Nevsun Extends Harena 150 Metres Beyond Current Resource and Identifies New Regional Targets from VTEM Survey

Similar documents
Bisha: Untapped Exploration Potential. TSX: NSU NYSE MKT: NSU February 2016

Asmara Mining Conference

October 8, 2015 News Release Brucejack Regional Drilling Intersects Over 8,000 Grams Per Tonne Gold

July 15, 2015 News Release Valley of the Kings Underground Infill Drilling Progresses

June 4, 2015 News Release Valley of the Kings Underground Infill Drilling Underway

Underground Exploration Drilling Complete; Brucejack Mineralization Extends to the East

June 4, 2014 News Release Valley of the Kings Exploration Program Underway; Project Update

Drilling Extending Mineralization in La Mina North Zone

Hole (93) From (m) To (m) m Au (g/t) Ag (g/t) Cu (%) Pb (%) Zn (%) CMLP

Drilling Extending Mineralization in La Mina North Zone

KIRKLAND LAKE GOLD EXPANDS NEW HIGH-GRADE ZONE BELOW TAYLOR MINE, REPORTS MINERALIZED EXTENSIONS ALONG STRIKE AND AT DEPTH

KIRKLAND LAKE GOLD INTERSECTS NEW MINERALIZATION AT TAYLOR MINE, CONTINUES TO EXTEND PORPHYRY DEPOSITS TO DEPTH

MONETA INTERCEPTS g/t GOLD INCLUDING g/t GOLD AND g/t GOLD INCLUDING g/t GOLD AT SOUTH WEST

Toronto, Canada March 4, 2013

Highlights include: Hole TTD050: 6.12 g/t Au over 7.00 metres from metres o Including g/t Au over 1.18 metres

The new sulphide mineralization lies within a 1.4 kilometer long east-west trending

Assay Results Highlights (as of November 16, 2017) representing approximately 4,500 metres ( m ) of drilling:

North American Palladium Announces Positive Exploration Results from Lac des Iles Mine

Probe Metals Continues to Intersect Significant Gold Mineralization in Expansion Drilling at Val-d Or East, including 4.1 g/t Gold Over 15.

CROCODILE GOLD CONTINUES POSITIVE EXPLORATION RESULTS INTERSECTS HIGH GRADE GOLD AT UNION REEFS PROJECT

CHAMPION IRON REPORTS EXPLORATION RESULTS AT POWDERHORN PROJECT, NEWFOUNDLAND

MONETA INTERCEPTS g/t GOLD INCLUDING g/t GOLD AT SOUTH WEST

Probe Metals Continues to Expand Gold Zones At Val-d Or East

Salazar intersects metres (13.07m true) averaging 2.65 g/t gold, g/t silver, 1.32% copper, 6.63% zinc at its Curipamba Project.

Probe Metals Confirms Continuity of Gold Mineralization on its Val-d Or East Project And Increases 2017 Drill Program to 75,000 metres

Spruce Ridge Resources Ltd Leslie Road West, Puslinch, ON N0B 2J0 Telephone: (519) , Fax: (519)

Drilling highlights include:

NGEX ANNOUNCES COPPER GOLD DISCOVERY AT NACIMIENTOS PROJECT

NEWS RELEASE. Foran Completes Winter Program with High-Grade Copper and/or Zinc in All Holes Drilled at Bigstone

Probe Metals Intersects 3.2 g/t Gold Over 45.5 Metres At Val-d Or East

August 20, 2018 SBB NR SBB TSX

Probe Metals Intersects 1,122 g/t Gold Over 0.7 Metres in New Zone at Val-d Or East

Pacific Empire Minerals Provides Copper King RC Drilling Results

NEWS RELEASE TSX: ELD NYSE: EGO September 6, Eldorado Announces Drilling Results from KMC Project, Serbia

FALCO ANNOUNCES INITIAL HORNE 5 DRILLING RESULTS. Confirmation Holes in Line with Historical Data

CROCODILE GOLD INTERSECTS 7.1 G/T AU OVER 4.5 METERS INCLUDING 11.2 G/T AU OVER 2.6 METERS AT THE UNION REEFS PROJECT, PROSPECT DEPOSIT

