO GROUP LTD. Buzinski prilaz 28, Zagreb, Croatia tel.: ,

New Pig Corporation newpig.com HOT-HOGS Page 1 of 10

PERSONAL DISASTER PREPAREDNESS

Earthquake Source. Kazuki Koketsu. Special Session: Great East Japan (Tohoku) Earthquake. Earthquake Research Institute, University of Tokyo

Estimation of Seismic Shutoff of Intelligent Gas Meters in the Tokyo Metropolitan Area

IG-WRDRR, UNESCAP, UNESCO-IOC, WMO. Yukio Tamura Chairman, International. Group. Tuesday 10 May, , Room 13. for Disaster. Risk.

Predicting Tsunami Inundated Area and Evacuation Road Based On Local Condition Using GIS

A page from Willow s computer diary

PRELIMINARY STUDY OF GROUND MOTION CHARACTERISTICS IN FURUKAWA DISTRICT, JAPAN, BASED ON VERY DENSE SEISMIC-ARRAY-OBSERVATION

Tornadoes Module 2. - Tornado Watch -

Fantasy. The. build a home. by Daniel Haikin illustrated by Fian Arroyo PAIRED. Sunrise and Sunset READ

Tahlequah Public Schools Inclement Weather Transportation Plan

Shake, Rattle n Roll! Earthquake Science & Safety. STACEY EDWARDS Education Officer The University of the West Indies Seismic Research Centre

Mechanism of tsunami generation,propagation and runup -sharing experiences with Japanese

The Three Things You Need to Know About Tsunami Preparedness Patrick Corcoran, Oregon Sea Grant,

Preliminary Damage Report of the August 22, 2011 Mw 5.3 Earthquake near Trinidad, Colorado

July 5-6, 2010 Mytilene, Greece

JMA Tsunami Warning Services. Takeshi KOIZUMI Senior Coordinator for International Earthquake and Tsunami Information Japan Meteorological Agency

UNIVERSITY OF WISCONSIN-PARKSIDE TORNADO WARNINGS AND ALERT POLICY ADMINISTRATIVE POLICY NUMBER 39 TABLE OF CONTENTS

RADIATION MEASUREMENTS AT THE CAMPUS OF FUKUSHIMA MEDICAL UNIVERSITY THROUGH THE 2011 OFF THE PACIFIC COAST OF TOHOKU EARTHQUAKE AND

Processes and Impact of Natural Hazards

Special feature: Are its lessons being adequately applied? Follow-up on the ten-year anniversary of the Hanshin-Awaji Earthquake

IN VEHICLES: Do not try to outrun a tornado. Abandon your vehicle and hide in a nearby ditch or depression and cover your head.

AN EVALUATION MODEL OF MEDICAL TRANSPORT WITH TSUNAMI EARLY WARNING SYSTEM

Scientists: Explosive eruption risk rises for Hawaii volcano 10 May 2018, by Sophia Yan And Audrey Mcavoy

Transcription:

Report of 1F Status about Great East Japan Earthquake Tokyo Electric Power Services Co. Ltd. 1

Back ground TEPSCO member of our group have stayed at 1F site for 1F-5 PPC replacement work at that period 1F-5 unit was just going to start up for commercial operation from April, so SAT of PPC was almost done. We have worked in the site at that day also, and we were caught in an earthquake disaster. 2

Contents 1. Plant status after the earthquake 2. Our situation of the day 3. PPC status at the day 3

Plant status after the earthquake Several place of the site 4

Plant status after the earthquake Several place of the site 5

Plant status after the earthquake Several place of the site 6

Plant status after the earthquake Wall of reacter building of Unit 1 7

Plant status after the earthquake Tsunami coming to the plant (Just top of breakwater could be seen) 8

Plant status after the earthquake State that the seawater flows into plant by tsunami 9

Plant status after the earthquake Heavy oil tank which was carried away by a Tsunami Original location 10

Plant status after the earthquake Concrete Pump Vehicle for injecting water 11

Plant status after the earthquake Unit 2 control room that the electricity was recovered 12

Our situation of the day 1. Our working location Unit 5 Control room : 2 person ( Akiyama ) Administration Building : 7 person ( Naito ) Unit 6 Unit 5 To TEPSCO site office Administration Building Unit 1 Unit 2 Unit 3 Unit 4 Inundated Area 13

Time chart of that day Our situation of the day 14:26 Earthquake occur 14:58 The high Tsunami warning was announced from Meteorological Agency 15:37~ Massive tsunami attacked the 1F site (16:30) All our members evacuated to our site office and were able to confirm their safety 17:00~ Went back to each Hotel or home ( We didn t know that power of Unit 1 to 4 were lost ) 14

Our situation of the day Administration Building Very huge rolling happened many times in about 20 min. PCs and monitors on the table fell into the floor Dusts and some piece of ceiling fell from the ceiling Steel fire prevention door was closed by rolling of the earthquake, so we had to force open the door to go out the building 15

Unit 5 control room Our situation of the day Very huge rolling happened many times in about 20 min. Performed automatic SCRAM by earthquake, and operator carried out urgent stop operation Corridor to outside from control room was filled with dusts fell from the ceiling After Tsunami was gone, TEPSCO member went out to site office from control room 16

To Tokyo from refuge Our situation of the day Because gym of the town was appointed as refuge, we spent a night there. Early in the morning, urgent broadcast was announced, so we are divided into several groups and will go to Tokyo. 17

PPC status at those period Most of the power was lost at that day, but external power sources were prepared later. TEPCO asked us to retrieve PPC data ( Both unit 2 and 5 ) to confirm the behavior of that period We have been to 1F site to retrieve PPC data at 25 th April 18

PPC status at the day There was no problem with the appearance of cabinets and servers We started up each servers without any problem, so we could check the server status and logs According to system event logs Unit 2 : Server was stopped at 3/11 15:50 Unit 5 : Server was stopped at 3/12 16:05 19

PPC status at the day After that, we have copied the archive files to external drive, and retrieved those data in development system in Tokyo. Retrieved Data ( 1 seconds frequency) Unit 2 PPC data ~ 3/11 15:50 Unit 5 PPC data ~ 3/12 16:05 20

PPC status at the day PPCs of other plant did not have function to store archive data in their system So it was just our system ( R*Time system ) that was able to provide archive data to TEPCO 21

Current status of our work We are going to provide R*Time system to monitor some plant process parameters from Unit 1 to 4 at administration building This system collects data from YOKOGAWA digital recorders and Web cameras installed at fields 22