Proton. source. Antiproton CDF. source. Tevatron. Main Injector\ Recycler. CERN John Adams Lecture Shiltsev - December 13, 2010

Similar documents
RUN II LUMINOSITY PROGRESS*

Fermilab Collider Run II: Accelerator Status and Upgrades 1

FY04 Luminosity Plan. SAG Meeting September 22, 2003 Dave McGinnis

Run II Status and Prospects

ACHIEVEMENTS AND LESSONS FROM TEVATRON*

Run2 Problem List (Bold-faced items are those the BP Department can work on) October 4, 2002

Particle physics experiments

Accelerator Details: the Antiproton Source

Physics 736. Experimental Methods in Nuclear-, Particle-, and Astrophysics. - Accelerator Techniques: Introduction and History -

LHC Luminosity and Energy Upgrade

The FAIR Accelerator Facility

The TESLA Dogbone Damping Ring

Modern Accelerators for High Energy Physics

Tools of Particle Physics I Accelerators

Beam. RF antenna. RF cable

SLS at the Paul Scherrer Institute (PSI), Villigen, Switzerland

Accelerator development

Operational Experience with HERA

Short Introduction to CLIC and CTF3, Technologies for Future Linear Colliders

Accelerators. Lecture V. Oliver Brüning. school/lecture5

The achievements of the CERN proton antiproton collider

Advanced Design of the FAIR Storage Ring Complex

e + e Factories M. Sullivan Presented at the Particle Accelerator Conference June 25-29, 2007 in Albuquerque, New Mexico e+e- Factories

SPPC Study and R&D Planning. Jingyu Tang for the SPPC study group IAS Program for High Energy Physics January 18-21, 2016, HKUST

BEAM TESTS OF THE LHC TRANSVERSE FEEDBACK SYSTEM

US LHC Accelerator Research Program BNL - FNAL- LBNL - SLAC Hollow e-beam Lens for LHC Scraping

Large Hadron Collider at CERN

arxiv: v1 [physics.acc-ph] 18 Dec 2013

Luminosity for the 100 TeV collider

US LHC Accelerator Research Program BNL - FNAL- LBNL - SLAC Hollow e-beam Lens for LHC Scraping

Longitudinal stacking and electron cooling of ion beams in the ESR as a proof of principle for FAIR. C. Dimopoulou

Status of the ESR And Future Options

The Luminosity Upgrade at RHIC. G. Robert-Demolaize, Brookhaven National Laboratory

ELIC: A High Luminosity And Efficient Spin Manipulation Electron-Light Ion Collider Based At CEBAF

LHC accelerator status and prospects. Frédérick Bordry Higgs Hunting nd September Paris

General Considerations

Low Energy RHIC electron Cooling (LEReC)

Introduction to Elementary Particle Physics I

+ EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH CERN PS DIVISION. The CERN Antiproton Decelerator (AD) Operation, Progress and Plans for the Future

The MAX IV Thermionic preinjector

LC Commissioning, Operations and Availability

LHC upgrade based on a high intensity high energy injector chain

ELECTRON COOLING OF PB54+ IONS IN LEIR

Why a muon collider?

On-axis injection into small dynamic aperture

LHC Run 2: Results and Challenges. Roderik Bruce on behalf of the CERN teams

Much of this material comes from lectures given by Philippe Lebrun (head of CERN's Accelerator Technology Department), at SUSSP, Aug

III. CesrTA Configuration and Optics for Ultra-Low Emittance David Rice Cornell Laboratory for Accelerator-Based Sciences and Education

Compressor Ring. Contents Where do we go? Beam physics limitations Possible Compressor ring choices Conclusions. Valeri Lebedev.

Hollow Electron Beam Collimator: R&D Status Report

LHC Commissioning in 2008

Superconducting RF Accelerators: Why all the interest?

TLEP White Paper : Executive Summary

The Alignment Concept For The Fermilab Recycler Ring Using Permanent Magnets

PBL (Problem-Based Learning) scenario for Accelerator Physics Mats Lindroos and E. Métral (CERN, Switzerland) Lund University, Sweden, March 19-23,

RHIC - the high luminosity hadron collider

Tevatron Beam-Beam Phenomena and Counter-Measures

FAIR AT GSI. P. Spiller, GSI, Darmstadt, Germany

Survey and Alignment of the Fermilab Electron Cooling System

Practical Lattice Design

Remembering the Tevatron: The Machine(s)

LHC commissioning. 22nd June Mike Lamont LHC commissioning - CMS 1

Status Report on the Survey and Alignment Activities at Fermilab

Introduction to Collider Physics

Why do we accelerate particles?

