News Release February 27, 2014 TSX SYMBOL: COP

Similar documents
News Release September 6, 2016 TSX SYMBOL: COP

BENTON ADVISED THAT CORO INTERSECTS 0.71%CuT AND 0.99%CuT AT ITS EL DESESPERADO PROJECT, IN THE CHUQUICAMATA DISTRICT, CHILE

News Release October 4, 2016 TSX SYMBOL: COP

Coro Reports a Significantly Increased Resource Estimate for the Marimaca Claim

Coro Reports Maiden Resource Estimate for the Marimaca Project

MONETA INTERCEPTS g/t GOLD INCLUDING g/t GOLD AT SOUTH WEST

MONETA INTERCEPTS g/t GOLD INCLUDING g/t GOLD AND g/t GOLD INCLUDING g/t GOLD AT SOUTH WEST

Cordoba Minerals Provides an Update on Exploration Activities at the San Matias Copper-Gold Project in Colombia

BELO SUN RELEASES RESULTS FROM 65 DRILL HOLES FURTHER EXTENDING THE OURO VERDE DEPOSIT ALONG STRIKE NORTHWEST AND DOWN DIP

NGEX DRILLS 42 METRES OF 1.13 G/T GOLD AND G/T SILVER AT FILO DEL SOL PROJECT

Pacific Empire Minerals Provides Copper King RC Drilling Results

Highlights include: Hole TTD050: 6.12 g/t Au over 7.00 metres from metres o Including g/t Au over 1.18 metres

Atacama Pacific Drills 208 Metres Grading 0.60 g/t Gold at Cerro Maricunga. Reports Further Positive Metallurgical Test Results

ET and and and

MINAURUM GOLD INC : : News Releases

(TSXV: GPLY, OTCQB: GLYXF

COPPER MOUNTAIN COMPLETES PHASE 2 DRILL PROGRAM AT NEW INGERBELLE WITH CONTINUED POSITIVE RESULTS

BELO SUN INTERSECTS NEW HIGH GRADE ZONE AT GROTA SECA AND EXPANDS GRANDE DEPOSIT

NGEX INTERSECTS 1.45% COPPER OVER 97.6 METRES AND G/T SILVER OVER 36 METRES AT FILO DEL SOL PROJECT

Revelo Completes Geological Review of its Montezuma Copper-Gold Project & Defines Priority Targets

LH Property Update: Magnum Goldcorp Hits High Grade Gold 16.9 m of g/t, including 10.9 m of g/t, and as well, 11 m of 20.

LME m averaging 0.65 g/t Au and 0.32% Cu, or 1.19 g/t Au Equiv LME m averaging 0.64 g/t Au and 0.11% Cu, or 0.

BELO SUN RELEASES RESULTS FOR 74 ADDITIONAL DRILL HOLES AT ITS VOLTA GRANDE PROJECT

Drilling at Perseverance in Arizona, USA Suggests Proximity to Porphyry Copper System

DRILLING EXPANDS SIGNIFICANT COPPER-GOLD PORPHYRY SYSTEM AT IVANHOE S KHARMAGTAI PROJECT IN MONGOLIA

GOLDPLAY ANNOUNCES FURTHER SAMPLING RESULTS FROM SAN MARCIAL HISTORICAL CORE; CONFIRMS OPEN PIT TARGET NEAR SURFACE WITH gpt AgEq.

Minsud to recommence resource outline diamond drilling at the Chita Valley Cu- Au-Ag-Mo Project, San Juan, Argentina

Yorbeau identifies two new exciting exploration targets at the Rouyn Property

FILO EXPANDS OXIDE COPPER AND GOLD ZONES - DRILLING INTERSECTS 0.77% COPPER OVER 102 METRES AND 0.73 G/T GOLD OVER 112 METRES

CREATING VALUE THROUGH DISCOVERY IN SOUTH AMERICA. Lara Copper Project. Lara 45%-Owned Property in Southern Peru

