IAMGOLD CONTINUES TO INTERSECT HIGH GRADES AT MONSTER LAKE

Similar documents
IAMGOLD PROVIDES UPDATE ON ADVANCED EXPLORATION PROJECT DIAMOND DRILLING RESULTS BOTO PROJECT, SENEGAL

IAMGOLD REPORTS HIGH-GRADE DRILL INTERSECTIONS FROM ITS 2017 DRILLING PROGRAM ON THE DIAKHA DEPOSIT, SIRIBAYA PROJECT IN MALI

IAMGOLD REPORTS FURTHER HIGH-GRADE INTERSECTIONS FROM INFILL AND EXPANSION DRILLING AT SARAMACCA

IAMGOLD PROVIDES EXPLORATION UPDATE ON BOTO PROJECT IN SENEGAL

IAMGOLD REPORTS ADDITIONAL HIGH GRADE INTERSECTIONS FROM THE DELINEATION DRILLING PROGRAM ON THE SARAMACCA PROJECT, SURINAME

IAMGOLD REPORTS HIGH GRADE INTERSECTIONS FROM THE ONGOING DELINEATION DRILLING PROGRAM ON THE SARAMACCA PROJECT, SURINAME

IAMGOLD INTERSECTS MINERALIZATION ALONG STRIKE OF THE SARAMACCA DEPOSIT AND REPORTS FIRST DRILL RESULTS FROM BROKOLONKO

Probe Metals Continues to Expand Gold Zones At Val-d Or East

Probe Metals Intersects 3.2 g/t Gold Over 45.5 Metres At Val-d Or East

Probe Metals Continues to Intersect Significant Gold Mineralization in Expansion Drilling at Val-d Or East, including 4.1 g/t Gold Over 15.

Probe Metals Confirms Continuity of Gold Mineralization on its Val-d Or East Project And Increases 2017 Drill Program to 75,000 metres

Probe Metals Discovers New High Grade Gold Zone on Val-d Or East Project: Intersects 12.6 g/t Gold Over 7.3 Metres

Detour Gold Reports Drilling Results from Lower Detour

Probe Metals Intersects 1,122 g/t Gold Over 0.7 Metres in New Zone at Val-d Or East

IAMGOLD ANNOUNCES RESULTS FROM THE WESTWOOD-MOOSHLA EXPLORATION PROJECT

MONETA INTERCEPTS g/t GOLD INCLUDING g/t GOLD AND g/t GOLD INCLUDING g/t GOLD AT SOUTH WEST

QMX GOLD CONTINUES TO INTERSECT STRONG MINERALIZATION AT BONNEFOND, INTERSECTING 39.5 g/t Au OVER 2.4 METRES AND 31.5 g/t Au OVER 1.

MONETA INTERCEPTS g/t GOLD INCLUDING g/t GOLD AT SOUTH WEST

55 Adelaide Street East, Suite St-Charles west, Suite 411, West Tower

NEWS RELEASE FULLER PROPERTY CONTINUES TO DELIVER GOOD RESULTS 2.53 GRAMS PER TONNE GOLD OVER METRES

KIRKLAND LAKE GOLD ANNOUNCES 120 METRE DOWN-PLUNGE EXTENSION OF SWAN ZONE

Strategic Phase 2 Exploration Program Launched at Island Gold High-Grade Resource Potential Identified Laterally and at Depth

BALMORAL INTERSECTS g/t GOLD OVER 7.99 METRES, BUG LAKE SOUTH, DETOUR GOLD TREND PROJECT, QUEBEC

NEWS RELEASE. FOR IMMEDIATE RELEASE Shares Outstanding: 35,190,286

KIRKLAND LAKE GOLD INTERSECTS NEW MINERALIZATION AT TAYLOR MINE, CONTINUES TO EXTEND PORPHYRY DEPOSITS TO DEPTH

JUNE 25, 2015 TSX: WDO

Assay Results Highlights (as of November 16, 2017) representing approximately 4,500 metres ( m ) of drilling:

San Gold Drills New Mine Horizon Adjacent to Rice Lake Mine, Returns 10.4 Metres Grading 25.7 g/t Au

BELO SUN INTERSECTS NEW HIGH GRADE ZONE AT GROTA SECA AND EXPANDS GRANDE DEPOSIT

PRESS RELEASE. DUBUISSON NORTH DRILLING CUTS g/t AU OVER 5.0 METRES NEW S50 EAST DISCOVERY, 3.39 g/t AU OVER 25.9 METRES

Mineral Resource Estimate Comparison at 3 g/t Au cut-off

Teranga s Golden Hill Drill Program Intersects High-Grade Gold and Expands Mineralized Zones at Peksou and Ma Prospects

BELO SUN RELEASES RESULTS FROM 65 DRILL HOLES FURTHER EXTENDING THE OURO VERDE DEPOSIT ALONG STRIKE NORTHWEST AND DOWN DIP

AUGUSTINE VENTURES ANNOUNCES HIGH GRADE GOLD BEARING TENSION VEINS IN THE HANGING WALL OF THE SURLUGA DEPOSIT

BALMORAL ANNOUNCES SIGNIFICANT GOLD DISCOVERY ON DETOUR GOLD TREND IN QUEBEC

A B C PAD A HIGHLIGHTS

OSISKO METALS INTERSECTS 10.49% ZINC+LEAD OVER METRES AND 12.15% ZINC+LEAD OVER METRES AT PINE POINT

CAUTIONARY STATEMENT

ANTLER GOLD DRILLS GRAMS PER TONNE GOLD OVER 5.35 METRES AT THE WILDING LAKE GOLD PROJECT, NEWFOUNDLAND

KIRKLAND LAKE GOLD EXTENDS HIGH-GRADE GOLD MINERALIZATION AT MACASSA, NEW GOLD SYSTEM DISCOVERED AT DEPTH

NEWS RELEASE ORCA GOLD REPORTS CONTINUED SUCCESS AT GSS

West Pender Street Vancouver, BC V6C 2V6 Tel: Fax: TSX-V: GBR NEWS RELEASE

BALMORAL INTERSECTS 1,138 g/t (33 oz/ton) GOLD OVER 4.87 METRES, BUG LAKE FOOTWALL ZONE, DETOUR GOLD TREND PROJECT, QUEBEC

MANN SILVER-COBALT MINE. PORE: TSXV PowerOre.com

ET and and and

AVION GOLD DJAMBAYE II ZONE, TABAKOTO PROJECT, MALI, RETURNS HIGH GRADE INTERCEPTS OF 7.56 G/T Au OVER 7.0 METRES AND G/T Au OVER 3.

ANTLER GOLD EXPLORATION UPDATE, WILDING LAKE GOLD PROJECT, NEWFOUNDLAND

GOLDEN MINERALS DISCOVERS ADDITIONAL HIGH GRADE VEINS AT SANTA MARIA RESULTS UP TO 1.88 g/t Au and 648 g/t Ag

OSISKO INTERSECTS 36 g/t Au OVER 6.9 METRES AT LYNX

Drilling Extending Mineralization in La Mina North Zone

July Exploring for Canadian Gold in the Rainy River District of Ontario

At the contact, mineralization is associated with strong tourmalinization of the Bevcon Intrusion.