Ion Polarization in RHIC/eRHIC

Status and Outlook of the LHC

Summary of lecture 1 and 2: Main ingredients in LHC success

Engines of Discovery

Current and Future Developments in Accelerator Facilities. Jordan Nash, Imperial College London

LHC. Construction Understanding first the commissioning. Prospects for

BEAM COOLING AT NICA COLLIDER

Fundamental Concepts of Particle Accelerators V : Future of the High Energy Accelerators. Koji TAKATA KEK. Accelerator Course, Sokendai

arxiv: v1 [physics.acc-ph] 21 Oct 2014

LHC Status and CERN s future plans. Lyn Evans

LHC operation in 2015 and prospects for the future

Diagnostics at the MAX IV 3 GeV storage ring during commissioning. PPT-mall 2. Åke Andersson On behalf of the MAX IV team

Spin-Filtering Studies at COSY

Statusreport. Status of the GSI accelerators for FRS operation. Jens Stadlmann (FAIR Synchrotrons)

Accelerators. Acceleration mechanism always electromagnetic Start with what s available: e - or p Significant differences between accelerators of

Particles and Universe: Particle accelerators

Why are particle accelerators so inefficient?

The Large Hadron electron Collider (LHeC) at the LHC

RHIC upgrades and capabilities for the next decade. Wolfram Fischer Brookhaven National Laboratory

First propositions of a lattice for the future upgrade of SOLEIL. A. Nadji On behalf of the Accelerators and Engineering Division

Thanks to all Contributors

Physics at Accelerators

Beam Cooling M. Steck, GSI Darmstadt CAS Advanced Accelerator Physics, Royal Holloway University of London, 3-15 September 2017

ELECTRON COOLING EXPERIMENTS IN CSR*

TeV Scale Muon RLA Complex Large Emittance MC Scenario

Physics 610. Adv Particle Physics. April 7, 2014

Diagnostics Needs for Energy Recovery Linacs

The Large Hadron Collider Lyndon Evans CERN

Lattice Design and Performance for PEP-X Light Source

Fermilab Program. Pier Oddone, Fermilab NAS Board of Physics and Astronomy, 2009

Colliders and the Machine Detector Interface

Contents. LC : Linear Collider. µ-µ Collider. Laser-Plasma Wave Accelerator. Livingston Chart 6 References

RHIC Electron Lens Commissioning

Longitudinal Momentum Mining of Beam Particles in a Storage Ring

The LHC Collider. STOA lecture, Brussels, 27 th November 2012 Steve Myers Director of Accelerators and Technology, CERN

Transcription:

Proton source Antiproton source CDF Tevatron DØ Main Injector\ Recycler CERN John Adams Lecture Shiltsev - December 13, 2010 1

Accelerator Breakthroughs, Achievements and Lessons from the Tevatron Collider Vladimir Shiltsev Fermilab John Adams Lecture December 13, 2010, CERN CERN John Adams Lecture Shiltsev - December 13, 2010 2

Intro: History Accelerators Physics of Beams: Stochastic cooling Electron cooling Slip stacking RF barrier buckets Content Beam-beam compensation Hollow e-beam collimator Sociology Summary Technology SC magnets Cryoplant Recycler magnets Plumbing : Magnet leads Zebra mussels Alignment Black tape Performance/outlook Achieved and plans CPT theorem & LHC CERN John Adams Lecture Shiltsev - December 13, 2010 3

Budker Lawrence Adams Wilson CERN John Adams Lecture Shiltsev - December 13, 2010 4

Jul 1983 Tevatron Collider Timeline Tevatron SC synchrotron commissioned, reached world record 512 GeV (protons) 1982-1985 Antiproton source construction & commissioning, installation of the B0 low beta insertion magnets Oct 1985 First 1.6 TeV c.o.m. p-pbar collisions in CDF 1987-1989 Collider Run at 1.8TeV c.o.m., magnet leads fix 1990-1992 HV separators installed, new low beta insertions at D0 and B0 interaction regions 1992-1993 Collider Run Ia at 1.8 TeV c.o.m.,both CDF & D0 1992-1993 400 MeV Linac construction and commissioning 1994-1996 Collider Run Ib, top quark discovery 1993-1999 Main Injector construction and commissioning Mar 2001-(?) Collider Run II, 1.96 TeV c.o.m. CERN John Adams Lecture Shiltsev - December 13, 2010 5

CERN John Adams Lecture Shiltsev - December 13, 2010 6

Technology: 4.5T SC Magnets Moving magnet current leads (almost everywhere) CERN John Adams Lecture Shiltsev - December 13, 2010 7

Tevatron Magnets This is not Tevatron! -remnants of Main Ring This is the Tevatron! C=6.28km, ~800 SC magnets (4d+q) @ 4.2 K, E_max/inj=980/150GeV, small size, quench protection CERN John Adams Lecture Shiltsev - December 13, 2010 8