A B C PAD A HIGHLIGHTS

Pershing Gold Extends High-Grade Mineralization through Step-Out Drilling in Phase 1 and Initiates Phase 2 Drilling Program

FILO MINING DRILLS 50 METRES OF G/T SILVER, 0.56% COPPER, 0.50 G/T GOLD AND 36 METRES OF 1.45% COPPER AT FILO DEL SOL

AbraPlata defines gold-rich zone with up to 16.7g/t Au over 10.6m in the basement at its Diablillos property in Argentina

NEWS RELEASE. Evrim announces initial drilling results at Cuale Gold Project in Mexico

BELO SUN DISCOVERS NEW MINERALIZED ZONE AT ITS VOLTA GRANDE GOLD PROJECT, BRAZIL

SAMPLE ID SAMPLE TYPE Au (g/t) Ag (g/t) Cu (%) AuEq**(g/t)

Revelo Defines Porphyry Copper Targets at its Calvario Project

Fortuna provides review of Brownfields exploration programs

Pahtavaara Drill Program Intersects 32.8 G/T Gold Over 2.0M And 2.1 G/T Gold Over 18.0M In The Karoliina Zone

For Immediate Release May 21, 2002

Rich Saddle North Au-Cu-Ag Porphyry Expands by 275m Along Strike and 250m Down-Dip

No SIERRA METALS CONTINUES TO EXPAND MINERALIZATION AT ITS BOLIVAR MINE, CHIHUAHUA STATE, MEXICO

PUMA EXPLORATION AND TREVALI MINING CORPORATION DRILLED 13.1% Zn, 4.8% Pb OVER 27.0 METERS AT MURRAY BROOK DEPOSIT

Corvus Gold Drills g/t Gold, Extends Mother Lode Sediment Hosted Gold System to at Least 450 Metres Along Strike

MINERA ALAMOS TO COMMENCE DRILLING AIMED AT EXPANDING AREAS OF DEFINED GOLD MINERALIZATION AT SANTANA/LOS VERDES PROPERTY, SONORA, MEXICO

INFILL DRILLING EXPANDS MINERALIZATION IN HIGH-GRADE GOLD-COPPER CORE AT SOUTHWEST DISCOVERY ZONE TURQUOISE HILL PROJECT, MONGOLIA

Pershing Gold Hits Highest Grade Gold to Date in Relief Canyon with Grams per Tonne (3.618 Ounces per Ton) Intercept

Surface Trenching Highlights. Santos Target. To (m) Width (m) Au (g/t) Comment. (m) Santos (1)-includes internal dilution

BK Copper Project Strong Copper Results Confirm and Extend BKM

Highlights from the four holes announced in this news release include:

ENTRÉE GOLD REPORTS ADDITIONAL RESULTS FROM DRILLING ON JAVHLANT LICENSE, MONGOLIA

DRILLING AT ASCOT S PREMIER PROPERTY EXTENDS GOLD MINERALIZATION 150 METRES WEST TOWARDS UNDERGROUND PORTAL

NEWS RELEASE NOVEMBER 28th, 2017 Trading Symbols: TSX-V: AMZ; OTCQX: AXDDF

NEWS RELEASE. Tigray Intersects 28.2 metres at 8.50 grams per tonne gold at Mato Bula, Adyabo Project, Northern Ethiopia

Asiamet Drilling Further Extends BKM Mineralisation

True Width (m) Carneritos to

5.65 m of g/t gold and 25.1 g/t silver (vertical hole) 4.15 m of g/t gold and 12.2 g/t silver (vertical hole)

OSISKO METALS INTERSECTS 10.49% ZINC+LEAD OVER METRES AND 12.15% ZINC+LEAD OVER METRES AT PINE POINT

IDM Mining s Underground Drilling Intersects g/t Au and g/t Ag over 6.80 Meters True Width at the Red Mountain Gold Project

Revelo Reports on Initial Drill Test of its Cerro Buenos Aires Project

NEWS RELEASE. Empire Mining Corporation 1090 Hamilton Street Vancouver, B.C. V6B 2R9