Suite 1800 Two Bentall Centre 555 Burrard Street Vancouver, BC V7X 1M9 Tel: (604) Tel: (888) April 8, 2018 SBB NR SBB TSX

Sabina Gold & Silver Reports 2018 Drilling has Commenced at Back River Gold Project

OSISKO METALS INTERSECTS 10.49% ZINC+LEAD OVER METRES AND 12.15% ZINC+LEAD OVER METRES AT PINE POINT

May 12, 2016 News Release Valley of the Kings Infill Drilling Intersects 37,000 Grams Per Tonne Gold

Toachi Mining Inc. Drills Four High Grade Gold-Copper-Zinc-Silver intercepts at the Gold-Rich La Plata VMS Project in Ecuador

Highlights from the four holes announced in this news release include:

BOREAL EXPANDS DISCOVERY ZONE OF HIGH-GRADE ZINC, SILVER AND LEAD MINERALIZATION AT GUMSBERG PROJECT IN SWEDEN

DRILLING AT ASCOT S PREMIER PROPERTY EXTENDS GOLD MINERALIZATION 150 METRES WEST TOWARDS UNDERGROUND PORTAL

SABINA GOLD &SILVER REPORTS COMPLETION OF DRILLING AT ECHO DEPOSIT, BACK RIVER, NUNAVUT.

Wallbridge Completes Successful Initial Drill Program at Beschefer

QMX GOLD CONTINUES TO INTERSECT STRONG MINERALIZATION AT BONNEFOND, INTERSECTING 39.5 g/t Au OVER 2.4 METRES AND 31.5 g/t Au OVER 1.

INV METALS ANNOUNCES DRILL RESULTS AT LOMA LARGA AND INITIAL PROSPECTING RESULTS ON NEW REGIONAL PROPERTIES

KIRKLAND LAKE GOLD ANNOUNCES 120 METRE DOWN-PLUNGE EXTENSION OF SWAN ZONE

Interval (meters) To (meters)

Probe Metals Discovers New High Grade Gold Zone on Val-d Or East Project: Intersects 12.6 g/t Gold Over 7.3 Metres

Junior Uranium explorer in the Athabasca Basin. Patterson Claims

IAMGOLD ANNOUNCES RESULTS FROM THE WESTWOOD-MOOSHLA EXPLORATION PROJECT

23 January, 2018 CSE: RFR For Immediate Release. Renforth extends Parbec Gold Deposit strike 60m with gold in all 7 drillholes

MCEWEN MINING ANNOUNCES EXPLORATION UPDATE FOR EL GALLO 1, MEXICO

REGULUS DISCOVERS NEW GOLD-RICH, HIGH-GRADE COPPER-GOLD ZONE AT RIO GRANDE

EXPLOR INTERSECTS MULTIPLE COPPER ZONES GRADES UP TO 3.65% CU OVER 5.35 METERS ON THE CHESTER COPPER PROPERTY

Rich Saddle North Au-Cu-Ag Porphyry Expands by 275m Along Strike and 250m Down-Dip

A B C PAD A HIGHLIGHTS

QMX GOLD INTERSECTS 29.8 G/T AU OVER 3.0 METERS AND 19.3 G/T AU OVER 3.2 METERS AT BONNEFOND

Corvus Gold Drills g/t Gold, Extends Mother Lode Sediment Hosted Gold System to at Least 450 Metres Along Strike

News Release. Infill Drilling Program

Teranga s Golden Hill Drill Program Intersects High-Grade Gold and Expands Mineralized Zones at Peksou and Ma Prospects

NEWS RELEASE. Foran Intersects Over 28 Metres of Copper Mineralization

555 Burrard Street, Suite 375, Vancouver, B.C. V7X 1M June 13, 2017 SBB NR SBB TSX

First Cobalt Extends Iron Creek 100 Metres Downdip in Central Area

First Phase Metallurgical Optimization Program Initiated

Wallbridge Options 100% of the Beschefer Project near Fenelon Gold

(TSXV: GPLY, OTCQB: GLYXF

PRESS RELEASE. DUBUISSON NORTH DRILLING CUTS g/t AU OVER 5.0 METRES NEW S50 EAST DISCOVERY, 3.39 g/t AU OVER 25.9 METRES

NEWS RELEASE. Mountain Province Diamonds Completes the Kennady North Winter Exploration Program