Technology: Cryoplant CERN John Adams Lecture Shiltsev - December 13, 2010 9

Technology: Permanent Magnets Sr-Fe + iron poles B_max=1.45T combined function T-compensation db/b~0.01% CERN John Adams Lecture Shiltsev - December 13, 2010 10

Main Injector Gerry Jackson Recycler Ring Recycler Bill Foster E_kin=8 GeV fixed Shares tunnel with 150 GeV fast cycling Main Injector C=3.32km 344 Permanent magnets (344, 1.45T, Sr-Fe combined function) Stores and cools antiprotons Build by the US Congressman CERN John Adams Lecture Shiltsev - December 13, 2010 11

Plumbing : Magnet Leads Current leads moving during ramps every magnet X-ray and boroscoped all opened in re-tied CERN John Adams Lecture Shiltsev - December 13, 2010 12

Plumbing : Alignment Example of the Tevatron magnet alignment (not common, but) every year: survey and reset major offenders to <0.2mm and <2mrad every minute: orbit stabilization to <20 microns CERN John Adams Lecture Shiltsev - December 13, 2010 13

Plumbing : Zebra Mussels Zebra mussels Mussels in the Main Injector CERN John heat-exchanger Adams Lecture Shiltsev - December 13, 2010 14

Plumbing : Anecdotal Tape Cryo-vacuum leak thru rubber O-ring CERN John Adams Lecture Shiltsev - December 13, 2010 15

Healthy Life RecipeModern Collider BEAM-BEAM EFFECTS COOLING FEEDBACKS OPTICS CORRECTORS DIAGNOSTICS COLLIMATION INJECTION, EXTRACTION KICKERS Daily Action Recommendations: Analysis Communication Engineers Experiments Accelerator physicists Wine in moderation MAGNETS, VACUUM SYSTEM RF SYSTEM PHYSICISTS, ENGINEERS, MONEY CERN John Adams Lecture Shiltsev - December 13, 2010 16

Beam Physics: Stochastic Cooling Recycler Simon VanDerMeer Debuncher Pbar Accumulator Stochastic cooling signal paths CERN 5 10 10 p - /hr CERN John Adams Lecture Shiltsev - December 13, 2010 17

Antiproton Production Rate Wider Bandwidth 2-8 GHz Main Injector and SlipStacking Recycler as Storage Ring Electron Cooling in RR Apertures opened 75kG/cm Li lens 28.5 x 10 10 /hr CERN AA/AC Stochastic cooling signal paths CERN John Adams Lecture Shiltsev - December 13, 2010 18

Physics: Electron Cooling Gersh Budker Ions in a bath of cold electrons Condition#1 for effective heat transfer: V_e = V_antiproton 4.338 MeV e- for 8.89GeV pbar CERN John Adams Lecture Shiltsev - December 13, 2010 19

Recycler Ring Electron Cooler Moving magnet current leads (almost everywhere) Pelletron (VanDerGraaf) 4.4 MeV x 720 ma (max) = 3.2 MW DC beam power recirculation 20 +20 meters 100 G B-field S.Nagaitsev, et al. CERN John Adams Lecture Shiltsev - December 13, 2010 20

Electron Cooling of Antiprotons 7 min cooling time for small amplitude particles S.Nagaitsev, et al. 2005 CERN John Adams Lecture Shiltsev - December 13, 2010 21

Physics: Slip-Stacking The technique to double single bunch intensity for antiproton production F.Mills (BNL, 1971) CERN John Adams Lecture Shiltsev - December 13, 2010 22

Slip-Stacking in Main Injector 4.1e12+4.1e12 =8.2 e12 protons on target per 2.2 s MI cycle K.Seiya I.Kourbanis Also used for simultaneous generation of >30e12 protons on neutrino target Requires sophisticated FB system CERN John Adams Lecture Shiltsev - December 13, 2010 23

Physics: RF Barrier Bucket To manipulate with pbars in Recycler: create bunch structures, etc C.Bhat Broad band ~1kV RF, ferrite loaded J.Griffin, FNAL 1983 RF Voltage 2 sec/div Pbar Beam current Longitudinal momentum mining in the Recycler to generate constant emittance, constant intensity pbar bunches for the Tevatron shots (since 2004) CERN John Adams Lecture Shiltsev - December 13, 2010 24

Physics: Electron Lenses ~4 mm dia 2 m long in 3T solenoid beam of ~10kV ~1A electrons (~10 12 ) can turn on/off in 0.5 usec CERN John Adams Lecture Shiltsev - December 13, 2010 25

Tevatron Electron Lens Two TELs installed in the Tevatron V.Shiltsev, et al., FNAL 1997 CERN John Adams Lecture Shiltsev - December 13, 2010 26