West Pender Street Vancouver, BC V6C 2V6 Tel: Fax: TSX-V: GBR NEWS RELEASE

NEWS RELEASE CANADIAN ZINC REPORTS REMAINING DRILL RESULTS AT LEMARCHANT DEPOSIT, SOUTH TALLY POND PROJECT, NEWFOUNDLAND

Sherlock drilling returns best intercept to date of 0.63% Cu and 7.45 g/t Ag over m

News Release No GOLD AND COPPER MINERALIZATION DISCOVERED DURING PHASE 2 EXPLORATION AT THE MCBRIDE PROPERTY

MINERAL MOUNTAIN RESOURCES LTD. MMV.TSX-V

ANTLER GOLD EXPLORATION UPDATE, WILDING LAKE GOLD PROJECT, NEWFOUNDLAND

Drilling Extending Mineralization in La Mina North Zone

NEWS RELEASE. Evrim and Harvest Gold Complete Drilling at Cerro Cascaron

Underground Exploration Drilling Complete; Brucejack Mineralization Extends to the East

CANARC RESOURCE CORP Howe Street Vancouver, BC V6C 2T6. News Release

NEWS RELEASE. Evrim announces additional drilling results at Cuale Gold Project in Mexico

Bellhaven Adds Gold at the El Limon Target at the La Mina Project, Colombia

October 8, 2015 News Release Brucejack Regional Drilling Intersects Over 8,000 Grams Per Tonne Gold

News Release. Canarc Continues to Intersect High-Grade Gold at Fondaway Canyon, Nevada, Including 3.24 Grams per Tonne Gold over 12.

The ALTPF: OTCQB 9AJ1: FWB Altiplano Provides 2017 Exploration Update For Its Maria Luisa and Farellon Projects, Chile

Northern Dynasty Minerals Ltd.

GOLDEN MINERALS DISCOVERS ADDITIONAL HIGH GRADE VEINS AT SANTA MARIA RESULTS UP TO 1.88 g/t Au and 648 g/t Ag

NEWS RELEASE. March 22, 2017

NEWS RELEASE LATEST EXPLORATION PROGRAM CONTINUES TO DEMONSTRATE NARANJILLO AS A HIGH GRADE SILVER HOST

Bellhaven Expands the Middle Zone Prospect with New Drilling: Advances toward New Resource in First Half of 2012

NEW GOLD AND COPPER DISCOVERY IN CENTRAL OYU ZONE AT TURQUOISE HILL PROJECT IN MONGOLIA S GOBI DESERT REGION

Salazar intersects metres (13.07m true) averaging 2.65 g/t gold, g/t silver, 1.32% copper, 6.63% zinc at its Curipamba Project.

NEWS RELEASE. Highlights:

SAVARY GOLD DRILLING EXTENDS KNOWN ZONES AND INTERSECTS SIGNFICANT GOLD MINERALIZATION AT FOUR NEW TARGETS

Drilling Extending Mineralization in La Mina North Zone

A New Direction. Copper-Gold Deposit at Thor TSX.V:COL. August 11, May 2013

Novo Resources Corp. Suite West Georgia Street Vancouver, BC V6E 3C9

NEWS RELEASE Ocean Park Ventures Identifies Large Multi-Structure Sulfide Mineralized System Trapper Gold Project, British Columbia

TIGER INTERNATIONAL RESOURCES, INC. (TGR.V) NEWS RELEASE - JUNE 18 th, 2015

Goldcrest Resources Ltd.