MEDIA RELEASE OCEANAGOLD ANNOUNCES FURTHER DOWN DIP EXTENSIONS OF MINERALISATION AT PANEL 2: FRASERS UNDERGROUND MINE

CANARC RESOURCE CORP Howe Street Vancouver, BC V6C 2T6. News Release

Surface Trenching Highlights. Santos Target. To (m) Width (m) Au (g/t) Comment. (m) Santos (1)-includes internal dilution

DPM EXPLORATION CONFIRMS EXTENSION OF LIMESTONE HOSTED GOLD MINERALIZATION, SERBIA

DRILLING FURTHER EXTENDS MINERALIZATION AT EXETER S CASPICHE GOLD-COPPER PORPHYRY PROJECT IN CHILE

IDM Mining s Underground Drilling Intersects g/t Au and g/t Ag over 6.80 Meters True Width at the Red Mountain Gold Project

GOLDEN MINERALS DISCOVERS ADDITIONAL HIGH GRADE VEINS AT SANTA MARIA RESULTS UP TO 1.88 g/t Au and 648 g/t Ag

July Exploring for Canadian Gold in the Rainy River District of Ontario

GOLDEN RIDGE RESOURCES DRILLS 60.27m of 2.60 G/T AUEQ AT THE HANK PROJECT IN BC S GOLDEN TRIANGLE

GOLDPLAY ANNOUNCES FURTHER SAMPLING RESULTS FROM SAN MARCIAL HISTORICAL CORE; CONFIRMS OPEN PIT TARGET NEAR SURFACE WITH gpt AgEq.

For Immediate Release ASCOT DRLLING AT UNICORN INTERSECTS MORE HIGH-GRADE GOLD

ITH Continues to Significantly Expand Sediment Hosted Mineralization at Livengood Gold Deposit, Alaska

TRENCHING AT LAS DOLORES EXTENDS STRIKE LENGTH TO OVER 1,000 METRES, INTERSECTING

Plateau Extends Falchani East Lithium Deposit Community Agreements Executed and Three Drill Rigs Active at Falchani West

AbraPlata defines gold-rich zone with up to 16.7g/t Au over 10.6m in the basement at its Diablillos property in Argentina

TROILUS GOLD CORP. INITIATES 30,000 METRE DRILL PROGRAM ON TROILUS PROPERTY

EL CONDOR IN-FILL DRILLING INTERSECTS 26.9 METERS 2.19% CU & 0.58% NI

CROCODILE GOLD INTERSECTS GRAMS PER TONNE GOLD OVER 2.05 METERS BELOW THE PROSPECT DEPOSIT AT UNION REEFS

Cordoba Minerals Provides an Update on Exploration Activities at the San Matias Copper-Gold Project in Colombia

Vendetta Reports Additional High Grade Drilling Results from Zones 2 and 3 at Pegmont Lead-Zinc Project

Altynalmas Gold s new upgraded and confirmed Bakyrchik East Mineral Resource Gold deposit boosts total gold resources at Kyzyl Project in Kazakhstan

Monument Announces NOA 7/8 Drilling Program Results at Burnakura Gold Project

Queenston Announces 112% Increase in Indicated Resource (to 1.5 M oz. gold) and 16% Increase in Inferred Resource (to 0.7 M oz. gold) at Upper Beaver

NEWS RELEASE FULLER PROPERTY CONTINUES TO DELIVER GOOD RESULTS 2.53 GRAMS PER TONNE GOLD OVER METRES

COPPER MOUNTAIN COMPLETES PHASE 2 DRILL PROGRAM AT NEW INGERBELLE WITH CONTINUED POSITIVE RESULTS

Monument Announces Significant Intercepts Assay Results at NOA7_8 in Burnakura

ET and and and

High Grade Gold Intercepts at Bangaba

Minsud to recommence resource outline diamond drilling at the Chita Valley Cu- Au-Ag-Mo Project, San Juan, Argentina

Transcription:

N E W S R E L E A S E Nevsun Extends Harena 150 Metres Beyond Current Resource and Identifies New Regional Targets from VTEM Survey April 4, 2017 Nevsun Resources Ltd. (TSX: NSU) (NYSE MKT: NSU) ( Nevsun or the Company ) is pleased to announce new assay results from on-going drilling at Harena. These results include in-fill drilling of large gaps in the resource model, as well as new results from the testing of Harena at depth. Nevsun is also pleased to report that the 6,386 line kilometre VTEM (Versatile Time Domain Electromagnetic) airborne survey has been completed over an 825 square kilometre licensed area at Bisha. Highlights Intersected 18.4 metres of 1.65% Cu, 4.03% Zn, 0.82g/t Au, 55g/t Ag extending the deposit by 150 metres Borehole electromagnetic surveys suggest further down plunge extensions likely Additional new drilling results include: o 57.4 metres of 0.37% Cu, 7.08% Zn, 0.17g/t Au, 9g/t Ag o 44.5 metres of 0.49% Cu, 6.51% Zn, 0.43g/t Au, 29g/t Ag o 40.5 metres of 0.76% Cu, 4.82% Zn, 0.18g/t Au, 18g/t Ag o 84.0 metres of 0.80% Cu, 4.72% Zn, 0.27g/t Au, 15g/t Ag Preliminary VTEM survey results highlight numerous new untested shallow drill targets Cliff Davis, Nevsun CEO, commented, The new drilling demonstrates that the already sizeable Harena resource extends 150 metres beyond its currently modelled limits, further enhancing the potential for underground mining. We are particularly encouraged by the increasing copper content which indicates the mineralizing system is strengthening. Mr. Davis went on to say, The recently completed airborne survey over the Mogoraib River and Tabakin Exploration Licenses that were acquired in 2016 has highlighted a significant number of new shallow drill targets. Evaluation of the highest priority anomalies is currently underway but the full suite of targets will take years to pursue. As we have always stated, Bisha is evolving into a large VMS district with exploration still in its infancy. Harena Harena is located 10 kilometres south of the Bisha processing plant and drilling continues to expand the deposit at depth. Some of the results reported in today s update are part of an in-fill program designed to upgrade the mineral resource and tighten the drill spacing at Harena to 100 metre centres, while others are from an on-going program focused on expanding the deposit. A drill-hole plan map, longitudinal section and representative cross section through Harena can be found in Figures 1, 2 and 3. Hole HX-083, which is the deepest hole yet drilled at Harena, is relatively higher in copper than recent holes drilled above it and has an 11.0 metre interval grading 2.23% Cu, 4.92% Zn, 1.10 g/t Au, 79 g/t Ag including 2.6 metres grading 4.88% Cu, 7.79% Zn, 2.49 g/t Au, 201 g/t Ag. This suggests that the mineralizing system is strengthening and Borehole transient electromagnetic (BHEM) modeling indicates that the mineralization should continue down dip. Further drilling will determine if this is the case. The mineralization at Harena displays a well-defined base metal and host rock alteration zonation pattern consisting of a sphalerite and pyrite, zinc-rich upper portion and a lower chalcopyrite and pyrite, copper-rich basal section. The copper-rich basal area is focussed along the northeastern edge of the deposit and is commonly underlain by a thick zone of highly altered felsic volcanics indicative of the high temperature focus point of the mineralizing system. The zinc-rich upper portion tends to be displaced to the southwest and has much less alteration associated with the volcanic rocks below it, indicating that it is somewhat distal from the active mineralizing centre. BHEM surveys are routinely completed in all holes drilled at Harena. The results of these surveys are typically interpreted and modeled as plates of various conductivities in three dimensional space. These models, along with the geology and alteration patterns, have been instrumental in guiding the drilling at Harena. Chalcopyrite is the main conductive mineral and the borehole survey results preferentially focus our efforts toward copper enriched mineralization. Sphalerite is not conductive, but is associated with pyrite, which is less conductive than chalcopyrite giving weaker anomalies. A longitudinal section with the interpreted borehole plate models derived from hole HX-083 is shown in Figure 4. The highly predictable nature of the geology at Harena, coupled with the borehole geophysical modeling, has allowed us to aggressively step out with our drill pattern. This will ultimately enable us to quickly define the full geometry of Harena. 1