Beam-Beam Compensation in Tevatron operation - TELs compensated of long range BB effects V.Shiltsev, et al., FNAL 1997 CERN John Adams Lecture Shiltsev - December 13, 2010 27

TEL2 on One Bad Bunch (P12) When TEL off: bunches #12 and #24 have same lifetime of 8.7 hrshrs=11%/hr loss When TEL on: bunch #12 lifetime is ~2x #24 lifetime: 17.4 hrs vs 10.0 hr V.Shiltsev (FNAL) - EPAC'08 28

Physics: Hollow Electron Beam No EM field inside Strong field outside V.Shiltsev, FNAL 2006 CERN John Adams Lecture Shiltsev - December 13, 2010 29

Collimation by Hollow e-beam Traditional 2-stage collimation scheme: HERA, Tevatron, LHC CERN John Adams Lecture Shiltsev - December 13, 2010 30

Tevatron HEB-Collimator To explore advantages: Kicks are small but not random Halo diffusion enhancement ( smooth scraper) Resonant excitation is possible (pulsed e-beam) No material damage No ion breakup Low impedance Position control by magnetic field (no motors or bellows) Established e-lens technology CERN John Adams Lecture Shiltsev - December 13, 2010 31

G.Stancari A.Valishev Oct.2010 Hollow ebeam in Tev Store Presented is RATIO of decay rates with TEL on/tel off: 3.5 1.0 Intensity losses are UP Luminosity INTACT!!! That IS collimation! CERN John Adams Lecture Shiltsev - December 13, 2010 32

Accelerator Science & Social Stir 29 PhD Theses in the Accelerator Physics made at the Tevatron since 1987 Over the past decade, some 140 operators worked in the MCR 33 of them moved to Machine Departments (charged with maintenance, operation & upgrades of 9 accelerators, beamlines) Many of them got advanced degrees (MSc, PhD) CERN John Adams Lecture Shiltsev - December 13, 2010 33

Tevatron Collider as a Melting Pot Sociology of the Collider Run II Team CERN John Adams Lecture Shiltsev - December 13, 2010 34

Tevatron Performance As of Dec 2010: 9.4 fb -1 total; about 2.4 fb -1 /year; 60+ pb -1 /week CERN John Adams Lecture Shiltsev - December 13, 2010 35

Lesson: Expectation Management The road to superb Collider performance was not smooth: during the first 2 years of Run II we were way below the 2001 plan Expectations are a primary measure of your success CERN John Adams Lecture Shiltsev - December 13, 2010 36

Run II Luminosity Progress CERN John Adams Lecture Shiltsev - December 13, 2010 37

Run II Luminosity Progress Overall factor of 30 luminosity increase Some 30 steps, no silver bullet CERN John Adams Lecture Shiltsev - December 13, 2010 38

Tevatron Exponential Progress.that makes an average ~12.5% increase per step Gain after 8 steps (1 0.125) 8 e after 16 steps (1 0.125) 16 e 2, etc. So, due to regular improvements the evolution was L( after time T) L exp( T / C) 0 C (Complexity) = time [years] to e-fold CERN Academic Training Programme Tevatron: Lessons 39

Tevatron Run II Complexity Startup phase Progress, Developments and Upgrades phase Just Operations Phase CERN John Adams Lecture Shiltsev - December 13, 2010 40

Machine Complexity Table CERN Academic Training Programme Tevatron: Lessons 41

CPT Theorem for Accelerators C x P = T C = Complexity of the machine P = Performance (or Challenge) = ln (Luminosity Increase) T = Time to reach P CERN Academic Training Programme Tevatron: Lessons 42

CPT at LHC CERN John Adams Lecture Shiltsev - December 13, 2010 43

Computations Speed C=17 years/ ln(40 000)=1.6 CERN John Adams Lecture Shiltsev - December 13, 2010 44

Physics Highlight: Higgs Search ICHEP2010 CERN John Adams Lecture Shiltsev - December 13, 2010 45

Tevatron Run Extension 2014 Luminosity Delivered/Analyzed : 12/10 20/16 fb -1 Key is the 60% increase in luminosity + continually improving analysis techniques Strongly recommended by PAC, endorsed by HEPAP P5 Required funding of 35 M$/yr x 3 yrs is not secured yet CERN John Adams Lecture Shiltsev - December 13, 2010 46

Summary The Tevatron Collider has worked extremely well for 25 years and is still working well. The Collider has greatly advanced accelerator technology and beam physics It has enabled CDF and D0 to discover the top quark and observe important features of the standard model for the first time. By the end of 2011 it will have delivered about 12 fb -1 to each detector. 3 extra years will make at least one more important discovery possible. Its success is a great tribute to the Fermilab staff CERN John Adams Lecture Shiltsev - December 13, 2010 47

CERN John Adams Lecture Shiltsev - December 13, 2010 48