COPPER MOUNTAIN COMPLETES PHASE 2 DRILL PROGRAM AT NEW INGERBELLE WITH CONTINUED POSITIVE RESULTS

Trading Symbol: ADA TSX-V; C2Z-Frankfurt Press Release No Shares Outstanding: 104,808,584 November 1, 2006

MINERAL MOUNTAIN RESOURCES LTD. MMV.TSX-V

BELO SUN RELEASES RESULTS FOR 74 ADDITIONAL DRILL HOLES AT ITS VOLTA GRANDE PROJECT

OSISKO INTERSECTS 37.0 g/t Au OVER 5.4 METRES AT OSBORNE-BELL Infill Drilling Continues to Confirm High-Grade

NEWS RELEASE ORCA GOLD INDICATED AND INFERRED RESOURCES AT BLOCK 14 INCREASE BY 24% AND 48% RESPECTIVELY

KIRKLAND LAKE GOLD EXPANDS NEW HIGH-GRADE ZONE BELOW TAYLOR MINE, REPORTS MINERALIZED EXTENSIONS ALONG STRIKE AND AT DEPTH

Marathon Announces Discovery of New High-Grade Gold Zone in Marathon Area and Sprite Zone Drilling Results, Valentine Lake Gold Camp

Hole (93) From (m) To (m) m Au (g/t) Ag (g/t) Cu (%) Pb (%) Zn (%) CMLP

Melkior retains Geologica to complete a NI report on its Launay property, Québec

NEWS RELEASE August 8, 2018

BELO SUN DISCOVERS NEW MINERALIZED ZONE AT ITS VOLTA GRANDE GOLD PROJECT, BRAZIL

Drilling Extending Mineralization in La Mina North Zone

April Exploring for Canadian Gold in the Rainy River District of Ontario

Queenston Announces 112% Increase in Indicated Resource (to 1.5 M oz. gold) and 16% Increase in Inferred Resource (to 0.7 M oz. gold) at Upper Beaver

June 4, 2015 News Release Valley of the Kings Underground Infill Drilling Underway

News Release. Infill Drilling Program

July 15, 2015 News Release Valley of the Kings Underground Infill Drilling Progresses

OSISKO INTERSECTS 115 g/t Au OVER 8.4 METRES AT LYNX. Interval (m)

23 January, 2018 CSE: RFR For Immediate Release. Renforth extends Parbec Gold Deposit strike 60m with gold in all 7 drillholes

PRESS RELEASE WESDOME PLANS AGGRESSIVE DRILLING AND DEVELOPMENT PROGRAM IN 2011

Northern Dynasty Minerals Ltd.

NEWS RELEASE. Tigray Intersects 28.2 metres at 8.50 grams per tonne gold at Mato Bula, Adyabo Project, Northern Ethiopia

HIGHLIGHTS INCLUDE: ^ Includes 466g/t Au Includes 153g/t Au + Includes 45.3g/t Au

WESDOME ANNOUNCES HIGH GRADE GOLD DISCOVERY AT KIENA COMPLEX IN VAL D OR QUEBEC

Corvus Gold Drills g/t Gold, Extends Mother Lode Sediment Hosted Gold System to at Least 450 Metres Along Strike

Pahtavaara Drill Program Intersects 32.8 G/T Gold Over 2.0M And 2.1 G/T Gold Over 18.0M In The Karoliina Zone

QMX GOLD INTERSECTS 29.8 G/T AU OVER 3.0 METERS AND 19.3 G/T AU OVER 3.2 METERS AT BONNEFOND

Teranga Gold s Golden Hill Drill Results Include More High-Grade Gold at Multiple Prospects

NEWS RELEASE August 10, 2017

NEWS RELEASE GOLD CANYON INTERCEPTS 286 METERS AT 1.03 GRAMS PER TONNE GOLD CONFIRMING NORTHEAST DIP OF PORTAGE ZONE AT SPRINGPOLE GOLD PROJECT

ANTLER GOLD HIGHLIGHTS NEW GOLD-IN-SOIL ANOMALIES, CENTRAL NEWFOUNDLAND

FALCO PACIFIC COMPLETES INITIAL MODEL FOR THE HORNE 5 GOLD/SILVER/ZINC/COPPER DEPOSIT

MEDIA RELEASE OCEANAGOLD ANNOUNCES FURTHER DOWN DIP EXTENSIONS OF MINERALISATION AT PANEL 2: FRASERS UNDERGROUND MINE

Yorbeau identifies two new exciting exploration targets at the Rouyn Property

Highlights from the four holes announced in this news release include:

October 8, 2015 News Release Brucejack Regional Drilling Intersects Over 8,000 Grams Per Tonne Gold

NEWS RELEASE July 26, 2018

NEWS RELEASE. Foran Intersects Over 28 Metres of Copper Mineralization

AUC.V PRESS RELEASE NO. 01/06

BALMORAL CONTINUES TO EXPAND GRASSET NI-CU-PGE DISCOVERY

SALAZAR ANNOUNCES AN UPDATED RESOURCE REPORT OF 5.53 MT INDICATED AND 1.46 MT INFERRED AT ITS HIGH GRADE VMS EL DOMO DEPOSIT

OSISKO INFILL 38.9 g/t Au OVER 13.7 METRES AT UNDERDOG Infill Drilling Continues to Intersect High Grade

NEWS RELEASE. March 22, 2017

NEWS RELEASE. Mountain Province Diamonds Completes the Kennady North Winter Exploration Program

V Sample from C.O.D vein 15 metres southwest of V

June 4, 2014 News Release Valley of the Kings Exploration Program Underway; Project Update

NEWS RELEASE. Evrim and Harvest Gold Complete Drilling at Cerro Cascaron

Transcription:

TSX: IMG NYSE: IAG NEWS RELEASE IAMGOLD CONTINUES TO INTERSECT HIGH GRADES AT MONSTER LAKE Toronto, Ontario, June 14, 2018 IAMGOLD Corporation ( IAMGOLD or the Company ) today announced assay results from the 2018 winter drilling program completed at its Monster Lake joint venture project (currently held by IAMGOLD Corporation: 50%, TomaGold Corporation: 45%, and Quinto Resources Inc.: 5% on the Monster Lake claims block with IAMGOLD continuing to advance its option to earn in up to a 75% interest). The project is located 50 kilometres southwest of Chibougamau, Quebec, Canada. The company is reporting the final assay results from all 26 drill holes, totaling 8,282 metres, completed as part of the initial 2018 program. The assay results are provided in Table 1 below and include the following highlights: (A drill hole plan map and longitudinal sections are attached to this news release.) 325 - Megane Zone and : Drill hole ML18-212: 3.83 metres grading 23.96 g/t gold o Includes: 1.30 metres grading 67.22 g/t gold Drill hole ML18-213: 3.84 metres grading 39.24 g/t gold o Includes: 1.09 metres grading 127.4 g/t gold Drill hole ML18-217: 5.32 metres grading 40.94 g/t gold o Includes: 0.70 metres grading 251.0 g/t gold Drill hole ML18-225: 2.62 metres grading 72.17 g/t gold o Includes: 1.75 metres grading 107.3 g/t gold Lower Shear Zone: Drill hole ML18-224: 4.32 metres grading 32.07 g/t gold o Includes: 0.74 metre grading 134.0 g/t gold Drill hole ML16-176B Ext : 0.70 metres grading 14.10 g/t gold The Monster Lake joint venture project hosts an NI 43-101 compliant resource, effective as at February 26, 2018, comprising 1,109,700 tonnes of inferred resources averaging 12.14 grams of gold per tonne for 433,300 ounces of contained gold (see news release dated March 28, 2018). The 2018 winter drilling program was designed to improve confidence in the continuity of the mineralization and to test for extensions of the known mineralized zones. Key objectives of the drilling program included: infill drilling targeting the upper part of the 325-Megane Zone largely delineated by only historical drilling; testing for proximal extensions along strike and at depth; and evaluating newly discovered areas of mineralization within a structure parallel to the and adjacent to the 325-Megane Zone, referred to as the Lower Shear Zone. All of the areas targeted in this program are best accessed during the winter when the ground is frozen. Craig MacDougall, Senior Vice President, Exploration for IAMGOLD, stated: We continue to be impressed with both the continuity and the high grades demonstrated by infill drilling of the 325-Megane Zone. Although confirming resource extensions and expanding additional areas of mineralization has proved to