VTEM Survey A 6,386 line kilometre VTEM survey has been recently completed by helicopter over the Mogoraib River and Tabakin Exploration Licenses covering an area of 825 square kilometres. These licenses were acquired in mid-2016 and much of the area had never been covered by any geophysical survey. Preliminary results have highlighted many new anomalies that, by the nature of the survey, should be relatively shallow (i.e., less than 100 metre depth). Field evaluation is underway to determine the nature of the anomalies and over 11,000 metres of drilling has been allocated for the testing of targets. Quality Assurance A Quality Assurance/Quality Control program was part of the assaying program at Harena. This program includes chain of custody protocols as well as systematic use of standards, duplicates and blank samples into the flow of samples produced by the sampling. All samples were prepared and analyzed at Bisha s on-site laboratory independently operated by SGS. Mr. Robert Foy P.Geo., BMSC s Exploration Manager, has been overseeing the drilling at Harena and is a Qualified Person as defined by NI 43-101. Mr. Foy has reviewed the technical content of this press release and approved its dissemination. About Nevsun Resources Ltd. Nevsun Resources Ltd. is the 100% owner of the high-grade copper-gold Timok Upper Zone in Serbia and 60% owner of the high-grade copper-zinc Bisha Mine in Eritrea. Nevsun is well positioned with a strong debt-free balance sheet to grow shareholder value through advancing the Timok project to production. Forward Looking Statements The above contains forward-looking statements or forward-looking information within the meaning of the United States Private Securities Litigation Reform Act of 1995, and applicable Canadian securities laws. Forward-looking statements are frequently, but not always, identified by words such as expects, anticipates, believes, hopes, intends, estimated, potential, possible and similar expressions, or statements that events, conditions or results will, may, could or should occur or be achieved. Forward-looking statements are statements concerning the Company s current beliefs, plans and expectations about the future, including but not limited to statements and information made concerning: statements relating to the business, prospects and future activities of, and developments related to the Company, anticipated dividends, goals, strategies, future growth, planned future acquisitions and explorations activities, the adequacy of financial resources and other events or conditions that may occur in the future, and are inherently uncertain. The actual achievements of the Company or other future events or conditions may differ materially from those reflected in the forward-looking statements due to a variety of risks, uncertainties and other factors, including, without limitation, the risks that: (i) any of the assumptions in the historical resource estimates turn out to be incorrect, incomplete, or flawed in any respect; (ii) the methodologies and models used to prepare the resource and reserve estimates either underestimate or overestimate the resources or reserves due to hidden or unknown conditions, (iii) exploration activities or the mine operations are disrupted or suspended due to acts of god, internal conflicts in the country of Eritrea or Serbia, unforeseen government actions or other events; (iv) the Company experiences the loss of key personnel; (v) the Company s operations or exploration activities are adversely affected by other political or military, or terrorist activities; (vi) the Company becomes involved in any material disputes with any of its key business partners, suppliers or customers; (vii) the Company is subjected to any hostile takeover or other unsolicited attempts to acquire control of the Company; (viii) the Company is subject to any adverse ruling in any of the pending litigation to which it is a party; (ix) the timing and success of improving the quality of the copper circuit product by resolving the metallurgical challenges from the variable ore materials being processed to produce concentrate from the copper circuit; (x) the effect on resource or reserve estimates due to the possible inability to resolve the metallurgical challenges on the variable ore materials being processed on a timely basis or at all; and other risks are more fully described in the Company s Annual Information Form for the fiscal year ended December 31, 2016, which are incorporated herein by reference. The Company s forward-looking statements are based on the beliefs, expectations and opinions of management on the date the statements are made and the Company assumes no obligation to update such forward-looking statements in the future, except as required by law. For the reasons set forth above, investors should not place undue reliance on the Company s forward-looking statements. Further information concerning risks and uncertainties associated with these forward-looking statements and our business can be found in our Annual Information Form for the year ended December 31, 2016, which is available on the Company s website (www.nevsun.com), filed under our profile on SEDAR (www.sedar.com) and on EDGAR (www.sec.gov) under cover of Form 40-F. NEVSUN RESOURCES LTD. Cliff T. Davis Cliff T. Davis President & Chief Executive Officer NSU 17-08.doc For further information, contact: Nevsun Investor Relations Tel: +1 604 623 4700 Toll free: 1 888 600 2200 Email: IR@nevsun.com Website: www.nevsun.com 2