NGEX ANNOUNCES COPPER GOLD DISCOVERY AT NACIMIENTOS PROJECT

INV METALS ANNOUNCES DRILL RESULTS AT LOMA LARGA AND INITIAL PROSPECTING RESULTS ON NEW REGIONAL PROPERTIES

Nortec Minerals reports Assays, Phase 1 drilling, Tom 1 North - Priority 1 Target, Tomboko Gold Property, Northeast Guinea, West Africa

Assay Results Highlights (as of November 16, 2017) representing approximately 4,500 metres ( m ) of drilling:

36 Holes drilled in an approximate 100 meter by 100 meter grid covering an area of 1,000 meters long by 400 meters depth

OSISKO INFILL 38.9 g/t Au OVER 13.7 METRES AT UNDERDOG Infill Drilling Continues to Intersect High Grade

GOLDPLAY OUTLINES FIVE NEW EXPLORATION TARGETS AT THE SAN MARCIAL PROJECT IN MEXICO

Timberline Completes Technical Reports on the Elder Creek and Paiute Porphyry Copper-Gold Projects, Nevada

Transcription:

Suite 1280 625 Howe St Vancouver, B.C. V6C 2T6 February 27, 2014 TSX SYMBOL: COP www.coromining.com CORO ANNOUNCES DRILLING RESULTS FROM ITS EL DESESPERADO PROJECT, CHILE February 27 2014, Coro Mining Corp. ("Coro" or the "Company") (TSX Symbol: COP) Coro has recently completed a 5 hole, 1191m diamond drilling program (EDH-01 to 05) and a 7 hole, 950m reverse circulation drilling program (CED-R-9 to 15) at its El Desesperado copper project, located 7 km NW of the city of Calama in the II Region of Chile, and immediately west of Codelco s Toki Cluster of copper deposits (Figure 1). The objective of this drilling program was to confirm the presence of significant near surface leachable copper mineralization contained within a partially oxidized chalcocite blanket, similar to that intersected in our 2012 drilling. Assay results and drill description for the program are summarized below; Table 1; Drill Intersections Hole From To m CuT% CuS% EDH-01 12.8 28 15.2 0.26 0.19 16 40 24 0.26 0.25 EDH-03 46 52 6 0.38 0.35 56 68 12 3.03 2.22 EDH-04 20 30 10 0.39 0.28 CED-R-11 32 68 36 0.32 0.24 CED-R-12 6 32 26 0.40 0.38 EDH-01, 03 & 04 and CED-R-11 & 12 intersected the same partially oxidized and leached chalcocite blanket as CED-R-04, but significantly thinner. EDH-05 was a diamond tail of RC hole CED-R-04 drilled in November 2012 which intersected 204m at 0.55%CuT from surface before the hole was lost. Core logging of EDH-05 indicates that the RC hole was lost in a major fault and only sporadic mineralization was encountered at depth. EDH-02 was targeted at intersecting primary mineralization at depth beneath the old workings; trace amounts of bornite and chalcopyrite were intersected over a 48m width, but this mineralization did not return copper assays in excess of 0.2%CuT. CED-R-9, 10, 13, 14 and 15 were drilled to test possible extensions to the N and E but did not intersect significant mineralization and were not assayed. Alan Stephens, President and CEO of Coro commented, These results indicate that the supergene mineralization is of more reduced dimensions than we had expected, due to a more pronounced structural control; a greater degree of leaching; and the presence of a post mineral porphyry and breccia complex which has invaded the prospective area (Figure 2). A major