be challenging for our exploration team, this style of mineralization remains an attractive exploration target. As I have said before, we believe the structural setting suggests favourable potential for the occurrence of additional mineralized shoots along the Monster Lake structural corridor and we continue to evaluate this setting for additional zones of mineralization. Next Steps These results will be incorporated into the deposit model and used to update the mineral resources to guide the next drilling programs. Ongoing geochemical and structural studies will continue to support exploration targeting. A further round of drilling is being planned to test specific structural targets which are accessible in the summer season. About the Monster Lake Project The Monster Lake project is underlain by Archean volcanic rocks of the Obatogamau Formation and is traversed by an important deformation corridor and associated gold-bearing mineralized structures. Historical drilling and exploration by TomaGold Corporation ( TomaGold ) have identified a four-kilometre long structural corridor, along which most of the known gold occurrences discovered to date on the property are associated, including the Megane Zone. The Monster Lake Project is held under an earn-in option to joint venture agreement with TomaGold. The Company holds an undivided 50% interest in the property, and holds an option to earn a further 25% undivided interest, for a total 75% undivided interest in the Project, should it spend a total of C$10.0 million on the Project within a seven year period, beginning January 1, 2015. Should a development decision be made by the joint venture, or should the joint venture declare commercial production, TomaGold would be entitled to a further C$1.0 million payment. Under the terms of the option agreement, IAMGOLD continues to conduct exploration on the project with a view to increase its ownership to 75%. On August 14, 2017, IAMGOLD subscribed for 27.7 million common shares of TomaGold from treasury representing 19.98% of the outstanding common shares of TomaGold. The common shares were purchased at a price of C$0.09 per common share, for an aggregate purchase price of C$2.5 million. Prior to the acquisition, IAMGOLD did not hold any common shares of TomaGold. Technical Information and Quality Control Notes The drilling results contained in this news release have been prepared in accordance with National Instrument 43-101 Standards of Disclosure for Mineral Projects ("NI 43-101"). The "Qualified Person" responsible for the supervision of the preparation and review of this information is Marie-France Bugnon, P. Geo., General Manager Exploration. Marie-France is considered a "Qualified Person" for the purposes of National Instrument 43-101 with respect to the technical information being reported on. The technical information has been included herein with the consent and prior review of the above noted Qualified Person. The Qualified person has verified the data disclosed, and data underlying the information or opinions contained herein. The sampling of, and assay data from, the drill core is monitored through the implementation of a quality assurance - quality control (QA-QC) program designed to follow industry best practice. Drill core (NQ size) samples are selected by the IAMGOLD geologists and sawn in half with a diamond saw at the project site. Half of the core is retained at the site for reference purposes. Sample intervals may vary from half a metre to one and a half metres in length depending on the geological observations. Samples are transported in sealed bags to ALS Minerals Laboratory located in Val-d Or, Québec. Samples are coarse crushed to a -10 mesh and then a 1,000 gram split is pulverized to 95% passing -150 mesh. ALS Minerals processes analytical pulps directly at their facilities located in Val-d Or which is ISO / IEC 17025 certified by the Standards Council of Canada. Samples are analyzed using a standard fire assay with a 50 gram charge with an Atomic Absorption (AA) finish. For samples that return assay values over 5.0 grams per tonne (g/t), another pulp is taken and fire assayed with a gravimetric finish. Core samples showing visible gold or samples which have returned values greater than 10.0 g/t are re-analyzed by pulp metallic analysis. IAMGOLD inserts blanks and certified reference standard in the sample sequence for quality control. page 2 of 6