Table of previously unreleased assay results from Harena HOLE ID Harena From (m) To (m) Length (m) Cu (%) Zn (%) Au (g/t) Ag (g/t) HX-072 539.50 594.10 54.60 1.02 2.54 0.46 20 includes 574.30 594.10 19.80 2.27 1.76 0.59 31 HX-073 285.60 319.00 33.40 1.08 4.08 2.07 40 includes 314.00 319.00 5.00 0.92 0.14 11.05 95 HX-074 190.00 193.60 3.60 0.40 9.31 0.33 46 HX-075 219.00 225.50 6.50 0.72 6.44 0.65 42 HX-076 371.60 374.30 2.70 0.49 10.62 0.25 26 HX-077 701.00 701.50 0.50 0.91 0.06 0.21 12 HX-078 No Significant Values HX-079 795.10 852.50 57.40 0.37 7.08 0.17 9 includes 800.90 840.10 39.20 0.35 7.99 0.18 8 and 845.40 852.50 7.10 0.33 9.33 0.11 10 HX-080 909.00 916.60 7.60 0.40 4.69 1.51 47 and 1,077.10 1,082.60 5.50 0.67 5.21 0.58 60 HX-081 762.60 768.50 5.90 0.06 8.20 0.07 6 and 883.20 927.70 44.50 0.49 6.51 0.43 29 includes 883.20 888.90 5.70 0.29 15.02 0.32 19 and 894.00 898.00 4.00 2.64 1.25 1.11 84 and 914.00 923.20 8.40 0.08 15.23 0.20 19 HX-082 856.00 896.50 40.50 0.76 4.82 0.18 18 includes 869.20 875.10 5.90 1.67 2.45 0.14 21 and 875.10 892.30 17.20 0.37 5.67 0.12 10 and 892.30 896.50 4.20 2.48 4.33 0.59 73 HX-083 1170.70 1176.00 5.30 0.17 3.87 0.85 26 and 1211.00 1229.40 18.40 1.65 4.03 0.82 55 includes 1213.50 1224.50 11.00 2.23 4.92 1.10 79 and 1213.50 1216.10 2.60 4.88 7.79 2.49 201 HX-084 598.00 682.00 84.00 0.80 4.72 0.27 15 includes 598.00 616.60 18.60 0.31 7.51 0.66 24 and 625.30 640.50 15.20 0.45 6.66 0.15 5 and 640.50 646.70 6.20 4.42 1.23 0.76 49 and 649.70 669.00 19.30 0.89 6.69 0.11 11 and 658.60 661.00 2.40 4.62 1.35 0.25 54 and 678.70 682.00 3.30 2.53 1.30 0.29 43 Estimated true widths are approximately 70% of the drill intercept length. 3

Figure 1. Harena Drill-hole Location Map Figure 2. Harena Longitudinal Section 4

Figure 3. Harena Section A A (L6350) Figure 4. Harena Longitudinal Section Showing Borehole Plate Models from HX-083 5

Drill Collar Locations HOLE ID UTM Easting UTM Northing Elevation Depth (m) Azimuth Dip HX-072 334229 1707761 602 702 125-65 HX-073 334424 1707684 602 407 125-67 HX-074 334605 1707864 600 387 125-65 HX-075 334339 1707439 604 389 125-66 HX-076 334162 1707443 604 464 125-65 HX-077 334448 1708041 599 765 125-69 HX-078 334710 1708216 597 775 125-74 HX-079 334015 1707667 602 875 122-74 HX-080 333879 1707639 601 1199 122-76 HX-081 333995 1707558 602 947 125-76 HX-082 334033 1707777 601 1126 123-74 HX-083 333710 1707635 601 1410 123-75 HX-084 334170 1707619 600 695 125-70 Note: Collar coordinates are in UTM WGS84 Zone37N 6