NNE oriented fault, as well as NW oriented structures, appear to have influenced blanket thickness, and the NNE Main Fault may also be controlling the emplacement of primary mineralization. Finally, the copper oxides are present partly in the form of water soluble copper sulphates and it is possible that some of this copper may have been washed away during diamond drilling, particularly in more heavily fractured core. The area drilled is some 200-300m topographically higher than the adjacent Toki deposits and this is reflected in the higher level alteration assemblage at El Desesperado. Mineralization identified so far is almost entirely supergene in nature and is associated with quartz-sericite-pyrite (QSP) alteration of Triassic sediments, particularly where these have been converted to a crackle breccia; and of a hydrothermal breccia emplaced in the Main Fault. The primary driver for this QSP alteration and supergene chalcocite has not yet been found, but may be a Toki style porphyry copper system located at depth. The trace amounts of bornite intersected in EDH-02 support this concept. As recently announced, Coro has agreed a three month extension to the February 17 th 2014 option payment with the property owners, at a cost of US$20,000 per month. During this period, we will evaluate all of the available data and determine our next course of action. Table 2; Collar Coordinates Hole East North Elev Az Inc TD EDH-01 501103 7520475 2515 260-60 249.25 EDH-02 501230 7520546 2468 260-55 351 EDH-03 501047 7520478 2517 240-60 218 EDH-04 501019 7520563 2529 240-60 220 EDH-05 501061 7520473 2513 0-90 153 CED-R-9 501051 7520803 2535 0-90 240 CED-R-10 501138 7520744 2531 0-90 160 CED-R-11 501052 7520509 2522 0-90 120 CED-R-12 501002 7520503 2499 0-90 120 CED-R-13 501048 7520616 2506 0-90 120 CED-R-14 501100 7520622 2505 0-90 120 CED-R-15 501145 7520652 2502 0-90 70 Sampling and Assay Protocol The mineralized sections of diamond drill holes were sampled on a 2m continuous basis, with core samples split on site and one half delivered to the Andes Analytical Assaying ("AAA") prep lab by Coro personnel. The remaining core was stored at a Coro facility for reference. Pulp samples were transported to the AAA assay laboratory in Santiago by AAA personnel.

RC holes CED-R-11 & 12 were sampled on a 2 m continuous basis, with dry samples riffle split on site and one quarter sent to the Andes Analytical Assaying prep lab by Coro personnel. A second quarter was stored on site for reference. Samples were prepared using the following standard protocol: drying, crushing to better than 80% passing -10#, homogenizing, splitting and pulverizing a 400 g subsample to 95% passing -150#. All samples were assayed for CuT, CuS and Mo by AAS. A full QA/QC program, involving insertion of appropriate blanks, standards and duplicates was employed for the diamond drill core sampling with acceptable results. True widths have not been determined. About El Desesperado: The El Desesperado copper project, is located 7 km NW of the city of Calama in the II Region of Chile, and immediately west of Codelco's Toki Cluster of copper deposits. Sergio Rivera, Vice President of Exploration, Coro Mining Corp, a geologist with more than 31 years of experience and a member of the Colegio de Geologos de Chile and of the Instituto de Ingenieros de Minas de Chile, was responsible for the design and execution of the exploration program and is the Qualified Person for the purposes of NI 43-101. Alan Stephens, FIMMM, President and CEO, of Coro Mining Corp, a geologist with more than 38 years of experience, and a Qualified Person for the purposes of NI 43-101, is responsible for the contents of this news release. CORO MINING CORP. Alan Stephens Alan Stephens President and CEO About Coro Mining Corp.: The Company was founded with the goal of building a mining company focused on medium-sized base and precious metals deposits in Latin America. The Company intends to achieve this through the exploration for, and acquisition of, projects that can be developed and placed into production. Coro s properties include the Berta, El Desesperado, and Payen copper properties located in Chile and the advanced San Jorge copper-gold project, in Argentina. For further information please visit the Company s website at www.coromining.com or contact Michael Philpot, Executive Vice-President at (604) 682 5546 or investor.info@coromining.com This news release includes certain "forward-looking statements" under applicable Canadian securities legislation. Such forward-looking statements or information, including but not limited to those with respect to potential mineralization and geological comparisons involve known and unknown risks, uncertainties, and other factors which may cause the actual results, performance or achievements of the Company to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements or information. Such factors include, among others, the actual prices of copper, the factual results of current exploration, development and mining activities, changes in project parameters as plans continue to be evaluated, as well as those factors disclosed in the Company's documents filed from time to time with the securities regulators in the Provinces of British Columbia, Alberta, Saskatchewan, Manitoba, Ontario, New Brunswick, Nova Scotia, Prince Edward Island and Newfoundland and Labrador.

Figure 1; Location and Claim Map Showing Toki Cluster Deposits

Figure 2; Exploration Summary Plan