Forward Looking Statement This news release contains forward-looking statements. All statements, other than of historical fact, that address activities, events or developments that the Company believes, expects or anticipates will or may occur in the future (including, without limitation, statements regarding expected, estimated or planned gold production, cash costs, margin expansion, capital expenditures and exploration expenditures and statements regarding the estimation of mineral resources, exploration results, potential mineralization, potential mineral resources and mineral reserves) are forward-looking statements. Forward-looking statements are generally identifiable by use of the words will, should, continue, expect, anticipate, estimate, believe, intend, to earn, to have, plan or project or the negative of these words or other variations on these words or comparable terminology. Forward-looking statements are subject to a number of risks and uncertainties, many of which are beyond the Company s ability to control or predict, that may cause the actual results of the Company to differ materially from those discussed in the forward-looking statements. Factors that could cause actual results or events to differ materially from current expectations include, among other things, without limitation, failure to meet expected, estimated or planned gold production, cash costs, margin expansion, capital expenditures and exploration expenditures and failure to establish estimated mineral resources, the possibility that future exploration results will not be consistent with the Company's expectations, changes in world gold markets and other risks disclosed in IAMGOLD s most recent Form 40-F/Annual Information Form on file with the United States Securities and Exchange Commission and Canadian provincial securities regulatory authorities. Any forward-looking statement speaks only as of the date on which it is made and, except as may be required by applicable securities laws, the Company disclaims any intent or obligation to update any forward-looking statement. About IAMGOLD IAMGOLD (www.iamgold.com) is a mid-tier mining company with four operating gold mines on three continents. A solid base of strategic assets in North and South America and West Africa is complemented by development and exploration projects and continued assessment of accretive acquisition opportunities. IAMGOLD is in a strong financial position with extensive management and operational expertise. For further information please contact: Ken Chernin, VP Investor Relations, IAMGOLD Corporation Tel: (416) 360-4743 Mobile: (416) 388-6883 Laura Young, Director, Investor Relations, IAMGOLD Corporation Tel: (416) 933-4952 Mobile: (416) 670-3815 Martin Dumont, Senior Analyst Investor Relations, IAMGOLD Corporation Tel: (416) 933-5783 Mobile: (647) 967-9942 Toll-free: 1-888-464-9999 info@iamgold.com Please note: This entire news release may be accessed via fax, e-mail, IAMGOLD's website at www.iamgold.com and through CNW Group s website at www.newswire.ca. All material information on IAMGOLD can be found at www.sedar.com or at www.sec.gov. Si vous désirez obtenir la version française de ce communiqué, veuillez consulter le http://www.iamgold.com/french/home/default.aspx. page 3 of 6

Table 1 Hole No. UTM NAD83 Zone18 AZ DIP EOH From To Interval True Width (2) Au (1) (3) NOTE Easting Northing Elevation ( ) ( ) (m) (m) (m) (m) (m) (g/t) ML-18-211 5488114,44 520231,34 370,73 284-50 657 466,00 468,00 2,00 1,75 1,11 ML-18-212 5488256,00 519817,79 368,61 290-50 162 26,00 31,00 5,00 3,83 23,96 Including 27,30 29,00 1,70 1,30 67,22 ML-18-213 5488285,18 519847,97 369,01 290-45 189 38,10 38,80 0,70 0,61 1,18 48,10 52,50 4,40 3,84 39,24 Including 49,00 50,25 1,25 1,09 127,38 53,25 54,15 0,90 0,79 1,45 137,80 140,00 2,20 1,92 0,90 Low er Shear Zone ML-18-214 5488323,46 519891,80 369,33 290-45 183 68,87 70,65 1,78 1,55 1,46 78,20 81,45 3,25 2,84 3,81 ML-18-215 5488070,54 520115,27 370,56 290-52 534 370,60 372,70 2,10 1,83 1,32 ML-18-216 5488302,00 519918,23 369,60 310-45 147 101,60 102,77 1,17 1,02 0,97 111,45 113,30 1,85 1,61 34,78 ML-18-217 5488301,62 519918,57 369,55 315-57 279 118,80 119,80 1,00 0,87 8,35 120,80 121,80 1,00 0,87 2,01 123,90 130,00 6,10 5,32 40,94 Including 125,40 126,20 0,80 0,70 251,00 133,10 134,60 1,50 1,31 0,80 ML-18-218 5488241,38 520172,85 370,73 289-60 549 75,90 77,10 1,20 1,05 1,69 E-W (az N70 ) Shear Zone 537,50 539,20 1,70 1,48 2,40 Low er Shear Zone ML-18-219 5488301,33 519918,87 369,56 315-67 192 138,00 143,30 5,30 4,63 1,09 ML-18-220 5488363,06 519895,62 369,24 290-45 177 60,60 63,90 3,30 2,88 2,31 69,80 70,80 1,00 0,87 1,08 ML-18-221 5488378,04 519918,88 369,44 295-45 99 76,10 77,83 1,73 1,51 1,47 88,80 90,00 1,20 1,05 1,92 ML-18-222 5488377,73 519919,52 369,37 295-63 147 88,70 98,70 10,00 8,73 1,31 Including 88,70 91,70 3,00 2,62 2,83 ML-18-223 5488377,54 519919,92 369,35 300-75 153 113,55 115,72 2,17 1,89 3,09 125,05 129,90 4,85 4,23 3,75 ML-18-224 5488225,13 520136,93 370,54 290-59 549 98,80 100,00 1,20 1,05 1,21 E-W Shear Zone 513,80 518,75 4,95 4,32 32,07 Including 515,80 516,65 0,85 0,74 134,00 ML-18-225 5488335,41 519981,46 370,01 294-59 228 175,50 178,50 3,00 2,62 72,17 Including 175,50 177,50 2,00 1,75 107,30 182,50 183,50 1,00 0,87 4,33 ML-18-226 5488220,05 520004,76 369,73 290-52 369 220,30 220,97 0,67 0,58 2,86 ML-18-227 5488408,63 520071,67 370,52 315-70 465 287,40 288,75 1,35 1,18 5,55 292,30 293,40 1,10 0,96 1,15 ML-18-228 5488219,90 520005,26 369,74 290-62 417 245,60 248,60 3,00 2,62 0,52 356,00 356,50 0,50 0,44 1,43 Low er Shear Zone ML-18-229 5488476,86 520177,74 370,98 292-64 519 336,00 340,35 4,35 3,80 4,52 Including 348,54 349,27 0,73 0,64 3,79 ML-18-230 5488170,98 519966,54 369,37 290-48 345 14,05 15,60 1,55 1,35 6,52 E-W (az N70 ) Shear Zone ML-18-231 5488593,39 520195,11 370,93 290-70 501 No significant results 193,35 194,35 1,00 0,87 0,74 259,50 260,10 0,60 0,52 1,05 284,00 288,20 4,20 3,67 0,46 ML-18-232 5488717,30 520216,88 372,12 293-45 390 217,60 219,55 1,95 1,70 0,77 222,90 223,90 1,00 0,87 0,93 ML-18-233 5488700,24 520144,84 371,24 290-60 324 116,65 117,55 0,90 0,79 1,43 E-W Shear Zone 182,00 186,10 4,10 3,58 1,47 ML-18-234 5488716,64 520218,46 372,00 300-60 417 373,30 375,80 2,50 2,18 2,97 Low er Shear Zone ML-16-176B Ext 5488282,89 520128,70 370,72 283-60 M-13-102 Ext 5488281,57 520129,45 370,59 290-63 Monster Lake Project Drilling Final Results - 2018 Winter Drilling Program (+101m) EOH 551 (+123m) EOH 507 469,55 470,35 0,80 0,70 14,10 Low er Shear Zone No significant results Low er Shear Zone Low er Shear Zone Low er Shear Zone Notes: 1. Drill hole intercepts are calculated using a 0.50 g/t Au assay cut-off. 2. True widths of intersections are approximately 85 to 90% of the core interval. 3. Assays are reported uncut but high grade sub-intervals are highlighted. page 4 of 6

page 5 of 6

page 6 of 6